 "dataset": "data-centre-records",
 "version": "1.4.0",
 "generated_on": "2026-11-12",
 "licence": "CC BY 4.0 for ComputeFinder-owned summaries, labels and compilation rights only, except where a record supplies a specific adaptation licence. Third-party material retains its source terms.",
 "licence_url": "https://creativecommons.org/licenses/by/4.0/",
 "licence_scope": "Only copyright and database rights controlled by ComputeFinder in its original contributions. No third-party rights are granted. Source reuse terms have not been comprehensively cleared; consult each linked source. Private submissions, contact details, code and branding are excluded.",
 "source_terms_status": "Not comprehensively cleared; check linked sources before reusing third-party material.",
 "attribution": "Compiled by ComputeFinder (https://computefinder.net). Original contributions licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/), except adaptations carrying a record-specific licence. Give appropriate credit, retain licence and source notices, and indicate changes when sharing. Each record links its primary source; retain any attribution required by that source. Material is provided as-is without warranties.",
 "note": "No prices are included. Missing values are null or absent, never zero.",
 "records": [
  {
   "id": "cf-dc-0001",
   "slug": "qts-cambois-blyth",
   "name": "QTS Cambois Data Centre Campus",
   "operator": "QTS",
   "owner": "Blackstone",
   "country": "GB",
   "locality": "Cambois, Blyth, Northumberland",
   "lat": null,
   "lon": null,
   "stage": "permitted",
   "stage_as_of": "2025-12-02",
   "stage_source_url": "https://www.northumberland.gov.uk/news/data-centre-project-hits-another-milestone",
   "capacity": [],
   "power_note": "The government press release for the North East AI Growth Zone says the zone as a whole will reach 1.1GW of energy capacity within six years, but it does not say which metric that is or how much belongs to Cambois.",
   "cooling_note": "The council says the scheme will use a closed loop water system.",
   "connectivity_note": null,
   "planning": [
    {
     "title": "First phase approved by Northumberland Strategic Planning Committee: first two of up to ten data centre buildings",
     "url": "https://www.northumberland.gov.uk/news/data-centre-project-hits-another-milestone",
     "status": "approved",
     "date": "2025-12-02"
    }
   ],
   "participation": {
    "title": "Northumberland planning application search and comment route",
    "url": "https://www.northumberland.gov.uk/planning-and-building/planning/find-planning-applications-and-comment",
    "checked_on": "2026-10-05",
    "note": "This is the council's general planning participation route. ComputeFinder has not recorded a current Cambois comment deadline."
   },
   "certifications": [],
   "notes": "Council news item dated 2 December 2025 reports approval of phase one; the date shown is the news date, not necessarily the committee date. No MW figure was found in a fetched primary source, so capacity is left empty.",
   "facts": [
    {
     "text": "Councillors approved the first phase, which covers the first two of up to ten data centre buildings planned for the Cambois campus.",
     "source_url": "https://www.northumberland.gov.uk/news/data-centre-project-hits-another-milestone"
    },
    {
     "text": "The full campus is described as up to 540,000 square metres of floorspace, with about 400 staff forecast once fully operational.",
     "source_url": "https://www.northumberland.gov.uk/news/data-centre-project-hits-another-milestone"
    },
    {
     "text": "A government release of 16 September 2025 quotes a regional leader saying the QTS Cambois campus is due to open in 2028, and states that Blackstone has committed 10 billion pounds to the Blyth site.",
     "source_url": "https://www.gov.uk/government/news/north-east-england-set-for-billions-in-investment-and-thousands-of-jobs-as-uk-and-us-ink-tech-partnership"
    }
   ],
   "checked_on": "2026-10-02",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/qts-cambois-blyth",
   "permalink": "https://computefinder.net/entity/cf-dc-0001"
  },
  {
   "id": "cf-dc-0002",
   "slug": "cobalt-park-wallsend-stargate-uk",
   "name": "Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone)",
   "operator": "Nscale",
   "owner": null,
   "country": "GB",
   "locality": "Wallsend, North Tyneside",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2025-09-16",
   "stage_source_url": "https://www.gov.uk/government/news/north-east-england-set-for-billions-in-investment-and-thousands-of-jobs-as-uk-and-us-ink-tech-partnership",
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "participation": {
    "title": "North Tyneside planning application search route",
    "url": "https://idoxpublicaccess.northtyneside.gov.uk/online-applications/",
    "checked_on": "2026-10-06",
    "note": "This is the council's planning register for applications, appeals and enforcements; an application page shows whether comments can be submitted. Searches checked on 6 October 2026 did not identify an application explicitly labelled Stargate or Nscale for this proposed AI project, or a matching current comment deadline. Descriptions or applicant names may differ, so this is not evidence that no application exists."
   },
   "certifications": [],
   "notes": "Reported plan only: the government says Stargate UK is expected to span several UK sites including Cobalt Park, and gives GPU counts rather than MW. North Tyneside Council says the AI Growth Zone designation does not mean development happens immediately, and individual development still requires a planning application. Searches checked on 6 October 2026 did not identify an application explicitly labelled Stargate or Nscale for this proposed AI project; this is not evidence that no application exists. Existing Cobalt Park Data Centres in Wallsend are mentioned separately and were not assessed.",
   "facts": [
    {
     "text": "The government release names Cobalt Park near Newcastle as one of two sites in the North East AI Growth Zone, alongside Blyth.",
     "source_url": "https://www.gov.uk/government/news/north-east-england-set-for-billions-in-investment-and-thousands-of-jobs-as-uk-and-us-ink-tech-partnership"
    },
    {
     "text": "It says Nscale chips are expected to be rolled out at Cobalt Park with OpenAI as first user, starting around 8,000 GPUs and possibly growing to about 31,000.",
     "source_url": "https://www.gov.uk/government/news/north-east-england-set-for-billions-in-investment-and-thousands-of-jobs-as-uk-and-us-ink-tech-partnership"
    },
    {
     "text": "In its Local Plan consultation context, North Tyneside Council says AI Growth Zone designation does not mean development at Cobalt will happen immediately, and that individual development still needs a planning application through the formal process.",
     "source_url": "https://haveyoursay.northtyneside.gov.uk/local-plan-webinar-q-a"
    }
   ],
   "checked_on": "2026-10-02",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/cobalt-park-wallsend-stargate-uk",
   "permalink": "https://computefinder.net/entity/cf-dc-0002"
  },
  {
   "id": "cf-dc-0003",
   "slug": "culham-ai-growth-zone",
   "name": "Culham AI Growth Zone (UKAEA Culham Campus)",
   "operator": null,
   "owner": "UK Atomic Energy Authority",
   "country": "GB",
   "locality": "Culham, Oxfordshire",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2025-02-10",
   "stage_source_url": "https://www.gov.uk/government/news/government-fires-starting-gun-on-ai-growth-zones-to-turbocharge-plan-for-change",
   "capacity": [],
   "power_note": "Government policy aims to scale each AI Growth Zone to 500MW or more with network operators; no Culham-specific figure was found.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "participation": {
    "title": "South Oxfordshire local planning application search route",
    "url": "https://www.southoxon.gov.uk/south-oxfordshire-district-council/planning-and-development/comment-on-planning-applications/find-and-comment-on-a-planning-application/",
    "checked_on": "2026-10-06",
    "note": "The council's register can be searched by reference, address or keywords and allows comments on current applications. No Culham AI Growth Zone application reference or current comment deadline is recorded in this ComputeFinder record. Project descriptions or applicant names may differ, so the missing reference is not evidence that no application exists. Use the register as an official local search route, then confirm which authority or process applies; this general route is not evidence of a live consultation or permission."
   },
   "certifications": [],
   "notes": "Designated as the first AI Growth Zone. UKAEA issued a prior information notice seeking interest in a mission-led AI data centre and an investment partner. No operator, Culham-specific campus MW figure or AI Growth Zone planning reference is recorded here. The Sunrise announcement describes a 1.4MW key first step towards the Growth Zone, but it does not establish permission or delivery of a wider data-centre project.",
   "facts": [
    {
     "text": "The government confirmed on 10 February 2025 that the first AI Growth Zone would be at Culham, Oxfordshire.",
     "source_url": "https://www.gov.uk/government/news/government-fires-starting-gun-on-ai-growth-zones-to-turbocharge-plan-for-change"
    },
    {
     "text": "A UKAEA notice on Find a Tender sought third-party interest in a mission-led AI data centre and a funder for future campus development, with an information day on 10 March 2025.",
     "source_url": "https://www.find-tender.service.gov.uk/Notice/005218-2025?origin=SearchResults&p=542"
    },
    {
     "text": "On 16 March 2026 the government announced 45 million pounds for a 1.4MW supercomputer called Sunrise, described as a first step towards the Culham AI Growth Zone.",
     "source_url": "https://www.gov.uk/government/news/45m-for-uks-first-ai-supercomputer-to-accelerate-fusion-energy"
    }
   ],
   "checked_on": "2026-10-02",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/culham-ai-growth-zone",
   "permalink": "https://computefinder.net/entity/cf-dc-0003"
  },
  {
   "id": "cf-dc-0004",
   "slug": "nscale-loughton",
   "name": "Nscale Loughton AI Campus",
   "operator": "Nscale",
   "owner": null,
   "country": "GB",
   "locality": "Loughton, Essex",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2025-09-16",
   "stage_source_url": "https://www.nscale.com/press-releases/nscale-uk-ai-infrastructure-announcement",
   "capacity": [],
   "power_note": "Nscale describes the site as 50MW of AI capacity scalable to 90MW, and its earlier release calls 90MW a power allocation.",
   "cooling_note": "Nscale says the site will use advanced liquid cooling.",
   "connectivity_note": null,
   "planning": [
    {
     "title": "Reported by trade press: outline approval in 2024, with council officers calling for a fresh application over revised plans (not checked at the council portal)",
     "url": "https://datacentrereview.com/2026/03/nscale-latest-to-face-public-backlash-over-proposed-data-centre/",
     "status": "unknown",
     "date": null
    }
   ],
   "certifications": [],
   "notes": "The 50MW and 90MW figures are left out of capacity because the operator wording (AI and HPC capacity, power allocation) does not say whether it is IT, facility or grid power. Planning status is reported only and unverified, so stage is kept at announced.",
   "facts": [
    {
     "text": "Nscale and Microsoft announced a commitment on the Loughton campus on 16 September 2025, with 23,040 NVIDIA GB300 GPUs initially, planned for delivery in Q1 2027.",
     "source_url": "https://www.nscale.com/press-releases/nscale-uk-ai-infrastructure-announcement"
    },
    {
     "text": "Nscale's earlier release says it bought the Loughton site as its first UK data centre.",
     "source_url": "https://www.nscale.com/press-releases/ai-hyperscaler-nscale-to-invest-gbp-2-billion-in-the-uk-data-centre-industry"
    },
    {
     "text": "Reported: a March 2026 trade report says Nscale expects the site to be operational in the second quarter of 2027.",
     "source_url": "https://datacentrereview.com/2026/03/nscale-latest-to-face-public-backlash-over-proposed-data-centre/"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/nscale-loughton",
   "permalink": "https://computefinder.net/entity/cf-dc-0004"
  },
  {
   "id": "cf-dc-0005",
   "slug": "google-waltham-cross",
   "name": "Google Waltham Cross data centre",
   "operator": "Google",
   "owner": null,
   "country": "GB",
   "locality": "Waltham Cross (Theobalds Business Park, Cheshunt), Hertfordshire",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2025-09-16",
   "stage_source_url": "https://www.googlecloudpresscorner.com/2025-09-16-Google-Opens-Waltham-Cross-Data-Centre-as-Part-of-Two-year-GBP5-Billion-Investment-in-the-UK-to-Help-Power-its-AI-Economy",
   "capacity": [],
   "power_note": "Google says it holds a 100MW power purchase agreement with ENGIE from the Moray West offshore wind farm, which is a UK-wide supply contract and not a statement of this site's capacity.",
   "cooling_note": "Google says the facility uses air cooling to limit water use and is capable of off-site heat recovery.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "No MW figure for the site was found in fetched primary sources. Planning documents were not fetched.",
   "facts": [
    {
     "text": "Google announced the opening of the Waltham Cross data centre on 16 September 2025.",
     "source_url": "https://www.googlecloudpresscorner.com/2025-09-16-Google-Opens-Waltham-Cross-Data-Centre-as-Part-of-Two-year-GBP5-Billion-Investment-in-the-UK-to-Help-Power-its-AI-Economy"
    },
    {
     "text": "The January 2024 announcement describes a 33 acre site bought in October 2020 and a 1 billion dollar investment, with construction under way.",
     "source_url": "https://www.googlecloudpresscorner.com/2024-01-18-Google-to-Invest-1-Billion-in-United-Kingdom-Data-Centre"
    },
    {
     "text": "Broxbourne Council says the centre is being built at Theobalds Business Park in Cheshunt.",
     "source_url": "https://www.broxbourne.gov.uk/news/article/321/google-set-to-build-new-data-centre-in-cheshunt"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/google-waltham-cross",
   "permalink": "https://computefinder.net/entity/cf-dc-0005"
  },
  {
   "id": "cf-dc-0006",
   "slug": "north-weald-airfield-data-centre",
   "name": "North Weald Airfield data centre campus",
   "operator": "Google",
   "owner": null,
   "country": "GB",
   "locality": "North Weald Bassett, Essex",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": "https://eppingforestdc.my.site.com/pr/s/planning-application/a0hTv000007HGNh/epf084925",
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "EPF/0849/25: committee voted to approve with conditions, subject to a section 106 legal agreement; no decision date is shown",
     "url": "https://eppingforestdc.my.site.com/pr/s/planning-application/a0hTv000007HGNh/epf084925",
     "status": "unknown",
     "date": "2025-12-10"
    }
   ],
   "participation": {
    "title": "Epping Forest planning application search and comment route",
    "url": "https://www.eppingforestdc.gov.uk/planning-and-building/search-view-and-comment-on-planning-applications/",
    "checked_on": "2026-10-06",
    "note": "Search for EPF/0849/25 and any later reserved-matters applications. As checked on 6 October 2026, the council record was marked Under Consultation but displayed a consultation deadline of 9 December 2025 and no decision date, so it does not establish a live window. Current commentability and any reserved-matters reference or deadline remain unknown; verify the live register. Guidance checked on 14 October 2026: the council asks respondents to use their own views rather than AI-written comments. Whether EPF/0849/25 currently accepts comments remains unverified. This is a guidance-only check, not a fresh application-status or whole-record review."
   },
   "certifications": [],
   "notes": "The council officer report names Global Infrastructure UK Ltd as applicant, while the site operator remains recorded as Google from earlier published project material. The committee vote does not establish an issued permission or approve the reserved layout, scale, appearance or landscaping. No MW figure was found; the scheme is described by floorspace only.",
   "facts": [
    {
     "text": "The outline application covers up to two data centre buildings plus offices, with up to 77,148 square metres of gross external floorspace, with all matters reserved except access.",
     "source_url": "https://eppingforest.moderngov.co.uk/ieListDocuments.aspx?CId=875&MId=12397"
    },
    {
     "text": "Planning Committee A voted to approve EPF/0849/25 with conditions on 10 December 2025. The current register records Approved with Conditions (Subject to s106 Legal Agreement), with no decision date shown as checked on 6 October 2026.",
     "source_url": "https://eppingforestdc.my.site.com/pr/s/planning-application/a0hTv000007HGNh/epf084925"
    },
    {
     "text": "The committee addendum records a conditional Heritage and Innovation Hub centred on the listed air traffic control tower, with heritage, local skills and digital-inclusion activity and reasonable SME opportunities. Detailed design, fit-out and programming remain for reserved matters or listed-building consent; delivery is subject to required consents, security and viability, and the owner must use reasonable endeavours to obtain statutory consents within 12 months of commencement.",
     "source_url": "https://eppingforest.moderngov.co.uk/mgConvert2PDF.aspx?ID=125805"
    },
    {
     "text": "The addendum says managed public access should begin within 12 months of first occupation, outside the secure perimeter and only insofar as the area is within the owner's control. A council-approved protocol must cover opening arrangements and complaints or escalation; safety, security or maintenance closures are temporary, with notice to the council and public where practicable.",
     "source_url": "https://eppingforest.moderngov.co.uk/mgConvert2PDF.aspx?ID=125805"
    },
    {
     "text": "Reserved-matters applications may cover the whole site or phases and are due within three years of the date of permission. No decision date is shown on the current register, so the calendar deadline remains unknown.",
     "source_url": "https://eppingforestdc.my.site.com/pr/s/planning-application/a0hTv000007HGNh/epf084925"
    }
   ],
   "checked_on": "2026-10-06",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/north-weald-airfield-data-centre",
   "permalink": "https://computefinder.net/entity/cf-dc-0006"
  },
  {
   "id": "cf-dc-0007",
   "slug": "kao-data-harlow",
   "name": "Kao Data Harlow campus",
   "operator": "Kao Data",
   "owner": null,
   "country": "GB",
   "locality": "Harlow, Essex",
   "lat": 51.771411,
   "lon": 0.128977,
   "stage": "operating",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://kaodata.com/locations/harlow/",
   "capacity": [
    {
     "metric": "it_mw",
     "stage": "announced",
     "basis": "reported",
     "value_mw": 71,
     "as_of": "2026-10-02",
     "source_url": "https://kaodata.com/locations/harlow/"
    }
   ],
   "power_note": "Kao says the campus runs on 100 percent renewable electricity, with HVO fuelled backup generators.",
   "cooling_note": "The operator cites free-air cooled halls with an SLA-backed PUE of 1.2, and says KLON-03 supports hybrid air and direct-to-chip liquid cooling.",
   "connectivity_note": "Carrier neutral; a 2022 release lists carriers including BT Openreach, euNetworks, Jisc, LINX, Lumen and Vorboss.",
   "planning": [],
   "certifications": [
    "BREEAM Excellent",
    "NVIDIA DGX-Ready"
   ],
   "notes": "Capacity is the operator's stated IT equipment load for the fully built four-building campus, not current live capacity. Per-building MW figures differ between Kao pages (8.8MW versus 10MW for the first two buildings) and their metric is unstated, so they are omitted. Coordinates are the postcode centroid for the campus address.",
   "facts": [
    {
     "text": "Kao lists KLON-01 and KLON-02 as operational, KLON-03 as under development and KLON-04 as planned on its Harlow page.",
     "source_url": "https://kaodata.com/locations/harlow/"
    },
    {
     "text": "The campus page says the finished four-building campus would support 71MW of IT equipment load, with potential to reach 150MW of IT load later.",
     "source_url": "https://kaodata.com/locations/harlow/"
    },
    {
     "text": "Kao announced on 8 June 2026 a 10-year deployment for Nebius at the campus, described as 22MW.",
     "source_url": "https://kaodata.com/discover/news/nebius-chooses-kao-datas-harlow-campus-for-major-ai-infrastructure-deployment/"
    },
    {
     "text": "Kao announced KLON-02 as fully commissioned and operational on 28 November 2023.",
     "source_url": "https://kaodata.com/discover/news/kao-data-announces-its-second-10mw-harlow-data-centre-is-now-live-and-operational/"
    }
   ],
   "checked_on": "2026-10-02",
   "inspection_limits": [
    {
     "fields": [
      "pue"
     ],
     "status": "not_admitted",
     "scope": "The location page gives an SLA-backed PUE statement. This author does not relabel a contractual service assertion as design, target or measured, and proposes no scalar. A separately scoped kind/measurement clarification is needed.",
     "source_url": "https://kaodata.com/locations/harlow/",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Kao Data / Harlow Operations Limited",
      "licence": "Copyright retained; no open licence verified.",
      "scope": "Source-only inspection-limit metadata and ordinary links; no new physical field is proposed from these pages.",
      "licence_url": "https://kaodata.com/privacy-policy/",
      "attribution": "Kao Data / Harlow Operations Limited; exact original linked in source_url. No endorsement.",
      "modification_notice": "Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported.",
      "conditions": "A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only this original selected-source inspection-limit account and ordinary link. The operator pages retain copyright and the inspected privacy policy concerns personal-data processing; it is not a source-content reuse grant or complete website-terms clearance. No scalar PUE classification, third-party testimony, contacts, marketing expression or incidental GPU inventory is imported. Old parent facts and coordinates remain unchanged and are not newly verified."
     }
    },
    {
     "fields": [
      "grid_connection",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_inspected",
     "scope": "Selected Harlow location and KLON03 announcement passages were read, not a planning/EIA, upstream connection or water-accounting audit. Announced hybrid/direct-to-chip cooling and free-air cooling do not establish water withdrawal, consumption or WUE. Incidental historical GPU deployments were not taken as this campus-wide technical inventory. No explicit verified official point/CRS is admitted; old coordinates are unchanged, not newly verified.",
     "source_url": "https://kaodata.com/locations/harlow/",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Kao Data / Harlow Operations Limited",
      "licence": "Copyright retained; no open licence verified.",
      "scope": "Source-only inspection-limit metadata and ordinary links; no new physical field is proposed from these pages.",
      "licence_url": "https://kaodata.com/privacy-policy/",
      "attribution": "Kao Data / Harlow Operations Limited; exact original linked in source_url. No endorsement.",
      "modification_notice": "Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported.",
      "conditions": "A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only this original selected-source inspection-limit account and ordinary link. The operator pages retain copyright and the inspected privacy policy concerns personal-data processing; it is not a source-content reuse grant or complete website-terms clearance. No scalar PUE classification, third-party testimony, contacts, marketing expression or incidental GPU inventory is imported. Old parent facts and coordinates remain unchanged and are not newly verified."
     }
    }
   ],
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/kao-data-harlow",
   "permalink": "https://computefinder.net/entity/cf-dc-0007"
  },
  {
   "id": "cf-dc-0008",
   "slug": "virtus-slough-campus",
   "name": "Virtus Slough campus",
   "operator": "Virtus Data Centres",
   "owner": null,
   "country": "GB",
   "locality": "Slough, Berkshire",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://virtusdatacentres.com/locations/uk/london/slough-campus",
   "capacity": [
    {
     "metric": "it_mw",
     "stage": "operating",
     "basis": "reported",
     "value_mw": 145.5,
     "as_of": "2026-10-02",
     "source_url": "https://virtusdatacentres.com/locations/uk/london/slough-campus"
    }
   ],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": "Carrier neutral with access to major cloud and connectivity platforms, according to the operator.",
   "planning": [],
   "certifications": [],
   "notes": "The 145.5MW IT load is the operator's campus figure on an undated page. The seven building figures listed on the same page add up to 132.2MW, so the headline may include capacity that is not yet built; treat it with care.",
   "facts": [
    {
     "text": "Virtus describes the Slough campus as seven facilities and states 145.5MW of IT load.",
     "source_url": "https://virtusdatacentres.com/locations/uk/london/slough-campus"
    },
    {
     "text": "Buildings are listed with individual MW figures, from 6.6MW (LONDON10) to 33.5MW (LONDON19), and the operator says its sites are built to an Uptime Tier III standard.",
     "source_url": "https://virtusdatacentres.com/locations/uk/london/slough-campus"
    }
   ],
   "checked_on": "2026-10-02",
   "grid_connection": [
    {
     "value_text": "VIRTUS's undated LONDON9 sheet lists an incoming National Grid supply of 50 MVA with diverse routing.",
     "value_num": 50,
     "unit": "MVA",
     "scope": "LONDON9 building at the Slough campus only; apparent-power supply specification, with no verified energisation date, voltage or available compute.",
     "stage": "unknown",
     "basis": "reported",
     "label": "source_claim",
     "as_of": null,
     "source_url": "https://de.virtusdatacentres.com/bilder/2021specsheets/LONDON9_Spec_Sheet_2021_v2.pdf",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-10-31T22:53:56Z",
     "checked_on": "2026-10-31",
     "source_notice": {
      "publisher": "VIRTUS Data Centres",
      "licence": "Copyright retained; no open licence verified.",
      "scope": "Only this minimal operator-attributed basic technical fact and an ordinary unframed exact source link. No narrative, quotations, technical-table reproduction, graphics, marketing expression, contacts or dataset adaptation/import.",
      "licence_url": null,
      "conditions": "Terms route exposes no substantive terms; missing terms are not permission or proof no restriction exists. No contrary express condition observed for this exact use. Reassess newly evidenced applicable restriction; no blanket or recurring grant."
     }
    }
   ],
   "pue": [
    {
     "value_text": "VIRTUS's undated LONDON9 sheet states a design PUE below 1.3.",
     "value_num": null,
     "unit": null,
     "scope": "LONDON9 building only. The inequality is retained as text; no exact-value, campus-wide or measured PUE is asserted.",
     "stage": "unknown",
     "basis": "reported",
     "label": "source_claim",
     "as_of": null,
     "source_url": "https://de.virtusdatacentres.com/bilder/2021specsheets/LONDON9_Spec_Sheet_2021_v2.pdf",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-10-31T22:53:56Z",
     "checked_on": "2026-10-31",
     "kind": "design",
     "source_notice": {
      "publisher": "VIRTUS Data Centres",
      "licence": "Copyright retained; no open licence verified.",
      "scope": "Only this minimal operator-attributed basic technical fact and an ordinary unframed exact source link. No narrative, quotations, technical-table reproduction, graphics, marketing expression, contacts or dataset adaptation/import.",
      "licence_url": null,
      "conditions": "Terms route exposes no substantive terms; missing terms are not permission or proof no restriction exists. No contrary express condition observed for this exact use. Reassess newly evidenced applicable restriction; no blanket or recurring grant."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_inspected",
     "scope": "This admission checks only LONDON9 incoming-supply and design-PUE statements. It does not audit campus-wide water records, installed-equipment schedules or numeric site coordinates for these unfilled fields.",
     "source_url": "https://de.virtusdatacentres.com/bilder/2021specsheets/LONDON9_Spec_Sheet_2021_v2.pdf",
     "checked_on": "2026-10-31",
     "source_notice": {
      "publisher": "VIRTUS Data Centres",
      "licence": "Copyright retained; no open licence verified.",
      "scope": "Only this minimal operator-attributed basic technical fact and an ordinary unframed exact source link. No narrative, quotations, technical-table reproduction, graphics, marketing expression, contacts or dataset adaptation/import.",
      "licence_url": null,
      "conditions": "Terms route exposes no substantive terms; missing terms are not permission or proof no restriction exists. No contrary express condition observed for this exact use. Reassess newly evidenced applicable restriction; no blanket or recurring grant."
     }
    }
   ],
   "participation": null,
   "water_use": null,
   "chips": null,
   "decision_evidence": {
    "checked_on": "2026-10-17",
    "review_by": "2026-10-23",
    "independently_reviewed_at": "2026-10-17T19:39:38Z",
    "source_updated_on": null,
    "event_date": null,
    "retrieved_at": null,
    "raw_body_sha256": null,
    "raw_body_bytes": null,
    "mode": "link_only",
    "title": "Virtus Slough source route",
    "claims": [],
    "source_url": "https://www.gov.uk/government/publications/sl1-4qz-virtus-holdco-limited-permit-variation-issued-eprbp3945qxv003",
    "source_label": "Environment Agency Virtus Slough publication",
    "publisher": "Environment Agency / GOV.UK",
    "source_publication_date": "2026-04-20",
    "observed_at_upper_bound": "2026-10-17T19:37:53Z",
    "parsed_evidence": {
     "sha256": "a44b84d3740477055fe12616e8f2f061f619257a730e7755f1ff7c0ec505b59d",
     "kind": "Serialized connected-tool parsed response bundle for official publication, document and terms views including a licence-target technical error, not raw HTML/PDF bytes or a full-document fingerprint"
    },
    "next_step": "Open the original for its dates, scope and conditions. This link does not verify current operation or availability.",
    "limitations": "Source discovery only. The publication date identifies the linked page, not an admitted permit-content fact or a licence grant. No permit-condition, operator, physical-phase, current permission, compliance, stage, capacity, grid connection or availability claim is added. Earlier campus records, mismatch cautions and dates remain unchanged.",
    "source_notice": {
     "publisher": "Environment Agency / GOV.UK",
     "licence": "Crown copyright retained; ordinary link only",
     "licence_url": null,
     "scope": "Ordinary unframed source link and neutral citation metadata only. Actual GOV.UK terms expressly welcome linking without charged click-through, endorsement or affiliation claims. No permit-content adaptation, quotations, PDFs, maps, applicant evidence, tables, private signatories, contacts or datasets reproduced. Full applicable Open Government Licence conditions could not be independently inspected after a technical retrieval error; content adaptation remains held, with no retry or alternate-access attempt in this batch. No open-content clearance, blanket source or recurring-monitoring grant is asserted. A successful supported licence inspection and independent exact-use review are required before factual adaptation."
    }
   },
   "page_url": "https://computefinder.net/data-centres/virtus-slough-campus",
   "permalink": "https://computefinder.net/entity/cf-dc-0008"
  },
  {
   "id": "cf-dc-0009",
   "slug": "virtus-london5-stockley-park",
   "name": "Virtus LONDON5 (Stockley Park)",
   "operator": "Virtus Data Centres",
   "owner": null,
   "country": "GB",
   "locality": "Stockley Park, Hayes, London",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://virtusdatacentres.com/locations/uk/london/london5-stockley-park",
   "capacity": [
    {
     "metric": "it_mw",
     "stage": "operating",
     "basis": "reported",
     "value_mw": 24,
     "as_of": "2026-10-02",
     "source_url": "https://virtusdatacentres.com/locations/uk/london/london5-stockley-park"
    }
   ],
   "power_note": "A 2019 Virtus release says the LONDON5 and LONDON6 site had secured power to rise to 110MVA of incoming supply.",
   "cooling_note": "Virtus says nearby LONDON14 is compatible with direct to chip, immersion and rear door liquid cooling; the LONDON5 page itself gives no cooling detail.",
   "connectivity_note": "Carrier neutral with on-ramps to major cloud platforms, according to the operator.",
   "planning": [],
   "certifications": [],
   "notes": "Capacity covers LONDON5 only. The Stockley Park campus has further buildings (LONDON6, 7, 8, 14) with separate figures whose metric is not stated, so they are excluded. The page is undated.",
   "facts": [
    {
     "text": "Virtus says LONDON5 offers over 10,000 square metres of net technical space and 24MW of IT load, designed to Uptime Tier III.",
     "source_url": "https://virtusdatacentres.com/locations/uk/london/london5-stockley-park"
    },
    {
     "text": "A 2020 Virtus release reported LONDON6 at Stockley Park opening in early Q2 2020.",
     "source_url": "https://virtusdatacentres.com/press-releases/virtus-opens-london6-in-stockley-park-and-london10-in-slough-taking-its-live-london-portfolio-to-97mw"
    }
   ],
   "checked_on": "2026-10-02",
   "grid_connection": [
    {
     "value_text": "VIRTUS's undated LONDON5 sheet lists a 36 MVA incoming National Grid supply with diverse routing.",
     "value_num": 36,
     "unit": "MVA",
     "scope": "LONDON5 at Stockley Park only. MVA is the operator-reported apparent-power supply rating, not MW, IT load or available compute. The sheet does not establish the external connection voltage, named upstream substation, energisation date or current delivery status. No other Stockley Park phase is merged.",
     "stage": "unknown",
     "basis": "reported",
     "label": "source_claim",
     "as_of": null,
     "source_url": "https://virtusdatacentres.com/media/attachments/2026/10/13/virtus_spec_sheet_london5_v4.1.pdf",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T03:23:36.511Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "VIRTUS Data Centres",
      "licence": "Copyright retained; no open licence verified for this specification sheet.",
      "scope": "Minimal independently worded attributed basic technical facts and ordinary unframed exact source links only. No copied source expression, specification table, marketing narrative, marks, assets, personal contact, source body or dataset import.",
      "licence_url": null,
      "attribution": "VIRTUS Data Centres; exact original linked in source_url. No endorsement.",
      "modification_notice": "Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported.",
      "conditions": "A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only these minimal independently worded, attributed basic facts and an ordinary unframed exact link. The sheet retains VIRTUS copyright. The actual location/home footer inspection exposed no substantive terms link; that is not permission or proof no other condition exists. No open licence, domain-wide permission, commercial-copying grant or recurring acquisition grant is declared. No sheet expression, technical table, image, map, mark, personal contact or underlying dataset is imported. URL directory and filename are not publication/version clocks."
     }
    }
   ],
   "pue": [
    {
     "value_text": "VIRTUS's undated LONDON5 sheet states a design PUE below 1.3.",
     "value_num": null,
     "unit": null,
     "scope": "LONDON5 design statement only, not measured performance, an exact 1.3 value, an annual result or a current operating assertion. The inequality is kept in text; value_num remains null.",
     "stage": "unknown",
     "basis": "reported",
     "label": "source_claim",
     "as_of": null,
     "source_url": "https://virtusdatacentres.com/media/attachments/2026/10/13/virtus_spec_sheet_london5_v4.1.pdf",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T03:23:36.511Z",
     "checked_on": "2026-11-01",
     "kind": "design",
     "source_notice": {
      "publisher": "VIRTUS Data Centres",
      "licence": "Copyright retained; no open licence verified for this specification sheet.",
      "scope": "Minimal independently worded attributed basic technical facts and ordinary unframed exact source links only. No copied source expression, specification table, marketing narrative, marks, assets, personal contact, source body or dataset import.",
      "licence_url": null,
      "attribution": "VIRTUS Data Centres; exact original linked in source_url. No endorsement.",
      "modification_notice": "Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported.",
      "conditions": "A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only these minimal independently worded, attributed basic facts and an ordinary unframed exact link. The sheet retains VIRTUS copyright. The actual location/home footer inspection exposed no substantive terms link; that is not permission or proof no other condition exists. No open licence, domain-wide permission, commercial-copying grant or recurring acquisition grant is declared. No sheet expression, technical table, image, map, mark, personal contact or underlying dataset is imported. URL directory and filename are not publication/version clocks."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "The two-page LONDON5 sheet describes chilled-water/free-cooling equipment but supplies no water withdrawal/consumption/WUE amount or measurement boundary/period, installed-chip inventory or explicit verified official point/CRS in the inspected text. A chilled-water system does not prove zero water. This is a selected-sheet limit, not a full planning-file or all-source absence finding.",
     "source_url": "https://virtusdatacentres.com/media/attachments/2026/10/13/virtus_spec_sheet_london5_v4.1.pdf",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "VIRTUS Data Centres",
      "licence": "Copyright retained; no open licence verified for this specification sheet.",
      "scope": "Minimal independently worded attributed basic technical facts and ordinary unframed exact source links only. No copied source expression, specification table, marketing narrative, marks, assets, personal contact, source body or dataset import.",
      "licence_url": null,
      "attribution": "VIRTUS Data Centres; exact original linked in source_url. No endorsement.",
      "modification_notice": "Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported.",
      "conditions": "A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only these minimal independently worded, attributed basic facts and an ordinary unframed exact link. The sheet retains VIRTUS copyright. The actual location/home footer inspection exposed no substantive terms link; that is not permission or proof no other condition exists. No open licence, domain-wide permission, commercial-copying grant or recurring acquisition grant is declared. No sheet expression, technical table, image, map, mark, personal contact or underlying dataset is imported. URL directory and filename are not publication/version clocks."
     }
    }
   ],
   "participation": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/virtus-london5-stockley-park",
   "permalink": "https://computefinder.net/entity/cf-dc-0009"
  },
  {
   "id": "cf-dc-0010",
   "slug": "pure-dc-brent-cross-lon01",
   "name": "Pure DC LON01 Brent Cross",
   "operator": "Pure DC",
   "owner": null,
   "country": "GB",
   "locality": "Brent Cross, London",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-09-03",
   "stage_source_url": "https://puredc.com/2026/09/03/puredc-final-build-lon01-campus",
   "capacity": [],
   "power_note": "Pure DC says the campus has full planning permission and power secured for what it calls a 90MW campus.",
   "cooling_note": "Pure DC describes a closed-loop system and an average annualised PUE of 1.29; the new building is described as closed-loop liquid cooled.",
   "connectivity_note": null,
   "planning": [
    {
     "title": "Full planning permission stated on the operator's Brent Cross page (council record not fetched)",
     "url": "https://puredc.com/london-brent-cross",
     "status": "approved",
     "date": null
    }
   ],
   "certifications": [],
   "notes": "The operator's 90MW, 20MW and 70MW figures are not labelled as IT, facility or grid, so they are not entered as capacity claims. Building 1 is live and Building 2 is under construction, hence the site is shown as operating.",
   "facts": [
    {
     "text": "The operator's page says Building 1 is fully operational with four data halls and Building 2 is under construction.",
     "source_url": "https://puredc.com/london-brent-cross"
    },
    {
     "text": "A 3 September 2026 release says piling has started on the west shell of the second building, with completion of the wider building scheduled for Q2 2029.",
     "source_url": "https://puredc.com/2026/09/03/puredc-final-build-lon01-campus"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/pure-dc-brent-cross-lon01",
   "permalink": "https://computefinder.net/entity/cf-dc-0010"
  },
  {
   "id": "cf-dc-0011",
   "slug": "vantage-cardiff-newport-cwl1",
   "name": "Vantage Cardiff campus (CWL1, Newport)",
   "operator": "Vantage Data Centers",
   "owner": null,
   "country": "GB",
   "locality": "Newport, South Wales (Vantage calls it Cardiff)",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://vantage-dc.com/data-center-locations/emea/cardiff-united-kingdom/",
   "capacity": [
    {
     "metric": "it_mw",
     "stage": "operating",
     "basis": "reported",
     "value_mw": 72,
     "as_of": "2026-10-02",
     "source_url": "https://vantage-dc.com/data-center-locations/emea/cardiff-united-kingdom/"
    },
    {
     "metric": "it_mw",
     "stage": "announced",
     "basis": "reported",
     "value_mw": 148,
     "as_of": "2026-10-02",
     "source_url": "https://vantage-dc.com/data-center-locations/emea/cardiff-united-kingdom/"
    }
   ],
   "power_note": "Vantage says a dedicated 400kV substation on campus connects privately to the national grid and that all power into the campus is renewable.",
   "cooling_note": "Vantage says the climate supports free air cooling for much of the year and cites air-to-air plate heat exchange.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [
    "ISO 9001",
    "ISO 14001",
    "ISO/IEC 27001",
    "ISO 45001",
    "ISAE 3402",
    "SOC 2"
   ],
   "notes": "Vantage gives 72MW existing and 148MW of critical IT load once fully developed; both are operator statements on an undated page. Certifications are Vantage corporate listings, not site audits. The Bridgend planning report refers to this as the existing Newport campus.",
   "facts": [
    {
     "text": "Vantage says three data centres are planned on the 46 acre campus, of which two are operational, for 148MW of critical IT load when complete.",
     "source_url": "https://vantage-dc.com/data-center-locations/emea/cardiff-united-kingdom/"
    },
    {
     "text": "The campus page also cites existing IT capacity of 72MW.",
     "source_url": "https://vantage-dc.com/data-center-locations/emea/cardiff-united-kingdom/"
    },
    {
     "text": "Bridgend council's planning report describes Vantage's existing Newport campus.",
     "source_url": "https://democratic.bridgend.gov.uk/documents/s36191/Officers%20Report_P25247HYB.pdf"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/vantage-cardiff-newport-cwl1",
   "permalink": "https://computefinder.net/entity/cf-dc-0011"
  },
  {
   "id": "cf-dc-0012",
   "slug": "vantage-bridgend-ford-engine-plant",
   "name": "Vantage Bridgend data centre campus (former Ford engine plant)",
   "operator": "Vantage Data Centers",
   "owner": null,
   "country": "GB",
   "locality": "Waterton, Bridgend, South Wales",
   "lat": null,
   "lon": null,
   "stage": "permitted",
   "stage_as_of": "2025-10-02",
   "stage_source_url": "https://democratic.bridgend.gov.uk/documents/s36577/Minutes%20of%20Previous%20Meeting.pdf?LLL=0",
   "capacity": [],
   "power_note": "The planning report says existing National Grid lines could supply the campus for roughly five years until late 2031, when a permanent connection is due, and an interim power solution needs a separate reserved matters application.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "P/25/247/HYB hybrid application: outline for the campus and full permission for the first data centre, approved by Bridgend Development Control Committee",
     "url": "https://democratic.bridgend.gov.uk/documents/s36577/Minutes%20of%20Previous%20Meeting.pdf?LLL=0",
     "status": "approved",
     "date": "2025-10-02"
    },
    {
     "title": "Officer report recommending approval of P/25/247/HYB",
     "url": "https://democratic.bridgend.gov.uk/documents/s36191/Officers%20Report_P25247HYB.pdf",
     "status": "approved",
     "date": null
    }
   ],
   "certifications": [],
   "notes": "The planning report does not state MW. The government says the South Wales AI Growth Zone, along the M4 from Newport to Bridgend, has potential to harness over 1GW by the early 2030s, but the metric is unstated and it covers several sites.",
   "facts": [
    {
     "text": "The applicant is VDC CWL4 Limited, a Vantage company, for a site of about 55 hectares at the former Ford engine plant.",
     "source_url": "https://democratic.bridgend.gov.uk/documents/s36191/Officers%20Report_P25247HYB.pdf"
    },
    {
     "text": "Committee minutes record the hybrid application as approved on 2 October 2025, subject to conditions.",
     "source_url": "https://democratic.bridgend.gov.uk/documents/s36577/Minutes%20of%20Previous%20Meeting.pdf?LLL=0"
    },
    {
     "text": "The government's November 2025 announcement names Vantage as a partner in a South Wales AI Growth Zone including the former Ford Bridgend engine plant.",
     "source_url": "https://www.gov.uk/government/news/ai-to-power-national-renewal-as-government-announces-billions-of-additional-investment-and-new-plans-to-boost-uk-businesses-jobs-and-innovation"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/vantage-bridgend-ford-engine-plant",
   "permalink": "https://computefinder.net/entity/cf-dc-0012"
  },
  {
   "id": "cf-dc-0013",
   "slug": "wapseys-wood-sdc-m40-campus",
   "name": "SDC M40 Campus, Wapseys Wood",
   "operator": null,
   "owner": null,
   "country": "GB",
   "locality": "Wapseys Wood landfill site, Buckinghamshire",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2026-03-16",
   "stage_source_url": "https://assets.publishing.service.gov.uk/media/69b7e853b84f01b2be53a27c/MHCLG_Decision_Letter_Data_Centre_Campus.pdf",
   "capacity": [
    {
     "metric": "it_mw",
     "stage": "announced",
     "basis": "reported",
     "value_mw": 300,
     "as_of": "2026-03-16",
     "source_url": "https://assets.publishing.service.gov.uk/media/69b7eb62b84f01b2be53a27e/Section_35_Direction_Wapseys_Wood.pdf"
    }
   ],
   "power_note": "The scheme includes an on-site gas energy centre with maximum generating capacity of roughly 250 to 350MW, per the Planning Inspectorate project page.",
   "cooling_note": "Air cooling is proposed.",
   "connectivity_note": null,
   "planning": [
    {
     "title": "Section 35 direction treating the data centre campus as development needing a development consent order (a procedural direction, not a consent)",
     "url": "https://assets.publishing.service.gov.uk/media/69b7eb62b84f01b2be53a27e/Section_35_Direction_Wapseys_Wood.pdf",
     "status": "unknown",
     "date": "2026-03-16"
    },
    {
     "title": "Planning Inspectorate project page EN0110030: pre-application",
     "url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110030",
     "status": "pending",
     "date": null
    }
   ],
   "participation": {
    "title": "Applicant Stage Two Community Consultation feedback route",
    "url": "https://sdcm40campus.co.uk/consultation/stage-two-community-consultation/",
    "checked_on": "2026-10-06",
    "note": "The applicant says its Stage Two Community Consultation is open from 15 September to 27 October 2026, with written feedback due by 23:59 on 27 October. This is a pre-application feedback route, not Planning Inspectorate registration, an accepted development consent order application or permission."
   },
   "certifications": [],
   "notes": "Proposal stage. The 300MW is the applicant's proposed IT load across three buildings of about 100MW each, as recorded in the Secretary of State's direction. The applicant named in the direction is Slough Holdings UK Limited; the end operator is not stated.",
   "facts": [
    {
     "text": "The Secretary of State directed on 16 March 2026 that the three-building campus be treated as a nationally significant project needing a development consent order.",
     "source_url": "https://assets.publishing.service.gov.uk/media/69b7e853b84f01b2be53a27c/MHCLG_Decision_Letter_Data_Centre_Campus.pdf"
    },
    {
     "text": "The proposal is for up to three hyperscale buildings with a proposed IT load of up to about 300MW in total.",
     "source_url": "https://assets.publishing.service.gov.uk/media/69b7eb62b84f01b2be53a27e/Section_35_Direction_Wapseys_Wood.pdf"
    },
    {
     "text": "The Planning Inspectorate lists the project as at pre-application stage and says the application is expected in January 2027. It says formal registration to have a say begins only if a submitted application is accepted for examination.",
     "source_url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110030"
    },
    {
     "text": "The applicant now plans development consent order submission in spring 2027. This differs from the Planning Inspectorate's January 2027 expectation, so the exact submission timing is unresolved here.",
     "source_url": "https://sdcm40campus.co.uk/sdc-m40-campus/the-planning-process/"
    }
   ],
   "checked_on": "2026-10-02",
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "The selected short official Section35 direction/decision identifies the named proposal and procedure, not a voltage/substation connection, explicit design/target/measured PUE, scoped water measurement/period, chips or official point/CRS. No IT/total-power ratio is converted to PUE; air cooling or a proposed energy centre is not zero-water or a delivered grid connection. No broader planning/EIA/utility audit or whole-application omission is claimed.",
     "source_url": "https://assets.publishing.service.gov.uk/media/69b7eb62b84f01b2be53a27e/Section_35_Direction_Wapseys_Wood.pdf",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "MHCLG / GOV.UK",
      "licence": "Crown/source rights retained; no new document-component OGL grant asserted",
      "scope": "Only an original selected-official-filing inspection-limit account and ordinary link. No directive/report text, developer evidence, map, contact, capacity figure, narrative adaptation or underlying dataset is imported.",
      "licence_url": "https://www.gov.uk/help/terms-conditions",
      "conditions": "A different independent review completed at 2026-11-01T03:10:26.335Z accepts only this original account of the selected two-page official direction and an ordinary link. GOV.UK terms were directly read: ordinary links are encouraged subject to the stated charged-click-through and endorsement limits. General Crown/OGL language is conditional; no new document-component open-licence grant is asserted. No source text, developer evidence, map, contact, technical capacity figure or underlying dataset is imported. The retained National Archives route was not requested."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/wapseys-wood-sdc-m40-campus",
   "permalink": "https://computefinder.net/entity/cf-dc-0013"
  },
  {
   "id": "cf-dc-0014",
   "slug": "dartford-new-barn-road-ai-campus",
   "name": "Dartford AI data centre campus, New Barn Road",
   "operator": null,
   "owner": null,
   "country": "GB",
   "locality": "Dartford, Kent",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2026-07-01",
   "stage_source_url": "https://assets.publishing.service.gov.uk/media/6a44f717065c5aec12a4e4e7/Direction_Granted.pdf",
   "capacity": [
    {
     "metric": "it_mw",
     "stage": "announced",
     "basis": "reported",
     "value_mw": 240,
     "as_of": "2026-07-01",
     "source_url": "https://assets.publishing.service.gov.uk/media/6a44f717065c5aec12a4e4e7/Direction_Granted.pdf"
    },
    {
     "metric": "facility_mw",
     "stage": "announced",
     "basis": "reported",
     "value_mw": 300,
     "as_of": "2026-07-01",
     "source_url": "https://assets.publishing.service.gov.uk/media/6a44f717065c5aec12a4e4e7/Direction_Granted.pdf"
    }
   ],
   "power_note": "The direction records a total power load of up to 300MW alongside associated energy and utility works.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "Section 35 direction treating the campus as development needing a development consent order (a procedural direction, not a consent)",
     "url": "https://assets.publishing.service.gov.uk/media/6a44f717065c5aec12a4e4e7/Direction_Granted.pdf",
     "status": "unknown",
     "date": "2026-07-01"
    }
   ],
   "certifications": [],
   "notes": "Proposal stage. The figures are the applicant's proposed totals for up to four buildings, recorded in the direction dated 1 July 2026: 240MW IT load and 300MW total power load. The applicant is named as CSE52 Limited; the end operator is not stated.",
   "facts": [
    {
     "text": "The Secretary of State directed on 1 July 2026 that an AI data centre campus of up to four buildings on land adjacent to New Barn Road, Dartford, be treated as needing a development consent order.",
     "source_url": "https://assets.publishing.service.gov.uk/media/6a44f717065c5aec12a4e4e7/Direction_Granted.pdf"
    },
    {
     "text": "The direction states a proposed total power load of up to 300MW and IT load of up to 240MW.",
     "source_url": "https://assets.publishing.service.gov.uk/media/6a44f717065c5aec12a4e4e7/Direction_Granted.pdf"
    }
   ],
   "checked_on": "2026-10-02",
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "The selected short official Section35 direction/decision identifies the named proposal and procedure, not a voltage/substation connection, explicit design/target/measured PUE, scoped water measurement/period, chips or official point/CRS. No IT/total-power ratio is converted to PUE; air cooling or a proposed energy centre is not zero-water or a delivered grid connection. No broader planning/EIA/utility audit or whole-application omission is claimed.",
     "source_url": "https://assets.publishing.service.gov.uk/media/6a44f717065c5aec12a4e4e7/Direction_Granted.pdf",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "MHCLG / GOV.UK",
      "licence": "Crown/source rights retained; no new document-component OGL grant asserted",
      "scope": "Only an original selected-official-filing inspection-limit account and ordinary link. No directive/report text, developer evidence, map, contact, capacity figure, narrative adaptation or underlying dataset is imported.",
      "licence_url": "https://www.gov.uk/help/terms-conditions",
      "conditions": "A different independent review completed at 2026-11-01T03:10:26.335Z accepts only this original account of the selected two-page official direction and an ordinary link. GOV.UK terms were directly read: ordinary links are encouraged subject to the stated charged-click-through and endorsement limits. General Crown/OGL language is conditional; no new document-component open-licence grant is asserted. No source text, developer evidence, map, contact, technical capacity figure or underlying dataset is imported. The retained National Archives route was not requested."
     }
    }
   ],
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/dartford-new-barn-road-ai-campus",
   "permalink": "https://computefinder.net/entity/cf-dc-0014"
  },
  {
   "id": "cf-dc-0015",
   "slug": "bedford-ampthill-road-data-centre-campus",
   "name": "Data centre campus, Ampthill Road, Bedford",
   "operator": null,
   "owner": null,
   "country": "GB",
   "locality": "Ampthill Road, Bedford area (Central Bedfordshire)",
   "lat": 52.072932,
   "lon": -0.48907,
   "stage": "announced",
   "stage_as_of": "2026-06-15",
   "stage_source_url": "https://assets.publishing.service.gov.uk/media/6a2fca4d1f6fa5c3377e5f27/MHCLG_Decision_Letter.pdf",
   "capacity": [
    {
     "metric": "it_mw",
     "stage": "announced",
     "basis": "reported",
     "value_mw": 720,
     "as_of": "2026-06-15",
     "source_url": "https://assets.publishing.service.gov.uk/media/6a2fcaea15f2a70fac7e5f54/260615_QuestPit_Data_Centre_Campus_s35_Direction.pdf"
    }
   ],
   "power_note": "The direction records a proposed IT load of up to about 720MW across four buildings. It also says the proposal is related to a separate proposed gas generating station; this does not establish available capacity, a grid connection or permission for either project.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "Section 35 direction (15 June 2026) that the proposed campus needs a development consent order; a request to treat prior consultation as complete was refused",
     "url": "https://assets.publishing.service.gov.uk/media/6a2fca4d1f6fa5c3377e5f27/MHCLG_Decision_Letter.pdf",
     "status": "unknown",
     "date": "2026-06-15"
    }
   ],
   "participation": {
    "title": "Planning Inspectorate guidance on how the public can take part",
    "url": "https://www.gov.uk/guidance/nationally-significant-infrastructure-projects-the-stages-of-the-nsip-process-and-how-you-can-have-your-say",
    "checked_on": "2026-10-06",
    "note": "No Ampthill Road project page or current response deadline is recorded here. The 15 June decision refused to treat consultation duties as already met under the law and policy then in force. Planning Inspectorate guidance updated on 27 July 2026 to reflect changes introduced by the Planning and Infrastructure Act 2025 says pre-application engagement or consultation is encouraged rather than required by legislation. Formal registration to have a say begins only if an application is accepted for examination. This guidance explains the process; it is not a live project response form."
   },
   "certifications": [],
   "notes": "Proposal stage only. The direction names Questpit Limited as the applicant and records a proposed IT load of up to about 720MW across four buildings. It does not name the end operator or establish permission, construction, operation or available capacity. Coordinates are the centroid of the postcode in the letter's site address.",
   "facts": [
    {
     "text": "A letter dated 15 June 2026 gives a direction under section 35 for a proposed data centre campus at Ampthill Road, Bedford, MK45 3JP.",
     "source_url": "https://assets.publishing.service.gov.uk/media/6a2fca4d1f6fa5c3377e5f27/MHCLG_Decision_Letter.pdf"
    },
    {
     "text": "The direction describes up to four data centre buildings with a proposed IT load of up to about 720MW in total.",
     "source_url": "https://assets.publishing.service.gov.uk/media/6a2fcaea15f2a70fac7e5f54/260615_QuestPit_Data_Centre_Campus_s35_Direction.pdf"
    },
    {
     "text": "In the 15 June decision, the Secretary of State declined to treat statutory consultation duties as already met, noting that engagement had been with Central Bedfordshire Council and National Gas only.",
     "source_url": "https://assets.publishing.service.gov.uk/media/6a2fca4d1f6fa5c3377e5f27/MHCLG_Decision_Letter.pdf"
    },
    {
     "text": "Current Planning Inspectorate guidance says pre-application engagement or consultation is encouraged rather than required by legislation, and that formal registration to have a say follows only if an application is accepted for examination.",
     "source_url": "https://www.gov.uk/guidance/nationally-significant-infrastructure-projects-the-stages-of-the-nsip-process-and-how-you-can-have-your-say"
    }
   ],
   "checked_on": "2026-10-06",
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "The selected short official Section35 direction/decision identifies the named proposal and procedure, not a voltage/substation connection, explicit design/target/measured PUE, scoped water measurement/period, chips or official point/CRS. No IT/total-power ratio is converted to PUE; air cooling or a proposed energy centre is not zero-water or a delivered grid connection. No broader planning/EIA/utility audit or whole-application omission is claimed.",
     "source_url": "https://assets.publishing.service.gov.uk/media/6a2fcaea15f2a70fac7e5f54/260615_QuestPit_Data_Centre_Campus_s35_Direction.pdf",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "MHCLG / GOV.UK",
      "licence": "Crown/source rights retained; no new document-component OGL grant asserted",
      "scope": "Only an original selected-official-filing inspection-limit account and ordinary link. No directive/report text, developer evidence, map, contact, capacity figure, narrative adaptation or underlying dataset is imported.",
      "licence_url": "https://www.gov.uk/help/terms-conditions",
      "conditions": "A different independent review completed at 2026-11-01T03:10:26.335Z accepts only this original account of the selected two-page official direction and an ordinary link. GOV.UK terms were directly read: ordinary links are encouraged subject to the stated charged-click-through and endorsement limits. General Crown/OGL language is conditional; no new document-component open-licence grant is asserted. No source text, developer evidence, map, contact, technical capacity figure or underlying dataset is imported. The retained National Archives route was not requested."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/bedford-ampthill-road-data-centre-campus",
   "permalink": "https://computefinder.net/entity/cf-dc-0015"
  },
  {
   "id": "cf-dc-0016",
   "slug": "teesworks-redcar-data-centre",
   "name": "Teesworks data centre site",
   "operator": null,
   "owner": "Teesworks",
   "country": "GB",
   "locality": "Redcar, Teesside",
   "lat": null,
   "lon": null,
   "stage": "permitted",
   "stage_as_of": "2025-08-11",
   "stage_source_url": "https://www.datacenterdynamics.com/en/news/teesworks-data-center-gets-approved-despite-clash-with-bp-over-planned-hydrogen-plant/",
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "Reported by trade press: Redcar and Cleveland Council approval in August 2025 (sources differ on whether outline or reserved matters; council record not fetched)",
     "url": "https://www.yorkshirepost.co.uk/business/teesworks-planning-permission-granted-for-massive-data-centre-at-teesworks-5257934",
     "status": "approved",
     "date": "2025-08-11"
    }
   ],
   "certifications": [],
   "notes": "Weak sourcing: approval is reported by trade and regional press only, and the two reports differ on the type of consent. No MW was stated; a law firm note says the site could host over a gigawatt of computing power, but that metric is unclear so it is left out. No operator or end user was named.",
   "facts": [
    {
     "text": "Trade press reports Redcar and Cleveland Council approved a data centre scheme at Teesworks in August 2025, with a site area of about 460,000 square metres reported.",
     "source_url": "https://www.yorkshirepost.co.uk/business/teesworks-planning-permission-granted-for-massive-data-centre-at-teesworks-5257934"
    },
    {
     "text": "A CMS law firm note says the competing H2Teesside hydrogen consent application was withdrawn on 1 December 2025, after the two proposals were assessed as incompatible.",
     "source_url": "https://cms.law/en/gbr/legal-updates/h2teesside-vs-south-tees-data-centre-government-prioritisation-and-overlapping-consents"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/teesworks-redcar-data-centre",
   "permalink": "https://computefinder.net/entity/cf-dc-0016"
  },
  {
   "id": "cf-dc-0017",
   "slug": "telehouse-london-docklands",
   "name": "Telehouse London Docklands campus",
   "operator": "Telehouse",
   "owner": null,
   "country": "GB",
   "locality": "Docklands, London",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://www.telehouse.net/data-centres/london",
   "capacity": [],
   "power_note": "Telehouse says it runs an on-site dual primary substation at 132kV with 50MVA total capacity at the Docklands campus.",
   "cooling_note": "The operator lists N+1 cooling redundancy for Telehouse South and an ASHRAE room design for the Docklands buildings.",
   "connectivity_note": "Telehouse says customers can reach over 1,000 carriers and ISPs, and that the campus hosts most of LINX capacity.",
   "planning": [],
   "certifications": [
    "PCI-DSS",
    "ISO 9001",
    "ISO 14001",
    "ISO 22301",
    "ISO/IEC 27001",
    "ISO 45001",
    "ISO 50001"
   ],
   "notes": "Five London buildings are listed: North, East, West, North Two and South. The operator states 18MW total power capacity for Telehouse South, but the metric is not defined, so it is not entered as a capacity claim. The substation figure is in MVA, not MW.",
   "facts": [
    {
     "text": "Telehouse operates five London data centres, four on the Docklands campus and Telehouse South, opened in 2022 at Blackwall Yard.",
     "source_url": "https://www.telehouse.net/data-centres/london"
    },
    {
     "text": "The campus has a private 132kV substation of 50MVA with two lines connected directly to the national grid.",
     "source_url": "https://www.telehouse.net/data-centres/london"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/telehouse-london-docklands",
   "permalink": "https://computefinder.net/entity/cf-dc-0017"
  },
  {
   "id": "cf-dc-0018",
   "slug": "equinix-ld10-slough",
   "name": "Equinix LD10 (Slough)",
   "operator": "Equinix",
   "owner": null,
   "country": "GB",
   "locality": "Slough, Berkshire",
   "lat": 51.522252,
   "lon": -0.622812,
   "stage": "operating",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://www.equinix.com/data-centers/europe-colocation/united-kingdom-colocation/london-data-centers/ld10",
   "capacity": [],
   "power_note": "Equinix lists N+1 power and generator redundancy, with 30 hours or more of generator autonomy at full load and a minimum cabinet density of 6kVA.",
   "cooling_note": "Equinix lists N+1 cooling redundancy and free cooling.",
   "connectivity_note": "Equinix lists Internet Exchange, Metro Connect, cross connects and Fabric products at this site.",
   "planning": [],
   "certifications": [
    "ISO 14001",
    "ISO 22301",
    "ISO 27001",
    "ISO 45001",
    "ISO 50001",
    "ISO 9001",
    "PCI DSS",
    "SOC 1 Type II",
    "SOC 2 Type II",
    "EU Code of Conduct"
   ],
   "notes": "No site MW is published on the page. Coordinates are the postcode centroid for the listed address at 13 Liverpool Road. Equinix also lists other Slough buildings, which were not assessed.",
   "facts": [
    {
     "text": "The page gives the address as 13 Liverpool Road, Slough SL1 4QZ and about 4,688 square metres of space.",
     "source_url": "https://www.equinix.com/data-centers/europe-colocation/united-kingdom-colocation/london-data-centers/ld10"
    },
    {
     "text": "Equinix states 2025 supplier-bundled UK wind and solar renewable energy certificates for this site.",
     "source_url": "https://www.equinix.com/data-centers/europe-colocation/united-kingdom-colocation/london-data-centers/ld10"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/equinix-ld10-slough",
   "permalink": "https://computefinder.net/entity/cf-dc-0018"
  },
  {
   "id": "cf-dc-0019",
   "slug": "digital-realty-lhr26-slough",
   "name": "Digital Realty LHR26 (Slough Trading Estate)",
   "operator": "Digital Realty",
   "owner": null,
   "country": "GB",
   "locality": "Slough Trading Estate, Slough",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://www.digitalrealty.com/data-centers/emea/london/lhr26",
   "capacity": [],
   "power_note": "Digital Realty lists N+1 redundancy for the facility.",
   "cooling_note": "The page lists N+1 cooling redundancy.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [
    "SOC 2",
    "SOC 3",
    "PCI-DSS",
    "ISO 14001",
    "ISO 27701",
    "ISO 50001",
    "ISO 9001"
   ],
   "notes": "Listed as part of Digital Realty's Slough campus. No MW is published on the page, so capacity is empty.",
   "facts": [
    {
     "text": "Digital Realty describes LHR26 as part of its Slough campus on the Slough Trading Estate, about 15 minutes from Heathrow.",
     "source_url": "https://www.digitalrealty.com/data-centers/emea/london/lhr26"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/digital-realty-lhr26-slough",
   "permalink": "https://computefinder.net/entity/cf-dc-0019"
  },
  {
   "id": "cf-dc-0020",
   "slug": "datavita-lanarkshire-ai-growth-zone",
   "name": "Lanarkshire AI Growth Zone (DataVita, Airdrie)",
   "operator": "DataVita",
   "owner": null,
   "country": "GB",
   "locality": "Airdrie and Chapelhall, North Lanarkshire",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2026-01-29",
   "stage_source_url": "https://www.gov.uk/government/news/more-than-3400-jobs-and-targeted-support-for-local-communities-to-help-tackle-the-cost-of-living-as-lanarkshire-named-latest-ai-growth-zone",
   "capacity": [],
   "power_note": "The government release mentions a renewables park as part of the build-out, but gives no MW figure.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "participation": {
    "title": "North Lanarkshire planning application search and comment route",
    "url": "https://www.northlanarkshire.gov.uk/planning-and-building/planning-applications/view-and-comment-on-planning-applications",
    "checked_on": "2026-10-06",
    "note": "This is the council's general planning route, not a live Lanarkshire AI Growth Zone consultation. ComputeFinder has not recorded a project application reference or comment deadline. Public and neighbour comments must arrive before the later of the neighbour-notification period or any associated public-advertisement period; the council warns that this may differ from the portal's standard consultation expiry date. Registration requires a name, address and email; the council says it publishes the name and address with a comment, but not the signature, phone number or email."
   },
   "certifications": [],
   "notes": "Announced zone around DataVita's Airdrie site, in partnership with CoreWeave. The government states 8.2 billion pounds of private investment; no MW figure was found in fetched sources.",
   "facts": [
    {
     "text": "The government announced Lanarkshire as an AI Growth Zone on 29 January 2026, delivered by DataVita with AI cloud firm CoreWeave.",
     "source_url": "https://www.gov.uk/government/news/more-than-3400-jobs-and-targeted-support-for-local-communities-to-help-tackle-the-cost-of-living-as-lanarkshire-named-latest-ai-growth-zone"
    },
    {
     "text": "North Lanarkshire Council says the plans are subject to the full statutory planning process and consultation before any decision.",
     "source_url": "https://www.northlanarkshire.gov.uk/news/plans-welcomed-north-lanarkshire-become-one-worlds-most-advanced-ai-sites"
    }
   ],
   "checked_on": "2026-10-02",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/datavita-lanarkshire-ai-growth-zone",
   "permalink": "https://computefinder.net/entity/cf-dc-0020"
  },
  {
   "id": "cf-dc-0021",
   "slug": "north-wales-ai-growth-zone",
   "name": "North Wales AI Growth Zone (Prosperity Parc and Trawsfynydd)",
   "operator": null,
   "owner": null,
   "country": "GB",
   "locality": "Anglesey and Gwynedd, North Wales",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2025-11-13",
   "stage_source_url": "https://www.gov.uk/government/news/ai-growth-zones-to-create-thousands-of-jobs-and-unlock-up-to-100-billion-in-investment-as-new-site-confirmed-for-north-wales",
   "capacity": [],
   "power_note": "The government links the zone to the planned Wylfa small modular reactors, with power to the grid expected from the mid-2030s.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Zone designation only. An investment partner was still being sought at announcement, and no operator, MW figure or planning application was found in fetched sources.",
   "facts": [
    {
     "text": "The zone straddles the Menai Strait with one base at Prosperity Parc on Anglesey and another at Trawsfynydd in Gwynedd.",
     "source_url": "https://www.gov.uk/government/news/ai-growth-zones-to-create-thousands-of-jobs-and-unlock-up-to-100-billion-in-investment-as-new-site-confirmed-for-north-wales"
    },
    {
     "text": "It is led by a consortium including Stena Line and regional bodies such as Isle of Anglesey County Council and Bangor University.",
     "source_url": "https://www.gov.uk/government/news/ai-growth-zones-to-create-thousands-of-jobs-and-unlock-up-to-100-billion-in-investment-as-new-site-confirmed-for-north-wales"
    }
   ],
   "checked_on": "2026-10-02",
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only the selected 13 November 2025 government announcement paragraphs and notes were inspected. They identify a two-location North Wales proposal and general future grid/planning measures; they state no site-specific voltage/named substation, design/target/measured PUE, bounded water withdrawal/consumption/WUE, hardware model or explicit official point/CRS. Prospective high-voltage/substation policy, priority access and Wylfa reactor ambitions are not an issued connection, delivered capacity, commissioning or operation at either place. This is not an exhaustive planning/EIA audit.",
     "source_url": "https://www.gov.uk/government/news/ai-growth-zones-to-create-thousands-of-jobs-and-unlock-up-to-100-billion-in-investment-as-new-site-confirmed-for-north-wales",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "UK Department for Science, Innovation and Technology / Wales Office / Prime Minister Office",
      "licence": "The exact page carries a conditional OGL v3.0 footer. This proposal uses only original minimal inspection-scope wording and ordinary links; no component-wide adaptation grant is assumed.",
      "scope": "Only an independently worded account of the selected official announcement paragraphs and ordinary uncharged, unframed source links. No stakeholder quotation, image, logo, ministerial quotation, source prose, contact, programme quantity, financial/job estimate or third-party material is imported. A separate independent review has completed for this exact limited account only; no source-content adaptation or recurring acquisition permission follows.",
      "licence_url": "https://www.gov.uk/help/terms-conditions",
      "attribution": "UK government departments; 13 November 2025 North Wales announcement; exact original linked. No endorsement.",
      "modification_notice": "Selected-source limits condensed in original words; no source narrative, quotation, table or asset reproduced.",
      "conditions": "Actual source footer and actual GOV.UK terms were inspected. Ordinary linking is encouraged within the stated conditions; no charge or endorsement is implied. General Crown/OGL wording has exceptions and is not extended to third-party content or graphics. The retained National Archives source/notice stop was respected; no such route was requested. Independent source/use review completed at 2026-11-01T04:27:58.130Z. This model mapping does not renew source, publication, event, retrieval or parent clocks."
     }
    }
   ],
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/north-wales-ai-growth-zone",
   "permalink": "https://computefinder.net/entity/cf-dc-0021"
  },
  {
   "id": "cf-dc-0022",
   "slug": "google-grange-castle-dc3",
   "name": "Google Grange Castle DC3",
   "operator": "Google",
   "owner": null,
   "country": "IE",
   "locality": "Grange Castle Business Park and Profile Park, Baldonnell, Dublin 22",
   "lat": null,
   "lon": null,
   "stage": "permitted",
   "stage_as_of": "2026-09-23",
   "stage_source_url": "https://www.pleanala.ie/en-ie/case/320852",
   "capacity": [],
   "power_note": "The applicant's environmental report says emergency generators are in enclosures, with rooftop solar panels expected to cover about 20 percent of the energy need of the occupied building.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "PL06S.320852 (SD24A/0164W): ten-year permission for expansion including a data storage facility, granted with conditions on appeal",
     "url": "https://www.pleanala.ie/en-ie/case/320852",
     "status": "granted_on_condition",
     "date": "2026-09-23"
    }
   ],
   "certifications": [],
   "notes": "Permission date is the signed order date on An Coimisiun Pleanala's case page. The environmental report states no MW figure, and its floorspace figures are inconsistent, so only the eight-hall description is used.",
   "facts": [
    {
     "text": "An Coimisiun Pleanala granted permission with conditions on 23 September 2026 after a first-party appeal by Google Ireland Limited.",
     "source_url": "https://www.pleanala.ie/en-ie/case/320852"
    },
    {
     "text": "The proposed DC3 is described in the applicant's environmental report as a data storage facility with eight data halls, south and east of existing DC1 and DC2.",
     "source_url": "https://www.pleanala.ie/publicaccess/EIAR-NIS/320852/320852%20-%20eiar%20-%20main%20report%20chapter%204-6.pdf"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/google-grange-castle-dc3",
   "permalink": "https://computefinder.net/entity/cf-dc-0022"
  },
  {
   "id": "cf-dc-0023",
   "slug": "edgeconnex-lucan-dub06",
   "name": "EdgeConneX DUB06, Ballymakaily, Lucan",
   "operator": "EdgeConneX",
   "owner": null,
   "country": "IE",
   "locality": "Ballymakaily, Lucan, Co. Dublin",
   "lat": null,
   "lon": null,
   "stage": "permitted",
   "stage_as_of": "2025-07-31",
   "stage_source_url": "https://www.pleanala.ie/en-ie/case/317802",
   "capacity": [
    {
     "metric": "facility_mw",
     "stage": "permitted",
     "basis": "permitted",
     "value_mw": 30,
     "as_of": "2025-07-31",
     "source_url": "https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/317/r317802.pdf"
    }
   ],
   "power_note": "The inspector's report says the grid connection comes via a 110kV EirGrid substation under a flexible-demand conditional offer, with permitted on-site gas power plants supplying the data centres.",
   "cooling_note": "The inspector's report notes mechanical cooling units on the roofs of the data halls.",
   "connectivity_note": null,
   "planning": [
    {
     "title": "PL06S.317802 (SD22A/0333): two adjoined single storey data centres, granted with conditions on appeal",
     "url": "https://www.pleanala.ie/en-ie/case/317802",
     "status": "granted_on_condition",
     "date": "2025-07-31"
    }
   ],
   "certifications": [],
   "notes": "The 30MW is the maximum operational electrical demand stated by the applicant, as summarised in the inspector's report, and is entered as facility demand rather than IT load.",
   "facts": [
    {
     "text": "An Coimisiun Pleanala granted permission with conditions on 31 July 2025 for two adjoined single storey data centres known as DUB 06.",
     "source_url": "https://www.pleanala.ie/en-ie/case/317802"
    },
    {
     "text": "The inspector's report gives the proposed development a gross floor area of 15,274 square metres and a maximum operational electrical demand of 30MW.",
     "source_url": "https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/317/r317802.pdf"
    }
   ],
   "checked_on": "2026-10-02",
   "grid_connection": [
    {
     "value_text": "The DUB06 Inspector’s account identifies the permitted Kishoge 110 kV GIS substation as the planned permanent supply route for the wider Facility Campus, including DUB06.",
     "value_num": 110,
     "unit": "kV",
     "scope": "ABP317802 DUB06 proposal within the Ballymakaily Facility Campus only. This is the Inspector’s account of the applicant’s supply description; the 110 kV class and permitted campus substation/link do not establish a current DUB06 connection, energisation, connection rights, MW/MVA capacity or operation. Other DUB04/DUB05 phases are not merged or summed.",
     "stage": "permitted",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/317/r317802.pdf",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T03:10:26.335Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "An Coimisiún Pleanála / former An Bord Pleanála",
      "licence": "Copyright retained; no open content licence verified for the authority report",
      "scope": "Minimal independently worded attributed basic technical facts from the authority’s own report description/assessment and ordinary unframed links only. No protected report passage/adaptation, developer EIAR, technical table, drawing, map, figure, submission, personal contact or underlying dataset is imported.",
      "licence_url": "https://www.pleanala.ie/en-IE/Copyright",
      "attribution": "An Coimisiún Pleanála, Inspector’s Report ABP-317802-23; exact original linked in source_url. No endorsement.",
      "modification_notice": "Selected case/phase-specific statements reduced to an original concise factual account. Authority-reported applicant estimates/plans remain attributed, not verified outcomes.",
      "conditions": "A different independent review completed at 2026-11-01T03:10:26.335Z accepts only these original, minimal, attributed basic-fact statements from the authority-authored Inspector report and an ordinary unframed link. Authority and third-party copyrights remain reserved. No report prose, adaptation, table, map, figure, developer EIAR, submission or underlying dataset is imported. No source-content open licence, public-domain determination, ownership ruling, endorsement or recurring-use grant is declared. The Copyright, Legal Notices and Disclaimer originals were directly read; the third-party permission condition is respected by excluding developer material."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_inspected",
     "scope": "Only selected identity/power paragraphs and bounded keyword windows were inspected; searches returning no exact phrase are not proof of absence or a full165-page/EIAR audit. No PUE kind, water measurement/boundary/period, chips or verified point/CRS is admitted. Developer EIAR remains uninspected under the third-party condition.",
     "source_url": "https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/317/r317802.pdf",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "An Coimisiún Pleanála / former An Bord Pleanála",
      "licence": "Copyright retained; no open content licence verified for the authority report",
      "scope": "Minimal independently worded attributed basic technical facts from the authority’s own report description/assessment and ordinary unframed links only. No protected report passage/adaptation, developer EIAR, technical table, drawing, map, figure, submission, personal contact or underlying dataset is imported.",
      "licence_url": "https://www.pleanala.ie/en-IE/Copyright",
      "attribution": "An Coimisiún Pleanála, Inspector’s Report ABP-317802-23; exact original linked in source_url. No endorsement.",
      "modification_notice": "Selected case/phase-specific statements reduced to an original concise factual account. Authority-reported applicant estimates/plans remain attributed, not verified outcomes.",
      "conditions": "A different independent review completed at 2026-11-01T03:10:26.335Z accepts only these original, minimal, attributed basic-fact statements from the authority-authored Inspector report and an ordinary unframed link. Authority and third-party copyrights remain reserved. No report prose, adaptation, table, map, figure, developer EIAR, submission or underlying dataset is imported. No source-content open licence, public-domain determination, ownership ruling, endorsement or recurring-use grant is declared. The Copyright, Legal Notices and Disclaimer originals were directly read; the third-party permission condition is respected by excluding developer material."
     }
    }
   ],
   "participation": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/edgeconnex-lucan-dub06",
   "permalink": "https://computefinder.net/entity/cf-dc-0023"
  },
  {
   "id": "cf-dc-0024",
   "slug": "equinix-profile-park-plot-100",
   "name": "Equinix Profile Park Plot 100",
   "operator": "Equinix",
   "owner": null,
   "country": "IE",
   "locality": "Profile Park, Nangor Road, Clondalkin, Dublin 22",
   "lat": null,
   "lon": null,
   "stage": "permitted",
   "stage_as_of": "2025-02-19",
   "stage_source_url": "https://www.pleanala.ie/en-ie/case/317936",
   "capacity": [],
   "power_note": "The inspector's report records a Gas Networks Ireland confirmation of a 45MW gas connection for the permitted development, and a separately permitted gas-fired plant with an electrical output of up to 125MW.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "PL06S.317936 (SD22A/0156): ten-year permission for modifications to the permitted data centre SD21A/0186, refused on appeal",
     "url": "https://www.pleanala.ie/en-ie/case/317936",
     "status": "refused",
     "date": "2025-02-19"
    }
   ],
   "certifications": [],
   "notes": "The modifications were refused on 19 February 2025, but the case description refers to an earlier permitted data centre on the plot (SD21A/0186), so the underlying permission is treated as standing. This was not independently confirmed. The 45MW and 125MW figures are gas connection and generation, not data hall capacity.",
   "facts": [
    {
     "text": "An Coimisiun Pleanala refused the appeal for modifications to the permitted Plot 100 data centre on 19 February 2025.",
     "source_url": "https://www.pleanala.ie/en-ie/case/317936"
    },
    {
     "text": "The application was accompanied by a Natura Impact Statement and an environmental impact assessment report.",
     "source_url": "https://www.pleanala.ie/en-ie/case/317936"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/equinix-profile-park-plot-100",
   "permalink": "https://computefinder.net/entity/cf-dc-0024"
  },
  {
   "id": "cf-dc-0025",
   "slug": "vantage-dublin-dub1-profile-park",
   "name": "Vantage Dublin DUB1 (Profile Park)",
   "operator": "Vantage Data Centers",
   "owner": null,
   "country": "IE",
   "locality": "Profile Park, Dublin 22",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://vantage-dc.com/data-center-locations/emea/dublin-ireland/",
   "capacity": [
    {
     "metric": "it_mw",
     "stage": "announced",
     "basis": "reported",
     "value_mw": 52,
     "as_of": "2026-10-02",
     "source_url": "https://vantage-dc.com/data-center-locations/emea/dublin-ireland/"
    }
   ],
   "power_note": "Vantage says an on-site 100MVA multi-fuel generation plant, running HVO and gas from Gas Networks Ireland, will power the campus.",
   "cooling_note": "Vantage describes a closed-loop chilled water system with air-cooled chillers and economisers.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "The page is written in the future tense, so whether the two buildings are live could not be confirmed and stage is unknown. The 52MW is the operator's critical IT load for the first two phases.",
   "facts": [
    {
     "text": "Vantage describes a 22 acre Profile Park campus with two data centres and 52MW of critical IT load, with land and power for a possible third building.",
     "source_url": "https://vantage-dc.com/data-center-locations/emea/dublin-ireland/"
    },
    {
     "text": "The campus is said to offer an average density of 300 watts per square foot and N+1 redundancy across electrical systems.",
     "source_url": "https://vantage-dc.com/data-center-locations/emea/dublin-ireland/"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/vantage-dublin-dub1-profile-park",
   "permalink": "https://computefinder.net/entity/cf-dc-0025"
  },
  {
   "id": "cf-dc-0026",
   "slug": "vantage-dub11-ballybane-kilbride",
   "name": "Vantage DUB11, Ballybane and Kilbride, Clondalkin",
   "operator": "Vantage Data Centers",
   "owner": null,
   "country": "IE",
   "locality": "Ballybane and Kilbride, Clondalkin, Dublin 22",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": "2025-04-04",
   "stage_source_url": "https://www.pleanala.ie/en-ie/case/317446",
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "PL06S.317446 (SD22A/0420): demolition and construction of a data centre, refused on appeal",
     "url": "https://www.pleanala.ie/en-ie/case/317446",
     "status": "refused",
     "date": "2025-04-04"
    }
   ],
   "certifications": [],
   "notes": "Permission was refused on appeal on 4 April 2025, so the proposal is not going ahead as filed; stage is left as unknown because no later resubmission was checked. The inspector's report discusses on-site gas generation but its figures were inconsistent, so none are used.",
   "facts": [
    {
     "text": "An Coimisiun Pleanala refused permission on 4 April 2025 after an appeal by Vantage Data Centres DUB11 Limited.",
     "source_url": "https://www.pleanala.ie/en-ie/case/317446"
    },
    {
     "text": "The inspector's report notes an EPA industrial emissions licence application relating to DUB11 and DUB12.",
     "source_url": "https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/317/r317446.pdf"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/vantage-dub11-ballybane-kilbride",
   "permalink": "https://computefinder.net/entity/cf-dc-0026"
  },
  {
   "id": "cf-dc-0027",
   "slug": "cruiserath-road-universal-developers",
   "name": "Cruiserath Road data centre expansion",
   "operator": null,
   "owner": null,
   "country": "IE",
   "locality": "Cruiserath Road, Dublin 15",
   "lat": null,
   "lon": null,
   "stage": "permitted",
   "stage_as_of": "2025-12-19",
   "stage_source_url": "https://www.pleanala.ie/en-ie/case/318180",
   "capacity": [],
   "power_note": "The inspector's report says a grid connection is in place, with power for one building available immediately and for the next building from 2027; appellants disputed the demand implications.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "PL06F.318180 (FW22A/0308): construction of a data centre, granted with revised conditions on appeal",
     "url": "https://www.pleanala.ie/en-ie/case/318180",
     "status": "granted_on_condition",
     "date": "2025-12-19"
    }
   ],
   "certifications": [],
   "notes": "The applicant is Universal Developers LLC and no end operator is named. An appellant claimed a 73MW constant load but the applicant disputed it, so no capacity claim is made.",
   "facts": [
    {
     "text": "An Coimisiun Pleanala granted permission with revised conditions on 19 December 2025 for a data centre at Cruiserath Road, after third-party appeals.",
     "source_url": "https://www.pleanala.ie/en-ie/case/318180"
    },
    {
     "text": "The inspector's report notes the existing site is covered by an EPA industrial emissions licence for combustion with a total thermal input of 50MW or more, which would need updating.",
     "source_url": "https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/318/r318180.pdf"
    }
   ],
   "checked_on": "2026-10-02",
   "grid_connection": [
    {
     "value_text": "The Cruiserath Inspector’s Report identifies a 220 kV transmission line and on-site 220 kV GIS substation as the supply context for the proposed extension.",
     "value_num": 220,
     "unit": "kV",
     "scope": "ABP318180 proposal for Buildings E/F/G within the existing Cruiserath campus only. The report discusses earlier substation approvals and existing campus infrastructure; no actual energisation date, present supply availability, capacity or current operation of the proposed extension is established. The voltage is not MW/MVA and no existing/new building capacities are combined.",
     "stage": "unknown",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/318/r318180.pdf",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T03:10:26.335Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "An Coimisiún Pleanála / former An Bord Pleanála",
      "licence": "Copyright retained; no open content licence verified for the authority report",
      "scope": "Minimal independently worded attributed basic technical facts from the authority’s own report description/assessment and ordinary unframed links only. No protected report passage/adaptation, developer EIAR, technical table, drawing, map, figure, submission, personal contact or underlying dataset is imported.",
      "licence_url": "https://www.pleanala.ie/en-IE/Copyright",
      "attribution": "An Coimisiún Pleanála, Inspector’s Report ABP-318180-23; exact original linked in source_url. No endorsement.",
      "modification_notice": "Selected case/phase-specific statements reduced to an original concise factual account. Authority-reported applicant estimates/plans remain attributed, not verified outcomes.",
      "conditions": "A different independent review completed at 2026-11-01T03:10:26.335Z accepts only these original, minimal, attributed basic-fact statements from the authority-authored Inspector report and an ordinary unframed link. Authority and third-party copyrights remain reserved. No report prose, adaptation, table, map, figure, developer EIAR, submission or underlying dataset is imported. No source-content open licence, public-domain determination, ownership ruling, endorsement or recurring-use grant is declared. The Copyright, Legal Notices and Disclaimer originals were directly read; the third-party permission condition is respected by excluding developer material."
     }
    }
   ],
   "pue": [
    {
     "value_text": "The Inspector records the applicant’s annualised DESIGN PUE of 1.12 for the proposed Cruiserath development.",
     "value_num": 1.12,
     "unit": null,
     "scope": "ABP318180 proposed Buildings E/F/G design only, as recorded in section10.1.3. Annualised design ratio, not measured/site-wide/current operating performance, a contractual result or independently validated efficiency. The separate generic pact benchmark is not assigned to this development.",
     "stage": "announced",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/318/r318180.pdf",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T03:10:26.335Z",
     "checked_on": "2026-11-01",
     "kind": "design",
     "source_notice": {
      "publisher": "An Coimisiún Pleanála / former An Bord Pleanála",
      "licence": "Copyright retained; no open content licence verified for the authority report",
      "scope": "Minimal independently worded attributed basic technical facts from the authority’s own report description/assessment and ordinary unframed links only. No protected report passage/adaptation, developer EIAR, technical table, drawing, map, figure, submission, personal contact or underlying dataset is imported.",
      "licence_url": "https://www.pleanala.ie/en-IE/Copyright",
      "attribution": "An Coimisiún Pleanála, Inspector’s Report ABP-318180-23; exact original linked in source_url. No endorsement.",
      "modification_notice": "Selected case/phase-specific statements reduced to an original concise factual account. Authority-reported applicant estimates/plans remain attributed, not verified outcomes.",
      "conditions": "A different independent review completed at 2026-11-01T03:10:26.335Z accepts only these original, minimal, attributed basic-fact statements from the authority-authored Inspector report and an ordinary unframed link. Authority and third-party copyrights remain reserved. No report prose, adaptation, table, map, figure, developer EIAR, submission or underlying dataset is imported. No source-content open licence, public-domain determination, ownership ruling, endorsement or recurring-use grant is declared. The Copyright, Legal Notices and Disclaimer originals were directly read; the third-party permission condition is respected by excluding developer material."
     }
    }
   ],
   "water_use": [
    {
     "value_text": "The Inspector reports projected additional mains-water demand for cooling of about 1110 m³ annually for the proposed Cruiserath development.",
     "value_num": null,
     "unit": null,
     "scope": "Only the proposal’s additional public-mains cooling-water demand described in sections11.9.8 and11.9.12. This is a projected approximate annual requirement with no separately named calendar year, not metered consumption, total site withdrawal, all-process/domestic demand, a WUE value or a current operating result. No rainwater/stored-water share, storage volume, stormwater discharge or existing-campus water total is imported or added.",
     "stage": "announced",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/318/r318180.pdf",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T03:10:26.335Z",
     "checked_on": "2026-11-01",
     "boundary": "Proposed Buildings E/F/G extension: supplemental public-mains water for cooling, principally hot periods, abstracted at low-demand times for storage. Annual estimate only; rainwater contribution, total withdrawal and consumptive/return fraction not quantified here.",
     "source_notice": {
      "publisher": "An Coimisiún Pleanála / former An Bord Pleanála",
      "licence": "Copyright retained; no open content licence verified for the authority report",
      "scope": "Minimal independently worded attributed basic technical facts from the authority’s own report description/assessment and ordinary unframed links only. No protected report passage/adaptation, developer EIAR, technical table, drawing, map, figure, submission, personal contact or underlying dataset is imported.",
      "licence_url": "https://www.pleanala.ie/en-IE/Copyright",
      "attribution": "An Coimisiún Pleanála, Inspector’s Report ABP-318180-23; exact original linked in source_url. No endorsement.",
      "modification_notice": "Selected case/phase-specific statements reduced to an original concise factual account. Authority-reported applicant estimates/plans remain attributed, not verified outcomes.",
      "conditions": "A different independent review completed at 2026-11-01T03:10:26.335Z accepts only these original, minimal, attributed basic-fact statements from the authority-authored Inspector report and an ordinary unframed link. Authority and third-party copyrights remain reserved. No report prose, adaptation, table, map, figure, developer EIAR, submission or underlying dataset is imported. No source-content open licence, public-domain determination, ownership ruling, endorsement or recurring-use grant is declared. The Copyright, Legal Notices and Disclaimer originals were directly read; the third-party permission condition is respected by excluding developer material."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "chips",
      "coordinates"
     ],
     "status": "not_inspected",
     "scope": "This scope checks only the named planning report’s identity, electrical, explicit design-PUE and projected additional cooling-water passages. No chip or verified official point/CRS inspection was performed. No whole-report/whole-application technical completeness is claimed.",
     "source_url": "https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/318/r318180.pdf",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "An Coimisiún Pleanála / former An Bord Pleanála",
      "licence": "Copyright retained; no open content licence verified for the authority report",
      "scope": "Minimal independently worded attributed basic technical facts from the authority’s own report description/assessment and ordinary unframed links only. No protected report passage/adaptation, developer EIAR, technical table, drawing, map, figure, submission, personal contact or underlying dataset is imported.",
      "licence_url": "https://www.pleanala.ie/en-IE/Copyright",
      "attribution": "An Coimisiún Pleanála, Inspector’s Report ABP-318180-23; exact original linked in source_url. No endorsement.",
      "modification_notice": "Selected case/phase-specific statements reduced to an original concise factual account. Authority-reported applicant estimates/plans remain attributed, not verified outcomes.",
      "conditions": "A different independent review completed at 2026-11-01T03:10:26.335Z accepts only these original, minimal, attributed basic-fact statements from the authority-authored Inspector report and an ordinary unframed link. Authority and third-party copyrights remain reserved. No report prose, adaptation, table, map, figure, developer EIAR, submission or underlying dataset is imported. No source-content open licence, public-domain determination, ownership ruling, endorsement or recurring-use grant is declared. The Copyright, Legal Notices and Disclaimer originals were directly read; the third-party permission condition is respected by excluding developer material."
     }
    }
   ],
   "participation": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/cruiserath-road-universal-developers",
   "permalink": "https://computefinder.net/entity/cf-dc-0027"
  },
  {
   "id": "cf-dc-0028",
   "slug": "orion-business-park-ballycoolin",
   "name": "Orion Business Park data centre, Ballycoolin",
   "operator": null,
   "owner": null,
   "country": "IE",
   "locality": "North-West Business Park, Ballycoolin, Dublin 15",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": "2026-04-09",
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "Related case 501133: contribution appeal decided 24 July 2026 (applicant South Dublin Routing 4 No. 2 Limited)",
     "url": "https://www.pleanala.ie/en-ie/case/501133",
     "status": "unknown",
     "date": "2026-07-24"
    }
   ],
   "certifications": [],
   "notes": "Proposal stage. The case page when fetched did not show an outcome for the main appeal, and its due date had passed, so the result is unconfirmed. The operator is not named and capacity is not stated.",
   "facts": [],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/orion-business-park-ballycoolin",
   "permalink": "https://computefinder.net/entity/cf-dc-0028"
  },
  {
   "id": "cf-dc-0029",
   "slug": "herbata-naas-data-centre",
   "name": "Herbata Limited data centre, Naas",
   "operator": null,
   "owner": null,
   "country": "IE",
   "locality": "Halverstown, Jigginstown and Newhall, Naas, Co. Kildare",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://www.pleanala.ie/en-ie/case/323677",
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "PL09.323677 (Kildare ref 2460787): data centre with demolition, planning appeal due to be decided by 28 January 2026",
     "url": "https://www.pleanala.ie/en-ie/case/323677",
     "status": "appeal",
     "date": null
    }
   ],
   "certifications": [],
   "notes": "Proposal stage. The case page still showed a due date of 28 January 2026 and no decision when fetched, so the outcome is unconfirmed. Applicant is Herbata Limited; no operator or MW stated.",
   "facts": [
    {
     "text": "The proposal is for a data centre including demolition works, accompanied by both an environmental impact report and a Natura impact statement.",
     "source_url": "https://www.pleanala.ie/en-ie/case/323677"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/herbata-naas-data-centre",
   "permalink": "https://computefinder.net/entity/cf-dc-0029"
  },
  {
   "id": "cf-dc-0030",
   "slug": "pure-dc-dublin-ballycoolin",
   "name": "Pure DC Dublin Ballycoolin (DUB01 to DUB03)",
   "operator": "Pure DC",
   "owner": null,
   "country": "IE",
   "locality": "Ballycoolin, Dublin 15",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://puredc.com/dublin",
   "capacity": [
    {
     "metric": "it_mw",
     "stage": "permitted",
     "basis": "permitted",
     "value_mw": 54,
     "as_of": "2026-07-21",
     "source_url": "https://puredc.com/2026/07/21/pure-dc-secures-additional-e1-3-billion-to-accelerate-growth-of-one-of-europes-largest-ai-campuses"
    }
   ],
   "power_note": "Pure DC says the site self-generates with on-site dual-fuel gas generators backed by a 200MW thermal gas connection, and uses HVO for backup.",
   "cooling_note": null,
   "connectivity_note": "The operator describes the site as being in the fibre-rich Ballycoolin area.",
   "planning": [],
   "certifications": [],
   "notes": "A July 2026 release says the campus is designed for up to 150MW of IT capacity with 54MW currently permitted; the operator page also gives 54MW across three buildings and says it has been operational since 2024. Planning register entries were not fetched.",
   "facts": [
    {
     "text": "Pure DC says the Dublin campus has been operational since 2024 and comprises three data centres, DUB01, DUB02 and DUB03.",
     "source_url": "https://puredc.com/dublin"
    },
    {
     "text": "The operator says it bought a further 25 acres in 2023 to the west for future expansion.",
     "source_url": "https://puredc.com/dublin"
    },
    {
     "text": "A 21 July 2026 release says the Dublin campus is designed for up to 150MW of IT capacity, with 54MW currently permitted.",
     "source_url": "https://puredc.com/2026/07/21/pure-dc-secures-additional-e1-3-billion-to-accelerate-growth-of-one-of-europes-largest-ai-campuses"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/pure-dc-dublin-ballycoolin",
   "permalink": "https://computefinder.net/entity/cf-dc-0030"
  },
  {
   "id": "cf-dc-0031",
   "slug": "stargate-norway-kvandal-narvik",
   "name": "Stargate Norway (Kvandal, Narvik)",
   "operator": "Nscale",
   "owner": "Nscale and Aker (planned 50/50 joint venture)",
   "country": "NO",
   "locality": "Kvandal, near Narvik",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2025-07-31",
   "stage_source_url": "https://nscale.com/press-releases/stargate-norway-nscale-aker-openai",
   "capacity": [],
   "power_note": "The partners describe the site as powered entirely by renewable (hydro) electricity.",
   "cooling_note": "Closed-loop direct-to-chip liquid cooling is planned, with surplus heat offered to local low-carbon businesses.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Announced in July 2025 with OpenAI as initial customer. The announcement quotes 230 MW of planned capacity and an ambition for 290 MW more but does not say whether this is IT, facility or grid power, so we have left it out of the structured capacity field. We found no 2026 construction status from a primary source.",
   "facts": [
    {
     "text": "The announcement says the project is planned to deliver 230 MW of capacity, with ambitions to add a further 290 MW, without defining the metric.",
     "source_url": "https://www.mfn.se/ob/a/aker/nscale-aker-and-openai-to-establish-stargate-norway-a-100-000-nvidia-gpu-ai-gigafactory-powered-by-renewable-energy-in-northern-norway-bb68d573"
    },
    {
     "text": "The target is 100,000 NVIDIA GPUs by the end of 2026, with the initial 20 MW phase starting through preparatory construction steps.",
     "source_url": "https://nscale.com/press-releases/stargate-norway-nscale-aker-openai"
    },
    {
     "text": "OpenAI describes the site as part of its OpenAI for Countries programme, with priority access for Norwegian users and surplus capacity for the UK and Nordics.",
     "source_url": "https://openai.com/index/introducing-stargate-norway"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/stargate-norway-kvandal-narvik",
   "permalink": "https://computefinder.net/entity/cf-dc-0031"
  },
  {
   "id": "cf-dc-0032",
   "slug": "skien-gromstul-telemark",
   "name": "Gromstul data centre (Project Telemark), Skien",
   "operator": "WS Computing AS",
   "owner": null,
   "country": "NO",
   "locality": "Gromstul, Skien, Telemark",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": "2025-12-12",
   "stage_source_url": null,
   "capacity": [
    {
     "metric": "grid_mw",
     "stage": "permitted",
     "basis": "reported",
     "value_mw": 100,
     "as_of": "2023-11-22",
     "source_url": "https://datacenterdynamics.com/en/news/norwegian-mayor-shoots-down-claims-that-new-google-campus-will-need-860mw"
    }
   ],
   "power_note": "A trade report quoting the mayor in November 2023 said 100 MW of grid power was then granted, with 20 MW awaiting approval and 120 MW more hoped for a second stage towards 2030.",
   "cooling_note": "The noise assessment for Building 2 lists 70 outdoor cooling units; the zoning plan allows heat recovery installations.",
   "connectivity_note": null,
   "planning": [
    {
     "title": "Detailed zoning plan for Gromstul data centre (plan ID 2017004), Skien municipality",
     "url": "https://www.skien.kommune.no/media/rnwcx20e/bilag-2-reguleringsbestemmelserpdf.pdf",
     "status": "approved",
     "date": null
    }
   ],
   "certifications": [],
   "notes": "Permit documents name WS Computing AS as applicant and do not name the end user. Trade press has linked the Gromstul campus to Google, which we treat as reported only. The 100 MW figure is from 2023 and may be out of date.",
   "facts": [
    {
     "text": "The municipal zoning plan was proposed by Skien municipality to enable power- and space-intensive uses, primarily data centres, with a cap of 500 parking spaces.",
     "source_url": "https://www.skien.kommune.no/media/rnwcx20e/bilag-2-reguleringsbestemmelserpdf.pdf"
    },
    {
     "text": "A Skanska-related report puts the 2024 groundworks contract for WS Computing at the Gromstul site at about NOK 1.1 billion.",
     "source_url": "https://property-magazine.eu/skanska-prepares-for-new-data-center-in-telemark-66420.html"
    },
    {
     "text": "Trade press said the mayor played down a widely quoted 860 MW figure as a long-range estimate for the whole industrial area, not one tenant's request.",
     "source_url": "https://datacenterdynamics.com/en/news/norwegian-mayor-shoots-down-claims-that-new-google-campus-will-need-860mw"
    }
   ],
   "checked_on": "2026-10-02",
   "grid_connection": [
    {
     "value_text": "NVE lists case 202607246 as licence granted, dated 28 August 2026. A separate page for the same case identifies two 132 kV line scopes in its title: Building 1 to Building 2, and Gromstul switch station to the data-centre transformer station.",
     "value_num": 132,
     "unit": "kV",
     "scope": "The two line spans identified in NVE case 202607246 at case-HTML/title grain only: Building 1 to Building 2, and Gromstul switch station to the data-centre transformer station. The permitted stage applies only to these listed line scopes. Construction, energisation, commissioning, all campus consents, current operation, capacity and available compute are not established.",
     "stage": "permitted",
     "basis": "permitted",
     "label": "official_source",
     "as_of": "2026-08-28",
     "source_url": "https://www.nve.no/konsesjon/konsesjonssaker/konsesjonssak?id=26255&type=A-1",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-10-25T16:32:51.701Z",
     "checked_on": "2026-10-25",
     "source_notice": {
      "publisher": "NVE and relevant underlying rightsholders",
      "licence": "Source copyright retained; exact basic-fact use assessed only",
      "scope": "One minimal attributed case/title fact and ordinary unframed case link only. No source narrative, quotations, attachments, maps, drawings, images, contacts, tables or datasets reproduced or adapted. No open licence, public-domain status, endorsement, blanket domain clearance or recurring-monitoring grant. The earlier inspected NVE open-data notice applies NLOD to api.nve.no data, not automatically this case HTML or attachments. Existing source-use review was read but is not treated as blanket permission; the exact candidate was independently reviewed.",
      "licence_url": null
     }
    }
   ],
   "participation": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "decision_evidence": {
    "title": "Gromstul electrical-installation evidence",
    "claims": [
     "NVE lists the Gromstul electrical-installation case as licence granted, dated 28 August 2026, and says permission was given to WS Computing AS for electrical installations linked to the data centre in Skien.",
     "NVE case 202607246 lists the electrical-installation licence and related documents."
    ],
    "source_url": "https://www.nve.no/konsesjon/konsesjonssaker/konsesjonssak?id=26039&type=A-1",
    "source_label": "NVE: Gromstul electrical-installation case",
    "publisher": "Norwegian Water Resources and Energy Directorate (NVE)",
    "checked_on": "2026-10-17",
    "review_by": "2026-10-23",
    "independently_reviewed_at": "2026-10-17T17:31:59Z",
    "source_publication_date": null,
    "source_updated_on": null,
    "event_date": "2026-08-28",
    "event_date_scope": "Date listed against this licence-granted case status, not a new campus-stage observation",
    "retrieved_at": null,
    "raw_body_sha256": null,
    "raw_body_bytes": null,
    "observed_at_upper_bound": "2026-10-17T17:30:26Z",
    "parsed_evidence": {
     "sha256": "8c81c4753e636ddbe4fd11e9a0813489cb41f880159851cefb4bddd749a20920",
     "kind": "Selected parsed case lines transcribed from a connected-tool response, not origin HTML or a complete body hash"
    },
    "next_step": "Open the NVE case page to inspect its listed electrical-installation decision and related documents directly.",
    "limitations": "The inspected evidence is the case HTML, not the underlying decision PDF or attachments. Electrical-installation permission does not establish all campus consents, legal finality, a current comment or appeal window, completion, commissioning, current operation, capacity or available compute. WS Computing AS is the named permission recipient, not newly verified campus owner, operator or end user. Earlier campus facts, stage, capacity and source dates are unchanged; no building or phase is split or merged.",
    "source_notice": {
     "publisher": "NVE and relevant underlying rightsholders",
     "licence": "Source copyright retained; exact basic-fact use assessed only",
     "licence_url": null,
     "scope": "Two minimal attributed basic case facts and ordinary unframed case link only. No source narrative, quotations, attachments, maps, drawings, images, contacts, tables or datasets reproduced or adapted. No open licence, public-domain status, endorsement, blanket domain clearance or recurring-monitoring grant. The inspected NVE open-data notice applies NLOD to api.nve.no data, not automatically this case HTML or attachments; no API data was acquired. No applicable express restriction was visible in the complete case and inspected notices; this is not proof that no broader terms exist. Reassess newly evidenced applicable conditions without a paraphrase workaround."
    }
   },
   "page_url": "https://computefinder.net/data-centres/skien-gromstul-telemark",
   "permalink": "https://computefinder.net/entity/cf-dc-0032"
  },
  {
   "id": "cf-dc-0033",
   "slug": "green-mountain-osl-enebakk",
   "name": "Green Mountain OSL-Enebakk",
   "operator": "Green Mountain",
   "owner": null,
   "country": "NO",
   "locality": "Enebakk, about 20 km from Oslo",
   "lat": null,
   "lon": null,
   "stage": "under_construction",
   "stage_as_of": "2023-11-17",
   "stage_source_url": "https://press-en.greenmountain.no/pressreleases/green-mountain-continues-expansion-of-its-data-center-in-oslo-region-3355862",
   "capacity": [
    {
     "metric": "it_mw",
     "stage": "under_construction",
     "basis": "reported",
     "value_mw": 10,
     "as_of": "2023-11-17",
     "source_url": "https://press-en.greenmountain.no/pressreleases/green-mountain-continues-expansion-of-its-data-center-in-oslo-region-3355862"
    }
   ],
   "power_note": "The operator states the site runs on 100 per cent renewable power.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "The only source we fetched is a November 2023 press release, which expected completion in September 2024 and a 41.5 MW site total, without defining that total. Current status should be rechecked on the operator site.",
   "facts": [
    {
     "text": "A 10 MW IT-load expansion in a three-storey, 9,600 square metre building was announced in November 2023, with about 5 MW pre-leased to an unnamed customer.",
     "source_url": "https://press-en.greenmountain.no/pressreleases/green-mountain-continues-expansion-of-its-data-center-in-oslo-region-3355862"
    },
    {
     "text": "The release said construction would start once the final start-up permit was approved, with completion projected for September 2024.",
     "source_url": "https://press-en.greenmountain.no/pressreleases/green-mountain-continues-expansion-of-its-data-center-in-oslo-region-3355862"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/green-mountain-osl-enebakk",
   "permalink": "https://computefinder.net/entity/cf-dc-0033"
  },
  {
   "id": "cf-dc-0034",
   "slug": "meta-odense",
   "name": "Meta Odense data centre campus",
   "operator": "Meta",
   "owner": "Meta",
   "country": "DK",
   "locality": "Odense",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2022-12-14",
   "stage_source_url": "https://datacenterdynamics.com/en/news/meta-terminates-contractor-on-danish-data-centers-kills-expansion-project",
   "capacity": [],
   "power_note": "A 2021 announcement tied the expansion to 294 MW of renewable energy from two wind projects.",
   "cooling_note": "The campus is connected to Odense district heating so that waste heat is reused.",
   "connectivity_note": null,
   "planning": [
    {
     "title": "Two-building expansion (about 90,000 sq m) stopped when Meta terminated its contractor",
     "url": "https://datacenterdynamics.com/en/news/meta-terminates-contractor-on-danish-data-centers-kills-expansion-project",
     "status": "withdrawn",
     "date": "2022-12-14"
    }
   ],
   "certifications": [],
   "notes": "Existing buildings operate; the two-building expansion announced in December 2021 was cancelled in December 2022. We have no MW figure from a primary source.",
   "facts": [
    {
     "text": "The original 55,000 sq m facility opened in 2019 and a third building was expected to finish in summer 2023.",
     "source_url": "https://datacenterdynamics.com/en/news/meta-terminates-contractor-on-danish-data-centers-kills-expansion-project"
    },
    {
     "text": "In December 2021 Meta announced two more buildings of about 90,000 sq m and a district heating link for the campus.",
     "source_url": "https://datacenterdynamics.com/en/news/metafacebook-to-expand-odense-data-center-campus-in-denmark"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/meta-odense",
   "permalink": "https://computefinder.net/entity/cf-dc-0034"
  },
  {
   "id": "cf-dc-0035",
   "slug": "google-fredericia",
   "name": "Google Fredericia data centre",
   "operator": "Google",
   "owner": "Google",
   "country": "DK",
   "locality": "Fredericia",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2020-12-14",
   "stage_source_url": "https://blog.google/company-news/inside-google/around-the-globe/google-europe/data-centers-europe-green-economic-recovery/",
   "capacity": [],
   "power_note": "Google says the site has used renewable energy since going online in 2020 and cites a Danish solar project as extra carbon-free supply.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Google's post of 14 December 2020 says the Fredericia data centre opened the previous week. The stage date records that it was operating by the publication date, not an exact opening day. No MW figure is stated.",
   "facts": [
    {
     "text": "Google's 14 December 2020 post says the Fredericia data centre opened the previous week.",
     "source_url": "https://blog.google/company-news/inside-google/around-the-globe/google-europe/data-centers-europe-green-economic-recovery/"
    },
    {
     "text": "Google's location page says the Fredericia data centre has been operating since 2020.",
     "source_url": "https://datacenters.google/locations/fredericia-denmark/"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/google-fredericia",
   "permalink": "https://computefinder.net/entity/cf-dc-0035"
  },
  {
   "id": "cf-dc-0036",
   "slug": "dcai-gefion-copenhagen",
   "name": "Gefion AI supercomputer (DCAI), Copenhagen",
   "operator": "Danish Centre for AI Innovation (DCAI)",
   "owner": "Danish Centre for AI Innovation (DCAI)",
   "country": "DK",
   "locality": "Copenhagen",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2024-10-23",
   "stage_source_url": "https://novonordiskfonden.dk/en/news/denmarks-first-ai-supercomputer-is-now-operational/",
   "capacity": [],
   "power_note": "The Novo Nordisk Foundation says the hosting data centre runs on 100 percent renewable energy. This is not a statement of Gefion's power demand or the site's capacity.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "The Foundation's 23 October 2024 release says Gefion was launched and was being readied for selected customers in a pilot phase. It identifies Digital Realty as the host in Denmark but does not name the facility or city. The Copenhagen locality remains based on the existing trade report.",
   "facts": [
    {
     "text": "A trade report says Gefion has 191 NVIDIA DGX H100 servers with 1,528 H100 GPUs, hosted in a Digital Realty data centre in Copenhagen.",
     "source_url": "https://www.nextplatform.com/ai/2024/10/23/the-great-danes-get-a-supercomputer-for-ai-and-maybe-hpc/1661701"
    },
    {
     "text": "The Novo Nordisk Foundation says DCAI then owned and would operate Gefion, which uses 1,528 NVIDIA H100 GPUs.",
     "source_url": "https://novonordiskfonden.dk/en/news/denmarks-first-ai-supercomputer-is-now-operational/"
    },
    {
     "text": "The Foundation says Digital Realty hosts Gefion in a data centre in Denmark and that the hosting facility runs on 100 percent renewable energy.",
     "source_url": "https://novonordiskfonden.dk/en/news/denmarks-first-ai-supercomputer-is-now-operational/"
    }
   ],
   "checked_on": "2026-10-02",
   "chips": [
    {
     "value_text": "The Novo Nordisk Foundation identified NVIDIA H100 Tensor Core GPUs in Gefion in its 23 October 2024 release.",
     "value_num": null,
     "unit": null,
     "scope": "Gefion system at its historical launch/pilot-description grain only. Not an inventory of a named Digital Realty building or a claim about current installed/available GPUs, host-facility stage, customer access or capacity. No GPU count is imported.",
     "stage": "unknown",
     "basis": "reported",
     "label": "source_claim",
     "as_of": null,
     "source_url": "https://novonordiskfonden.dk/en/news/denmarks-first-ai-supercomputer-is-now-operational/",
     "source_version": null,
     "source_published_on": "2024-10-23",
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T03:34:53.155Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Novo Nordisk Foundation",
      "licence": "Copyright retained; no open licence verified for this release.",
      "scope": "Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review.",
      "licence_url": "https://novonordiskfonden.dk//app/uploads/202412-Novo-Nordisk-Foundation-Intellectual-Property-Policy-for-Stand-Alone-Grants.pdf",
      "attribution": "Novo Nordisk Foundation; exact original linked. No endorsement.",
      "modification_notice": "Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported.",
      "conditions": "A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only the original minimal attributed historical Gefion hardware-identifier account and ordinary exact link. The actual release/footer retains all rights. The first independent request for the linked grant-IP policy returned tool-level not-accessible; it was not retried and no policy contents or grant are borrowed from the preparer. No open content licence, domain-wide permission or recurring-use grant is asserted. Source expression, quotations, counts, tables, images, marks, contacts and datasets are excluded."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "The inspected release gives no grid voltage/named substation, explicit design/target/measured PUE, bounded withdrawal/consumption/WUE or explicit official point/CRS in its selected technical sections. Renewable-energy and sustainable-design assertions are not those measurements. Host building remains unnamed; no coordinate or site-boundary inference.",
     "source_url": "https://novonordiskfonden.dk/en/news/denmarks-first-ai-supercomputer-is-now-operational/",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Novo Nordisk Foundation",
      "licence": "Copyright retained; no open licence verified for this release.",
      "scope": "Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review.",
      "licence_url": "https://novonordiskfonden.dk//app/uploads/202412-Novo-Nordisk-Foundation-Intellectual-Property-Policy-for-Stand-Alone-Grants.pdf",
      "attribution": "Novo Nordisk Foundation; exact original linked. No endorsement.",
      "modification_notice": "Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported.",
      "conditions": "A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only the original minimal attributed historical Gefion hardware-identifier account and ordinary exact link. The actual release/footer retains all rights. The first independent request for the linked grant-IP policy returned tool-level not-accessible; it was not retried and no policy contents or grant are borrowed from the preparer. No open content licence, domain-wide permission or recurring-use grant is asserted. Source expression, quotations, counts, tables, images, marks, contacts and datasets are excluded."
     }
    }
   ],
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/dcai-gefion-copenhagen",
   "permalink": "https://computefinder.net/entity/cf-dc-0036"
  },
  {
   "id": "cf-dc-0037",
   "slug": "prime-esbjerg-nordre-tovrup",
   "name": "Prime Data Centers Esbjerg campus",
   "operator": "Prime Data Centers",
   "owner": "Prime Data Centers and Brunswick Real Estate (partners)",
   "country": "DK",
   "locality": "Nordre Tovrupvej, Esbjerg",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2026-03-26",
   "stage_source_url": "https://www.businessesbjerg.com/en/news/esbjerg-kommune-byder-stor-international-datacenterinvestering-velkommen",
   "capacity": [
    {
     "metric": "it_mw",
     "stage": "announced",
     "basis": "reported",
     "value_mw": 160,
     "as_of": "2026-03-26",
     "source_url": "https://www.businessesbjerg.com/en/news/esbjerg-kommune-byder-stor-international-datacenterinvestering-velkommen"
    },
    {
     "metric": "it_mw",
     "stage": "announced",
     "basis": "reported",
     "value_mw": 550,
     "as_of": "2026-03-26",
     "source_url": "https://www.businessesbjerg.com/en/news/esbjerg-kommune-byder-stor-international-datacenterinvestering-velkommen"
    }
   ],
   "power_note": "The announcement says access to power is a prerequisite and that talks with Energinet on grid connection are under way.",
   "cooling_note": "Surplus heat could potentially be used in district heating.",
   "connectivity_note": null,
   "planning": [
    {
     "title": "Environmental impact assessment required before construction; construction could start in 2027",
     "url": "https://www.businessesbjerg.com/en/news/esbjerg-kommune-byder-stor-international-datacenterinvestering-velkommen",
     "status": "pending",
     "date": "2026-03-26"
    }
   ],
   "certifications": [],
   "notes": "Phase 1 is stated as 160 MW IT and the long-term potential as 550 MW IT; the second figure is an ambition, not a permitted amount. The site covers 640,000 sq m.",
   "facts": [
    {
     "text": "Esbjerg's business agency says phase 1 has 160 MW of IT capacity and could in the long term expand to 550 MW IT.",
     "source_url": "https://www.businessesbjerg.com/en/news/esbjerg-kommune-byder-stor-international-datacenterinvestering-velkommen"
    },
    {
     "text": "The project is subject to an environmental impact assessment and grid agreements with Energinet before construction, which could begin in 2027.",
     "source_url": "https://www.businessesbjerg.com/en/news/esbjerg-kommune-byder-stor-international-datacenterinvestering-velkommen"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/prime-esbjerg-nordre-tovrup",
   "permalink": "https://computefinder.net/entity/cf-dc-0037"
  },
  {
   "id": "cf-dc-0038",
   "slug": "google-hamina",
   "name": "Google Hamina data centre",
   "operator": "Google",
   "owner": "Google",
   "country": "FI",
   "locality": "Hamina",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-09-09",
   "stage_source_url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/google-ai-commitment-to-finland/",
   "capacity": [],
   "power_note": "Google reports 98 per cent carbon-free energy in Finland in 2023 and a 22-year agreement supporting life extension of the Loviisa nuclear plant.",
   "cooling_note": "Seawater from the Bay of Finland is used for cooling, and a heat recovery link with Haminan Energia is planned to cover about 80 per cent of local heat demand.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Operating since 2011 on the site of a former paper mill. A September 2026 Google post announces EUR 13 billion of Finnish investment including new facilities at Kajaani, Muhos and Vaala; those sites are not yet separate records because no capacity or permit details were found.",
   "facts": [
    {
     "text": "Google's location page says Hamina has operated since 2011 and uses seawater cooling.",
     "source_url": "https://datacenters.google/locations/hamina-finland/"
    },
    {
     "text": "A Google post dated 9 September 2026 describes the Hamina site as operating for 15 years and adds planned new facilities at Kajaani, Muhos and Vaala.",
     "source_url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/google-ai-commitment-to-finland/"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/google-hamina",
   "permalink": "https://computefinder.net/entity/cf-dc-0038"
  },
  {
   "id": "cf-dc-0039",
   "slug": "microsoft-hepokorpi-espoo",
   "name": "Microsoft Hepokorpi data centre, Espoo",
   "operator": "Microsoft",
   "owner": "Microsoft 3465 Finland Oy",
   "country": "FI",
   "locality": "Hepokorpi, Espoo",
   "lat": null,
   "lon": null,
   "stage": "under_construction",
   "stage_as_of": "2026-06-11",
   "stage_source_url": "https://www.sttinfo.fi/tiedote/72129950/ymparisto-ja-rakennuslautakunta-hepokorven-datakeskuksen-kolmannelle-vaiheelle-rakennuslupa?lang=fi",
   "capacity": [],
   "power_note": "Microsoft says its Finnish programme is backed by renewable energy agreements totalling over 200 MW.",
   "cooling_note": "Waste heat is to be recovered with Fortum for district heating; the 2022 town hall material expected mainly air cooling with rainwater supplement in hot weather.",
   "connectivity_note": null,
   "planning": [
    {
     "title": "Phase 3 building permit for the data centre, Espoo environment and building board",
     "url": "https://espoo.oncloudos.com/cgi/DREQUEST.PHP?id=20261687-10&page=meetingitem",
     "status": "approved",
     "date": "2026-06-11"
    }
   ],
   "certifications": [],
   "notes": "Permits for the first two phases on the northern plot were already granted and construction is under way. No site MW figure was found.",
   "facts": [
    {
     "text": "On 11 June 2026 the Espoo environment and building board approved a phase 3 building permit for Microsoft 3465 Finland Oy and allowed work to begin before the permit is final.",
     "source_url": "https://www.sttinfo.fi/tiedote/72129950/ymparisto-ja-rakennuslautakunta-hepokorven-datakeskuksen-kolmannelle-vaiheelle-rakennuslupa?lang=fi"
    },
    {
     "text": "The 2022 town hall summary expected air cooling as the main method and recovery of 70 to 85 per cent of heat for district heating.",
     "source_url": "https://local.microsoft.com/blog/microsoftin-datakeskusalue-suomessa-yleisotilaisuuden-yhteenveto/"
    },
    {
     "text": "Microsoft said in April 2026 that first-phase construction began in late 2024 and should finish around the turn of 2026 to 2027, with second-phase work starting in 2026 at Espoo, Kirkkonummi and Vihti.",
     "source_url": "https://news.microsoft.com/source/emea/2026/04/microsoft-kaynnistaa-paakaupunkiseudun-datakeskusalueen-toisen-vaiheen-rakentamisen/?lang=fi"
    }
   ],
   "checked_on": "2026-10-02",
   "grid_connection": [
    {
     "value_text": "Fingrid's 2022 plan described a 400/110 kV Hepokorpi substation and a planned Microsoft data-centre connection.",
     "value_num": null,
     "unit": null,
     "scope": "Historical shared-substation plan published 16 May 2022 only. The two voltage levels stay textual. No Microsoft supply voltage, completed connection, energisation, phase-three mapping or present operation is established.",
     "stage": "announced",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.fingrid.fi/en/news/news/2022/joint-project-in-hepokorpi-espoo-to-create-significant-climate-benefits/",
     "source_version": null,
     "source_published_on": "2022-05-16",
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-10-31T22:55:44.727Z",
     "checked_on": "2026-10-31",
     "source_notice": {
      "publisher": "Fingrid Oyj",
      "licence": "Copyright retained; no open licence verified. The inspected notice conditions other-material use on unchanged material and attribution.",
      "scope": "A minimal independently worded identification of a historical project plan with an ordinary source link. No source prose, quotations, technical table, market dataset, photograph, trademark asset or contact details are copied. Prior YLE2021 ordinary-link clearance does not cover this separately reviewed named-project technical statement.",
      "licence_url": "https://www.fingrid.fi/en/legal-terms/",
      "attribution": "Source: Fingrid Oyj, 16 May 2022 project announcement; original linked in source_url. No endorsement is implied.",
      "conditions": "This exact minimal factual use was independently assessed against the unchanged-material condition, separately from copied or modified source material and the notice's commercial market-information restriction. No new right or blanket commercial reuse permission is declared."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_inspected",
     "scope": "This admission checks a historical shared-substation plan in one Fingrid announcement. It does not audit the underlying EIA, later building or phase records, equipment schedules or numeric parcel coordinates for these unfilled fields.",
     "source_url": "https://www.fingrid.fi/en/news/news/2022/joint-project-in-hepokorpi-espoo-to-create-significant-climate-benefits/",
     "checked_on": "2026-10-31",
     "source_notice": {
      "publisher": "Fingrid Oyj",
      "licence": "Copyright retained; no open licence verified. The inspected notice conditions other-material use on unchanged material and attribution.",
      "scope": "A minimal independently worded identification of a historical project plan with an ordinary source link. No source prose, quotations, technical table, market dataset, photograph, trademark asset or contact details are copied. Prior YLE2021 ordinary-link clearance does not cover this separately reviewed named-project technical statement.",
      "licence_url": "https://www.fingrid.fi/en/legal-terms/",
      "attribution": "Source: Fingrid Oyj, 16 May 2022 project announcement; original linked in source_url. No endorsement is implied.",
      "conditions": "This exact minimal factual use was independently assessed against the unchanged-material condition, separately from copied or modified source material and the notice's commercial market-information restriction. No new right or blanket commercial reuse permission is declared."
     }
    }
   ],
   "participation": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/microsoft-hepokorpi-espoo",
   "permalink": "https://computefinder.net/entity/cf-dc-0039"
  },
  {
   "id": "cf-dc-0040",
   "slug": "microsoft-kirkkonummi",
   "name": "Microsoft Kirkkonummi data centre campus",
   "operator": "Microsoft",
   "owner": "Microsoft 3465 Finland Oy",
   "country": "FI",
   "locality": "Kirkkonummi",
   "lat": null,
   "lon": null,
   "stage": "under_construction",
   "stage_as_of": "2026-04-28",
   "stage_source_url": "https://news.microsoft.com/source/emea/2026/04/microsoft-kaynnistaa-paakaupunkiseudun-datakeskusalueen-toisen-vaiheen-rakentamisen/?lang=fi",
   "capacity": [],
   "power_note": null,
   "cooling_note": "Waste heat recovery with Fortum is central to the plan, with the company projecting it could cover about 40 per cent of heating for the district heating network when fully operating.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Microsoft says building permits are in hand for all three Helsinki-region campuses for phase 2. The revoked crushing permit concerns site works only, and we do not know whether it was reissued.",
   "facts": [
    {
     "text": "Microsoft's April 2026 statement says it holds building permits for the second phase at Espoo, Kirkkonummi and Vihti.",
     "source_url": "https://news.microsoft.com/source/emea/2026/04/microsoft-kaynnistaa-paakaupunkiseudun-datakeskusalueen-toisen-vaiheen-rakentamisen/?lang=fi"
    },
    {
     "text": "The original March 2022 announcement named Espoo, Kauniainen and Kirkkonummi and a district heating scheme using recycled data centre heat.",
     "source_url": "https://news.microsoft.com/europe/2022/03/17/microsoft-announces-intent-to-build-a-new-datacenter-region-in-finland-accelerating-sustainable-digital-transformation-and-enabling-large-scale-carbon-free-district-heating/"
    }
   ],
   "checked_on": "2026-10-02",
   "grid_connection": [
    {
     "value_text": "The authority’s Kirkkonummi account records two planned 400 kV underground circuits from Fingrid’s Mankki substation to Kolabacken.",
     "value_num": 400,
     "unit": "kV",
     "scope": "Only the proposed Kirkkonummi project described in authority case UUDELY/8117/2023. This is the authority’s account of the applicant’s plan, not a grid approval, connection right, constructed/energised link, current facility operation or available compute. Voltage class is separate from circuit count and MW/MVA capacity; no conversion or total is derived. Permanent planned Kolabacken supply route only. 400 kV is the class of each named circuit. No commissioning/connection event date is established.",
     "stage": "announced",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.ymparisto.fi/sites/default/files/documents/Microsoft_Kirkkonummen%20datakeskus_perusteltu%20p%C3%A4%C3%A4telm%C3%A4_09072024.pdf",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T02:53:38.785Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Uudenmaan ELY-keskus, Finland",
      "licence": "No open source-content licence or public-domain determination made for this component",
      "scope": "Three minimal independently worded attributed voltage/substation-route facts from the public authority reasoned-conclusion project-description section, with an ordinary unframed link. No source report passage/translation, diagram, map, figure, table, performance/capacity total, developer EIAR, personal contact or underlying dataset is imported.",
      "licence_url": null,
      "attribution": "Uudenmaan ELY-keskus, reasoned conclusion UUDELY/8117/2023, dated 9 July 2024; selected project-description paragraph, printed pp2-3. Original authority PDF linked in source_url. No endorsement.",
      "modification_notice": "Selected planned voltage classes and named endpoints reduced to original short English factual accounts. Not an official translation. The authority is summarising the applicant’s project description, not independently certifying constructed links.",
      "conditions": "Only the exact minimal basic-fact/link proposal is prepared under the user-authorised audit. No express use restriction for that precise proposal was visible in the selected public authority document sections or the inspected portal About/responsibility page. This is not permission inferred from an absent notice, a blanket government/public-domain/OGL grant or a clearance of developer/consultant materials. Source rights and third-party expression remain excluded; A separate independent factual and exact-use assessment completed at 2026-11-01T02:53:38.785Z accepts only these minimal basic facts and ordinary links. No source-content licence, ownership ruling or recurring acquisition permission follows."
     }
    },
    {
     "value_text": "The same project account records a separate planned 110 kV backup link from Fingrid’s Framnäs substation to Hammars.",
     "value_num": 110,
     "unit": "kV",
     "scope": "Only the proposed Kirkkonummi project described in authority case UUDELY/8117/2023. This is the authority’s account of the applicant’s plan, not a grid approval, connection right, constructed/energised link, current facility operation or available compute. Voltage class is separate from circuit count and MW/MVA capacity; no conversion or total is derived. Backup Hammars route only, kept separate from the Kolabacken supply and temporary construction connections. No energisation or construction completion is established.",
     "stage": "announced",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.ymparisto.fi/sites/default/files/documents/Microsoft_Kirkkonummen%20datakeskus_perusteltu%20p%C3%A4%C3%A4telm%C3%A4_09072024.pdf",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T02:53:38.785Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Uudenmaan ELY-keskus, Finland",
      "licence": "No open source-content licence or public-domain determination made for this component",
      "scope": "Three minimal independently worded attributed voltage/substation-route facts from the public authority reasoned-conclusion project-description section, with an ordinary unframed link. No source report passage/translation, diagram, map, figure, table, performance/capacity total, developer EIAR, personal contact or underlying dataset is imported.",
      "licence_url": null,
      "attribution": "Uudenmaan ELY-keskus, reasoned conclusion UUDELY/8117/2023, dated 9 July 2024; selected project-description paragraph, printed pp2-3. Original authority PDF linked in source_url. No endorsement.",
      "modification_notice": "Selected planned voltage classes and named endpoints reduced to original short English factual accounts. Not an official translation. The authority is summarising the applicant’s project description, not independently certifying constructed links.",
      "conditions": "Only the exact minimal basic-fact/link proposal is prepared under the user-authorised audit. No express use restriction for that precise proposal was visible in the selected public authority document sections or the inspected portal About/responsibility page. This is not permission inferred from an absent notice, a blanket government/public-domain/OGL grant or a clearance of developer/consultant materials. Source rights and third-party expression remain excluded; A separate independent factual and exact-use assessment completed at 2026-11-01T02:53:38.785Z accepts only these minimal basic facts and ordinary links. No source-content licence, ownership ruling or recurring acquisition permission follows."
     }
    },
    {
     "value_text": "Before those substations, the project account proposes two 20 kV underground construction-supply connections from Caruna’s Masala substation.",
     "value_num": 20,
     "unit": "kV",
     "scope": "Only the proposed Kirkkonummi project described in authority case UUDELY/8117/2023. This is the authority’s account of the applicant’s plan, not a grid approval, connection right, constructed/energised link, current facility operation or available compute. Voltage class is separate from circuit count and MW/MVA capacity; no conversion or total is derived. Temporary construction supply only. It is not the planned permanent grid supply or proof that works had begun. No actual connection date or capacity is established.",
     "stage": "announced",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.ymparisto.fi/sites/default/files/documents/Microsoft_Kirkkonummen%20datakeskus_perusteltu%20p%C3%A4%C3%A4telm%C3%A4_09072024.pdf",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T02:53:38.785Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Uudenmaan ELY-keskus, Finland",
      "licence": "No open source-content licence or public-domain determination made for this component",
      "scope": "Three minimal independently worded attributed voltage/substation-route facts from the public authority reasoned-conclusion project-description section, with an ordinary unframed link. No source report passage/translation, diagram, map, figure, table, performance/capacity total, developer EIAR, personal contact or underlying dataset is imported.",
      "licence_url": null,
      "attribution": "Uudenmaan ELY-keskus, reasoned conclusion UUDELY/8117/2023, dated 9 July 2024; selected project-description paragraph, printed pp2-3. Original authority PDF linked in source_url. No endorsement.",
      "modification_notice": "Selected planned voltage classes and named endpoints reduced to original short English factual accounts. Not an official translation. The authority is summarising the applicant’s project description, not independently certifying constructed links.",
      "conditions": "Only the exact minimal basic-fact/link proposal is prepared under the user-authorised audit. No express use restriction for that precise proposal was visible in the selected public authority document sections or the inspected portal About/responsibility page. This is not permission inferred from an absent notice, a blanket government/public-domain/OGL grant or a clearance of developer/consultant materials. Source rights and third-party expression remain excluded; A separate independent factual and exact-use assessment completed at 2026-11-01T02:53:38.785Z accepts only these minimal basic facts and ordinary links. No source-content licence, ownership ruling or recurring acquisition permission follows."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only the reasoned conclusion’s project identity and grid project-description paragraphs on printed pages 1 to 3 were freshly inspected for this proposal, with two selected PUE/water keyword lookups whose nonmatches do not establish absence. Those paragraphs did not establish an explicitly scoped PUE, water withdrawal/consumption/WUE measurement and period, chip identifier or verified point/CRS. The rest of the report, developer assessment and utility/parcel files were not audited; no document-wide or planning-application omission, physical absence or zero is claimed.",
     "source_url": "https://www.ymparisto.fi/sites/default/files/documents/Microsoft_Kirkkonummen%20datakeskus_perusteltu%20p%C3%A4%C3%A4telm%C3%A4_09072024.pdf",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Uudenmaan ELY-keskus, Finland",
      "licence": "No open source-content licence or public-domain determination made for this component",
      "scope": "Three minimal independently worded attributed voltage/substation-route facts from the public authority reasoned-conclusion project-description section, with an ordinary unframed link. No source report passage/translation, diagram, map, figure, table, performance/capacity total, developer EIAR, personal contact or underlying dataset is imported.",
      "licence_url": null,
      "attribution": "Uudenmaan ELY-keskus, reasoned conclusion UUDELY/8117/2023, dated 9 July 2024; selected project-description paragraph, printed pp2-3. Original authority PDF linked in source_url. No endorsement.",
      "modification_notice": "Selected planned voltage classes and named endpoints reduced to original short English factual accounts. Not an official translation. The authority is summarising the applicant’s project description, not independently certifying constructed links.",
      "conditions": "Only the exact minimal basic-fact/link proposal is prepared under the user-authorised audit. No express use restriction for that precise proposal was visible in the selected public authority document sections or the inspected portal About/responsibility page. This is not permission inferred from an absent notice, a blanket government/public-domain/OGL grant or a clearance of developer/consultant materials. Source rights and third-party expression remain excluded; A separate independent factual and exact-use assessment completed at 2026-11-01T02:53:38.785Z accepts only these minimal basic facts and ordinary links. No source-content licence, ownership ruling or recurring acquisition permission follows."
     }
    }
   ],
   "participation": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/microsoft-kirkkonummi",
   "permalink": "https://computefinder.net/entity/cf-dc-0040"
  },
  {
   "id": "cf-dc-0041",
   "slug": "nebius-mantsala",
   "name": "Nebius Mäntsälä data centre",
   "operator": "Nebius",
   "owner": "Nebius",
   "country": "FI",
   "locality": "Mäntsälä",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2024-10-08",
   "stage_source_url": "https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw",
   "capacity": [],
   "power_note": null,
   "cooling_note": "The company cites free cooling, a heat recovery system warming about 2,500 Finnish homes and a PUE of 1.1 at high IT loads.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Nebius states 75 MW of capacity after expansion but does not define the metric, so it is not in the structured field. Later Nebius material says the site hosts GB300 NVL72 systems.",
   "facts": [
    {
     "text": "In October 2024 Nebius announced tripling the Finnish site to 75 MW capacity (metric not defined) and up to 60,000 GPUs at full expansion.",
     "source_url": "https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw"
    },
    {
     "text": "Nebius says heat recovery at the site yields about 20,000 MWh a year.",
     "source_url": "https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw"
    }
   ],
   "checked_on": "2026-10-02",
   "inspection_limits": [
    {
     "fields": [
      "pue"
     ],
     "status": "not_admitted",
     "scope": "A conditional operator PUE assertion was actually read, but the source does not give the explicit design/target/measured kind or measurement period needed for the present canonical typed field. The separate source-only unknown-kind proposal is not a schema-valid/admitted field and keeps its numeric value null.",
     "source_url": "https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Nebius",
      "licence": "Copyright retained; no open-content licence verified for these newsroom releases.",
      "scope": "Minimal independently worded attributed basic technical facts and ordinary unframed exact source links only. No copied source expression, specification table, marketing narrative, marks, assets, personal contact, source body or dataset import.",
      "licence_url": "https://docs.nebius.com/legal/terms-of-use",
      "attribution": "Nebius; exact original linked in source_url. No endorsement.",
      "modification_notice": "Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported.",
      "conditions": "A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only the exact minimal independently worded attributed newsroom fact account and ordinary unframed link. The actual newsroom footer and linked Terms of Use of the Nebius Platform were inspected, including Platform/service copying/distribution restrictions. No express condition on this narrow original basic-fact/link account was identified; this does not declare the newsroom outside all terms, imply an open licence, blanket permission, historical-purpose exception or recurring-use grant. Source copyright is retained; no release prose, quotation, table, asset, contact or dataset is imported. Announced/conditional statements retain their original dated scope."
     }
    },
    {
     "fields": [
      "grid_connection",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_inspected",
     "scope": "The selected issuer release is not a grid-filing, water-accounting or coordinate/CRS audit. Historical H100/H200 deployment statements and forward-looking other-platform statements are not imported into a site-current chip inventory. No voltage/substation, bounded water quantity or verified point is admitted. Old parent checks remain unchanged.",
     "source_url": "https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Nebius",
      "licence": "Copyright retained; no open-content licence verified for these newsroom releases.",
      "scope": "Minimal independently worded attributed basic technical facts and ordinary unframed exact source links only. No copied source expression, specification table, marketing narrative, marks, assets, personal contact, source body or dataset import.",
      "licence_url": "https://docs.nebius.com/legal/terms-of-use",
      "attribution": "Nebius; exact original linked in source_url. No endorsement.",
      "modification_notice": "Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported.",
      "conditions": "A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only the exact minimal independently worded attributed newsroom fact account and ordinary unframed link. The actual newsroom footer and linked Terms of Use of the Nebius Platform were inspected, including Platform/service copying/distribution restrictions. No express condition on this narrow original basic-fact/link account was identified; this does not declare the newsroom outside all terms, imply an open licence, blanket permission, historical-purpose exception or recurring-use grant. Source copyright is retained; no release prose, quotation, table, asset, contact or dataset is imported. Announced/conditional statements retain their original dated scope."
     }
    }
   ],
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/nebius-mantsala",
   "permalink": "https://computefinder.net/entity/cf-dc-0041"
  },
  {
   "id": "cf-dc-0042",
   "slug": "nebius-lappeenranta",
   "name": "Nebius Lappeenranta AI factory",
   "operator": "Nebius",
   "owner": "Nebius",
   "country": "FI",
   "locality": "Lappeenranta",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2026-03-31",
   "stage_source_url": "https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland",
   "capacity": [],
   "power_note": "Nebius says electricity sourcing will reflect its mostly low-carbon mix.",
   "cooling_note": "Heat recovery into district heating is planned.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "The release gives 310 MW of power capacity without defining the metric, so we have not entered it as IT, facility or grid power. It gives no permit status; first capacity is expected in 2027.",
   "facts": [
    {
     "text": "Nebius announced on 31 March 2026 a multi-building AI factory of 310 MW (metric not defined) on about 100 acres of industrial land.",
     "source_url": "https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland"
    },
    {
     "text": "The company expects first capacity to be available to customers in 2027.",
     "source_url": "https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland"
    }
   ],
   "checked_on": "2026-10-02",
   "water_use": [
    {
     "value_text": "On 31 March 2026, Nebius announced closed-loop server cooling for its planned Lappeenranta campus and said that cooling would avoid reliance on intake from local water supplies.",
     "value_num": null,
     "unit": null,
     "scope": "Issuer-announced Lappeenranta campus design intention only, separate from the existing Mantsala facility. No commissioned cooling system, current water use or ready compute is inferred. No site-wide or whole-life zero claim is made.",
     "stage": "announced",
     "basis": "reported",
     "label": "source_claim",
     "as_of": null,
     "source_url": "https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland",
     "source_version": null,
     "source_published_on": "2026-03-31",
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T03:23:36.511Z",
     "checked_on": "2026-11-01",
     "boundary": "Future server-cooling/local-supply-intake assertion, not measured withdrawal, consumptive loss, WUE, domestic/construction/initial-fill/process demand or indirect electricity-supply water. No volume, WUE denominator, calendar measurement period or independent performance method is supplied in this selected passage. Physical quantities remain null.",
     "source_notice": {
      "publisher": "Nebius",
      "licence": "Copyright retained; no open-content licence verified for these newsroom releases.",
      "scope": "Minimal independently worded attributed basic technical facts and ordinary unframed exact source links only. No copied source expression, specification table, marketing narrative, marks, assets, personal contact, source body or dataset import.",
      "licence_url": "https://docs.nebius.com/legal/terms-of-use",
      "attribution": "Nebius; exact original linked in source_url. No endorsement.",
      "modification_notice": "Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported.",
      "conditions": "A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only the exact minimal independently worded attributed newsroom fact account and ordinary unframed link. The actual newsroom footer and linked Terms of Use of the Nebius Platform were inspected, including Platform/service copying/distribution restrictions. No express condition on this narrow original basic-fact/link account was identified; this does not declare the newsroom outside all terms, imply an open licence, blanket permission, historical-purpose exception or recurring-use grant. Source copyright is retained; no release prose, quotation, table, asset, contact or dataset is imported. Announced/conditional statements retain their original dated scope."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "chips",
      "coordinates"
     ],
     "status": "not_inspected",
     "scope": "Only the issuer release and applicable selected terms were inspected. Company-wide contracted power/GPU-platform statements and Mantsala comparisons are not site-specific Lappeenranta connection/chip/PUE evidence. No voltage/substation, explicit site-specific PUE kind/value, installed-chip configuration or verified official point/CRS is admitted; no planning/EIA audit is claimed.",
     "source_url": "https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Nebius",
      "licence": "Copyright retained; no open-content licence verified for these newsroom releases.",
      "scope": "Minimal independently worded attributed basic technical facts and ordinary unframed exact source links only. No copied source expression, specification table, marketing narrative, marks, assets, personal contact, source body or dataset import.",
      "licence_url": "https://docs.nebius.com/legal/terms-of-use",
      "attribution": "Nebius; exact original linked in source_url. No endorsement.",
      "modification_notice": "Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported.",
      "conditions": "A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only the exact minimal independently worded attributed newsroom fact account and ordinary unframed link. The actual newsroom footer and linked Terms of Use of the Nebius Platform were inspected, including Platform/service copying/distribution restrictions. No express condition on this narrow original basic-fact/link account was identified; this does not declare the newsroom outside all terms, imply an open licence, blanket permission, historical-purpose exception or recurring-use grant. Source copyright is retained; no release prose, quotation, table, asset, contact or dataset is imported. Announced/conditional statements retain their original dated scope."
     }
    }
   ],
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/nebius-lappeenranta",
   "permalink": "https://computefinder.net/entity/cf-dc-0042"
  },
  {
   "id": "cf-dc-0043",
   "slug": "lumi-ai-kajaani-csc",
   "name": "LUMI-AI AI Factory system, CSC Kajaani",
   "operator": "CSC (IT Center for Science)",
   "owner": null,
   "country": "FI",
   "locality": "Kajaani",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2026-08-31",
   "stage_source_url": "https://www.eurohpc-ju.europa.eu/eurohpc-ju-signs-contract-deploy-lumi-ai-supercomputer-2026-08-31_en",
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "A new AI supercomputer for the existing CSC data centre; EuroHPC signed the contract on 31 August 2026 and operation is expected in 2027. No power or cooling figures are disclosed.",
   "facts": [
    {
     "text": "EuroHPC signed a contract with Bull to deploy LUMI-AI at CSC in Kajaani, with AMD Instinct MI430X GPUs and a total budget of EUR 387.8 million.",
     "source_url": "https://www.eurohpc-ju.europa.eu/eurohpc-ju-signs-contract-deploy-lumi-ai-supercomputer-2026-08-31_en"
    },
    {
     "text": "Norway's research computing body says it joins LUMI-AI, which is due to enter operation in the second half of 2027.",
     "source_url": "https://www.sigma2.no/node/444"
    },
    {
     "text": "EuroHPC's first AI Factory selection in December 2024 named the LUMI AI Factory at CSC in Kajaani.",
     "source_url": "https://eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en"
    }
   ],
   "checked_on": "2026-10-02",
   "chips": [
    {
     "value_text": "EuroHPC identifies AMD Instinct MI430X GPUs and sixth-generation AMD EPYC processors for the planned LUMI-AI system.",
     "value_num": null,
     "unit": null,
     "scope": "The future LUMI-AI system described in its procurement announcement only. This is not hardware verification for the original LUMI, installed equipment, current operation, awarded access or available compute. The hardware-event date is not separately established.",
     "stage": "announced",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.eurohpc-ju.europa.eu/eurohpc-ju-signs-contract-deploy-lumi-ai-supercomputer-2026-08-31_en",
     "source_version": null,
     "source_published_on": "2026-08-31",
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-10-31T22:55:44.727Z",
     "checked_on": "2026-10-31",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned article text only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded chip identification from the attributed article and an ordinary unframed source link. Product names are descriptive identifiers only. No copied prose, specification table, performance figure, quantity, logo, image, quotation, mark asset or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "Source: European Union / EuroHPC JU; original article linked in source_url. No endorsement is implied.",
      "modification_notice": "Reduced to a short factual hardware identification with separate scope and uncertainty.",
      "conditions": "This exact new chip-identification use was independently reviewed. It does not extend the earlier directory-use scope or grant recurring acquisition or broader technical-data rights."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_inspected",
     "scope": "This admission checks the announced LUMI-AI hardware families in one EuroHPC article. Planning, utility, facility-efficiency, water and parcel records were not audited for these unfilled fields.",
     "source_url": "https://www.eurohpc-ju.europa.eu/eurohpc-ju-signs-contract-deploy-lumi-ai-supercomputer-2026-08-31_en",
     "checked_on": "2026-10-31",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned article text only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded chip identification from the attributed article and an ordinary unframed source link. Product names are descriptive identifiers only. No copied prose, specification table, performance figure, quantity, logo, image, quotation, mark asset or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "Source: European Union / EuroHPC JU; original article linked in source_url. No endorsement is implied.",
      "modification_notice": "Reduced to a short factual hardware identification with separate scope and uncertainty.",
      "conditions": "This exact new chip-identification use was independently reviewed. It does not extend the earlier directory-use scope or grant recurring acquisition or broader technical-data rights."
     }
    }
   ],
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/lumi-ai-kajaani-csc",
   "permalink": "https://computefinder.net/entity/cf-dc-0043"
  },
  {
   "id": "cf-dc-0044",
   "slug": "edgeconnex-skelleftea",
   "name": "EdgeConneX Skellefteå campus",
   "operator": "EdgeConneX",
   "owner": null,
   "country": "SE",
   "locality": "Skellefteå",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2026-02-27",
   "stage_source_url": "https://w.media/edgeconnex-plans-1gw-data-center-campus-in-skelleftea-sweden/",
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Reported only, from one trade article: a plan to acquire an existing data centre site and develop it towards 1 GW, subject to approvals. The metric for 1 GW is not defined and we found no operator or authority page.",
   "facts": [
    {
     "text": "A trade report of 27 February 2026 says EdgeConneX plans to buy an existing data centre site in Skellefteå and develop a campus of up to 1 GW, subject to regulatory approvals.",
     "source_url": "https://w.media/edgeconnex-plans-1gw-data-center-campus-in-skelleftea-sweden/"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/edgeconnex-skelleftea",
   "permalink": "https://computefinder.net/entity/cf-dc-0044"
  },
  {
   "id": "cf-dc-0045",
   "slug": "ecodatacenter-falun",
   "name": "EcoDataCenter 1, Falun",
   "operator": "EcoDataCenter",
   "owner": null,
   "country": "SE",
   "locality": "Falun",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2023-11-16",
   "stage_source_url": "https://www.datacenterdynamics.com/en/news/ecodatacenter-secures-170m-debt-facility/",
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Reported only, from a trade article: one building operating in November 2023, a second 15 MW building announced and up to 80 MW at full build-out, with no metric stated. Needs an operator source.",
   "facts": [
    {
     "text": "A November 2023 trade report says the Falun campus could reach up to 80 MW at full build-out across 35,000 sq m, with one building operating and a second 15 MW building announced.",
     "source_url": "https://www.datacenterdynamics.com/en/news/ecodatacenter-secures-170m-debt-facility/"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/ecodatacenter-falun",
   "permalink": "https://computefinder.net/entity/cf-dc-0045"
  },
  {
   "id": "cf-dc-0046",
   "slug": "ecodatacenter-borlange",
   "name": "EcoDataCenter Borlänge campus",
   "operator": "EcoDataCenter",
   "owner": null,
   "country": "SE",
   "locality": "Borlänge, former Kvarnsveden mill site",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2024-09-06",
   "stage_source_url": "https://www.mynewsdesk.com/se/ecodatacenter/pressreleases/ecodatacenter-announces-new-mega-campus-3341245",
   "capacity": [],
   "power_note": "The company says the campus will use 100 per cent renewable energy.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "Municipal council approval of the land agreement (vote scheduled 10 September 2024; outcome not confirmed by us)",
     "url": "https://www.mynewsdesk.com/se/ecodatacenter/pressreleases/ecodatacenter-announces-new-mega-campus-3341245",
     "status": "pending",
     "date": "2024-09-06"
    }
   ],
   "certifications": [],
   "notes": "The release states 240 MW of power capacity without a metric, and trade press adds up to 360 MW potential. The information is two years old and current status is unknown to us.",
   "facts": [
    {
     "text": "A 6 September 2024 press release announced a campus of 240 MW or more on a former paper mill site, with first facilities targeted for 2027 once permits are secured.",
     "source_url": "https://www.mynewsdesk.com/se/ecodatacenter/pressreleases/ecodatacenter-announces-new-mega-campus-3341245"
    },
    {
     "text": "A trade report says the site is about 20 hectares and could host up to nine buildings.",
     "source_url": "https://datacenterdynamics.com/en/news/ecodatacenter-plans-240mw-campus-in-borlange-sweden"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/ecodatacenter-borlange",
   "permalink": "https://computefinder.net/entity/cf-dc-0046"
  },
  {
   "id": "cf-dc-0047",
   "slug": "microsoft-gavle-sandviken",
   "name": "Microsoft Sweden Central region (Gävle and Sandviken)",
   "operator": "Microsoft",
   "owner": "Microsoft",
   "country": "SE",
   "locality": "Gävle and Sandviken",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2021-11-16",
   "stage_source_url": "https://news.microsoft.com/europe/2021/11/16/microsoft-opens-its-sustainable-datacenter-region-in-sweden-creating-new-opportunities-for-a-cloud-first-sweden/",
   "capacity": [],
   "power_note": "Microsoft said the region is matched with carbon-free energy hourly through Vattenfall.",
   "cooling_note": "Outside air cooling is used year-round, with captured rainwater for humidification.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Region opened in November 2021 across Gävle, Sandviken and Staffanstorp. No MW figure is stated.",
   "facts": [
    {
     "text": "Microsoft's November 2021 announcement says the Swedish datacentre region opened across Gävle, Sandviken and Staffanstorp.",
     "source_url": "https://news.microsoft.com/europe/2021/11/16/microsoft-opens-its-sustainable-datacenter-region-in-sweden-creating-new-opportunities-for-a-cloud-first-sweden/"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/microsoft-gavle-sandviken",
   "permalink": "https://computefinder.net/entity/cf-dc-0047"
  },
  {
   "id": "cf-dc-0048",
   "slug": "microsoft-staffanstorp",
   "name": "Microsoft Staffanstorp data centre",
   "operator": "Microsoft",
   "owner": "Microsoft",
   "country": "SE",
   "locality": "Staffanstorp, Skåne",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2022-08-30",
   "stage_source_url": "https://www.datacenterdynamics.com/en/news/microsoft-drops-plans-to-expand-staffanstorp-data-center-in-sweden-looking-for-new-site",
   "capacity": [],
   "power_note": "The withdrawn permit application was for 70 MW of reserve (backup) power, which is not IT or grid capacity.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "Permit application for reserve power expansion (70 MW of backup power) dropped",
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-drops-plans-to-expand-staffanstorp-data-center-in-sweden-looking-for-new-site",
     "status": "withdrawn",
     "date": "2022-08-30"
    }
   ],
   "certifications": [],
   "notes": "Reported only: in August 2022 Microsoft dropped the expansion and said it would keep operating the existing site with current backup units while seeking a new southern Sweden site.",
   "facts": [
    {
     "text": "A trade report of 30 August 2022 says Microsoft withdrew a planned 70 MW reserve power expansion at Staffanstorp.",
     "source_url": "https://www.datacenterdynamics.com/en/news/microsoft-drops-plans-to-expand-staffanstorp-data-center-in-sweden-looking-for-new-site"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/microsoft-staffanstorp",
   "permalink": "https://computefinder.net/entity/cf-dc-0048"
  },
  {
   "id": "cf-dc-0049",
   "slug": "atnorth-ice01-reykjavik",
   "name": "atNorth ICE01",
   "operator": "atNorth",
   "owner": null,
   "country": "IS",
   "locality": "Reykjavik metropolitan area",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://atnorth.com/colocation/ice01",
   "capacity": [],
   "power_note": "The operator page says the site runs on renewable energy and keeps fuel for at least 48 hours of generator operation.",
   "cooling_note": "Direct free air cooling, with a stated PUE of 1.2 or lower.",
   "connectivity_note": "Three diverse fibre entry points and two meet-me rooms; stated latency of about 21 ms to Frankfurt and 15.3 ms to Dublin.",
   "planning": [],
   "certifications": [
    "ISO 9001",
    "ISO 14001",
    "ISO/IEC 27001",
    "ISO 45001"
   ],
   "notes": "Operator page states 3.2 MW of power capacity without defining the metric, so it is not in the structured field. Stage date is the date we read the live page.",
   "facts": [
    {
     "text": "atNorth lists ICE01 as a Tier III metro data centre with 2,700 sq m of technical white space and 3.2 MW of power capacity (metric not defined).",
     "source_url": "https://atnorth.com/colocation/ice01"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/atnorth-ice01-reykjavik",
   "permalink": "https://computefinder.net/entity/cf-dc-0049"
  },
  {
   "id": "cf-dc-0050",
   "slug": "atnorth-ice02-keflavik",
   "name": "atNorth ICE02 campus",
   "operator": "atNorth",
   "owner": null,
   "country": "IS",
   "locality": "Near Keflavik International Airport",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://atnorth.com/colocation/ice02",
   "capacity": [],
   "power_note": "The operator says the campus runs on renewable energy, with N+1 distribution and at least 24 hours of generator fuel.",
   "cooling_note": "Chilled water with dry coolers and natural free cooling, a stated PUE of 1.2 or lower, and capability for 100 kW plus liquid-cooled racks.",
   "connectivity_note": "Five diverse fibre entry points and two meet-me rooms per building; latency of about 21 ms to Frankfurt.",
   "planning": [],
   "certifications": [
    "ISO/IEC 27001",
    "ISO 14001",
    "ISO 9001",
    "ISO 45001"
   ],
   "notes": "Operator page states an 83 MW campus power capacity without defining the metric, so it is not in the structured field. Trade press reports further expansion; we did not verify it.",
   "facts": [
    {
     "text": "atNorth describes ICE02 as a 9-hectare campus with 83 MW of campus power capacity (metric not defined).",
     "source_url": "https://atnorth.com/colocation/ice02"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/atnorth-ice02-keflavik",
   "permalink": "https://computefinder.net/entity/cf-dc-0050"
  },
  {
   "id": "cf-dc-0051",
   "slug": "verne-keflavik",
   "name": "Verne Keflavik campus",
   "operator": "Verne",
   "owner": null,
   "country": "IS",
   "locality": "Keflavik, Reykjanes peninsula",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2025-05-19",
   "stage_source_url": "https://www.verne.co/news/news-verne-and-landsnet-launch-high-capacity-substation",
   "capacity": [
    {
     "metric": "grid_mw",
     "stage": "energised",
     "basis": "reported",
     "value_mw": 120,
     "as_of": "2025-05-19",
     "source_url": "https://www.verne.co/news/news-verne-and-landsnet-launch-high-capacity-substation"
    }
   ],
   "power_note": "A new Landsnet substation has 240 MW installed, with 120 MW operational at launch and full capacity expected by end of 2026.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "The 120 MW figure is substation capacity operational at May 2025, not data hall capacity.",
   "facts": [
    {
     "text": "Verne and Landsnet launched a high-capacity substation at Keflavik on 19 May 2025, rated 240 MW installed with 120 MW operational initially.",
     "source_url": "https://www.verne.co/news/news-verne-and-landsnet-launch-high-capacity-substation"
    },
    {
     "text": "A January 2022 trade report said Verne was adding 20 MW and expected the campus to reach 40 MW of a potential 100 MW.",
     "source_url": "https://www.datacenterknowledge.com/colocation/verne-global-to-add-20mw-to-icelandic-data-center-campus"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/verne-keflavik",
   "permalink": "https://computefinder.net/entity/cf-dc-0051"
  },
  {
   "id": "cf-dc-0052",
   "slug": "google-eemshaven",
   "name": "Google Eemshaven data centre",
   "operator": "Google",
   "owner": "Google",
   "country": "NL",
   "locality": "Eemshaven, Groningen",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2016-12-06",
   "stage_source_url": "https://blog.google/company-news/inside-google/around-the-globe/google-europe/dutch-datacenter-google-100-renewable-energy/",
   "capacity": [],
   "power_note": "A 2019 report says Google buys 100 per cent renewable energy for its Dutch data centres.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Google's 6 December 2016 post says the Eemshaven data centre opened that day. The Tweede Kamer page dated 23 June 2022 provides later historical context, not a current operating check. No MW figure from a primary source; a second phase was reported under way in 2019.",
   "facts": [
    {
     "text": "Google's 6 December 2016 post says the Eemshaven data centre opened that day and was operational.",
     "source_url": "https://blog.google/company-news/inside-google/around-the-globe/google-europe/dutch-datacenter-google-100-renewable-energy/"
    },
    {
     "text": "The Dutch parliament's data centre page counts Google at Eemshaven among three existing hyperscale facilities, alongside Microsoft and Google in Wieringermeer.",
     "source_url": "https://www.tweedekamer.nl/debat_en_vergadering/uitgelicht/datacenters-nederland"
    },
    {
     "text": "In June 2019 Google announced a EUR 500 million Eemshaven expansion and a new Agriport site, with no MW figure given.",
     "source_url": "https://www.datacenterdynamics.com/en/news/google-invest-11-billion-netherlands-data-center-and-eemshaven-expansion/"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/google-eemshaven",
   "permalink": "https://computefinder.net/entity/cf-dc-0052"
  },
  {
   "id": "cf-dc-0053",
   "slug": "google-middenmeer",
   "name": "Google Middenmeer data centre",
   "operator": "Google",
   "owner": "Google",
   "country": "NL",
   "locality": "Middenmeer, Wieringermeer",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2020-12-08",
   "stage_source_url": "https://blog.google/intl/nl-nl/google-nieuws/over-google/2020_12_nieuw-datacenter-google-in-middenmeer/",
   "capacity": [],
   "power_note": "Google said it expected about 80 per cent renewable energy for the site in 2024, supplied partly by offshore wind.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Google's 8 December 2020 post says the Middenmeer data centre had been operational since that week. The stage date is the publication-date observation, not an exact opening day. No MW figure.",
   "facts": [
    {
     "text": "Google's 8 December 2020 post says the Middenmeer data centre had been operational since that week.",
     "source_url": "https://blog.google/intl/nl-nl/google-nieuws/over-google/2020_12_nieuw-datacenter-google-in-middenmeer/"
    },
    {
     "text": "Google's location page says the Middenmeer data centre has operated since 2020 on an industrial estate north of Amsterdam.",
     "source_url": "https://datacenters.google/locations/middenmeer-netherlands/"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/google-middenmeer",
   "permalink": "https://computefinder.net/entity/cf-dc-0053"
  },
  {
   "id": "cf-dc-0054",
   "slug": "microsoft-middenmeer",
   "name": "Microsoft Middenmeer data centre",
   "operator": "Microsoft",
   "owner": "Microsoft",
   "country": "NL",
   "locality": "Middenmeer, Hollands Kroon",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2022-06-23",
   "stage_source_url": "https://www.tweedekamer.nl/debat_en_vergadering/uitgelicht/datacenters-nederland",
   "capacity": [],
   "power_note": null,
   "cooling_note": "A report says the planned expansion would include rainwater harvesting and water features.",
   "connectivity_note": null,
   "planning": [
    {
     "title": "Planned second data centre at Middenmeer: land bought and plans shown to Hollands Kroon council; permits expected to take about a year",
     "url": "https://www.nhnieuws.nl/nieuws/352169/weer-een-datacenter-in-middenmeer-microsoft-kondigt-uitbreiding-aan",
     "status": "pending",
     "date": "2025-09-09"
    }
   ],
   "certifications": [],
   "notes": "The Dutch parliament page dated 23 June 2022 lists an existing Microsoft hyperscale data centre in Wieringermeer. This record maps it to Middenmeer. The stage date is a historical operating observation, not an exact opening day or a current status check. The separately reported expansion remains pending; no MW or hectares were stated.",
   "facts": [
    {
     "text": "The Dutch parliament's 23 June 2022 page lists an existing Microsoft hyperscale data centre in Wieringermeer; this record maps it to Middenmeer.",
     "source_url": "https://www.tweedekamer.nl/debat_en_vergadering/uitgelicht/datacenters-nederland"
    },
    {
     "text": "Regional news on 9 September 2025 said Microsoft bought land for a second Middenmeer data centre and expected about a year to obtain permits.",
     "source_url": "https://www.nhnieuws.nl/nieuws/352169/weer-een-datacenter-in-middenmeer-microsoft-kondigt-uitbreiding-aan"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "decision_evidence": {
    "title": "Middenmeer MER-intent notice context",
    "claims": [
     "A Noord-Holland notice published on 30 December 2025 records a MER preparation notification for Microsoft Datacenters Netherlands B.V.'s proposed AMS-E, Deelgebied B1 expansion at Westlanderweg 50, Middenmeer, case OD2025-0043382.",
     "The notice states that the MER procedure does not itself decide the environmental permit; that decision follows completion of the MER and submission of a permit application."
    ],
    "source_url": "https://zoek.officielebekendmakingen.nl/prb-2025-21956.html",
    "source_label": "Noord-Holland: AMS-E, Deelgebied B1 MER-intent notice",
    "publisher": "Province of Noord-Holland, official publication service",
    "checked_on": "2026-10-17",
    "review_by": "2026-10-23",
    "independently_reviewed_at": "2026-10-17T18:36:44Z",
    "source_publication_date": "2025-12-30",
    "source_updated_on": null,
    "event_date": null,
    "retrieved_at": null,
    "raw_body_sha256": null,
    "raw_body_bytes": null,
    "observed_at_upper_bound": "2026-10-17T18:35:19Z",
    "parsed_evidence": {
     "sha256": "d9b76d25083f033dd6800d4e6838066ba41c8a0f597d8ab74bf4acb6098826c4",
     "kind": "Selected parsed notice lines transcribed from a connected-tool response, not origin bytes, raw HTML or a complete body hash"
    },
    "next_step": "Read the official notice and use its document link to inspect the underlying case materials directly, checking for later decisions before relying on current status.",
    "limitations": "This supplement is locality/operator discovery context beside the older Microsoft Middenmeer record, not a verified physical-campus or phase association. AMS-E, Deelgebied B1 and Westlanderweg 50 are not matched to Westlanderweg 150, AMS13/14, AMS15/40 or Campus West in the separate coordination decision. The underlying case documents, NRD, PDFs, applications and later decisions were not inspected. This historic notice does not establish current permitting, legal finality, a current comment or appeal window, construction, operation, capacity or available compute. Earlier facility facts, stages, planning and source dates remain unchanged; no building or phase is split or merged.",
    "source_notice": {
     "publisher": "Province of Noord-Holland and relevant underlying rightsholders",
     "licence": "Source copyright retained; exact basic-fact use assessed only",
     "licence_url": null,
     "scope": "Two minimal attributed basic notice facts and ordinary unframed original link only, not source narrative translation, adaptation or legal advice. No quotations, applicant documents, attachments, maps, drawings, images, contacts, tables or datasets reproduced or adapted. No open licence, public-domain status, endorsement, blanket domain clearance or recurring-monitoring grant. The inspected KOOP CC0 notice is limited to its own website, not this provincial notice or third-party attachments. No express restriction on the bounded basic-fact/link use was visible in the inspected notice HTML; inaccessible Overheid help/reuse conditions remain uninspected, not permission inferred from absence. Reassess newly evidenced applicable conditions without a paraphrase workaround."
    }
   },
   "page_url": "https://computefinder.net/data-centres/microsoft-middenmeer",
   "permalink": "https://computefinder.net/entity/cf-dc-0054"
  },
  {
   "id": "cf-dc-0055",
   "slug": "groningen-ai-factory-eurofiber",
   "name": "Groningen AI Factory (Zernike, Eurofiber data centre)",
   "operator": "Eurofiber Cloud Infra",
   "owner": null,
   "country": "NL",
   "locality": "Zernike campus, Groningen",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2026-09-21",
   "stage_source_url": "https://datanorth.ai/nl/nieuws/ai-fabriek-kiest-zernike-in-groningen",
   "capacity": [],
   "power_note": "The programme says the site already has adequate electrical connections and so adds no extra grid congestion.",
   "cooling_note": "Waste heat is to serve about 2,000 homes through WarmteStad, and no surface or drinking water is used for cooling.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "About 1,800 GPUs are planned; no MW figure. Completion is expected in 2027 with full operation by early 2028. The funding sum differs between sources (about EUR 200 million).",
   "facts": [
    {
     "text": "A September 2026 programme update says the Dutch AI Factory supercomputer of about 1,800 GPUs will sit in an existing Eurofiber data centre on the Zernike campus.",
     "source_url": "https://datanorth.ai/nl/nieuws/ai-fabriek-kiest-zernike-in-groningen"
    },
    {
     "text": "An industry report says the facility is due for completion in 2027, with the supercomputer fully operational by early 2028.",
     "source_url": "https://ioplus.nl/en/posts/eurofiber-to-host-ai-facility-in-groningen"
    },
    {
     "text": "A trade report of October 2025 says Groningen was one of six new EuroHPC AI Factory sites, with funding of about EUR 200 million.",
     "source_url": "https://bits-chips.com/article/groningen-gets-ai-factory/"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/groningen-ai-factory-eurofiber",
   "permalink": "https://computefinder.net/entity/cf-dc-0055"
  },
  {
   "id": "cf-dc-0056",
   "slug": "meta-zeewolde",
   "name": "Meta Zeewolde data centre (cancelled)",
   "operator": "Meta",
   "owner": null,
   "country": "NL",
   "locality": "Zeewolde, Flevoland",
   "lat": null,
   "lon": null,
   "stage": "cancelled",
   "stage_as_of": "2022-07-01",
   "stage_source_url": "https://datacenterdynamics.com/en/news/facebook-parent-meta-officially-kills-zeewolde-data-center-after-pushback-in-the-netherlands",
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [
    {
     "title": "Municipal approval followed by Dutch government refusal to sell the land; project dropped by Meta",
     "url": "https://datacenterdynamics.com/en/news/facebook-parent-meta-officially-kills-zeewolde-data-center-after-pushback-in-the-netherlands",
     "status": "withdrawn",
     "date": "2022-07-01"
    }
   ],
   "certifications": [],
   "notes": "Cancelled. A trade report said full build would have been 200 MW across five halls, but the metric is not stated, so no capacity entry is made.",
   "facts": [
    {
     "text": "Meta confirmed on 1 July 2022 that it would not build at Zeewolde after the Dutch state declined to sell the needed land.",
     "source_url": "https://datacenterdynamics.com/en/news/facebook-parent-meta-officially-kills-zeewolde-data-center-after-pushback-in-the-netherlands"
    },
    {
     "text": "The Dutch parliament's data centre page describes the 166-hectare Zeewolde project as suspended pending extra conditions.",
     "source_url": "https://www.tweedekamer.nl/debat_en_vergadering/uitgelicht/datacenters-nederland"
    }
   ],
   "checked_on": "2026-10-02",
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only the selected 23 June 2022 parliamentary context article was inspected, including its Zeewolde paragraphs. It states no site-specific voltage/named substation, design/target/measured PUE, bounded water withdrawal/consumption/WUE, hardware model or explicit official point/CRS. The historical proposal discussion and household-electricity comparison establish none of those fields or a later cancellation, current stage or delivered capacity. The national description and Wieringermeer/Eemshaven context are not transferred to Zeewolde. This is not an exhaustive municipal planning/EIA review.",
     "source_url": "https://www.tweedekamer.nl/debat_en_vergadering/uitgelicht/datacenters-nederland",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Tweede Kamer der Staten-Generaal",
      "licence": "Actual disclaimer permits text reuse with source attribution unless otherwise stated; no named open licence is claimed for this article. Photo/audio licences and exceptions are separate.",
      "scope": "Only an independently worded selected-article inspection-limit account with ordinary exact source attribution/link. No article text, energy comparison, quantities, image, photographer/other contacts, audio or linked developer material is imported. A separate independent review has completed for this exact limited account only; no source-content adaptation or recurring acquisition permission follows.",
      "licence_url": "https://www.tweedekamer.nl/applicaties/disclaimer",
      "attribution": "Tweede Kamer der Staten-Generaal; Datacenters in Nederland; 23 June 2022; exact original linked. No endorsement.",
      "modification_notice": "Original concise check-boundary account only; no source expression or asset reproduced.",
      "conditions": "The actual disclaimer copyright text section was read: attribution is required and exceptions remain. The separate non-commercial photo terms are not a general article-text grant. No assets or third-party passages are copied; the page is historical parliamentary context, not a planning/EIA or current operational audit. Independent source/use review completed at 2026-11-01T04:27:58.130Z. This model mapping does not renew source, publication, event, retrieval or parent clocks."
     }
    }
   ],
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/meta-zeewolde",
   "permalink": "https://computefinder.net/entity/cf-dc-0056"
  },
  {
   "id": "cf-dc-0057",
   "slug": "equinix-amsterdam",
   "name": "Equinix Amsterdam IBX sites (metro cluster)",
   "operator": "Equinix",
   "owner": "Equinix",
   "country": "NL",
   "locality": "Amsterdam",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://www.equinix.com/data-centers/europe-colocation/netherlands-colocation/amsterdam-data-centers",
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": "Peering with AMS-IX and NL-ix and direct links to major cloud providers.",
   "planning": [],
   "certifications": [
    "ISO 14001",
    "ISO 22301",
    "ISO 27001",
    "ISO 45001",
    "ISO 50001",
    "ISO 9001",
    "PCI DSS",
    "SOC 1 Type II",
    "SOC 2 Type II",
    "LEED",
    "TIA-942"
   ],
   "notes": "Cluster record for nine sites (AM1 to AM8 and AM11); per-site MW is not given on the operator page.",
   "facts": [
    {
     "text": "Equinix lists nine Amsterdam data centres, from AM1 and AM2 at Laarderhoogtweg to AM3 and AM4 at Science Park and AM11.",
     "source_url": "https://www.equinix.com/data-centers/europe-colocation/netherlands-colocation/amsterdam-data-centers"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/equinix-amsterdam",
   "permalink": "https://computefinder.net/entity/cf-dc-0057"
  },
  {
   "id": "cf-dc-0058",
   "slug": "digital-realty-amsterdam",
   "name": "Digital Realty Amsterdam sites (metro cluster)",
   "operator": "Digital Realty",
   "owner": "Digital Realty",
   "country": "NL",
   "locality": "Amsterdam, Schiphol-Rijk, Hoofddorp and Rozenburg",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://www.digitalrealty.com/data-centers/amsterdam",
   "capacity": [],
   "power_note": null,
   "cooling_note": "The operator page lists N+1 cooling redundancy for the Amsterdam sites.",
   "connectivity_note": "Access to AMS-IX, NL-IX and DE-CIX.",
   "planning": [],
   "certifications": [
    "SOC 1",
    "SOC 2",
    "SOC 3",
    "PCI-DSS",
    "ISO 9001",
    "ISO 14001",
    "ISO 22301",
    "ISO 27001",
    "ISO 45001",
    "ISO 50001"
   ],
   "notes": "Cluster record for twelve sites (AMS3 to AMS18). The page gives floor space, not MW.",
   "facts": [
    {
     "text": "Digital Realty lists twelve Amsterdam-area data centres with a combined 125,600 sq m of colocation space.",
     "source_url": "https://www.digitalrealty.com/data-centers/amsterdam"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/digital-realty-amsterdam",
   "permalink": "https://computefinder.net/entity/cf-dc-0058"
  },
  {
   "id": "cf-dc-0059",
   "slug": "schwarz-luebbenau",
   "name": "Schwarz Digits Lübbenau data centre",
   "operator": "Schwarz Digits (STACKIT)",
   "owner": "Schwarz Group",
   "country": "DE",
   "locality": "Lübbenau, Spreewald, Brandenburg",
   "lat": null,
   "lon": null,
   "stage": "under_construction",
   "stage_as_of": "2025-11-17",
   "stage_source_url": "https://www.max-boegl.de/content/dam/maxboeglsitesassets/hochbau/datacenter/pm_spatenstich_luebbenau.pdf.coredownload.pdf",
   "capacity": [
    {
     "metric": "grid_mw",
     "stage": "under_construction",
     "basis": "reported",
     "value_mw": 200,
     "as_of": "2025-11-17",
     "source_url": "https://www.max-boegl.de/content/dam/maxboeglsitesassets/hochbau/datacenter/pm_spatenstich_luebbenau.pdf.coredownload.pdf"
    }
   ],
   "power_note": "The contractor describes about 200 MW of connection capacity.",
   "cooling_note": "A trade report says the site will be liquid cooled with waste heat for local district heating; the contractor release does not mention cooling.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Groundbreaking was 17 November 2025 on a 13-hectare former power plant site, with two phases and completion targeted for end of 2027. Capacity comes from the general contractor, not the owner.",
   "facts": [
    {
     "text": "The general contractor says groundbreaking was 17 November 2025 for a campus with about 200 MW of connection capacity and up to 100,000 processors, finishing by end of 2027.",
     "source_url": "https://www.max-boegl.de/content/dam/maxboeglsitesassets/hochbau/datacenter/pm_spatenstich_luebbenau.pdf.coredownload.pdf"
    },
    {
     "text": "A trade report says the investment is EUR 11 billion and the site reuses a former power station area.",
     "source_url": "https://www.datacenterdynamics.com/en/news/lidl-owner-schwarz-breaks-ground-on-200mw-data-center-in-germany/"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/schwarz-luebbenau",
   "permalink": "https://computefinder.net/entity/cf-dc-0059"
  },
  {
   "id": "cf-dc-0060",
   "slug": "telekom-munich-tucherpark",
   "name": "Telekom Industrial AI Cloud, Munich (Tucherpark)",
   "operator": "Deutsche Telekom (T-Systems)",
   "owner": "Deutsche Telekom",
   "country": "DE",
   "locality": "Tucherpark, Munich",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-02-04",
   "stage_source_url": "https://www.telekom.com/en/newsroom/media-center/media-kits/2026/industrial-ai-cloud",
   "capacity": [],
   "power_note": null,
   "cooling_note": "GPU pods use heat exchangers for thermal management.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "A renovated Munich data centre hosting up to about 10,000 NVIDIA Blackwell GPUs. No MW figure published in what we fetched. Stage date is the opening press event in Telekom's media calendar.",
   "facts": [
    {
     "text": "Telekom's media kit says the Industrial AI Cloud launched in February 2026 at the Tucherpark facility in Munich, operated through T-Systems with NVIDIA and SAP.",
     "source_url": "https://www.telekom.com/en/newsroom/media-center/media-kits/2026/industrial-ai-cloud"
    },
    {
     "text": "A trade report says the system uses up to 10,000 Blackwell GPUs in a repurposed data centre.",
     "source_url": "https://www.datacenterdynamics.com/en/news/nvidia-and-deutsche-telecom-officially-announce-data-center-project-in-munich-germany/"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/telekom-munich-tucherpark",
   "permalink": "https://computefinder.net/entity/cf-dc-0060"
  },
  {
   "id": "cf-dc-0061",
   "slug": "jupiter-juelich",
   "name": "JUPITER exascale system, Forschungszentrum Jülich",
   "operator": "Forschungszentrum Jülich (Jülich Supercomputing Centre)",
   "owner": null,
   "country": "DE",
   "locality": "Jülich, North Rhine-Westphalia",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2025-09-05",
   "stage_source_url": "https://www.mkw.nrw/system/files/media/document/file/mkw_2025-09-05_pm_einweihung_supercomputer_jupiter_final.pdf",
   "capacity": [],
   "power_note": null,
   "cooling_note": "Direct liquid cooling in a modular container data centre; the supplier calls the design flexible for future power and cooling changes.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Inaugurated 5 September 2025. The facility is about 50 container modules on over 2,300 sq m. No MW figure appeared in the pages we fetched.",
   "facts": [
    {
     "text": "The NRW science ministry says JUPITER was inaugurated on 5 September 2025 and is housed in around 50 container modules over more than 2,300 sq m.",
     "source_url": "https://www.mkw.nrw/system/files/media/document/file/mkw_2025-09-05_pm_einweihung_supercomputer_jupiter_final.pdf"
    },
    {
     "text": "A supplier release describes about 50 modules, including 20 IT containers and 15 energy supply containers.",
     "source_url": "https://press.par-tec.com/news/modular-data-centre-mdc-consisting-of-50-container-modules-for-jupiter-478380"
    }
   ],
   "checked_on": "2026-10-02",
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "The inspected three-page state press PDF does not identify chip models, grid voltage/substation, explicit PUE kind/value, water-use accounting or an explicit verified point/CRS. Container counts, area, rankings, funding and general renewable claims do not supply them.",
     "source_url": "https://www.mkw.nrw/system/files/media/document/file/mkw_2025-09-05_pm_einweihung_supercomputer_jupiter_final.pdf",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "State Chancellery and Ministry of Culture and Science, North Rhine-Westphalia",
      "licence": "No component open licence verified for this press PDF.",
      "scope": "Selected-source limits and ordinary exact links only; no new technical fact or stage admission.",
      "licence_url": null,
      "attribution": "State Chancellery and Ministry of Culture and Science, North Rhine-Westphalia; exact original linked. No endorsement.",
      "modification_notice": "Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported.",
      "conditions": "A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only this original selected-source inspection-limit account and ordinary link. No new physical-field, stage, capacity, certification or availability fact is imported. Copyright/source rights remain with their holders; no government/public-entity public-domain, blanket content, service-use or recurring-source grant is inferred. Any separately failed or restricted source remains held; no body, asset, contact or dataset is retained."
     }
    }
   ],
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/jupiter-juelich",
   "permalink": "https://computefinder.net/entity/cf-dc-0061"
  },
  {
   "id": "cf-dc-0062",
   "slug": "hlrs-stuttgart",
   "name": "HLRS Stuttgart (Hunter and HammerHAI)",
   "operator": "High-Performance Computing Center Stuttgart (HLRS)",
   "owner": "University of Stuttgart",
   "country": "DE",
   "locality": "Stuttgart-Vaihingen",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2025-01-16",
   "stage_source_url": "https://www.hlrs.de/press/detail/hunter-supercomputer-goes-into-service-in-stuttgart",
   "capacity": [],
   "power_note": null,
   "cooling_note": "Hunter uses fully fanless direct liquid cooling.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Hunter is in service; the HammerHAI AI Factory system was contracted in March 2026 for operation in the second half of 2026, which we have not confirmed. No MW figure found.",
   "facts": [
    {
     "text": "HLRS says Hunter was inaugurated on 16 January 2025 with 48.1 petaflops peak and 188 nodes of AMD MI300A.",
     "source_url": "https://www.hlrs.de/press/detail/hunter-supercomputer-goes-into-service-in-stuttgart"
    },
    {
     "text": "A March 2026 trade report says EuroHPC signed a contract with HPE for HammerHAI at HLRS, expected to run in the second half of 2026.",
     "source_url": "https://www.datacenterdynamics.com/en/news/eurohpc-ju-signs-contract-with-hpe-to-deploy-hammerhai-supercomputer-at-hlrs-in-stuttgart-germany/"
    }
   ],
   "checked_on": "2026-10-02",
   "chips": [
    {
     "value_text": "HLRS lists AMD Instinct MI300A for the APU nodes of Hunter.",
     "value_num": null,
     "unit": null,
     "scope": "Hunter APU partition only. The undated system page is not proof of a current service state or chip availability, not the CPU partition or a whole-HLRS inventory. No quantities, performance, power or hardware generation for other systems is inferred.",
     "stage": "unknown",
     "basis": "reported",
     "label": "source_claim",
     "as_of": null,
     "source_url": "https://www.hlrs.de/solutions/systems/hunter",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T03:34:53.155Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "High-Performance Computing Center Stuttgart, University of Stuttgart",
      "licence": "Copyright retained; no open licence verified for these HLRS pages.",
      "scope": "Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review.",
      "licence_url": null,
      "attribution": "High-Performance Computing Center Stuttgart, University of Stuttgart; exact original linked. No endorsement.",
      "modification_notice": "Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported.",
      "conditions": "A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only two original minimal attributed processor-identification facts at separate Hunter APU/CPU partition grain and ordinary links. The actual institutional release and system-page footer retain rights; no substantive reuse grant appeared in inspected footer text. That is not permission or proof none exists. No counts, technical table, benchmark, power figure, source expression, assets, contacts, whole-HLRS inventory or recurring/domain grant is imported."
     }
    },
    {
     "value_text": "HLRS lists AMD EPYC 9374F for the CPU nodes of Hunter.",
     "value_num": null,
     "unit": null,
     "scope": "Hunter CPU-node partition only, distinct from the MI300A APU nodes. No summed inventory, current GPU availability, Hawk/Herder/HammerHAI mapping, measured PUE or facility operation date is inferred.",
     "stage": "unknown",
     "basis": "reported",
     "label": "source_claim",
     "as_of": null,
     "source_url": "https://www.hlrs.de/solutions/systems/hunter",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T03:34:53.155Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "High-Performance Computing Center Stuttgart, University of Stuttgart",
      "licence": "Copyright retained; no open licence verified for these HLRS pages.",
      "scope": "Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review.",
      "licence_url": null,
      "attribution": "High-Performance Computing Center Stuttgart, University of Stuttgart; exact original linked. No endorsement.",
      "modification_notice": "Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported.",
      "conditions": "A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only two original minimal attributed processor-identification facts at separate Hunter APU/CPU partition grain and ordinary links. The actual institutional release and system-page footer retain rights; no substantive reuse grant appeared in inspected footer text. That is not permission or proof none exists. No counts, technical table, benchmark, power figure, source expression, assets, contacts, whole-HLRS inventory or recurring/domain grant is imported."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "The selected Hunter release/system page supplies no connection voltage/named upstream substation, explicit design/target/measured PUE, bounded withdrawal/consumption/WUE or verified official point/CRS. Fanless direct-liquid cooling and reported average kW are not PUE or water accounting. Future Herder-building heat reuse is not a Hunter current result.",
     "source_url": "https://www.hlrs.de/solutions/systems/hunter",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "High-Performance Computing Center Stuttgart, University of Stuttgart",
      "licence": "Copyright retained; no open licence verified for these HLRS pages.",
      "scope": "Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review.",
      "licence_url": null,
      "attribution": "High-Performance Computing Center Stuttgart, University of Stuttgart; exact original linked. No endorsement.",
      "modification_notice": "Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported.",
      "conditions": "A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only two original minimal attributed processor-identification facts at separate Hunter APU/CPU partition grain and ordinary links. The actual institutional release and system-page footer retain rights; no substantive reuse grant appeared in inspected footer text. That is not permission or proof none exists. No counts, technical table, benchmark, power figure, source expression, assets, contacts, whole-HLRS inventory or recurring/domain grant is imported."
     }
    }
   ],
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/hlrs-stuttgart",
   "permalink": "https://computefinder.net/entity/cf-dc-0062"
  },
  {
   "id": "cf-dc-0063",
   "slug": "google-dietzenbach",
   "name": "Google Dietzenbach data centre",
   "operator": "Google",
   "owner": "Google",
   "country": "DE",
   "locality": "Dietzenbach, Offenbach district, Hesse",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2025-11-11",
   "stage_source_url": "https://www.hessenschau.de/wirtschaft/neues-rechenzentrum-in-dietzenbach-google-investiert-milliarden-euro-v6,google-rechenzentren-hessen-100.html",
   "capacity": [],
   "power_note": null,
   "cooling_note": "A heat partnership with regional utility EVO could supply district heating for about 2,000 households.",
   "connectivity_note": "The broadcaster notes proximity to the DE-CIX exchange at Frankfurt as a draw.",
   "planning": [],
   "certifications": [],
   "notes": "Reported only, from public broadcaster coverage of Google's EUR 5.5 billion programme for 2026 to 2029. No MW or permit details found.",
   "facts": [
    {
     "text": "On 11 November 2025 Google announced a new data centre at Dietzenbach as the main part of a 2026 to 2029 investment in Hesse.",
     "source_url": "https://www.hessenschau.de/wirtschaft/neues-rechenzentrum-in-dietzenbach-google-investiert-milliarden-euro-v6,google-rechenzentren-hessen-100.html"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/google-dietzenbach",
   "permalink": "https://computefinder.net/entity/cf-dc-0063"
  },
  {
   "id": "cf-dc-0064",
   "slug": "google-hanau",
   "name": "Google Hanau data centre",
   "operator": "Google",
   "owner": "Google",
   "country": "DE",
   "locality": "Hanau, Hesse",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2025-11-11",
   "stage_source_url": "https://www.hessenschau.de/wirtschaft/neues-rechenzentrum-in-dietzenbach-google-investiert-milliarden-euro-v6,google-rechenzentren-hessen-100.html",
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Reported only: the broadcaster describes an existing Hanau facility that opened in October 2023 and is to be expanded. No MW or permit data found.",
   "facts": [
    {
     "text": "Coverage of Google's November 2025 Hesse announcement says the Hanau facility opened in October 2023 and will be expanded.",
     "source_url": "https://www.hessenschau.de/wirtschaft/neues-rechenzentrum-in-dietzenbach-google-investiert-milliarden-euro-v6,google-rechenzentren-hessen-100.html"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/google-hanau",
   "permalink": "https://computefinder.net/entity/cf-dc-0064"
  },
  {
   "id": "cf-dc-0065",
   "slug": "digital-realty-frankfurt",
   "name": "Digital Realty Frankfurt campus (metro cluster)",
   "operator": "Digital Realty",
   "owner": "Digital Realty",
   "country": "DE",
   "locality": "Frankfurt am Main",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": "2026-10-02",
   "stage_source_url": "https://www.digitalrealty.com/data-centers/frankfurt",
   "capacity": [],
   "power_note": null,
   "cooling_note": "The operator page states 2N+1 cooling redundancy across the sites.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [
    "ISO 14001",
    "ISO 27001",
    "ISO 22301",
    "ISO 9001",
    "ISO 50001",
    "PCI-DSS",
    "SOC 1",
    "SOC 2",
    "SOC 3",
    "EN 50600"
   ],
   "notes": "Cluster record for 24 sites on Hanauer Landstrasse, Weismullerstrasse, Hugo-Junkers-Strasse and Wilhelm-Fay-Strasse. The page gives floor space, not MW.",
   "facts": [
    {
     "text": "Digital Realty lists 24 Frankfurt-area data centres with about 220,900 sq m of colocation space.",
     "source_url": "https://www.digitalrealty.com/data-centers/frankfurt"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/digital-realty-frankfurt",
   "permalink": "https://computefinder.net/entity/cf-dc-0065"
  },
  {
   "id": "cf-dc-0066",
   "slug": "campus-ia-fouju",
   "name": "Campus IA, Fouju",
   "operator": null,
   "owner": null,
   "country": "FR",
   "locality": "Fouju, Seine-et-Marne",
   "lat": null,
   "lon": null,
   "stage": "permitted",
   "stage_as_of": "2026-07-29",
   "stage_source_url": "https://next.ink/brief-article/la-prefecture-de-seine-et-marne-autorise-linstallation-de-campus-ia-a-fouju/",
   "capacity": [
    {
     "metric": "grid_mw",
     "stage": "permitted",
     "basis": "reported",
     "value_mw": 1400,
     "as_of": "2026-07-29",
     "source_url": "https://next.ink/brief-article/la-prefecture-de-seine-et-marne-autorise-linstallation-de-campus-ia-a-fouju/"
    }
   ],
   "power_note": "The public debate summary describes 1,400 MW total power need, with a 700 MW provisional connection for phase 1 by 2028, via two 400 kV RTE lines.",
   "cooling_note": "Rooftop refrigeration units are planned instead of groundwater use, with waste heat for a training centre, greenhouses and a nearby prison.",
   "connectivity_note": null,
   "planning": [
    {
     "title": "Prefectoral authorisation for the Campus IA installation, Seine-et-Marne",
     "url": "https://next.ink/brief-article/la-prefecture-de-seine-et-marne-autorise-linstallation-de-campus-ia-a-fouju/",
     "status": "approved",
     "date": "2026-07-29"
    },
    {
     "title": "Local authority project calendar: environmental decree July 2026, phase 1 construction permit August 2026",
     "url": "https://www.briedesrivieresetchateaux.fr/wp-content/uploads/2026/09/Calendrier_du_projet_Campus_IA_.pdf",
     "status": "approved",
     "date": null
    }
   ],
   "certifications": [],
   "notes": "The 1.4 GW figure is a power need described by press and the national public debate summary, not a stated IT capacity. Opponents have announced a legal challenge; we did not confirm one has been filed. The project owner or operator is not named in the primary documents we read.",
   "facts": [
    {
     "text": "The Seine-et-Marne prefecture authorised the project on 29 July 2026 for about 89 hectares, eleven data centre buildings and one training building.",
     "source_url": "https://next.ink/brief-article/la-prefecture-de-seine-et-marne-autorise-linstallation-de-campus-ia-a-fouju/"
    },
    {
     "text": "The local authority calendar says phase 1 construction begins in September 2026 with first delivery of three data centres and the substation estimated in early 2028.",
     "source_url": "https://www.briedesrivieresetchateaux.fr/wp-content/uploads/2026/09/Calendrier_du_projet_Campus_IA_.pdf"
    },
    {
     "text": "The same calendar says Mistral AI secured up to 200 MW of computing capacity as founding client, a figure whose metric is not defined.",
     "source_url": "https://www.briedesrivieresetchateaux.fr/wp-content/uploads/2026/09/Calendrier_du_projet_Campus_IA_.pdf"
    },
    {
     "text": "The public debate commission's summary gives phase 1 as three data centres plus a training facility and phase 2 as nine more, on about 70 hectares.",
     "source_url": "https://www.debatpublic.fr/sites/default/files/2026-01/bilan-campus-ia-accessible_0.pdf"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/campus-ia-fouju",
   "permalink": "https://computefinder.net/entity/cf-dc-0066"
  },
  {
   "id": "cf-dc-0067",
   "slug": "eclairion-bruyeres-le-chatel",
   "name": "Eclairion Bruyères-le-Châtel",
   "operator": "Eclairion",
   "owner": null,
   "country": "FR",
   "locality": "Bruyères-le-Châtel, Essonne",
   "lat": null,
   "lon": null,
   "stage": "operating",
   "stage_as_of": null,
   "stage_source_url": "https://eclairion.com/en/sites/bruyeres-le-chatel",
   "capacity": [],
   "power_note": null,
   "cooling_note": "Eclairion describes direct liquid cooling for the site's high-density racks.",
   "connectivity_note": null,
   "planning": [
    {
     "title": "15-page ICPE environmental registration order 2020-PREF/DCPPAT/BUPPE/073 (internally numbered 1/15-15/15) in RAA no. 052 (not the main building permit)",
     "url": "https://www.essonne.gouv.fr/content/download/30940/237746/file/RAA%2Bn%C2%B0%2B052%2Bdu%2B30%2B04.pdf",
     "status": "approved",
     "date": "2020-04-27"
    },
    {
     "title": "ICPE commissioning deadline extension (not a new building permission)",
     "url": "https://www.essonne.gouv.fr/index.php/layout/set/print/Publications/Enquetes-publiques/Installations-classees-pour-la-protection-de-l-environnement/BRUYERES-LE-CHATEL-Ste-BDC2-HPC-DATA-FRANCE-Enregistrement",
     "status": "approved",
     "date": "2025-03-25"
    }
   ],
   "participation": {
    "kind": "operational_complaint",
    "title": "Report an operational ICPE concern to DRIEAT Île-de-France",
    "url": "https://www.drieat.ile-de-france.developpement-durable.gouv.fr/organisation-et-missions-de-l-inspection-des-icpe-a4701.html",
    "checked_on": "2026-10-06",
    "note": "This is a standing regulatory complaint route for the operating installation, not a project consultation. The recorded ICPE public consultation closed on 10 January 2020, and ComputeFinder found no current formal participation window."
   },
   "certifications": [],
   "notes": "The operator describes a first phase as operational since 2025, but gives no exact opening date. Full-site delivery is shown separately for Q4 2027. RTE publishes a June 2025 to October 2026 works schedule for a 225 kV underground connection. The formal ICPE consultation closed on 10 January 2020. The prefecture page lists deadline extensions in 2023, 2024 and, most recently, 25 March 2025. The ICPE environmental registration and deadline extensions do not establish the main-facility building permit. The current DRIEAT route is for operational complaints, not support or opposition. These separate schedules and procedures do not establish whole-site completion, available capacity or community consent.",
   "facts": [
    {
     "text": "Eclairion describes the site's first phase as operational since 2025; the exact operating date is not stated.",
     "source_url": "https://eclairion.com/en/sites/bruyeres-le-chatel"
    },
    {
     "text": "Eclairion describes direct liquid cooling for the site's high-density racks.",
     "source_url": "https://eclairion.com/en/sites/bruyeres-le-chatel"
    },
    {
     "text": "RTE publishes a June 2025 to October 2026 works schedule for a 225 kV underground line to the site.",
     "source_url": "https://www.rte-france.com/projets/nos-projets/rte-ligne-souterraine-essonne-alimentation-site-eclairion"
    },
    {
     "text": "Géorisques identifies the regulated installation at 2 rue de la Libération as Eclairion Paris Sud, formerly HPC Data Service and BDC2.",
     "source_url": "https://www.georisques.gouv.fr/risques/installations/donnees/details/0006522592"
    },
    {
     "text": "The Essonne prefecture records a public consultation from 2 December 2019 to 10 January 2020, an ICPE registration order dated 27 April 2020, and commissioning deadline extensions in 2023, 2024 and 2025.",
     "source_url": "https://www.essonne.gouv.fr/index.php/layout/set/print/Publications/Enquetes-publiques/Installations-classees-pour-la-protection-de-l-environnement/BRUYERES-LE-CHATEL-Ste-BDC2-HPC-DATA-FRANCE-Enregistrement"
    }
   ],
   "checked_on": "2026-10-06",
   "independently_reviewed_on": "2026-10-06",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/eclairion-bruyeres-le-chatel",
   "permalink": "https://computefinder.net/entity/cf-dc-0067"
  },
  {
   "id": "cf-dc-0068",
   "slug": "digital-realty-paris-south",
   "name": "Digital Realty Paris South (Mistral AI cluster)",
   "operator": "Digital Realty",
   "owner": "Digital Realty",
   "country": "FR",
   "locality": "Paris South campus",
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2026-05-28",
   "stage_source_url": "https://investor.digitalrealty.com/news-releases/news-release-details/mistral-ai-leverages-digital-realty-expand-its-ai-services",
   "capacity": [],
   "power_note": null,
   "cooling_note": "The release refers to advanced cooling for high-density AI without giving specifics.",
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "The 28 May 2026 release says Digital Realty will host a 10 MW Mistral AI compute cluster but does not say whether 10 MW is IT or facility load, so it is not entered. The exact site is described only as the Paris South campus.",
   "facts": [
    {
     "text": "Digital Realty announced on 28 May 2026 that it will host a 10 MW Mistral AI compute cluster at its Paris South campus (metric not defined).",
     "source_url": "https://investor.digitalrealty.com/news-releases/news-release-details/mistral-ai-leverages-digital-realty-expand-its-ai-services"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/digital-realty-paris-south",
   "permalink": "https://computefinder.net/entity/cf-dc-0068"
  },
  {
   "id": "cf-dc-0069",
   "slug": "data4-paris-saclay",
   "name": "Data4 Paris-Saclay campus (PAR01, PAR02, PAR03)",
   "operator": "Data4",
   "owner": null,
   "country": "FR",
   "locality": "Nozay and Marcoussis, Essonne",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": "https://www.data4group.com/en/data-center-in-paris-france/",
   "capacity": [],
   "power_note": "Data4 quotes campus power capacities of 250 MW each for PAR01 and PAR03 and 5 MW for PAR02, 505 MW overall, without defining the metric.",
   "cooling_note": null,
   "connectivity_note": "The operator says the campus connects to more than 70 telecom operators and over 150 public cloud platforms.",
   "planning": [],
   "certifications": [],
   "notes": "This combined PAR01, PAR02 and PAR03 record does not establish which buildings or phases are operating. Its stage is therefore unknown until phase-specific evidence is recorded. The 505 MW figure is a power capacity of the whole campus with an undefined metric, not evidence of delivered IT load.",
   "facts": [
    {
     "text": "Data4 lists PAR01 and PAR03 at Nozay and PAR02 at Marcoussis on 133 hectares with 505 MW of total power capacity (metric not defined).",
     "source_url": "https://www.data4group.com/en/data-center-in-paris-france/"
    }
   ],
   "checked_on": "2026-10-02",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/data4-paris-saclay",
   "permalink": "https://computefinder.net/entity/cf-dc-0069"
  },
  {
   "id": "cf-dc-0070",
   "slug": "fluidstack-france-1gw",
   "name": "Fluidstack France 1 GW AI supercomputer",
   "operator": "Fluidstack",
   "owner": null,
   "country": "FR",
   "locality": null,
   "lat": null,
   "lon": null,
   "stage": "announced",
   "stage_as_of": "2025-02-18",
   "stage_source_url": "https://datacenterdynamics.com/en/news/gpu-cloud-provider-fluidstack-signs-mou-for-1gw-ai-supercomputer-in-france",
   "capacity": [],
   "power_note": "The project is to be powered by French nuclear electricity.",
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Reported only: a February 2025 memorandum of understanding with no site disclosed, and 1 GW of dedicated AI compute without a stated metric. We found no later status from the company or authorities.",
   "facts": [
    {
     "text": "A trade report of 18 February 2025 says Fluidstack signed a memorandum of understanding for a 1 GW AI supercomputer in France with no site named, targeting 2026 operation for phase one.",
     "source_url": "https://datacenterdynamics.com/en/news/gpu-cloud-provider-fluidstack-signs-mou-for-1gw-ai-supercomputer-in-france"
    }
   ],
   "checked_on": "2026-10-02",
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only the selected Fluidstack announcement paragraph in the English official-host presskit and its cover metadata were inspected for this record. The paragraph states no named-site grid voltage/substation, design/target/measured PUE, bounded water withdrawal/consumption/WUE, hardware model or explicit official point/CRS. Its broad French programme, investment and planned-launch language is not a specific site/phase, connection agreement, delivered capacity, commissioning or current operation. National grid chapters and other companies are not assigned to this record. This is not an exhaustive planning/EIA or later project-status audit.",
     "source_url": "https://www.elysee.fr/admin/upload/default/0001/17/d9c1462e7337d353f918aac7d654b896b77c5349.pdf",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Presidency of the French Republic / elysee.fr; selected presskit paragraph attributed to Fluidstack",
      "licence": "Actual site notice gives conditional open-content and ordinary deep-link permissions with third-party exclusions. Exact company-paragraph open-licence status/version is unverified; no adaptation grant is claimed for that component.",
      "scope": "Only original independently worded selected-Fluidstack-paragraph inspection-limit wording and ordinary attributed exact links. No company paragraph text, image, logo, chart, table, contacts, presskit narrative, programme/financial/jobs quantity or other-company claim is imported. A separate independent review has completed for this exact limited account only. No company-paragraph adaptation, open-content licence or recurring acquisition permission is granted.",
      "licence_url": "https://www.elysee.fr/informations-legales-editoriales",
      "attribution": "Site of the Presidency of the French Republic, elysee.fr; Make France an AI Powerhouse; selected Fluidstack paragraph; exact original and legal notice linked. No endorsement.",
      "modification_notice": "Original concise source-check boundary only; no source prose or asset reproduced.",
      "conditions": "The actual legal/editorial notice was read before the exact English PDF, following a separately Git-frozen discovery/permission decision. Third-party intellectual property and graphics/multimedia are excluded from general site reuse language. No Etalab licence-version or developer-material grant is presumed from government hosting. No parallel-language PDF, BusinessFrance media representation or source body is used or retained. Independent source/use review completed at 2026-11-01T04:46:13.364Z. This model mapping does not renew source, publication, event, retrieval or parent clocks."
     }
    }
   ],
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/fluidstack-france-1gw",
   "permalink": "https://computefinder.net/entity/cf-dc-0070"
  },
  {
   "id": "cf-dc-0071",
   "slug": "google-council-bluffs",
   "name": "Google Council Bluffs data centre location",
   "operator": "Google",
   "owner": null,
   "country": "US",
   "locality": "Council Bluffs, Iowa",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "notes": "Location-level account of the facility Google described as existing on 30 May 2025. The announcement does not identify a particular building or expansion phase. Current operating status, precise location, capacity and public compute availability remain unverified. Identity with the imported Google Council Bluffs (East) record is not established by these sources; no estimates are transferred. Google is a source-attributed brand name; the contracting entity has not been verified.",
   "facts": [
    {
     "text": "Google announced expansion of its existing Council Bluffs facility separately from a new Cedar Rapids data centre development on 30 May 2025.",
     "source_url": "https://blog.google/feed/new-7-billion-investment-iowa/"
    }
   ],
   "checked_on": "2026-10-14",
   "participation": null,
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/google-council-bluffs",
   "permalink": "https://computefinder.net/entity/cf-dc-0071"
  },
  {
   "id": "cf-dc-0072",
   "slug": "mcgill-calcul-quebec-montreal",
   "name": "McGill-Calcul Québec data centre, Montréal",
   "operator": null,
   "owner": null,
   "country": "CA",
   "locality": "Montréal, Québec",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "notes": "This is a named-facility account, not a record for every Calcul Québec system or an entire Canadian campus. Rorqual's June 2025 commissioning is historical system-level evidence, not a current whole-facility operating check, an exact facility opening day or available capacity. The undated postal route identifies ÉTS in Montréal but does not establish map coordinates, a particular building or phase. Current operator and legal owner, precise location, capacity, planning and public compute availability remain unverified. Narval is not joined to this record.",
   "facts": [
    {
     "text": "Calcul Québec's announcement dated 18 June 2025 reports Rorqual entering service in the McGill-Calcul Québec national data centre.",
     "source_url": "https://www.calculquebec.ca/nouvelle/rorqual-un-superordinateur-attendu-par-la-communaute-de-la-recherche/"
    },
    {
     "text": "Calcul Québec's undated contact page lists a large-package postal route for the McGill-CQ data centre at ÉTS: 391 rue Eleanor, Montréal, Québec H3C 1P7. It distinguishes this from its administrative office and small-package route.",
     "source_url": "https://www.calculquebec.ca/en/contact/"
    }
   ],
   "checked_on": "2026-10-14",
   "independently_reviewed_on": "2026-10-14",
   "independent_review_scope": "the two checked statements and their source-use limits",
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "The inspected Rorqual article states generic GPU/core counts but no processor/GPU model, and no grid voltage/substation, explicit PUE kind/value, water accounting or verified official point/CRS. Generic accelerator counts and commissioning are not chip identities, current availability, facility opening or a postal/geocoded point.",
     "source_url": "https://www.calculquebec.ca/nouvelle/rorqual-un-superordinateur-attendu-par-la-communaute-de-la-recherche/",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Calcul Quebec",
      "licence": "Copyright retained; no open website licence verified.",
      "scope": "Inspection-limit metadata and ordinary release link only; no new hardware quantity, specification, article adaptation or availability account.",
      "licence_url": "https://www.calculquebec.ca/wp-content/uploads/2024/08/terms-of-use.pdf",
      "attribution": "Calcul Quebec; exact original linked. No endorsement.",
      "modification_notice": "Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported.",
      "conditions": "A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only this original selected-source inspection-limit account and ordinary link. No new physical-field, stage, capacity, certification or availability fact is imported. Copyright/source rights remain with their holders; no government/public-entity public-domain, blanket content, service-use or recurring-source grant is inferred. Any separately failed or restricted source remains held; no body, asset, contact or dataset is retained. The directly inspected version1.0 services/account/SLA Terms dated19September2023 are not an open website-content licence; no account/service, denied wiki or failed funding route was used."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/mcgill-calcul-quebec-montreal",
   "permalink": "https://computefinder.net/entity/cf-dc-0072"
  },
  {
   "id": "cf-dc-0073",
   "slug": "lncc-santos-dumont-petropolis",
   "name": "LNCC Santos Dumont hosting location, Petrópolis",
   "country": "BR",
   "locality": "Petrópolis",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_notice": {
    "publisher": "LNCC",
    "licence": "CC BY-ND 3.0 Unported",
    "licence_url": "https://creativecommons.org/licenses/by-nd/3.0/",
    "scope": "Linked LNCC source articles only, not a licence grant over this original factual account. No article adaptation, translation, media or dataset is reproduced; no endorsement is implied."
   },
   "notes": "The named context is Santos Dumont at LNCC, not every LNCC site or a complete campus. The August 2026 source reports a working computer, not a current whole-facility status check, completed expansion, exact building or available capacity. LNCC is identified as the system host, not assigned here as the verified facility operator or legal owner. The proposed PAX installation in Macaíba is separate. Precise location, capacity, planning, cooling, power and public compute availability remain unverified. Source articles retain their CC BY-ND 3.0 terms; no article adaptation, translated passage, image or dataset is reproduced.",
   "facts": [
    {
     "text": "LNCC reported on 21 August 2026 that Santos Dumont remained installed and operating at LNCC in Petrópolis, separately from a planned new system at PAX in Macaíba.",
     "source_url": "https://www.gov.br/lncc/pt-br/assuntos/noticias/ultimas-noticias-1/lncc-conduz-implantacao-de-supercomputador-de-inteligencia-artificial-que-ampliara-a-capacidade-computacional-do-brasil"
    },
    {
     "text": "LNCC records 2015 as the year Santos Dumont was installed there. This is not an exact facility opening date.",
     "source_url": "https://www.gov.br/lncc/pt-br/supercomputador-santos-dumont"
    }
   ],
   "checked_on": "2026-10-14",
   "independently_reviewed_on": "2026-10-14",
   "independent_review_scope": "the two checked statements and their source-use limits",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/lncc-santos-dumont-petropolis",
   "permalink": "https://computefinder.net/entity/cf-dc-0073"
  },
  {
   "id": "cf-dc-0074",
   "slug": "cdac-pune-national-ai-facility",
   "name": "C-DAC Pune National AI Facility (PARAM Siddhi)",
   "country": "IN",
   "locality": "Pune, Maharashtra",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_notice": {
    "publisher": "Government of India ministries, via Press Information Bureau",
    "licence": "PIB source terms, not a Creative Commons source licence",
    "licence_url": "https://www.pib.gov.in/ContentPage.aspx?lang=2&menuid=19&reg=48",
    "scope": "Linked government releases retain their source terms: accurate, non-misleading reproduction with prominent source acknowledgement; third-party material is excluded. This record uses two original factual accounts and links, not source passages, media, a capacity table or a full annexure. No endorsement or blanket source clearance is implied."
   },
   "notes": "This is the National AI Facility context listed for PARAM Siddhi, not every C-DAC Pune system or a verified whole-campus boundary. The government records a historical system commissioning year, not a facility opening day or current operating check. PARAM Rudra Pilot and GMRT-NCRA Pune are distinct source rows and are not joined here. Precise location, facility operator and legal owner, capacity, planning, power, cooling and current public compute access remain unverified. C-DAC institutional pages could not be retrieved during this check; no administrative address or application route is assigned to the hardware. One named account does not establish Indian coverage or available compute.",
   "facts": [
    {
     "text": "The Ministry of Electronics and IT release dated 10 December 2025 lists PARAM Siddhi at C-DAC Pune National AI Facility in Maharashtra.",
     "source_url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2"
    },
    {
     "text": "The Ministry of Science and Technology release dated 3 December 2025 records 2020 as the installed supercomputer's commissioning year at C-DAC Pune National AI Facility. This is not an exact facility opening date or a current whole-facility status check.",
     "source_url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2198307&lang=2&reg=3"
    }
   ],
   "checked_on": "2026-10-14",
   "independently_reviewed_on": "2026-10-14",
   "independent_review_scope": "the two historical system/facility-context statements and their precise source-use limits",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/cdac-pune-national-ai-facility",
   "permalink": "https://computefinder.net/entity/cf-dc-0074"
  },
  {
   "id": "cf-dc-0075",
   "slug": "riken-rccs-kobe-fugaku",
   "name": "RIKEN Center for Computational Science, Kobe (Fugaku)",
   "country": "JP",
   "locality": "Kobe, Hyogo",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_notice": {
    "publisher": "Ministry of Education, Culture, Sports, Science and Technology (MEXT), Japan",
    "licence": "MEXT Website Usage Policy, compatible with CC BY 4.0, with source-specific exclusions",
    "licence_url": "https://www.mext.go.jp/en/other/title01/detail01/1375290.htm",
    "scope": "Created by ComputeFinder from selected MEXT HPCI body text, adapted and translated from Japanese into original English wording, with historical date conversion; accessed 14 October 2026. This is not an official Government of Japan translation, publication or endorsement. Source acknowledgement, modification notice and third-party exclusions are retained. No source images, captions, diagrams, RIKEN quotation, technical figures or external material are reproduced. The source page has no verified publication or last-update date; its initial June 2011 registration is not the date of the later Fugaku account."
   },
   "notes": "This record identifies the named Kobe host for Fugaku from MEXT's historical system-development account. Shared use beginning in 2021 is a system milestone, not a current whole-facility operating check, facility opening date or an offer of compute. The predecessor K computer and prospective successor are not merged into a current campus status. Facility operator and legal owner, precise coordinates, street address, capacity, power, cooling, planning and current eligibility or allocation remain unverified. RIKEN website material and links are excluded under the source-use assessment. One host account does not establish Japanese coverage or available compute.",
   "facts": [
    {
     "text": "MEXT identifies RIKEN Center for Computational Science in Kobe, Hyogo as the installation location for the Fugaku supercomputer.",
     "source_url": "https://www.mext.go.jp/a_menu/kaihatu/jouhou/hpci/1307375.htm"
    },
    {
     "text": "MEXT records 9 March 2021 as the start of full shared use of Fugaku. This is a historical system milestone, not a current whole-facility operating check or an offer of available compute.",
     "source_url": "https://www.mext.go.jp/a_menu/kaihatu/jouhou/hpci/1307375.htm"
    }
   ],
   "checked_on": "2026-10-14",
   "independently_reviewed_on": "2026-10-14",
   "independent_review_scope": "the two historical host/system statements, Japanese date conversion and precise MEXT source-use limits",
   "chips": [
    {
     "value_text": "MEXT’s draft post-evaluation describes development of the A64FX CPU for Fugaku.",
     "value_num": null,
     "unit": null,
     "scope": "Historical system-development account in the February2022 Information Committee draft, not a final evaluation, current hardware inventory, facility status or evidence of available compute. The selected paragraph is about the developed CPU; it does not supply an installation date. The February10 committee meeting date is not a hardware event date.",
     "stage": "unknown",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.mext.go.jp/content/20220214-mxt_jyohoka01-000020577_04.pdf",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T02:38:26.395Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "MEXT, Japan / Information Committee",
      "licence": "MEXT Website Usage Policy compatible with CC BY 4.0 for MEXT-owned content only; third-party exclusions retained",
      "scope": "One minimal original attributed A64FX identifier from the unquoted evaluation body of the selected MEXT-hosted draft and an ordinary source link. No report passage, translation of the report, table, performance/power figure, photograph, diagram, committee-member data, logo, RIKEN quotation or underlying dataset is imported. ComputeFinder also records its own bounded selected-source inspection scope; no substantive value in an unadmitted field is copied.",
      "licence_url": "https://www.mext.go.jp/en/other/title01/detail01/1375290.htm",
      "attribution": "Source: MEXT, Information Committee, Fugaku system-development post-evaluation results (draft), Material 2-2, February 2022; original PDF linked in source_url. Accessed 1 November 2026. No endorsement.",
      "modification_notice": "Original concise English hardware-identification account by ComputeFinder, reduced from the selected Japanese draft paragraph. This is not an official Government of Japan translation or publication.",
      "conditions": "The inspected MEXT usage policy permits commercial use with source credit and indicated modifications and declares CC BY 4.0 compatibility; third-party works and separately governed content remain excluded. The attachment warns that ownership may not be indicated, especially in undated/older content. No blanket ownership determination over the entire PDF or RIKEN content is made. The independently reviewed use is limited to the minimal factual hardware identifier and ordinary source link; no ownership or reuse grant over third-party expression or the whole PDF is established. RIKEN material and the previously503 HPCI-overview route were not fetched or used."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only the draft cover, project context and selected CPU-development paragraph were inspected for this proposal. No grid voltage/substation boundary, typed PUE result, water-use measurement or verified point/CRS was established there. Reported application power/performance figures are not admitted or treated as grid connection/capacity. No utility, environmental, planning or parcel audit or report-wide absence conclusion is claimed.",
     "source_url": "https://www.mext.go.jp/content/20220214-mxt_jyohoka01-000020577_04.pdf",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "MEXT, Japan / Information Committee",
      "licence": "MEXT Website Usage Policy compatible with CC BY 4.0 for MEXT-owned content only; third-party exclusions retained",
      "scope": "One minimal original attributed A64FX identifier from the unquoted evaluation body of the selected MEXT-hosted draft and an ordinary source link. No report passage, translation of the report, table, performance/power figure, photograph, diagram, committee-member data, logo, RIKEN quotation or underlying dataset is imported. ComputeFinder also records its own bounded selected-source inspection scope; no substantive value in an unadmitted field is copied.",
      "licence_url": "https://www.mext.go.jp/en/other/title01/detail01/1375290.htm",
      "attribution": "Source: MEXT, Information Committee, Fugaku system-development post-evaluation results (draft), Material 2-2, February 2022; original PDF linked in source_url. Accessed 1 November 2026. No endorsement.",
      "modification_notice": "Original concise English hardware-identification account by ComputeFinder, reduced from the selected Japanese draft paragraph. This is not an official Government of Japan translation or publication.",
      "conditions": "The inspected MEXT usage policy permits commercial use with source credit and indicated modifications and declares CC BY 4.0 compatibility; third-party works and separately governed content remain excluded. The attachment warns that ownership may not be indicated, especially in undated/older content. No blanket ownership determination over the entire PDF or RIKEN content is made. The independently reviewed use is limited to the minimal factual hardware identifier and ordinary source link; no ownership or reuse grant over third-party expression or the whole PDF is established. RIKEN material and the previously503 HPCI-overview route were not fetched or used."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/riken-rccs-kobe-fugaku",
   "permalink": "https://computefinder.net/entity/cf-dc-0075"
  },
  {
   "id": "cf-dc-0076",
   "slug": "pawsey-kensington-perth",
   "name": "Pawsey Centre, Kensington, Perth",
   "country": "AU",
   "locality": "Kensington, Perth",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "related_programme_slugs": [
    "ncmas-australia",
    "pawsey-partner-allocation-scheme",
    "pawsey-preparatory-and-fast-track"
   ],
   "institutional_source": {
    "url": "https://www.csiro.au/en/about/facilities-collections/Pawsey-Supercomputing-Research-Centre",
    "label": "Later CSIRO facility account",
    "updated_on": "2024-03-15",
    "note": "A later institutional source, not a verified current allocation route or offer of compute."
   },
   "source_notice": {
    "publisher": "Commonwealth Scientific and Industrial Research Organisation (CSIRO)",
    "licence": "CSIRO copyright and exact basic-fact/link-out use; no open source licence asserted",
    "licence_url": "https://www.csiro.au/en/about/Policies/Legal/Copyright",
    "scope": "Two minimal original historical factual accounts from the 25 February 2013 CSIRO media release, with attribution and ordinary source links; no source article adaptation, passages, images, quantities, specifications, claimed delivered benefits, database or personal contacts are copied. CSIRO retains copyright in its material. Its media-release reporting permission is not a blanket website or evergreen-directory licence. The later institutional link https://www.csiro.au/en/about/facilities-collections/Pawsey-Supercomputing-Research-Centre is a link-out only; its page is dated 15 March 2024. Legal notice permits ordinary links without endorsement, subject to withdrawal. Accessed 14 October 2026. WA.gov.au material is excluded."
   },
   "notes": "This is a dated historical host account, not a current whole-facility operating or environmental assessment. The 2013 construction description is not an opening date. A planned cooling method is not evidence of delivered water savings, current cooling performance or resolved local effects. Legal owner and facility operator, street address, coordinates, capacity, power, planning and current eligibility or allocation remain unverified. One record does not establish Australian coverage, available compute or a unique-facility census.",
   "facts": [
    {
     "text": "CSIRO's 25 February 2013 announcement placed Pawsey Centre construction in Kensington, south Perth, at the Australian Resources Research Centre site in Kensington's Technology Park.",
     "source_url": "https://www.csiro.au/en/news/All/News/2013/February/Cooling-solution-for-supercomputer-heralds-new-age-in-renewable-energy"
    },
    {
     "text": "The same announcement described a planned groundwater-cooling system for the centre. It does not establish delivered water savings or the current cooling system.",
     "source_url": "https://www.csiro.au/en/news/All/News/2013/February/Cooling-solution-for-supercomputer-heralds-new-age-in-renewable-energy"
    }
   ],
   "checked_on": "2026-10-14",
   "independently_reviewed_on": "2026-10-14",
   "independent_review_scope": "the two historical location and cooling-proposal statements, source dates and precise basic-fact/link-out limits",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/pawsey-kensington-perth",
   "permalink": "https://computefinder.net/entity/cf-dc-0076"
  },
  {
   "id": "cf-dc-0077",
   "slug": "nscc-fusionopolis-aspire-1",
   "name": "NSCC Fusionopolis (historical ASPIRE 1 host)",
   "country": "SG",
   "locality": "Fusionopolis",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "institutional_source": {
    "url": "https://www.nscc.sg/project-calls/",
    "label": "NSCC project-call information",
    "updated_on": null,
    "note": "Inspect the institution's information for applicable systems, eligibility and dates. This is not an offer of available ASPIRE 1 compute or a verified current allocation window."
   },
   "related_programme_slugs": [
    "nscc-eighth-call-2026"
   ],
   "source_notice": {
    "publisher": "National Supercomputing Centre (NSCC) Singapore",
    "licence": "NSCC source copyright retained; no open licence or blanket reuse grant asserted",
    "licence_url": "https://www.nscc.sg/aspire-1-decommissioned/",
    "scope": "Two minimal original basic historical host/system facts and ordinary outbound links only. No source passage, article adaptation, image, video, specification, rank, PUE, capacity, user statistic, database, personal contact or address is copied. The platform and project-call pages have no verified page-specific publication/update date; their repeated 14 May 2024 footer is not treated as a claim date. Accessed 14 October 2026. NSCC retains copyright. A*STAR/Wildtype Media Group article material and source-rights assumptions are excluded."
   },
   "notes": "This record identifies a historical system host. ASPIRE 1 retirement does not establish closure of the Fusionopolis building, the current stage of a whole campus or the physical location of ASPIRE 2A, 2A+ or 2B. The institution's contact address is not reused as proof of successor hardware location. Legal owner, facility operator, street address, precise coordinates, capacity, power, cooling, planning and current allocation or eligibility remain unverified. One historical host does not establish Singapore-wide coverage or available compute.",
   "facts": [
    {
     "text": "NSCC identifies the 17th floor of Fusionopolis as the historical location of its ASPIRE 1 supercomputer.",
     "source_url": "https://www.nscc.sg/aspire-1-decommissioned/"
    },
    {
     "text": "NSCC records 31 August 2023 as the official decommissioning date of ASPIRE 1. This is a system milestone, not a whole-building closure or successor-location check.",
     "source_url": "https://www.nscc.sg/aspire-1-decommissioned/"
    }
   ],
   "checked_on": "2026-10-14",
   "independently_reviewed_on": "2026-10-14",
   "independent_review_scope": "the two historical system-host statements, retirement date and precise basic-fact/link-out limits",
   "chips": [
    {
     "value_text": "NSCC identifies E5-2690v3 CPUs and Tesla K40 GPUs for the historical ASPIRE 1 system.",
     "value_num": null,
     "unit": null,
     "scope": "Only ASPIRE 1 in NSCC’s retrospective decommissioned-system page, historically hosted at Fusionopolis. The hardware description has no separately established installation/configuration date. No ASPIRE2 system, current installed configuration, current building operation, allocation, available compute or decommissioning completion for the building is established.",
     "stage": "unknown",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.nscc.sg/aspire-1-decommissioned/",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T02:38:26.395Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "National Supercomputing Centre (NSCC) Singapore",
      "licence": "Copyright retained; no open source-content licence verified",
      "scope": "Only two hardware model identifiers in one minimal independently worded attributed historical statement and an ordinary source link. No specification table, chip/node counts, performance/rank, PUE measurement, demand/user statistics, cooling design, narrative, image, video, marks, personal contacts or underlying dataset is imported. ComputeFinder also records its own bounded selected-source inspection scope; no substantive value in an unadmitted field is copied.",
      "licence_url": null,
      "attribution": "National Supercomputing Centre Singapore, ASPIRE 1 - Decommissioned; original source linked in source_url. No endorsement.",
      "modification_notice": "Reduced to an original short hardware-identification account with explicit historical system and evidence limits.",
      "conditions": "The source retains NSCC copyright. The linked privacy statement governs personal data and is not a content licence. No contrary express condition for this exact minimal fact/link use was visible in the inspected page/footer/linked privacy statement; this is not a blanket grant or permission inferred from missing terms. A*STAR/Wildtype Media Group material and all third-party assets remain excluded. This independently reviewed exact hardware-only use does not extend the old host-context clearance or admit PUE, cooling, water, retirement chronology, current hardware or building-state claims."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only the historical ASPIRE1 page was inspected. It does not identify a grid voltage/substation boundary or a verified official coordinate point/CRS in the selected system account. Administrative street/floor details are not geocoded or treated as coordinates; utility/planning/parcel files were not audited.",
     "source_url": "https://www.nscc.sg/aspire-1-decommissioned/",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "National Supercomputing Centre (NSCC) Singapore",
      "licence": "Copyright retained; no open source-content licence verified",
      "scope": "Only two hardware model identifiers in one minimal independently worded attributed historical statement and an ordinary source link. No specification table, chip/node counts, performance/rank, PUE measurement, demand/user statistics, cooling design, narrative, image, video, marks, personal contacts or underlying dataset is imported. ComputeFinder also records its own bounded selected-source inspection scope; no substantive value in an unadmitted field is copied.",
      "licence_url": null,
      "attribution": "National Supercomputing Centre Singapore, ASPIRE 1 - Decommissioned; original source linked in source_url. No endorsement.",
      "modification_notice": "Reduced to an original short hardware-identification account with explicit historical system and evidence limits.",
      "conditions": "The source retains NSCC copyright. The linked privacy statement governs personal data and is not a content licence. No contrary express condition for this exact minimal fact/link use was visible in the inspected page/footer/linked privacy statement; this is not a blanket grant or permission inferred from missing terms. A*STAR/Wildtype Media Group material and all third-party assets remain excluded. This independently reviewed exact hardware-only use does not extend the old host-context clearance or admit PUE, cooling, water, retirement chronology, current hardware or building-state claims."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/nscc-fusionopolis-aspire-1",
   "permalink": "https://computefinder.net/entity/cf-dc-0077"
  },
  {
   "id": "cf-dc-0078",
   "slug": "moro-hub-solar-park",
   "name": "Moro Hub Green Data Centre (Solar Park)",
   "country": "AE",
   "locality": "Mohammed bin Rashid Al Maktoum Solar Park",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_notice": {
    "publisher": "Dubai Electricity and Water Authority (DEWA)",
    "licence": "DEWA source copyright retained; no open reuse licence asserted",
    "licence_url": "https://www.dewa.gov.ae/en/terms-and-conditions",
    "scope": "Three minimal original historical facts from the two dated DEWA notices, with attribution and ordinary unframed source links. This is not an open licence or permission to adapt the articles, import a database, copy passages, quotations, personal names, images or other assets. DEWA retains copyright; material is provided as-is without currency warranties. No claim of DEWA endorsement or legal certainty. Source dates and precise use checked 15 October 2026. Specifications, superlatives, certification, renewable-energy and carbon-benefit claims are excluded."
   },
   "notes": "This record distinguishes historical inauguration milestones from the current status of a whole campus. Green is part of the source-reported name, not independently verified environmental performance. An inauguration does not verify completion of every planned phase, current whole-campus operation or compute available to buy. No Warsan facts or other facilities are merged here. Current legal owner and facility operator, precise coordinates, street address, capacity, power, cooling, planning and current eligibility or availability remain unverified. One named record does not establish UAE-wide coverage or a unique-facility census.",
   "facts": [
    {
     "text": "DEWA reported the inauguration of the Moro Hub Green Data Centre at the Mohammed bin Rashid Al Maktoum Solar Park on 16 February 2023.",
     "source_url": "https://dewa.gov.ae/en/about-us/media-publications/latest-news/2023/02/hamdan-bin-mohammed-inaugurates"
    },
    {
     "text": "DEWA reported the inauguration of a second phase at the same solar-park facility on 22 January 2025. This is a dated phase milestone, not verification of a completed campus or available compute.",
     "source_url": "https://www.dewa.gov.ae/en/about-us/media-publications/latest-news/2025/01/maktoum-bin-mohammed-inaugurates-second-phase"
    }
   ],
   "checked_on": "2026-10-15",
   "independently_reviewed_on": "2026-10-15",
   "independent_review_scope": "the three basic historical locality and inauguration facts, their source dates and precise original-fact/link-out use",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/moro-hub-solar-park",
   "permalink": "https://computefinder.net/entity/cf-dc-0078"
  },
  {
   "id": "cf-dc-0079",
   "slug": "bridge-data-centres-my06",
   "name": "Bridge Data Centres MY06",
   "country": "MY",
   "locality": "Sedenak Tech Park, Johor",
   "operator": "Bridge Data Centres",
   "owner": null,
   "lat": null,
   "lon": null,
   "record_scope": "campus",
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "epoch-ai-20261012",
    "name": "Bridge Data Centres MY06",
    "country": "Malaysia",
    "address": "Bridge Data Centres, Sedenak Tech Park, Johor, Malaysia",
    "source_url": "https://epoch.ai/data/data_centers/data_centers.csv",
    "directory_url": "https://epoch.ai/data/ai-data-centers/directory/bridge-data-centres-my06",
    "source_sha256": "2820f8e22d0f4db5cda8f59f7598d6d14916ee0280758a7007e8721e19aa5a37",
    "source_bytes": 70660,
    "source_rows": 94,
    "source_updated_on": "2026-10-12",
    "observed_at": "2026-10-17T01:30:11.991Z",
    "independently_reviewed_at": "2026-10-17T01:32:37Z",
    "scope": "identity_address_only"
   },
   "institutional_source": {
    "url": "https://www.bridgedatacentres.com/who-we-are/contact-us/",
    "label": "Ask Bridge Data Centres about MY06",
    "updated_on": null,
    "note": "Use the company's general enquiry form and name MY06 at Sedenak Tech Park. Specify the building or phase, equipment, power and network requirements, and intended start date. Confirm services, available space and delivery timing directly; this is not a booking or an availability guarantee. Enquiry route checked 14 November 2026; the page's update date is not stated."
   },
   "source_notice": {
    "publisher": "Epoch AI; Bridge Data Centres",
    "licence": "CC BY 4.0 for the retained Epoch fields only; Bridge copyright retained",
    "licence_url": "https://creativecommons.org/licenses/by/4.0/",
    "scope": "Epoch AI, AI data centers, https://epoch.ai/data/ai-data-centers. Reduced and adapted to the selected Name, Country and Address fields only, with an original uncertainty note. CSV updated12October2026; retrieved17October01:30:11.991UTC; independently reviewed17October01:32:37UTC. Provided as-is without warranties. No endorsement. The licence does not transfer rights in underlying satellite imagery, drone material, maps or third-party documents; none is reproduced. Bridge Data Centres material is separately assessed for minimal independently worded, attributed identity and locality facts and ordinary company links only. No Bridge article passages, personal profiles, images, technical tables, capacity figures, performance claims or prices are reproduced; no open content licence or endorsement is asserted. The Bridge footer links its privacy policy, checked 14 November 2026; no relevant refusal for this narrow factual/link use was found."
   },
   "notes": "Bridge Data Centres' 9 September 2026 account identifies MY06 as its campus in Sedenak Tech Park, Johor and describes its campus-management team. This supports the operator identity and locality, not legal title or a current assessment of every building. The earlier Epoch source-reported address and 17 October check remain preserved; its directory uses Kulai, Johor, a different locality grain. No street address, coordinates, physical boundary, whole-campus stage, capacity, power, chips, prices or current availability are admitted. Use the general company enquiry route to confirm the exact phase and your deployment requirements. Operator and enquiry evidence checked 14 November 2026; retained Epoch values are not refreshed.",
   "facts": [
    {
     "text": "Epoch AI's dataset updated12October2026 includes a Malaysia record named Bridge Data Centres MY06.",
     "source_url": "https://epoch.ai/data/data_centers/data_centers.csv"
    },
    {
     "text": "Epoch records the address/location as Bridge Data Centres, Sedenak Tech Park, Johor, Malaysia. This is a source-reported location claim, not verified coordinates or a building/phase boundary.",
     "source_url": "https://epoch.ai/data/data_centers/data_centers.csv"
    },
    {
     "text": "Bridge Data Centres' 9 September 2026 account identifies MY06 as its campus in Sedenak Tech Park, Johor, Malaysia. It describes a Bridge campus-management team, not a legal ownership determination or current available capacity.",
     "source_url": "https://www.bridgedatacentres.com/building-the-next-generation/"
    },
    {
     "text": "Bridge Data Centres provides a general company enquiry form. Name MY06 and confirm the building, services and intended start date directly; the form is not a reservation or an offer of available compute.",
     "source_url": "https://www.bridgedatacentres.com/who-we-are/contact-us/"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-11-14",
   "independent_review_scope": "retained Epoch identity/address facts and licence boundary; minimal Bridge operator/locality account and general enquiry link, with no stage, capacity or availability admission",
   "inspection_limits": [
    {
     "fields": [
      "grid_connection"
     ],
     "status": "not_admitted",
     "scope": "The undated operator Malaysia page explicitly labels an MY06 campus card with an intake-voltage figure. The separate historical operator release identifies a first phase of MY06 at Sedenak. No exact electrical building/phase allocation or mapping from that historical phase to the undated campus-wide card was established. The card cannot be assigned as the grid connection of a particular building, historical phase, permission or energised/current facility. Its reported source value stays an unassigned held lead, not a canonical field or capacity metric.",
     "source_url": "https://www.bridgedatacentres.com/locations/malaysia/",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Bridge Data Centres",
      "licence": "Copyright retained; no explicit open licence verified for either selected operator original. The actual linked notice is a privacy/data-handling policy and is not a website-content licence.",
      "scope": "Only the independently worded attributed MY06 intake-card claim, historical named-first-phase context and exact selected-source inspection limits, with ordinary links, cleared by this distinct bounded source/use review. No card/table/article reproduction, unrelated quantities, third-party quotations, images, maps, contacts, assets or source bodies. No canonical physical grid assignment is cleared.",
      "licence_url": "https://www.bridgedatacentres.com/privacy-policy/",
      "attribution": "Bridge Data Centres; selected Malaysia MY06 card and historical MY06 Sedenak release; exact originals and actual policy linked. No endorsement.",
      "modification_notice": "Original concise source-check and phase-limit wording only; no source prose, specification table, quotation or asset is reproduced.",
      "conditions": "The selected originals retain all rights. The actual footer Terms of Use & Privacy Policy link resolves to the same personal-data/privacy policy; its 22 May 2026 update is a notice clock only, not a card or release date. No contrary condition blocking these precise independently worded basic facts and ordinary links was observed in the inspected notice/footer scope. This is not an open licence, proof that no other conditions exist, a complete-site terms clearance or a recurring acquisition/reuse grant. Epoch CC BY 4.0 remains limited to the old reduced identity/address statements and does not license these operator materials. Independent source/use review completed at 2026-11-01T04:59:37.848Z. This model mapping does not renew source, publication, event, retrieval or parent clocks."
     }
    },
    {
     "fields": [
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "For PUE, water_use, chips and coordinates only, the selected MY06 card and adjacent generic features state no design/target/measured PUE with period, bounded water withdrawal/consumption/WUE, specific hardware model or explicit official facility point/CRS. Generic cooling, efficiency, rack readiness and map/image material do not establish those fields, a water zero or a device model. This status does not apply to grid_connection: the same MY06 card explicitly states a 275 kV intake, preserved separately as an unassigned source claim because exact building/phase allocation is unverified. No other campus value is transferred. This is a selected-page inspection, not an exhaustive operator, planning or EIA audit.",
     "source_url": "https://www.bridgedatacentres.com/locations/malaysia/",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Bridge Data Centres",
      "licence": "Copyright retained; no explicit open licence verified for either selected operator original. The actual linked notice is a privacy/data-handling policy and is not a website-content licence.",
      "scope": "Only the independently worded attributed MY06 intake-card claim, historical named-first-phase context and exact selected-source inspection limits, with ordinary links, cleared by this distinct bounded source/use review. No card/table/article reproduction, unrelated quantities, third-party quotations, images, maps, contacts, assets or source bodies. No canonical physical grid assignment is cleared.",
      "licence_url": "https://www.bridgedatacentres.com/privacy-policy/",
      "attribution": "Bridge Data Centres; selected Malaysia MY06 card and historical MY06 Sedenak release; exact originals and actual policy linked. No endorsement.",
      "modification_notice": "Original concise source-check and phase-limit wording only; no source prose, specification table, quotation or asset is reproduced.",
      "conditions": "The selected originals retain all rights. The actual footer Terms of Use & Privacy Policy link resolves to the same personal-data/privacy policy; its 22 May 2026 update is a notice clock only, not a card or release date. No contrary condition blocking these precise independently worded basic facts and ordinary links was observed in the inspected notice/footer scope. This is not an open licence, proof that no other conditions exist, a complete-site terms clearance or a recurring acquisition/reuse grant. Epoch CC BY 4.0 remains limited to the old reduced identity/address statements and does not license these operator materials. Independent source/use review completed at 2026-11-01T04:59:37.848Z. This model mapping does not renew source, publication, event, retrieval or parent clocks."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/bridge-data-centres-my06",
   "permalink": "https://computefinder.net/entity/cf-dc-0079"
  },
  {
   "id": "cf-dc-0080",
   "slug": "alcf-argonne",
   "name": "Argonne Leadership Computing Facility (ALCF)",
   "country": "US",
   "locality": "Argonne, Illinois",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "doe-ascr-user-facilities-20261017",
    "name": "Argonne Leadership Computing Facility (ALCF)",
    "host": "Argonne National Laboratory",
    "locality": "Argonne, Illinois",
    "source_url": "https://science.osti.gov/ascr/Facilities/User-Facilities/ALCF",
    "source_sha256": "a08b0dd1994dea3256311aa04ec7ed7970387f1c935329ee2134887f1d8dcc62",
    "source_bytes": 217653,
    "source_updated_on": null,
    "observed_at": "2026-10-17T02:34:36.911Z",
    "independently_reviewed_at": "2026-10-17T02:37:57Z",
    "scope": "identity_host_locality_only",
    "country_normalisation": "US from named US state, not a copied country field or geocode"
   },
   "institutional_source": {
    "url": "https://science.osti.gov/ascr/Facilities/User-Facilities/ALCF",
    "label": "Read the DOE Office of Science facility account",
    "updated_on": null,
    "note": "Official publisher evidence, not a live availability or application page. Follow the related programme records for their separately dated eligibility, cautions and official next steps."
   },
   "related_programme_slugs": [
    "doe-incite",
    "doe-alcc"
   ],
   "source_notice": {
    "publisher": "U.S. Department of Energy, Office of Science / ASCR",
    "licence": "Selected DOE-authored government information: public domain",
    "licence_url": "https://www.energy.gov/web-policies",
    "scope": "DOE acknowledgement: https://science.osti.gov/ascr/Facilities/User-Facilities. Reduced and adapted to the selected facility name, host laboratory and locality, with original uncertainty wording. No endorsement. Third-party resources, contractor sites, images, quotations, hardware, statistics and other assets are excluded. This is not blanket domain or recurring-monitoring permission."
   },
   "notes": "This is an attributed scientific-facility identity/locality record, not a verified physical campus, building or phase boundary. Host laboratory is not a verified legal operator or owner. The US country filter is an explicit state-to-country normalisation, not a copied country field or geocode. No present operation, hardware, capacity, power, capital flow or available compute is inferred. Related programme navigation retains each existing record's own check date and cautions; it does not verify a current open call or eligibility. Three selected identities do not establish national or worldwide completeness.",
   "facts": [
    {
     "text": "DOE lists Argonne Leadership Computing Facility (ALCF) at Argonne National Laboratory.",
     "source_url": "https://science.osti.gov/ascr/Facilities"
    },
    {
     "text": "DOE records the facility's locality as Argonne, Illinois.",
     "source_url": "https://science.osti.gov/ascr/Facilities/User-Facilities/ALCF"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "the two selected DOE-authored name/host and locality statements, explicit US normalisation, exact reduced reuse and existing programme navigation only",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "system_reference": {
    "names": [
     "Aurora",
     "Polaris"
    ],
    "text": "DOE names Aurora and Polaris among ALCF computing resources.",
    "source_url": "https://science.osti.gov/ascr/Facilities/User-Facilities/ALCF",
    "checked_on": "2026-10-17",
    "review_by": "2026-10-23",
    "observed_at": "2026-10-17T10:41:14.957Z",
    "source_bytes": 217459,
    "source_sha256": "1a8e93e1e875391761d423d91f0b46ae08941d10f89b7808684608e208da7d64",
    "source_updated_on": null,
    "independently_reviewed_at": "2026-10-17T10:40:35Z",
    "independent_review_scope": "The three attributed name associations and exact DOE-authored names-only reuse; raw owner-acquisition hashes were not independently recomputed.",
    "source_notice": {
     "publisher": "U.S. Department of Energy, Office of Science / ASCR",
     "licence": "Selected DOE-authored government information: public domain",
     "licence_url": "https://science.osti.gov/Web-Policies",
     "scope": "Reduced to named-system associations only, with DOE acknowledgement and original links. No endorsement. Excludes images, quotations, third-party resources, technical specifications, statistics and rankings. Not blanket source or recurring-monitoring permission."
    },
    "note": "A named system is not an additional facility or evidence of a separate campus or phase. This association does not verify current operation, hardware specifications, capacity, available compute, an open call or eligibility. Earlier identity evidence and related programme dates are unchanged. Source page update date is not stated."
   },
   "decision_evidence": {
    "title": "ALCF allocation preparation",
    "claims": [
     "ALCF says researchers at universities, in industry and in government agencies can seek a Director's Discretionary allocation without DOE sponsorship.",
     "ALCF describes this route as preparation for major INCITE or ALCC awards and requires projects to demonstrate a need for leadership-class resources."
    ],
    "source_url": "https://www.alcf.anl.gov/science/directors-discretionary-allocation-program",
    "source_label": "ALCF: Director's Discretionary information",
    "publisher": "Argonne Leadership Computing Facility (ALCF)",
    "checked_on": "2026-10-17",
    "review_by": "2026-10-23",
    "independently_reviewed_at": "2026-10-17T17:31:59Z",
    "source_publication_date": null,
    "source_updated_on": null,
    "event_date": null,
    "retrieved_at": null,
    "raw_body_sha256": null,
    "raw_body_bytes": null,
    "observed_at_upper_bound": "2026-10-17T17:29:49Z",
    "parsed_evidence": {
     "sha256": "8ae579a573f92f4e69f5ac9ff3850844a90049ee3f0c48b774665280bc6637d6",
     "kind": "Connected-tool parsed response bundle for the programme page and corroborating allocation guide, not origin HTML or a page-specific raw hash"
    },
    "next_step": "Read the current ALCF public programme information and follow its official application route if the project fits.",
    "limitations": "This scoped account does not verify nationality eligibility, every access condition, a guaranteed award, an active account, free access or available compute. Earlier facility identity, system-name and INCITE/ALCC evidence keep their original dates and cautions. The corroborating allocation guide was created on 30 August 2022 and updated on 7 October 2026; those dates do not date the undated programme page.",
    "source_notice": {
     "publisher": "Argonne National Laboratory / ALCF",
     "licence": "Source copyright retained; exact basic-fact use assessed only",
     "licence_url": null,
     "scope": "Two minimal attributed basic facts and ordinary unframed information link only. No source narrative, quotations, images, contacts or datasets reproduced or adapted. No open licence, public-domain status, endorsement, blanket domain clearance or recurring-monitoring grant. The earlier DOE-authored public-domain assessment does not cover this contractor content. No express restriction was visible on the complete programme and allocation-guide originals; the parent Argonne homepage returned 403 once and its conditions remain uninspected, not permission inferred from absence. Reassess newly evidenced applicable conditions without a paraphrase workaround."
    }
   },
   "page_url": "https://computefinder.net/data-centres/alcf-argonne",
   "permalink": "https://computefinder.net/entity/cf-dc-0080"
  },
  {
   "id": "cf-dc-0081",
   "slug": "olcf-oak-ridge",
   "name": "Oak Ridge Leadership Computing Facility (OLCF)",
   "country": "US",
   "locality": "Oak Ridge, Tennessee",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "doe-ascr-user-facilities-20261017",
    "name": "Oak Ridge Leadership Computing Facility (OLCF)",
    "host": "Oak Ridge National Laboratory",
    "locality": "Oak Ridge, Tennessee",
    "source_url": "https://science.osti.gov/ascr/Facilities/User-Facilities/OLCF",
    "source_sha256": "b11f92d266df75e46f0d2c9cd2e9c8c748001bd33f29ccb9dfc8b9b45198f91c",
    "source_bytes": 218573,
    "source_updated_on": null,
    "observed_at": "2026-10-17T02:34:37.572Z",
    "independently_reviewed_at": "2026-10-17T02:37:57Z",
    "scope": "identity_host_locality_only",
    "country_normalisation": "US from named US state, not a copied country field or geocode"
   },
   "institutional_source": {
    "url": "https://science.osti.gov/ascr/Facilities/User-Facilities/OLCF",
    "label": "Read the DOE Office of Science facility account",
    "updated_on": null,
    "note": "Official publisher evidence, not a live availability or application page. Follow the related programme records for their separately dated eligibility, cautions and official next steps."
   },
   "related_programme_slugs": [
    "doe-incite",
    "doe-alcc"
   ],
   "source_notice": {
    "publisher": "U.S. Department of Energy, Office of Science / ASCR",
    "licence": "Selected DOE-authored government information: public domain",
    "licence_url": "https://www.energy.gov/web-policies",
    "scope": "DOE acknowledgement: https://science.osti.gov/ascr/Facilities/User-Facilities. Reduced and adapted to the selected facility name, host laboratory and locality, with original uncertainty wording. No endorsement. Third-party resources, contractor sites, images, quotations, hardware, statistics and other assets are excluded. This is not blanket domain or recurring-monitoring permission."
   },
   "notes": "This is an attributed scientific-facility identity/locality record, not a verified physical campus, building or phase boundary. Host laboratory is not a verified legal operator or owner. The US country filter is an explicit state-to-country normalisation, not a copied country field or geocode. No present operation, hardware, capacity, power, capital flow or available compute is inferred. Related programme navigation retains each existing record's own check date and cautions; it does not verify a current open call or eligibility. Three selected identities do not establish national or worldwide completeness.",
   "facts": [
    {
     "text": "DOE lists Oak Ridge Leadership Computing Facility (OLCF) at Oak Ridge National Laboratory.",
     "source_url": "https://science.osti.gov/ascr/Facilities"
    },
    {
     "text": "DOE records the facility's locality as Oak Ridge, Tennessee.",
     "source_url": "https://science.osti.gov/ascr/Facilities/User-Facilities/OLCF"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "the two selected DOE-authored name/host and locality statements, explicit US normalisation, exact reduced reuse and existing programme navigation only",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "system_reference": {
    "names": [
     "Frontier"
    ],
    "text": "DOE names Frontier among OLCF computing resources.",
    "source_url": "https://science.osti.gov/ascr/Facilities/User-Facilities/OLCF",
    "checked_on": "2026-10-17",
    "review_by": "2026-10-23",
    "observed_at": "2026-10-17T10:41:21.805Z",
    "source_bytes": 218379,
    "source_sha256": "fe2af60b18e67dfbae46e2fe357109fd30c8646bf60045717d81c4c1b01c8b50",
    "source_updated_on": null,
    "independently_reviewed_at": "2026-10-17T10:40:35Z",
    "independent_review_scope": "The three attributed name associations and exact DOE-authored names-only reuse; raw owner-acquisition hashes were not independently recomputed.",
    "source_notice": {
     "publisher": "U.S. Department of Energy, Office of Science / ASCR",
     "licence": "Selected DOE-authored government information: public domain",
     "licence_url": "https://science.osti.gov/Web-Policies",
     "scope": "Reduced to named-system associations only, with DOE acknowledgement and original links. No endorsement. Excludes images, quotations, third-party resources, technical specifications, statistics and rankings. Not blanket source or recurring-monitoring permission."
    },
    "note": "A named system is not an additional facility or evidence of a separate campus or phase. This association does not verify current operation, hardware specifications, capacity, available compute, an open call or eligibility. Earlier identity evidence and related programme dates are unchanged. Source page update date is not stated."
   },
   "page_url": "https://computefinder.net/data-centres/olcf-oak-ridge",
   "permalink": "https://computefinder.net/entity/cf-dc-0081"
  },
  {
   "id": "cf-dc-0082",
   "slug": "nersc-berkeley",
   "name": "National Energy Research Scientific Computing Center (NERSC)",
   "country": "US",
   "locality": "Berkeley, California",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "doe-ascr-user-facilities-20261017",
    "name": "National Energy Research Scientific Computing Center (NERSC)",
    "host": "Lawrence Berkeley National Laboratory",
    "locality": "Berkeley, California",
    "source_url": "https://science.osti.gov/ascr/Facilities/User-Facilities/NERSC",
    "source_sha256": "d77fdc3af001fd7d763085cf637f6427ffa5182dde8f61454fbaf608ae3194c8",
    "source_bytes": 219525,
    "source_updated_on": null,
    "observed_at": "2026-10-17T02:34:38.142Z",
    "independently_reviewed_at": "2026-10-17T02:37:57Z",
    "scope": "identity_host_locality_only",
    "country_normalisation": "US from named US state, not a copied country field or geocode"
   },
   "institutional_source": {
    "url": "https://science.osti.gov/ascr/Facilities/User-Facilities/NERSC",
    "label": "Read the DOE Office of Science facility account",
    "updated_on": null,
    "note": "Official publisher evidence, not a live availability or application page. Follow the related programme records for their separately dated eligibility, cautions and official next steps."
   },
   "related_programme_slugs": [
    "doe-alcc",
    "nersc-ercap-allocations"
   ],
   "source_notice": {
    "publisher": "U.S. Department of Energy, Office of Science / ASCR",
    "licence": "Selected DOE-authored government information: public domain",
    "licence_url": "https://www.energy.gov/web-policies",
    "scope": "DOE acknowledgement: https://science.osti.gov/ascr/Facilities/User-Facilities. Reduced and adapted to the selected facility name, host laboratory and locality, with original uncertainty wording. No endorsement. Third-party resources, contractor sites, images, quotations, hardware, statistics and other assets are excluded. This is not blanket domain or recurring-monitoring permission."
   },
   "notes": "This is an attributed scientific-facility identity/locality record, not a verified physical campus, building or phase boundary. Host laboratory is not a verified legal operator or owner. The US country filter is an explicit state-to-country normalisation, not a copied country field or geocode. No present operation, hardware, capacity, power, capital flow or available compute is inferred. Related programme navigation retains each existing record's own check date and cautions; it does not verify a current open call or eligibility. Three selected identities do not establish national or worldwide completeness.",
   "facts": [
    {
     "text": "DOE lists National Energy Research Scientific Computing Center (NERSC) at Lawrence Berkeley National Laboratory.",
     "source_url": "https://science.osti.gov/ascr/Facilities"
    },
    {
     "text": "DOE records the facility's locality as Berkeley, California.",
     "source_url": "https://science.osti.gov/ascr/Facilities/User-Facilities/NERSC"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "the two selected DOE-authored name/host and locality statements, explicit US normalisation, exact reduced reuse and existing programme navigation only",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "system_reference": {
    "names": [
     "Perlmutter"
    ],
    "text": "DOE identifies Perlmutter as a NERSC system.",
    "source_url": "https://science.osti.gov/ascr/Facilities/User-Facilities/NERSC",
    "checked_on": "2026-10-17",
    "review_by": "2026-10-23",
    "observed_at": "2026-10-17T10:41:28.760Z",
    "source_bytes": 219331,
    "source_sha256": "882754e8c3476a7605663fbaef081b5c6ca0313d32d55739cbbd04625a228aa1",
    "source_updated_on": null,
    "independently_reviewed_at": "2026-10-17T10:40:35Z",
    "independent_review_scope": "The three attributed name associations and exact DOE-authored names-only reuse; raw owner-acquisition hashes were not independently recomputed.",
    "source_notice": {
     "publisher": "U.S. Department of Energy, Office of Science / ASCR",
     "licence": "Selected DOE-authored government information: public domain",
     "licence_url": "https://science.osti.gov/Web-Policies",
     "scope": "Reduced to named-system associations only, with DOE acknowledgement and original links. No endorsement. Excludes images, quotations, third-party resources, technical specifications, statistics and rankings. Not blanket source or recurring-monitoring permission."
    },
    "note": "A named system is not an additional facility or evidence of a separate campus or phase. This association does not verify current operation, hardware specifications, capacity, available compute, an open call or eligibility. Earlier identity evidence and related programme dates are unchanged. Source page update date is not stated."
   },
   "page_url": "https://computefinder.net/data-centres/nersc-berkeley",
   "permalink": "https://computefinder.net/entity/cf-dc-0082"
  },
  {
   "id": "cf-dc-0083",
   "slug": "discoverer-sofia-tech-park",
   "name": "Discoverer (Sofia Tech Park)",
   "country": "BG",
   "locality": "Sofia",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "eurohpc-discoverer-identity-20261017",
    "name": "Discoverer",
    "host": "Sofia Tech Park",
    "locality": "Sofia",
    "country": "Bulgaria",
    "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "source_sha256": "521a06cd13e236cd3f87a57594c489f8b627e4c5a597ba766b91760d2c6e72d7",
    "source_bytes": 139438,
    "source_updated_on": null,
    "observed_at": "2026-10-17T02:45:23.695Z",
    "factual_reviewed_at": "2026-10-17T02:42:45Z",
    "independently_reviewed_at": "2026-10-17T02:46:38Z",
    "scope": "identity_host_locality_only",
    "selected_identity_count": 1,
    "directory_stated_systems": 12,
    "whole_directory_reconciled": false,
    "supporting_sources": [
     {
      "source_url": "https://www.eurohpc-ju.europa.eu/major-upgrade-eurohpc-discoverer-supercomputer-bulgaria-2025-04-02_en",
      "source_sha256": "6e33022045b5a66b47b3a281c1bfbd5ba6da76e5d8e612fc810f26ccb71538ed",
      "source_bytes": 81491,
      "observed_at": "2026-10-17T02:45:29.626Z",
      "source_publication_on": "2025-04-02",
      "source_updated_on": null
     }
    ]
   },
   "institutional_source": {
    "url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "label": "Read EuroHPC JU's Discoverer directory account",
    "updated_on": null,
    "note": "Official publisher evidence and a general access-calls link, not a verified currently eligible system or an immediate allocation. Related programme records retain their separately dated conditions and official next steps."
   },
   "related_programme_slugs": [
    "eurohpc-benchmark-and-development-access"
   ],
   "source_notice": {
    "publisher": "European Union / European High-Performance Computing Joint Undertaking",
    "licence": "CC BY 4.0, selected EU-owned content only",
    "licence_url": "https://creativecommons.org/licenses/by/4.0/",
    "scope": "European Union / EuroHPC JU, Our Supercomputers (https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en) and Major Upgrade for EuroHPC Discoverer Supercomputer in Bulgaria (https://www.eurohpc-ju.europa.eu/major-upgrade-eurohpc-discoverer-supercomputer-bulgaria-2025-04-02_en, published 2 April 2025). Reduced and adapted by ComputeFinder to selected scientific-system name, host and locality facts with original uncertainty wording. Rights notice: https://commission.europa.eu/legal-notice_en . No endorsement. Excludes photographs and captions, attributed third-party material, quotations, people, logos, trademarks, technical tables, hardware, performance, rankings and other assets. No blanket domain or recurring-monitoring clearance."
   },
   "notes": "This is an attributed scientific computing system identity, not a verified physical campus, building or phase boundary. Host is not a verified legal operator or owner. No current operation, hardware, capacity, power, capital flow or available compute is inferred. Discoverer upgrade, Discoverer++ and BRAIN++ project or phase claims are not imported. One selected identity is assessed; the directory's stated twelve systems have not been fully reconciled, and this is not worldwide coverage. Related generic EuroHPC Benchmark and Development navigation does not establish Discoverer's current eligibility or participation in a particular call. It preserves the existing programme's 12 October 2026 check date; no deadline, allocation or successful access is reverified.",
   "facts": [
    {
     "text": "EuroHPC JU lists Discoverer as a supercomputer located in Sofia, Bulgaria.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    },
    {
     "text": "EuroHPC JU identifies Sofia Tech Park as Discoverer's host.",
     "source_url": "https://www.eurohpc-ju.europa.eu/major-upgrade-eurohpc-discoverer-supercomputer-bulgaria-2025-04-02_en"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "two selected EU-authored identity/location and host statements, exact reduced CC BY 4.0 use, original clocks and generic existing-programme navigation only",
   "chips": [
    {
     "value_text": "The Discoverer project documentation lists AMD EPYC 7H12 for compute nodes in the original Discoverer CPU cluster.",
     "value_num": null,
     "unit": null,
     "scope": "Original Discoverer CPU-cluster node type only; distinct from Discoverer+ GPU partition and BRAIN++/Discoverer++ proposals. No total sockets/cores, sums across overlapping partitions, current utilisation or availability is inferred.",
     "stage": "unknown",
     "basis": "reported",
     "label": "source_claim",
     "as_of": null,
     "source_url": "https://docs.discoverer.bg/resource_overview.html",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T03:34:53.155Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Discoverer HPC project documentation",
      "licence": "No open content licence verified for docs.discoverer.bg.",
      "scope": "Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review.",
      "licence_url": null,
      "attribution": "Discoverer HPC project documentation; exact original linked. No endorsement.",
      "modification_notice": "Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported.",
      "conditions": "A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only minimal independently worded processor/node identifiers at separately named original CPU and Discoverer+ grain with ordinary links. No content licence was verified for these project docs; the Sphinx/ReadTheDocs footer is not a document-content grant. The separate EU-owned release and its notice do not license host documentation. Counts, tables, logs, hostnames, examples, benchmarks, source expression and datasets are excluded. The EU release supports named scientific-system upgrade lineage only, not a shared physical phase, current configuration or site boundary. No domain-wide or recurring-use grant is asserted."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_inspected",
     "scope": "Only named hardware sections, official-link provenance, copyright/terms discovery and footer context were inspected. This is not a grid/EIA/PUE/water/point-CRS audit. Node example watts, including illustrative zeroes, are not physical measurements and are excluded. No hostnames or source node/log tables are retained.",
     "source_url": "https://docs.discoverer.bg/resource_overview.html",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Discoverer HPC project documentation",
      "licence": "No open content licence verified for docs.discoverer.bg.",
      "scope": "Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review.",
      "licence_url": null,
      "attribution": "Discoverer HPC project documentation; exact original linked. No endorsement.",
      "modification_notice": "Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported.",
      "conditions": "A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only minimal independently worded processor/node identifiers at separately named original CPU and Discoverer+ grain with ordinary links. No content licence was verified for these project docs; the Sphinx/ReadTheDocs footer is not a document-content grant. The separate EU-owned release and its notice do not license host documentation. Counts, tables, logs, hostnames, examples, benchmarks, source expression and datasets are excluded. The EU release supports named scientific-system upgrade lineage only, not a shared physical phase, current configuration or site boundary. No domain-wide or recurring-use grant is asserted."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/discoverer-sofia-tech-park",
   "permalink": "https://computefinder.net/entity/cf-dc-0083"
  },
  {
   "id": "cf-dc-0084",
   "slug": "karolina-ostrava",
   "name": "Karolina (IT4Innovations, Ostrava)",
   "country": "CZ",
   "locality": "Ostrava",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "eurohpc-selected-three-identities-20261017",
    "name": "Karolina",
    "host": "IT4Innovations National Supercomputing Center",
    "locality": "Ostrava",
    "country": "Czechia",
    "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "source_sha256": "521a06cd13e236cd3f87a57594c489f8b627e4c5a597ba766b91760d2c6e72d7",
    "source_bytes": 139438,
    "source_updated_on": null,
    "source_publication_on": null,
    "observed_at": "2026-10-17T02:45:23.695Z",
    "independently_reviewed_at": "2026-10-17T03:04:04Z",
    "scope": "identity_host_locality_only",
    "selected_identity_count": 3,
    "directory_stated_systems": 12,
    "complete_directory_fact_admission": false,
    "source_hash_basis": "Existing owner one-off raw response fingerprint; not independently recomputed for this batch"
   },
   "institutional_source": {
    "url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "label": "Read EuroHPC JU's Karolina directory account",
    "updated_on": null,
    "note": "Official publisher evidence with a general access-calls route, not an immediate allocation or verification that this system participates in a particular current call. Related programme records retain their separately dated conditions and official next steps."
   },
   "related_programme_slugs": [
    "eurohpc-benchmark-and-development-access"
   ],
   "source_notice": {
    "publisher": "European Union / European High-Performance Computing Joint Undertaking",
    "licence": "CC BY 4.0, selected EU-owned content only",
    "licence_url": "https://creativecommons.org/licenses/by/4.0/",
    "scope": "European Union / EuroHPC JU, Our Supercomputers (https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en). Reduced and adapted by ComputeFinder to selected scientific-system name, host and locality facts with original uncertainty wording. Rights notice: https://commission.europa.eu/legal-notice_en . Provided as-is without warranties. No endorsement. Excludes photographs and captions, attributed third-party material, quotations, people, logos, trademarks, technical tables, hardware, performance, rankings and other assets. No blanket domain or recurring-monitoring clearance."
   },
   "notes": "This is an attributed scientific computing system identity, not a verified physical campus, building or phase boundary. Host is not a verified legal operator or owner. No current operation, hardware, capacity, power, capital flow or available compute is inferred. The selected three system identities are not three newly built physical sites or complete directory factual coverage. Related generic EuroHPC Benchmark and Development navigation does not establish this system's current eligibility or participation in a particular call. It preserves the existing programme's 12 October 2026 check date; no deadline, allocation or successful access is reverified. A shared host or place is not authority to merge distinct systems, phases or projects.",
   "facts": [
    {
     "text": "EuroHPC JU lists Karolina as a supercomputer located in Ostrava, Czechia.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    },
    {
     "text": "EuroHPC JU identifies IT4Innovations National Supercomputing Center as Karolina's host.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "two selected EU-authored system identity/location and explicit host statements, exact reduced CC BY 4.0 use and qualified generic existing-programme navigation only",
   "chips": [
    {
     "value_text": "EuroHPC names NVIDIA A100 Tensor Core GPU accelerators for Karolina.",
     "value_num": null,
     "unit": null,
     "scope": "GPU family only in the selected directory entry. Its CPU cell supplies no CPU model identifier, so none is inferred. No installed count, configuration completion or current whole-facility operation is established.",
     "stage": "unknown",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T02:03:26.681Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only this named system’s directory entry was inspected. No grid-voltage/substation boundary, water-use measurement or verified coordinate point/CRS was identified there; no planning, utility, environmental or parcel file was audited.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/karolina-ostrava",
   "permalink": "https://computefinder.net/entity/cf-dc-0084"
  },
  {
   "id": "cf-dc-0085",
   "slug": "vega-maribor",
   "name": "Vega (IZUM, Maribor)",
   "country": "SI",
   "locality": "Maribor",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "eurohpc-selected-three-identities-20261017",
    "name": "Vega",
    "host": "IZUM",
    "locality": "Maribor",
    "country": "Slovenia",
    "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "source_sha256": "521a06cd13e236cd3f87a57594c489f8b627e4c5a597ba766b91760d2c6e72d7",
    "source_bytes": 139438,
    "source_updated_on": null,
    "source_publication_on": null,
    "observed_at": "2026-10-17T02:45:23.695Z",
    "independently_reviewed_at": "2026-10-17T03:04:04Z",
    "scope": "identity_host_locality_only",
    "selected_identity_count": 3,
    "directory_stated_systems": 12,
    "complete_directory_fact_admission": false,
    "source_hash_basis": "Existing owner one-off raw response fingerprint; not independently recomputed for this batch"
   },
   "institutional_source": {
    "url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "label": "Read EuroHPC JU's Vega directory account",
    "updated_on": null,
    "note": "Official publisher evidence with a general access-calls route, not an immediate allocation or verification that this system participates in a particular current call. Related programme records retain their separately dated conditions and official next steps."
   },
   "related_programme_slugs": [
    "eurohpc-benchmark-and-development-access"
   ],
   "source_notice": {
    "publisher": "European Union / European High-Performance Computing Joint Undertaking",
    "licence": "CC BY 4.0, selected EU-owned content only",
    "licence_url": "https://creativecommons.org/licenses/by/4.0/",
    "scope": "European Union / EuroHPC JU, Our Supercomputers (https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en). Reduced and adapted by ComputeFinder to selected scientific-system name, host and locality facts with original uncertainty wording. Rights notice: https://commission.europa.eu/legal-notice_en . Provided as-is without warranties. No endorsement. Excludes photographs and captions, attributed third-party material, quotations, people, logos, trademarks, technical tables, hardware, performance, rankings and other assets. No blanket domain or recurring-monitoring clearance."
   },
   "notes": "This is an attributed scientific computing system identity, not a verified physical campus, building or phase boundary. Host is not a verified legal operator or owner. No current operation, hardware, capacity, power, capital flow or available compute is inferred. The selected three system identities are not three newly built physical sites or complete directory factual coverage. Related generic EuroHPC Benchmark and Development navigation does not establish this system's current eligibility or participation in a particular call. It preserves the existing programme's 12 October 2026 check date; no deadline, allocation or successful access is reverified. A shared host or place is not authority to merge distinct systems, phases or projects.",
   "facts": [
    {
     "text": "EuroHPC JU lists Vega as a supercomputer located in Maribor, Slovenia.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    },
    {
     "text": "EuroHPC JU identifies IZUM as Vega's host.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "two selected EU-authored system identity/location and explicit host statements, exact reduced CC BY 4.0 use and qualified generic existing-programme navigation only",
   "chips": [
    {
     "value_text": "EuroHPC lists AMD EPYC 7H12 CPUs and NVIDIA A100 GPUs for Vega.",
     "value_num": null,
     "unit": null,
     "scope": "Only the undated Vega directory entry. No chip count, frequency, memory configuration, installation milestone, whole-facility operating status or current access is established.",
     "stage": "unknown",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T02:03:26.681Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only this named system’s directory entry was inspected. No grid-voltage/substation boundary, water-use measurement or verified coordinate point/CRS was identified there; no planning, utility, environmental or parcel file was audited.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/vega-maribor",
   "permalink": "https://computefinder.net/entity/cf-dc-0085"
  },
  {
   "id": "cf-dc-0086",
   "slug": "deucalion-guimaraes",
   "name": "Deucalion (FCT, Guimarães)",
   "country": "PT",
   "locality": "Guimarães",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "eurohpc-selected-three-identities-20261017",
    "name": "Deucalion",
    "host": "FCT",
    "locality": "Guimarães",
    "country": "Portugal",
    "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "source_sha256": "521a06cd13e236cd3f87a57594c489f8b627e4c5a597ba766b91760d2c6e72d7",
    "source_bytes": 139438,
    "source_updated_on": null,
    "source_publication_on": null,
    "observed_at": "2026-10-17T02:45:23.695Z",
    "independently_reviewed_at": "2026-10-17T03:04:04Z",
    "scope": "identity_host_locality_only",
    "selected_identity_count": 3,
    "directory_stated_systems": 12,
    "complete_directory_fact_admission": false,
    "source_hash_basis": "Existing owner one-off raw response fingerprint; not independently recomputed for this batch"
   },
   "institutional_source": {
    "url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "label": "Read EuroHPC JU's Deucalion directory account",
    "updated_on": null,
    "note": "Official publisher evidence with a general access-calls route, not an immediate allocation or verification that this system participates in a particular current call. Related programme records retain their separately dated conditions and official next steps."
   },
   "related_programme_slugs": [
    "eurohpc-benchmark-and-development-access"
   ],
   "source_notice": {
    "publisher": "European Union / European High-Performance Computing Joint Undertaking",
    "licence": "CC BY 4.0, selected EU-owned content only",
    "licence_url": "https://creativecommons.org/licenses/by/4.0/",
    "scope": "European Union / EuroHPC JU, Our Supercomputers (https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en). Reduced and adapted by ComputeFinder to selected scientific-system name, host and locality facts with original uncertainty wording. Rights notice: https://commission.europa.eu/legal-notice_en . Provided as-is without warranties. No endorsement. Excludes photographs and captions, attributed third-party material, quotations, people, logos, trademarks, technical tables, hardware, performance, rankings and other assets. No blanket domain or recurring-monitoring clearance."
   },
   "notes": "This is an attributed scientific computing system identity, not a verified physical campus, building or phase boundary. Host is not a verified legal operator or owner. No current operation, hardware, capacity, power, capital flow or available compute is inferred. The selected three system identities are not three newly built physical sites or complete directory factual coverage. Related generic EuroHPC Benchmark and Development navigation does not establish this system's current eligibility or participation in a particular call. It preserves the existing programme's 12 October 2026 check date; no deadline, allocation or successful access is reverified. A shared host or place is not authority to merge distinct systems, phases or projects.",
   "facts": [
    {
     "text": "EuroHPC JU lists Deucalion as a supercomputer located in Guimarães, Portugal.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    },
    {
     "text": "EuroHPC JU identifies FCT as Deucalion's host.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "two selected EU-authored system identity/location and explicit host statements, exact reduced CC BY 4.0 use and qualified generic existing-programme navigation only",
   "chips": [
    {
     "value_text": "EuroHPC names A64FX for Deucalion’s ARM partition, AMD EPYC for x86 partitions, and NVIDIA Ampere A100 accelerators.",
     "value_num": null,
     "unit": null,
     "scope": "Only the named ARM, x86 and accelerated partition descriptions in this undated entry. No chip count, memory configuration, installation milestone, physical-building boundary or current access is established.",
     "stage": "unknown",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T02:03:26.681Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only this named system’s directory entry was inspected. No grid-voltage/substation boundary, water-use measurement or verified coordinate point/CRS was identified there; no planning, utility, environmental or parcel file was audited.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/deucalion-guimaraes",
   "permalink": "https://computefinder.net/entity/cf-dc-0086"
  },
  {
   "id": "cf-dc-0087",
   "slug": "param-shivay-iit-bhu-varanasi",
   "name": "PARAM Shivay (IIT(BHU), Varanasi)",
   "country": "IN",
   "locality": "Varanasi",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "pib-2201437-selected-identities-20261017",
    "row": 3,
    "name": "PARAM Shivay",
    "institution": "IIT(BHU), Varanasi",
    "state": "Uttar Pradesh",
    "country": "India",
    "source_url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2",
    "source_sha256": "884279142ec3734e02c68462be91d830bc29ba91faf5143357f4b98d23d34886",
    "source_bytes": 447015,
    "source_publication_on": "2025-12-10",
    "source_updated_on": null,
    "observed_at": "2026-10-17T04:32:22.830Z",
    "independently_reviewed_at": "2026-10-17T04:34:28Z",
    "reference_rows": 37,
    "scope": "identity_institution_state_only",
    "country_basis": "Explicit government-geography normalisation, not geocoding",
    "locality_basis": "Institution-name normalisation; no street or campus boundary verified"
   },
   "institutional_source": {
    "url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2",
    "label": "Read the Ministry of Electronics and IT annexure via PIB",
    "updated_on": null,
    "note": "Published 10 December 2025; no last-update date is verified. This historical system/institution reference is not a current operating or allocation check. No current system-specific application or eligibility route has been verified here."
   },
   "source_notice": {
    "publisher": "Government of India, Ministry of Electronics and IT, via Press Information Bureau (PIB)",
    "licence": "PIB accurate-reproduction permission with attribution; not a Creative Commons source licence",
    "licence_url": "https://www.pib.gov.in/ContentPage.aspx?lang=1&menuid=794&reg=23",
    "scope": "Source: Government of India, Ministry of Electronics and IT, via PIB, 10 December 2025 (https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2). Reduced by ComputeFinder to selected scientific-system/institution/state facts with explicit geographic normalisation and uncertainty. PIB permits accurate, non-misleading reproduction with prominent source acknowledgement; third-party material is excluded. No endorsement. Not a Creative Commons grant, blanket website licence or recurring-monitoring clearance. No source images, logos, people, quotations, capacity/specification/year table or current access terms reproduced."
   },
   "notes": "This is an attributed scientific-system identity, not a verified physical campus, building or phase boundary. Locality is institution-name normalisation from the official table, not a sourced street address or coordinates. Country India is explicit government-geography normalisation. A listed institution is not a verified legal operator or owner. The 10 December 2025 account is not a current operating, hardware, capacity or availability check. No current eligibility, allocation, application deadline or successful access is verified. The 3 December release corroborates institutions only; it does not supply these system names or state fields. Shared PARAM names or institutions do not merge distinct systems. These are not three newly built facilities or complete Indian or worldwide coverage.",
   "facts": [
    {
     "text": "The Ministry of Electronics and IT release dated 10 December 2025 lists PARAM Shivay at IIT(BHU), Varanasi.",
     "source_url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2"
    },
    {
     "text": "That annexure places this institutional entry in Uttar Pradesh.",
     "source_url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "two selected historical system/institution/state statements, geographic normalisation and precise attributed reduced use only",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/param-shivay-iit-bhu-varanasi",
   "permalink": "https://computefinder.net/entity/cf-dc-0087"
  },
  {
   "id": "cf-dc-0088",
   "slug": "param-ganga-iit-roorkee",
   "name": "PARAM Ganga (IIT Roorkee)",
   "country": "IN",
   "locality": "Roorkee",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "pib-2201437-selected-identities-20261017",
    "row": 19,
    "name": "PARAM Ganga",
    "institution": "IIT Roorkee",
    "state": "Uttarakhand",
    "country": "India",
    "source_url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2",
    "source_sha256": "884279142ec3734e02c68462be91d830bc29ba91faf5143357f4b98d23d34886",
    "source_bytes": 447015,
    "source_publication_on": "2025-12-10",
    "source_updated_on": null,
    "observed_at": "2026-10-17T04:32:22.830Z",
    "independently_reviewed_at": "2026-10-17T04:34:28Z",
    "reference_rows": 37,
    "scope": "identity_institution_state_only",
    "country_basis": "Explicit government-geography normalisation, not geocoding",
    "locality_basis": "Institution-name normalisation; no street or campus boundary verified"
   },
   "institutional_source": {
    "url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2",
    "label": "Read the Ministry of Electronics and IT annexure via PIB",
    "updated_on": null,
    "note": "Published 10 December 2025; no last-update date is verified. This historical system/institution reference is not a current operating or allocation check. No current system-specific application or eligibility route has been verified here."
   },
   "source_notice": {
    "publisher": "Government of India, Ministry of Electronics and IT, via Press Information Bureau (PIB)",
    "licence": "PIB accurate-reproduction permission with attribution; not a Creative Commons source licence",
    "licence_url": "https://www.pib.gov.in/ContentPage.aspx?lang=1&menuid=794&reg=23",
    "scope": "Source: Government of India, Ministry of Electronics and IT, via PIB, 10 December 2025 (https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2). Reduced by ComputeFinder to selected scientific-system/institution/state facts with explicit geographic normalisation and uncertainty. PIB permits accurate, non-misleading reproduction with prominent source acknowledgement; third-party material is excluded. No endorsement. Not a Creative Commons grant, blanket website licence or recurring-monitoring clearance. No source images, logos, people, quotations, capacity/specification/year table or current access terms reproduced."
   },
   "notes": "This is an attributed scientific-system identity, not a verified physical campus, building or phase boundary. Locality is institution-name normalisation from the official table, not a sourced street address or coordinates. Country India is explicit government-geography normalisation. A listed institution is not a verified legal operator or owner. The 10 December 2025 account is not a current operating, hardware, capacity or availability check. No current eligibility, allocation, application deadline or successful access is verified. The 3 December release corroborates institutions only; it does not supply these system names or state fields. Shared PARAM names or institutions do not merge distinct systems. These are not three newly built facilities or complete Indian or worldwide coverage.",
   "facts": [
    {
     "text": "The Ministry of Electronics and IT release dated 10 December 2025 lists PARAM Ganga at IIT Roorkee.",
     "source_url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2"
    },
    {
     "text": "That annexure places this institutional entry in Uttarakhand.",
     "source_url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "two selected historical system/institution/state statements, geographic normalisation and precise attributed reduced use only",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/param-ganga-iit-roorkee",
   "permalink": "https://computefinder.net/entity/cf-dc-0088"
  },
  {
   "id": "cf-dc-0089",
   "slug": "param-kamrupa-iit-guwahati",
   "name": "PARAM Kamrupa (IIT Guwahati)",
   "country": "IN",
   "locality": "Guwahati",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "pib-2201437-selected-identities-20261017",
    "row": 22,
    "name": "PARAM Kamrupa",
    "institution": "IIT Guwahati",
    "state": "Assam",
    "country": "India",
    "source_url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2",
    "source_sha256": "884279142ec3734e02c68462be91d830bc29ba91faf5143357f4b98d23d34886",
    "source_bytes": 447015,
    "source_publication_on": "2025-12-10",
    "source_updated_on": null,
    "observed_at": "2026-10-17T04:32:22.830Z",
    "independently_reviewed_at": "2026-10-17T04:34:28Z",
    "reference_rows": 37,
    "scope": "identity_institution_state_only",
    "country_basis": "Explicit government-geography normalisation, not geocoding",
    "locality_basis": "Institution-name normalisation; no street or campus boundary verified"
   },
   "institutional_source": {
    "url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2",
    "label": "Read the Ministry of Electronics and IT annexure via PIB",
    "updated_on": null,
    "note": "Published 10 December 2025; no last-update date is verified. This historical system/institution reference is not a current operating or allocation check. No current system-specific application or eligibility route has been verified here."
   },
   "source_notice": {
    "publisher": "Government of India, Ministry of Electronics and IT, via Press Information Bureau (PIB)",
    "licence": "PIB accurate-reproduction permission with attribution; not a Creative Commons source licence",
    "licence_url": "https://www.pib.gov.in/ContentPage.aspx?lang=1&menuid=794&reg=23",
    "scope": "Source: Government of India, Ministry of Electronics and IT, via PIB, 10 December 2025 (https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2). Reduced by ComputeFinder to selected scientific-system/institution/state facts with explicit geographic normalisation and uncertainty. PIB permits accurate, non-misleading reproduction with prominent source acknowledgement; third-party material is excluded. No endorsement. Not a Creative Commons grant, blanket website licence or recurring-monitoring clearance. No source images, logos, people, quotations, capacity/specification/year table or current access terms reproduced."
   },
   "notes": "This is an attributed scientific-system identity, not a verified physical campus, building or phase boundary. Locality is institution-name normalisation from the official table, not a sourced street address or coordinates. Country India is explicit government-geography normalisation. A listed institution is not a verified legal operator or owner. The 10 December 2025 account is not a current operating, hardware, capacity or availability check. No current eligibility, allocation, application deadline or successful access is verified. The 3 December release corroborates institutions only; it does not supply these system names or state fields. Shared PARAM names or institutions do not merge distinct systems. These are not three newly built facilities or complete Indian or worldwide coverage.",
   "facts": [
    {
     "text": "The Ministry of Electronics and IT release dated 10 December 2025 lists PARAM Kamrupa at IIT Guwahati.",
     "source_url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2"
    },
    {
     "text": "That annexure places this institutional entry in Assam.",
     "source_url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2201437&reg=48&lang=2"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "two selected historical system/institution/state statements, geographic normalisation and precise attributed reduced use only",
   "chips": [
    {
     "value_text": "IIT Guwahati identifies Intel Xeon Platinum 8268 and Xeon Gold 6248 CPUs, with NVIDIA Tesla V100 GPUs, in its PARAM Kamrupa configuration.",
     "value_num": null,
     "unit": null,
     "scope": "PARAM Kamrupa section only, excluding separately listed PARAM Ishan and the newer GPU Compute system. Chip identifiers do not establish current hardware availability, a campus total, access eligibility or current site operation. No chip/node counts or performance values are imported.",
     "stage": "unknown",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.iitg.ac.in/hpc/",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T02:38:26.395Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Indian Institute of Technology Guwahati",
      "licence": "Copyright retained; no open source-content licence verified",
      "scope": "Proposed exact use is one independently worded attributed hardware-identifier statement for PARAM Kamrupa and an ordinary unframed source link. No source prose, quotations, diagrams, tables, chip/node counts, capacities, prices, performance results, marks, people, contact details or underlying dataset are imported. Product names only identify the discussed hardware; no endorsement or trade-mark licence follows. ComputeFinder also records its own bounded selected-source inspection scope; no substantive value in an unadmitted field is copied.",
      "licence_url": null,
      "attribution": "Indian Institute of Technology Guwahati, HPC Facilities, PARAM Kamrupa section; original linked in source_url. General legal notice: https://iitg.ac.in/iitg_page_details?page=3/legal-disclaimer . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual statement. Other systems, quantities and operational assertions are excluded.",
      "conditions": "The inspected general institute disclaimer reserves copyright and disclaims accuracy/warranty. No express reproduction prohibition was observed there for this exact minimal fact/link proposal, but reserved copyright is not an open licence or permission inferred from silence. The hospital-only policy is not applied to HPC. This exact minimal hardware-identification/link use has a separate completed independent review; no open licence, blanket source grant or recurring acquisition permission follows."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only the PARAM Kamrupa technical section and the surrounding system-separation context were inspected. They did not supply a grid-voltage/substation boundary, explicitly scoped PUE or water measurement, or verified official point/CRS. Resource-location text is not a coordinate. No institution-wide omission, planning/EIA review or physical zero is claimed.",
     "source_url": "https://www.iitg.ac.in/hpc/",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Indian Institute of Technology Guwahati",
      "licence": "Copyright retained; no open source-content licence verified",
      "scope": "Proposed exact use is one independently worded attributed hardware-identifier statement for PARAM Kamrupa and an ordinary unframed source link. No source prose, quotations, diagrams, tables, chip/node counts, capacities, prices, performance results, marks, people, contact details or underlying dataset are imported. Product names only identify the discussed hardware; no endorsement or trade-mark licence follows. ComputeFinder also records its own bounded selected-source inspection scope; no substantive value in an unadmitted field is copied.",
      "licence_url": null,
      "attribution": "Indian Institute of Technology Guwahati, HPC Facilities, PARAM Kamrupa section; original linked in source_url. General legal notice: https://iitg.ac.in/iitg_page_details?page=3/legal-disclaimer . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual statement. Other systems, quantities and operational assertions are excluded.",
      "conditions": "The inspected general institute disclaimer reserves copyright and disclaims accuracy/warranty. No express reproduction prohibition was observed there for this exact minimal fact/link proposal, but reserved copyright is not an open licence or permission inferred from silence. The hospital-only policy is not applied to HPC. This exact minimal hardware-identification/link use has a separate completed independent review; no open licence, blanket source grant or recurring acquisition permission follows."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/param-kamrupa-iit-guwahati",
   "permalink": "https://computefinder.net/entity/cf-dc-0089"
  },
  {
   "id": "cf-dc-0090",
   "slug": "leonardo-bologna",
   "name": "Leonardo (CINECA, Bologna)",
   "country": "IT",
   "locality": "Bologna",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "eurohpc-next-three-identities-20261017",
    "name": "Leonardo",
    "host": "CINECA",
    "locality": "Bologna",
    "country": "Italy",
    "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "source_sha256": "91229a3e167d7e952962b88b45354e0028cda33f8cd3f2622369981827a6283a",
    "source_bytes": 139438,
    "source_publication_on": null,
    "source_updated_on": null,
    "observed_at": "2026-10-17T05:35:48.127Z",
    "retrieval_started_at": "2026-10-17T05:35:43.565Z",
    "headers_received_at": "2026-10-17T05:35:48.030Z",
    "independently_reviewed_at": "2026-10-17T05:37:15Z",
    "scope": "identity_host_locality_only",
    "selected_identity_count": 3,
    "directory_stated_systems": 12,
    "complete_directory_fact_admission": false,
    "source_hash_basis": "New bounded one-off raw directory response, not byte-equivalent to historical snapshot",
    "geographic_normalisation": "Locality Bologna normalised from explicit Bologna Technopole location; IT normalised from Italy. Not a street address, geocode or physical boundary."
   },
   "institutional_source": {
    "url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "label": "Read EuroHPC JU's Leonardo directory account",
    "updated_on": null,
    "note": "Official publisher evidence with a general access-calls route, not an immediate allocation or verification that this system participates in a particular current call. Related programme records retain their separately dated conditions and official next steps."
   },
   "related_programme_slugs": [
    "eurohpc-benchmark-and-development-access"
   ],
   "source_notice": {
    "publisher": "European Union / European High-Performance Computing Joint Undertaking",
    "licence": "CC BY 4.0, selected EU-owned content only",
    "licence_url": "https://creativecommons.org/licenses/by/4.0/",
    "scope": "European Union / EuroHPC JU, Our Supercomputers (https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en). Reduced and adapted by ComputeFinder to selected scientific-system name, host and locality facts with original uncertainty wording. Rights notice: https://commission.europa.eu/legal-notice_en . Provided as-is without warranties. No endorsement. Excludes photographs and captions, attributed third-party material, quotations, people, logos, trademarks, technical tables, hardware, performance, rankings and other assets. No blanket domain or recurring-monitoring clearance."
   },
   "notes": "This is an attributed scientific computing system identity, not a verified physical campus, building or phase boundary. Host is not a verified legal operator or owner. No current operation, hardware, capacity, power, capital flow or available compute is inferred. These selected three system identities are not three newly built physical sites or complete directory factual coverage. Related generic EuroHPC Benchmark and Development navigation does not establish current eligibility or participation in a particular call. It preserves the existing programme's 12 October 2026 check date; no deadline, allocation or successful access is reverified. A shared host or place is not authority to merge distinct systems, phases or projects.",
   "facts": [
    {
     "text": "EuroHPC JU lists Leonardo as a supercomputer located in the Bologna Technopole, Italy.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    },
    {
     "text": "EuroHPC JU identifies CINECA as Leonardo's host.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "Six selected EU-authored identity/location and explicit-host statements and twelve-name canonical reconciliation; one fresh original plus four previously checked unchanged legal/access references, not five fresh reads.",
   "chips": [
    {
     "value_text": "EuroHPC names Intel Ice Lake CPUs for Leonardo’s Booster, Sapphire Rapids for Data-Centric, and Ampere-based Da Vinci GPUs.",
     "value_num": null,
     "unit": null,
     "scope": "Only the named Leonardo partitions described by this undated directory entry. No A100 model is inferred from the architecture name; no current installed configuration or phase completion is established.",
     "stage": "unknown",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T02:03:26.681Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only this named system’s directory entry was inspected. No grid-voltage/substation boundary, water-use measurement or verified coordinate point/CRS was identified there; no planning, utility, environmental or parcel file was audited.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/leonardo-bologna",
   "permalink": "https://computefinder.net/entity/cf-dc-0090"
  },
  {
   "id": "cf-dc-0091",
   "slug": "marenostrum-5-barcelona",
   "name": "MareNostrum 5 (BSC, Barcelona)",
   "country": "ES",
   "locality": "Barcelona",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "eurohpc-next-three-identities-20261017",
    "name": "MareNostrum 5",
    "host": "Barcelona Supercomputing Center (BSC)",
    "locality": "Barcelona",
    "country": "Spain",
    "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "source_sha256": "91229a3e167d7e952962b88b45354e0028cda33f8cd3f2622369981827a6283a",
    "source_bytes": 139438,
    "source_publication_on": null,
    "source_updated_on": null,
    "observed_at": "2026-10-17T05:35:48.127Z",
    "retrieval_started_at": "2026-10-17T05:35:43.565Z",
    "headers_received_at": "2026-10-17T05:35:48.030Z",
    "independently_reviewed_at": "2026-10-17T05:37:15Z",
    "scope": "identity_host_locality_only",
    "selected_identity_count": 3,
    "directory_stated_systems": 12,
    "complete_directory_fact_admission": false,
    "source_hash_basis": "New bounded one-off raw directory response, not byte-equivalent to historical snapshot",
    "geographic_normalisation": "ES normalised from explicit Spain; locality as explicitly listed. Not a street address, geocode or physical boundary."
   },
   "institutional_source": {
    "url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "label": "Read EuroHPC JU's MareNostrum 5 directory account",
    "updated_on": null,
    "note": "Official publisher evidence with a general access-calls route, not an immediate allocation or verification that this system participates in a particular current call. Related programme records retain their separately dated conditions and official next steps."
   },
   "related_programme_slugs": [
    "eurohpc-benchmark-and-development-access"
   ],
   "source_notice": {
    "publisher": "European Union / European High-Performance Computing Joint Undertaking",
    "licence": "CC BY 4.0, selected EU-owned content only",
    "licence_url": "https://creativecommons.org/licenses/by/4.0/",
    "scope": "European Union / EuroHPC JU, Our Supercomputers (https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en). Reduced and adapted by ComputeFinder to selected scientific-system name, host and locality facts with original uncertainty wording. Rights notice: https://commission.europa.eu/legal-notice_en . Provided as-is without warranties. No endorsement. Excludes photographs and captions, attributed third-party material, quotations, people, logos, trademarks, technical tables, hardware, performance, rankings and other assets. No blanket domain or recurring-monitoring clearance."
   },
   "notes": "This is an attributed scientific computing system identity, not a verified physical campus, building or phase boundary. Host is not a verified legal operator or owner. No current operation, hardware, capacity, power, capital flow or available compute is inferred. These selected three system identities are not three newly built physical sites or complete directory factual coverage. Related generic EuroHPC Benchmark and Development navigation does not establish current eligibility or participation in a particular call. It preserves the existing programme's 12 October 2026 check date; no deadline, allocation or successful access is reverified. A shared host or place is not authority to merge distinct systems, phases or projects.",
   "facts": [
    {
     "text": "EuroHPC JU lists MareNostrum 5 as a supercomputer located in Barcelona, Spain.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    },
    {
     "text": "EuroHPC JU identifies Barcelona Supercomputing Center (BSC) as MareNostrum 5's host.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "Six selected EU-authored identity/location and explicit-host statements and twelve-name canonical reconciliation; one fresh original plus four previously checked unchanged legal/access references, not five fresh reads.",
   "chips": [
    {
     "value_text": "EuroHPC names Intel Sapphire Rapids CPUs for MareNostrum 5’s GPP and ACC partitions, and NVIDIA Hopper for ACC.",
     "value_num": null,
     "unit": null,
     "scope": "Only the directory’s GPP/ACC description. Next Generation Technology partitions are not admitted or merged here. No specific Hopper model, current installed configuration, phase completion or whole-building status is established.",
     "stage": "unknown",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T02:03:26.681Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "water_use",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only this named system’s directory entry was inspected. No grid-voltage/substation boundary, water-use measurement or verified coordinate point/CRS was identified there; no planning, utility, environmental or parcel file was audited.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    },
    {
     "fields": [
      "pue"
     ],
     "status": "not_admitted",
     "scope": "The directory gives a PUE inequality for its described data centre but does not identify a design, target or measured basis, observation period or precise measurement boundary. No typed PUE value is admitted; clarification requires a separate original operator/technical source.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/marenostrum-5-barcelona",
   "permalink": "https://computefinder.net/entity/cf-dc-0091"
  },
  {
   "id": "cf-dc-0092",
   "slug": "meluxina-bissen",
   "name": "MeluXina (LuxProvide, Bissen)",
   "country": "LU",
   "locality": "Bissen",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "eurohpc-next-three-identities-20261017",
    "name": "MeluXina",
    "host": "LuxProvide",
    "locality": "Bissen",
    "country": "Luxembourg",
    "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "source_sha256": "91229a3e167d7e952962b88b45354e0028cda33f8cd3f2622369981827a6283a",
    "source_bytes": 139438,
    "source_publication_on": null,
    "source_updated_on": null,
    "observed_at": "2026-10-17T05:35:48.127Z",
    "retrieval_started_at": "2026-10-17T05:35:43.565Z",
    "headers_received_at": "2026-10-17T05:35:48.030Z",
    "independently_reviewed_at": "2026-10-17T05:37:15Z",
    "scope": "identity_host_locality_only",
    "selected_identity_count": 3,
    "directory_stated_systems": 12,
    "complete_directory_fact_admission": false,
    "source_hash_basis": "New bounded one-off raw directory response, not byte-equivalent to historical snapshot",
    "geographic_normalisation": "LU normalised from explicit Luxembourg; locality as explicitly listed. Not a street address, geocode or physical boundary."
   },
   "institutional_source": {
    "url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "label": "Read EuroHPC JU's MeluXina directory account",
    "updated_on": null,
    "note": "Official publisher evidence with a general access-calls route, not an immediate allocation or verification that this system participates in a particular current call. Related programme records retain their separately dated conditions and official next steps."
   },
   "related_programme_slugs": [
    "eurohpc-benchmark-and-development-access"
   ],
   "source_notice": {
    "publisher": "European Union / European High-Performance Computing Joint Undertaking",
    "licence": "CC BY 4.0, selected EU-owned content only",
    "licence_url": "https://creativecommons.org/licenses/by/4.0/",
    "scope": "European Union / EuroHPC JU, Our Supercomputers (https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en). Reduced and adapted by ComputeFinder to selected scientific-system name, host and locality facts with original uncertainty wording. Rights notice: https://commission.europa.eu/legal-notice_en . Provided as-is without warranties. No endorsement. Excludes photographs and captions, attributed third-party material, quotations, people, logos, trademarks, technical tables, hardware, performance, rankings and other assets. No blanket domain or recurring-monitoring clearance."
   },
   "notes": "This is an attributed scientific computing system identity, not a verified physical campus, building or phase boundary. Host is not a verified legal operator or owner. No current operation, hardware, capacity, power, capital flow or available compute is inferred. These selected three system identities are not three newly built physical sites or complete directory factual coverage. Related generic EuroHPC Benchmark and Development navigation does not establish current eligibility or participation in a particular call. It preserves the existing programme's 12 October 2026 check date; no deadline, allocation or successful access is reverified. A shared host or place is not authority to merge distinct systems, phases or projects.",
   "facts": [
    {
     "text": "EuroHPC JU lists MeluXina as a supercomputer located in Bissen, Luxembourg.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    },
    {
     "text": "EuroHPC JU identifies LuxProvide as MeluXina's host.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "Six selected EU-authored identity/location and explicit-host statements and twelve-name canonical reconciliation; one fresh original plus four previously checked unchanged legal/access references, not five fresh reads.",
   "chips": [
    {
     "value_text": "EuroHPC lists AMD EPYC CPUs and NVIDIA Ampere A100 GPUs for MeluXina.",
     "value_num": null,
     "unit": null,
     "scope": "Original MeluXina only, not MeluXina-AI. This undated directory entry does not establish installed counts, a configuration-completion event, current whole-facility operation or access.",
     "stage": "unknown",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T02:03:26.681Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only this named system’s directory entry was inspected. No grid-voltage/substation boundary, water-use measurement or verified coordinate point/CRS was identified there; no planning, utility, environmental or parcel file was audited.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/meluxina-bissen",
   "permalink": "https://computefinder.net/entity/cf-dc-0092"
  },
  {
   "id": "cf-dc-0093",
   "slug": "gadi-nci",
   "name": "Gadi (NCI)",
   "country": "AU",
   "locality": null,
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "education-ncris-gadi-selected-case-20261017",
    "name": "Gadi",
    "institution": "National Computational Infrastructure (NCI)",
    "country": "Australia",
    "country_basis": "Australian government report context, explicit country-code normalisation, not a geocode",
    "locality": null,
    "source_url": "https://www.education.gov.au/download/20456/celebrating-20-years-national-collaborative-research-infrastructure-strategy-ncris/45359/document/pdf",
    "source_sha256": "056802002afbad8a1fec255f3dbdda6aadf26b70c9c79f1a7d7abc83828af065",
    "source_bytes": 34705,
    "snapshot_kind": "tool_extracted_pdf_text",
    "raw_pdf_sha256": null,
    "raw_bytes": null,
    "source_publication_on": "2026-06",
    "source_publication_day": null,
    "source_updated_on": null,
    "resource_created_on": "2026-06-25",
    "resource_modified_on": "2026-08-06",
    "observed_at": null,
    "observation_completed_no_later_than": "2026-10-17T05:37:52Z",
    "source_hash_basis": "Complete connected-web extracted PDF text snapshot, 663 numbered lines across 23 pages; not raw PDF bytes or a source-update clock",
    "independently_reviewed_at": "2026-10-17T05:39:02Z",
    "scope": "two attributed historical case-study facts only",
    "reference_rows": 1,
    "pdf_page_index": 19,
    "printed_page": 18
   },
   "institutional_source": {
    "url": "https://www.education.gov.au/download/20456/celebrating-20-years-national-collaborative-research-infrastructure-strategy-ncris/45359/document/pdf",
    "label": "Read the Department of Education NCRIS report (PDF, printed page 18)",
    "updated_on": null,
    "note": "Report dated June 2026; the resource page was created 25 June and modified 6 August 2026, which does not verify a PDF update or current system status. This is historical publisher evidence, not an application page."
   },
   "related_programme_slugs": [
    "ncmas-australia",
    "nci-australia-access-schemes"
   ],
   "source_notice": {
    "publisher": "Australian Government, Department of Education",
    "licence": "CC BY 4.0, selected government-authored document text only",
    "licence_url": "https://creativecommons.org/licenses/by/4.0/",
    "scope": "Celebrating 20 years of the National Collaborative Research Infrastructure Strategy (NCRIS), Department of Education, © Commonwealth of Australia, June 2026 (https://www.education.gov.au/download/20456/celebrating-20-years-national-collaborative-research-infrastructure-strategy-ncris/45359/document/pdf). Reduced and adapted by ComputeFinder to two attributed facts, under the document-specific CC BY 4.0 notice. No endorsement. Copyright policy: https://www.education.gov.au/using-site/copyright . Excludes images, personal quotations, third-party material, Coat of Arms, logos, trademarks, otherwise excluded material, performance and outcome claims, full-report or project-catalogue republication. All NCI website content and its restricted location text are excluded. No blanket domain or recurring-monitoring grant."
   },
   "notes": "This is an attributed scientific-system identity, not a verified physical campus, building or phase boundary. The June 2026 government case study is historical, not a current operating, hardware, availability or performance check. NCI association is not verified legal ownership or operation of a physical facility. City, street address and coordinates remain unknown; no location is carried over from restricted NCI material. Australian country context is explicit geographic normalisation. Related NCI and NCMAS records retain their own earlier dates, closure cautions and official next steps; no current Gadi eligibility, open call, allocation or successful access is established. One selected case study is not a whole-report or national inventory. The full extracted-text fingerprint is explicitly not a raw PDF hash.",
   "facts": [
    {
     "text": "The Department of Education's June 2026 NCRIS report identifies Gadi as a supercomputer associated with NCI.",
     "source_url": "https://www.education.gov.au/download/20456/celebrating-20-years-national-collaborative-research-infrastructure-strategy-ncris/45359/document/pdf"
    },
    {
     "text": "Its dated weather-forecasting case study describes NCI using Gadi for AIFS weather-forecasting work.",
     "source_url": "https://www.education.gov.au/download/20456/celebrating-20-years-national-collaborative-research-infrastructure-strategy-ncris/45359/document/pdf"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "Two selected government-authored Gadi-NCI association and attributed dated AIFS case-study facts; document-specific CC BY 4.0 exclusions and explicitly typed extracted-text provenance only.",
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "The selected Gadi weather-forecasting case in the June 2026 government report does not disclose chip models, grid voltage/substation, explicit PUE kind/value, water accounting or a verified official point/CRS. A software/model deployment does not establish hardware, location, facility operation or power. This is selected-case inspection, not the full NCI source corpus.",
     "source_url": "https://www.education.gov.au/download/20456/celebrating-20-years-national-collaborative-research-infrastructure-strategy-ncris/45359/document/pdf",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Australian Government, Department of Education",
      "licence": "Document-specific CC BY4.0 for selected government text, with stated exclusions.",
      "scope": "Only inspection-limit metadata and ordinary exact report link; no Gadi hardware, capacity, location, current-status or environmental claim.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "Australian Government, Department of Education, Celebrating 20 years of the National Collaborative Research Infrastructure Strategy (NCRIS), June 2026. Selected government text inspected; adapted only into an original scoped inspection-limit account. Exact original linked in source_url. No endorsement.",
      "modification_notice": "Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported.",
      "conditions": "A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. The report-specific CC BY4.0 statement and exclusions were directly inspected. Only an original selected-government-case inspection-limit account and ordinary report link are accepted; no source expression, image, third-party work, mark, hardware, current-status or environmental fact is imported. Commonwealth Coat of Arms, departmental logo, trademarks and otherwise-noted material remain excluded. This licence does not extend to NCI originals or change any retained NCI restriction."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/gadi-nci",
   "permalink": "https://computefinder.net/entity/cf-dc-0093"
  },
  {
   "id": "cf-dc-0094",
   "slug": "lumi-kajaani-csc",
   "name": "LUMI (CSC, Kajaani)",
   "country": "FI",
   "locality": "Kajaani",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "eurohpc-lumi-distinct-identity-20261017",
    "name": "LUMI",
    "host": "CSC (IT Center for Science)",
    "locality": "Kajaani",
    "country": "Finland",
    "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "source_sha256": "91229a3e167d7e952962b88b45354e0028cda33f8cd3f2622369981827a6283a",
    "source_bytes": 139438,
    "source_publication_on": null,
    "source_updated_on": null,
    "observed_at": "2026-10-17T05:35:48.127Z",
    "retrieval_started_at": "2026-10-17T05:35:43.565Z",
    "headers_received_at": "2026-10-17T05:35:48.030Z",
    "independently_reviewed_at": "2026-10-17T05:49:40Z",
    "scope": "identity_host_locality_only",
    "selected_identity_count": 1,
    "directory_stated_systems": 12,
    "complete_directory_fact_admission": false,
    "source_hash_basis": "Reused exact one-off raw directory body acquired 17 October 2026 at 05:35:48.127 UTC; no new source retrieval for this admission",
    "geographic_normalisation": "FI normalised from explicit Finland; Kajaani as explicitly listed. Host punctuation normalised from CSC followed by IT Center for Science. Not a street address, geocode or physical boundary."
   },
   "institutional_source": {
    "url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "label": "Read EuroHPC JU's LUMI directory account",
    "updated_on": null,
    "note": "Official publisher identity evidence and a general access-calls route, not an immediate allocation or verification of current eligibility. Separately recorded programme conditions and dates are unchanged."
   },
   "related_programme_slugs": [
    "lumi-access",
    "eurohpc-benchmark-and-development-access"
   ],
   "source_notice": {
    "publisher": "European Union / European High-Performance Computing Joint Undertaking",
    "licence": "CC BY 4.0, selected EU-owned content only",
    "licence_url": "https://creativecommons.org/licenses/by/4.0/",
    "scope": "European Union / EuroHPC JU, Our Supercomputers (https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en). Reduced and adapted by ComputeFinder to selected scientific-system name, host and locality facts with original uncertainty wording. Rights notice: https://commission.europa.eu/legal-notice_en . Provided as-is without warranties. No endorsement. Excludes photographs and captions, attributed third-party material, quotations, people, logos, trademarks, technical tables, hardware, performance, rankings and other assets. No blanket domain or recurring-monitoring clearance."
   },
   "notes": "This is an attributed scientific computing system identity, not a verified physical campus, building or phase boundary. Host is not a verified legal operator or owner. No current operation, hardware, capacity, power, capital flow or available compute is inferred. LUMI and LUMI-AI are separately named records here, not aliases; this distinction does not establish shared physical facilities or phase boundaries. Existing LUMI-AI facts and their 2 October 2026 check date are not reverified. Related programme records retain their own evidence dates and limitations; naming a system or linking a programme does not establish present eligibility, an open call, allocation or successful access. This is not a newly built physical site or complete directory factual coverage.",
   "facts": [
    {
     "text": "EuroHPC JU lists LUMI as a supercomputer located in Kajaani, Finland.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    },
    {
     "text": "EuroHPC JU identifies CSC (IT Center for Science) as LUMI's host.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "Two selected EU-authored LUMI identity/location and explicit-host statements, twelve-name canonical reconciliation and qualified distinct-record navigation only; existing rights basis and source acquisition reused without new retrieval.",
   "distinct_system_slugs": [
    "lumi-ai-kajaani-csc"
   ],
   "chips": [
    {
     "value_text": "EuroHPC lists AMD EPYC CPUs for LUMI-C and the AMD Instinct GPU family for LUMI-G.",
     "value_num": null,
     "unit": null,
     "scope": "Original LUMI only, distinct from LUMI-AI. This undated entry retains prospective GPU-generation wording and does not identify a GPU model. No installed configuration or current operation is established.",
     "stage": "unknown",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T02:03:26.681Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only this named system’s directory entry was inspected. No grid-voltage/substation boundary, water-use measurement or verified coordinate point/CRS was identified there; no planning, utility, environmental or parcel file was audited.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned source content only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded attributed hardware-family facts and an ordinary unframed source link. No source table, node/chip count, performance, rank, power result, quotation, image, logo, caption or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "European Union / EuroHPC JU, Our Supercomputers; original source linked in source_url. Legal notice: https://commission.europa.eu/legal-notice_en . No endorsement.",
      "modification_notice": "Selected hardware identifiers reduced to an original short factual account, with partition and evidence limits.",
      "conditions": "The selected source links the Commission notice, whose express CC BY 4.0 grant applies only to EU-owned content. All third-party works and industrial-property rights remain excluded regardless of owner location. Product names are descriptive factual identifiers, not a trade-mark licence. The exact seven field statements and eight selected-source limits passed a distinct independent source/use review completed 2026-11-01T02:03:26.681Z. No blanket source or recurring-acquisition grant follows."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/lumi-kajaani-csc",
   "permalink": "https://computefinder.net/entity/cf-dc-0094"
  },
  {
   "id": "cf-dc-0095",
   "slug": "daedalus-lavrio",
   "name": "Daedalus (Lavrio)",
   "country": "GR",
   "locality": "Lavrio",
   "operator": "GRNET",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "eurohpc-remaining-three-identities-20261017",
    "name": "Daedalus",
    "host": null,
    "place_text": "Attica (Lavrio), Greece",
    "source_tense": "future: will be; will be located; operated by coordinated with future verb",
    "source_described_role": {
     "organisation": "GRNET (National Infrastructures for Research and Technology)",
     "role": "prospective operator in the future-tense source account"
    },
    "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "source_sha256": "91229a3e167d7e952962b88b45354e0028cda33f8cd3f2622369981827a6283a",
    "source_bytes": 139438,
    "source_publication_on": null,
    "source_updated_on": null,
    "observed_at": "2026-10-17T05:35:48.127Z",
    "independently_reviewed_at": "2026-10-17T06:13:44Z",
    "scope": "identity_place_and_attributed_role_only",
    "selected_identity_count": 3,
    "directory_stated_systems": 12,
    "complete_directory_fact_admission": false,
    "source_hash_basis": "Reused exact one-off raw directory response acquired 17 October 2026 at 05:35:48.127 UTC; no new source retrieval for this admission",
    "geographic_normalisation": "GR normalised from explicit Greece. Locality Lavrio is the source's parenthetical locality within Attica, not a verified street address or geocode."
   },
   "institutional_source": {
    "url": "https://www.hpc.grnet.gr/en/contact/",
    "label": "Ask GRNET which current call covers DAEDALUS",
    "updated_on": null,
    "note": "Enquiry link checked 11 November 2026. This is GRNET's general access contact, not a verified DAEDALUS application form. Ask for the named call, eligibility, resources and allocation start date. A current DAEDALUS allocation route was not verified in this bounded review; this does not prove no call exists. The separately linked EuroHPC identity evidence and October inauguration account keep their original dates. Ordinary attributed link only; no source text, image or price copied."
   },
   "change_observation": {
    "event": "inauguration_before_public_access",
    "event_on": "2026-10-19",
    "source_publication_on": "2026-10-19",
    "observed_at": "2026-10-21T06:12:28Z",
    "independently_reviewed_at": "2026-10-21T10:28:10Z",
    "source_url": "https://grnet.gr/2026/10/19/national-hpc-daedalus_inauguration/",
    "supported_stage": "Inaugurated while configuration and tests continue before planned user access",
    "access_status": "First-user access is planned gradually during December after full configuration; calls, terms and exact deadlines are not yet announced",
    "unknowns": "Production start, live call URLs, eligibility, allocation, pricing, awarded users and demonstrated service availability",
    "source_use": "Ordinary link and short original factual account only. No source expression, quotation, image, logo, table or dataset is copied; no blanket-domain or recurring-use permission is inferred."
   },
   "related_programme_slugs": [
    "eurohpc-benchmark-and-development-access"
   ],
   "source_notice": {
    "publisher": "European Union / European High-Performance Computing Joint Undertaking",
    "licence": "CC BY 4.0, selected EU-owned content only",
    "licence_url": "https://creativecommons.org/licenses/by/4.0/",
    "scope": "European Union / EuroHPC JU, Our Supercomputers (https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en). Reduced and adapted by ComputeFinder to selected scientific-system identity, stated or intended place and source-described organisational-role facts, retaining source tense and uncertainty. Rights notice: https://commission.europa.eu/legal-notice_en . Provided as-is without warranties. No endorsement. Excludes photographs and captions, attributed third-party material, quotations, people, logos, trademarks, technical tables, hardware, performance, rankings and other assets. No blanket domain or recurring-monitoring clearance."
   },
   "notes": "This is an attributed scientific computing system identity, not a verified physical campus, building or phase boundary. GRNET's separate 19 October 2026 account supports inauguration at Lavrio and identifies GRNET as manager and operator, while also saying configuration and tests precede user services. That attribution is not a separate legal operator or ownership determination. The lifecycle enum remains unknown because inauguration does not establish production operation or general availability, and current operation remains unverified. First-user access is planned gradually during December, but calls, terms and exact deadlines remain unannounced. Related generic EuroHPC Benchmark and Development guidance retains its 12 October 2026 evidence date and does not verify current eligibility, an open call, allocation or participation for DAEDALUS; DAEDALUS eligibility therefore remains unknown. No current available compute, pricing, allocation or delivered access is inferred.",
   "facts": [
    {
     "text": "EuroHPC JU describes Daedalus as a supercomputer that will be located in Attica (Lavrio), Greece.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    },
    {
     "text": "The same directory names GRNET (National Infrastructures for Research and Technology) as Daedalus's prospective operator.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    },
    {
     "text": "GRNET reports that DAEDALUS was inaugurated at Lavrio on 19 October 2026 and identifies GRNET as its manager and operator.",
     "source_url": "https://grnet.gr/2026/10/19/national-hpc-daedalus_inauguration/"
    },
    {
     "text": "The same release says first-user access is planned to begin gradually during December after full configuration, with calls, terms and exact deadlines still to be announced.",
     "source_url": "https://grnet.gr/2026/10/19/national-hpc-daedalus_inauguration/"
    }
   ],
   "checked_on": "2026-10-21",
   "review_by": "2026-10-28",
   "independently_reviewed_on": "2026-10-21",
   "independent_review_scope": "The original six EU-authored identity statements retain their 17 October evidence. The additional review covers GRNET's dated inauguration, manager/operator attribution, configuration boundary, planned December user-access start and still-unannounced access conditions only.",
   "chips": [
    {
     "value_text": "EuroHPC identifies NVIDIA GH200 Grace Hopper Superchips in its DAEDALUS hardware account.",
     "value_num": null,
     "unit": null,
     "scope": "The DAEDALUS scientific computing system described by EuroHPC only. Hardware identity does not establish a whole-facility operating stage, current public access or available compute. No chip count, capacity or configuration-completion date is admitted.",
     "stage": "unknown",
     "basis": "reported",
     "label": "official_source",
     "as_of": null,
     "source_url": "https://www.eurohpc-ju.europa.eu/eurohpc-ju-and-grnet-inaugurate-daedalus-ranked-among-worlds-top-50-supercomputers-2026-10-19_en?prefLang=cs",
     "source_version": null,
     "source_published_on": "2026-10-19",
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-10-31T22:55:44.727Z",
     "checked_on": "2026-10-31",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned article text only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded chip identification from the attributed article and an ordinary unframed source link. Product names are descriptive identifiers only. No copied prose, specification table, performance figure, quantity, logo, image, quotation, mark asset or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "Source: European Union / EuroHPC JU; original article linked in source_url. No endorsement is implied.",
      "modification_notice": "Reduced to a short factual hardware identification with separate scope and uncertainty.",
      "conditions": "This exact new chip-identification use was independently reviewed. It does not extend the earlier directory-use scope or grant recurring acquisition or broader technical-data rights."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_inspected",
     "scope": "This admission checks DAEDALUS hardware identification in one EuroHPC article. Planning, utility, facility-efficiency, water and parcel records were not audited for these unfilled fields.",
     "source_url": "https://www.eurohpc-ju.europa.eu/eurohpc-ju-and-grnet-inaugurate-daedalus-ranked-among-worlds-top-50-supercomputers-2026-10-19_en?prefLang=cs",
     "checked_on": "2026-10-31",
     "source_notice": {
      "publisher": "European Union / European High-Performance Computing Joint Undertaking",
      "licence": "CC BY 4.0 for EU-owned article text only; third-party and industrial-property exclusions retained",
      "scope": "Minimal independently worded chip identification from the attributed article and an ordinary unframed source link. Product names are descriptive identifiers only. No copied prose, specification table, performance figure, quantity, logo, image, quotation, mark asset or underlying dataset is imported.",
      "licence_url": "https://creativecommons.org/licenses/by/4.0/",
      "attribution": "Source: European Union / EuroHPC JU; original article linked in source_url. No endorsement is implied.",
      "modification_notice": "Reduced to a short factual hardware identification with separate scope and uncertainty.",
      "conditions": "This exact new chip-identification use was independently reviewed. It does not extend the earlier directory-use scope or grant recurring acquisition or broader technical-data rights."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/daedalus-lavrio",
   "permalink": "https://computefinder.net/entity/cf-dc-0095"
  },
  {
   "id": "cf-dc-0096",
   "slug": "arrhenius-linkoping-university",
   "name": "Arrhenius (Linköping University campus)",
   "country": "SE",
   "locality": null,
   "operator": null,
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "eurohpc-remaining-three-identities-20261017",
    "name": "Arrhenius",
    "host": null,
    "place_text": "Linköping University campus in Sweden",
    "source_tense": "present: is located; operated by. This row is not described as future merely because earlier batches excluded it.",
    "source_described_role": {
     "organisation": "NAISS (National Academic Infrastructure for Supercomputing in Sweden)",
     "role": "source-described operator, not independently verified legal/current operating status"
    },
    "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "source_sha256": "91229a3e167d7e952962b88b45354e0028cda33f8cd3f2622369981827a6283a",
    "source_bytes": 139438,
    "source_publication_on": null,
    "source_updated_on": null,
    "observed_at": "2026-10-17T05:35:48.127Z",
    "independently_reviewed_at": "2026-10-17T06:13:44Z",
    "scope": "identity_place_and_attributed_role_only",
    "selected_identity_count": 3,
    "directory_stated_systems": 12,
    "complete_directory_fact_admission": false,
    "source_hash_basis": "Reused exact one-off raw directory response acquired 17 October 2026 at 05:35:48.127 UTC; no new source retrieval for this admission",
    "geographic_normalisation": "SE normalised from explicit Sweden. Linköping occurs in the university's name, not as a separately stated city locality; locality stays null. A university-campus descriptor is not a verified campus boundary, precise address or host organisation."
   },
   "institutional_source": {
    "url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "label": "Read EuroHPC JU's Arrhenius directory account",
    "updated_on": null,
    "note": "Official publisher identity, stated or intended place and organisational-role account only. General access-calls navigation is not current system eligibility, an immediate allocation or available compute; related programme facts retain their own dates."
   },
   "related_programme_slugs": [
    "eurohpc-benchmark-and-development-access"
   ],
   "source_notice": {
    "publisher": "European Union / European High-Performance Computing Joint Undertaking",
    "licence": "CC BY 4.0, selected EU-owned content only",
    "licence_url": "https://creativecommons.org/licenses/by/4.0/",
    "scope": "European Union / EuroHPC JU, Our Supercomputers (https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en). Reduced and adapted by ComputeFinder to selected scientific-system identity, stated or intended place and source-described organisational-role facts, retaining source tense and uncertainty. Rights notice: https://commission.europa.eu/legal-notice_en . Provided as-is without warranties. No endorsement. Excludes photographs and captions, attributed third-party material, quotations, people, logos, trademarks, technical tables, hardware, performance, rankings and other assets. No blanket domain or recurring-monitoring clearance."
   },
   "notes": "This is an attributed scientific computing system identity, not a verified physical campus, building or phase boundary. The source-described organisational role is not verification of the legal operator, owner or host. No current operation, hardware, capacity, power, capital flow or available compute is inferred. Publisher publication/update dates are unknown; the observation date is not an announcement, commissioning or service-start date. The source uses present-tense campus wording, not a future-stage statement. Linköping occurs in the university name; city locality remains unknown rather than inferred. Related generic EuroHPC Benchmark and Development guidance retains its 12 October 2026 evidence date. It does not verify current eligibility, an open call, allocation or participation for this system. Three admitted names are not three newly operating physical sites, complete directory factual depth or worldwide coverage.",
   "facts": [
    {
     "text": "EuroHPC JU places Arrhenius at the Linköping University campus in Sweden.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    },
    {
     "text": "The directory names NAISS (National Academic Infrastructure for Supercomputing in Sweden) as the operator of Arrhenius.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "Six exact EU-authored identity, stated/intended place and source-described/intended organisational-role statements, source-tense/geography distinctions and selected twelve-name reconciliation; retained raw body and existing precise licence basis, zero new network reads.",
   "chips": [
    {
     "value_text": "EuroHPC identifies the AMD Turin family for the Arrhenius CPU partition.",
     "value_num": null,
     "unit": null,
     "scope": "Named Arrhenius CPU partition at Linkoping University/NAISS only. Turin is retained at the family/code-name precision actually stated, without an inferred retail part number, CPU count, core count, current installation or available capacity.",
     "stage": "unknown",
     "basis": "reported",
     "label": "source_claim",
     "as_of": null,
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T04:26:23.610Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "EuroHPC Joint Undertaking",
      "licence": "The linked Commission notice applies CC BY 4.0 to EU-owned content unless otherwise stated; third-party material is excluded. No blanket hardware/vendor licence is claimed.",
      "scope": "Only independently worded attributed basic identifiers from the selected Arrhenius and planned Alice Recoque directory paragraphs, with ordinary exact links. No source tables, quantities, performance figures, logos, images, brands as graphics, contacts or linked third-party documents are imported. Independent review accepts only these exact selected facts and ordinary links.",
      "licence_url": "https://commission.europa.eu/legal-notice_en",
      "attribution": "EuroHPC Joint Undertaking; Our Supercomputers; exact directory and legal notice linked. No endorsement.",
      "modification_notice": "Technical identifiers condensed into original concise statements; no specification table or other source expression/asset is reproduced.",
      "conditions": "A different independent review completed at 2026-11-01T04:26:23.610Z. The actual EuroHPC directory footer points to the directly inspected Commission legal notice. Its CC BY4.0 scope applies only to EU-owned content unless otherwise indicated, with attribution/change acknowledgement and third-party/personal/mark exclusions. The exact use is minimal independently worded attributed family/planned-model identifiers and selected-source limit accounts only; no table, quantity, benchmark, image, logo, trademark graphic, quotation, linked third-party document or dataset is imported. No hardware-vendor, whole-directory, domain-wide or recurring-source grant is inferred. Undated source tense does not establish current installation or availability."
     }
    },
    {
     "value_text": "EuroHPC identifies NVIDIA Grace Hopper Superchips for the Arrhenius GPU partition.",
     "value_num": null,
     "unit": null,
     "scope": "Named Arrhenius GPU partition at Linkoping University/NAISS only. No GH200 part number is inferred from the family name. No device count, performance, current installation, availability or host-facility-wide inventory is imported.",
     "stage": "unknown",
     "basis": "reported",
     "label": "source_claim",
     "as_of": null,
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T04:26:23.610Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "EuroHPC Joint Undertaking",
      "licence": "The linked Commission notice applies CC BY 4.0 to EU-owned content unless otherwise stated; third-party material is excluded. No blanket hardware/vendor licence is claimed.",
      "scope": "Only independently worded attributed basic identifiers from the selected Arrhenius and planned Alice Recoque directory paragraphs, with ordinary exact links. No source tables, quantities, performance figures, logos, images, brands as graphics, contacts or linked third-party documents are imported. Independent review accepts only these exact selected facts and ordinary links.",
      "licence_url": "https://commission.europa.eu/legal-notice_en",
      "attribution": "EuroHPC Joint Undertaking; Our Supercomputers; exact directory and legal notice linked. No endorsement.",
      "modification_notice": "Technical identifiers condensed into original concise statements; no specification table or other source expression/asset is reproduced.",
      "conditions": "A different independent review completed at 2026-11-01T04:26:23.610Z. The actual EuroHPC directory footer points to the directly inspected Commission legal notice. Its CC BY4.0 scope applies only to EU-owned content unless otherwise indicated, with attribution/change acknowledgement and third-party/personal/mark exclusions. The exact use is minimal independently worded attributed family/planned-model identifiers and selected-source limit accounts only; no table, quantity, benchmark, image, logo, trademark graphic, quotation, linked third-party document or dataset is imported. No hardware-vendor, whole-directory, domain-wide or recurring-source grant is inferred. Undated source tense does not establish current installation or availability."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only the selected Arrhenius directory paragraphs/partition bullets were inspected. They give no grid voltage/named substation, explicit design/target/measured PUE with period, bounded water withdrawal/consumption/WUE or official point/CRS. Direct liquid cooling wording supplies none of those metrics. This is not an exhaustive operator/planning review.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "EuroHPC Joint Undertaking",
      "licence": "The linked Commission notice applies CC BY 4.0 to EU-owned content unless otherwise stated; third-party material is excluded. No blanket hardware/vendor licence is claimed.",
      "scope": "Only independently worded attributed basic identifiers from the selected Arrhenius and planned Alice Recoque directory paragraphs, with ordinary exact links. No source tables, quantities, performance figures, logos, images, brands as graphics, contacts or linked third-party documents are imported. Independent review accepts only these exact selected facts and ordinary links.",
      "licence_url": "https://commission.europa.eu/legal-notice_en",
      "attribution": "EuroHPC Joint Undertaking; Our Supercomputers; exact directory and legal notice linked. No endorsement.",
      "modification_notice": "Technical identifiers condensed into original concise statements; no specification table or other source expression/asset is reproduced.",
      "conditions": "A different independent review completed at 2026-11-01T04:26:23.610Z. The actual EuroHPC directory footer points to the directly inspected Commission legal notice. Its CC BY4.0 scope applies only to EU-owned content unless otherwise indicated, with attribution/change acknowledgement and third-party/personal/mark exclusions. The exact use is minimal independently worded attributed family/planned-model identifiers and selected-source limit accounts only; no table, quantity, benchmark, image, logo, trademark graphic, quotation, linked third-party document or dataset is imported. No hardware-vendor, whole-directory, domain-wide or recurring-source grant is inferred. Undated source tense does not establish current installation or availability."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/arrhenius-linkoping-university",
   "permalink": "https://computefinder.net/entity/cf-dc-0096"
  },
  {
   "id": "cf-dc-0097",
   "slug": "alice-recoque-tgcc",
   "name": "Alice Recoque (proposed TGCC location)",
   "country": "FR",
   "locality": "Bruyères-le-Châtel",
   "operator": null,
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "planning": [],
   "certifications": [],
   "participation": null,
   "source_reference": {
    "reference_id": "eurohpc-remaining-three-identities-20261017",
    "name": "Alice Recoque",
    "host": null,
    "place_text": "CEA's supercomputing centre TGCC in Bruyères-le-Châtel, France",
    "source_tense": "future: will be located; intended operator follows the future-tense system description. Original duplicated words operated by operated by are grammatical noise, not a second role.",
    "source_described_role": {
     "organisation": "Jules Verne consortium",
     "role": "intended operator in future-tense source account"
    },
    "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "source_sha256": "91229a3e167d7e952962b88b45354e0028cda33f8cd3f2622369981827a6283a",
    "source_bytes": 139438,
    "source_publication_on": null,
    "source_updated_on": null,
    "observed_at": "2026-10-17T05:35:48.127Z",
    "independently_reviewed_at": "2026-10-17T06:13:44Z",
    "scope": "identity_place_and_attributed_role_only",
    "selected_identity_count": 3,
    "directory_stated_systems": 12,
    "complete_directory_fact_admission": false,
    "source_hash_basis": "Reused exact one-off raw directory response acquired 17 October 2026 at 05:35:48.127 UTC; no new source retrieval for this admission",
    "geographic_normalisation": "FR normalised from explicit France. Bruyères-le-Châtel is explicitly stated. CEA/TGCC is a source location descriptor, not separately verified legal ownership or hosting entity."
   },
   "institutional_source": {
    "url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
    "label": "Read EuroHPC JU's Alice Recoque directory account",
    "updated_on": null,
    "note": "Official publisher identity, stated or intended place and organisational-role account only. General access-calls navigation is not current system eligibility, an immediate allocation or available compute; related programme facts retain their own dates."
   },
   "related_programme_slugs": [
    "eurohpc-benchmark-and-development-access"
   ],
   "source_notice": {
    "publisher": "European Union / European High-Performance Computing Joint Undertaking",
    "licence": "CC BY 4.0, selected EU-owned content only",
    "licence_url": "https://creativecommons.org/licenses/by/4.0/",
    "scope": "European Union / EuroHPC JU, Our Supercomputers (https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en). Reduced and adapted by ComputeFinder to selected scientific-system identity, stated or intended place and source-described organisational-role facts, retaining source tense and uncertainty. Rights notice: https://commission.europa.eu/legal-notice_en . Provided as-is without warranties. No endorsement. Excludes photographs and captions, attributed third-party material, quotations, people, logos, trademarks, technical tables, hardware, performance, rankings and other assets. No blanket domain or recurring-monitoring clearance."
   },
   "notes": "This is an attributed scientific computing system identity, not a verified physical campus, building or phase boundary. The source-described organisational role is not verification of the legal operator, owner or host. No current operation, hardware, capacity, power, capital flow or available compute is inferred. Publisher publication/update dates are unknown; the observation date is not an announcement, commissioning or service-start date. The source uses future-tense location wording; it does not establish delivery, installation or a formal current project stage. A shared locality label does not merge this account with Eclairion or establish shared or separate physical buildings, campuses or phases. Related generic EuroHPC Benchmark and Development guidance retains its 12 October 2026 evidence date. It does not verify current eligibility, an open call, allocation or participation for this system. Three admitted names are not three newly operating physical sites, complete directory factual depth or worldwide coverage.",
   "facts": [
    {
     "text": "EuroHPC JU says Alice Recoque will be located at CEA's TGCC supercomputing centre in Bruyères-le-Châtel, France.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    },
    {
     "text": "The directory names the Jules Verne consortium as Alice Recoque's intended operator.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "Six exact EU-authored identity, stated/intended place and source-described/intended organisational-role statements, source-tense/geography distinctions and selected twelve-name reconciliation; retained raw body and existing precise licence basis, zero new network reads.",
   "chips": [
    {
     "value_text": "EuroHPC names AMD EPYC Venice processors for the planned Alice Recoque unified partition.",
     "value_num": null,
     "unit": null,
     "scope": "Announced future Alice Recoque unified partition, stated for TGCC at Bruyeres-le-Chatel. No scalar-partition composition, site-wide inventory, CPU quantities, delivery, commissioning, installed or available capacity is inferred.",
     "stage": "announced",
     "basis": "reported",
     "label": "source_claim",
     "as_of": null,
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T04:26:23.610Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "EuroHPC Joint Undertaking",
      "licence": "The linked Commission notice applies CC BY 4.0 to EU-owned content unless otherwise stated; third-party material is excluded. No blanket hardware/vendor licence is claimed.",
      "scope": "Only independently worded attributed basic identifiers from the selected Arrhenius and planned Alice Recoque directory paragraphs, with ordinary exact links. No source tables, quantities, performance figures, logos, images, brands as graphics, contacts or linked third-party documents are imported. Independent review accepts only these exact selected facts and ordinary links.",
      "licence_url": "https://commission.europa.eu/legal-notice_en",
      "attribution": "EuroHPC Joint Undertaking; Our Supercomputers; exact directory and legal notice linked. No endorsement.",
      "modification_notice": "Technical identifiers condensed into original concise statements; no specification table or other source expression/asset is reproduced.",
      "conditions": "A different independent review completed at 2026-11-01T04:26:23.610Z. The actual EuroHPC directory footer points to the directly inspected Commission legal notice. Its CC BY4.0 scope applies only to EU-owned content unless otherwise indicated, with attribution/change acknowledgement and third-party/personal/mark exclusions. The exact use is minimal independently worded attributed family/planned-model identifiers and selected-source limit accounts only; no table, quantity, benchmark, image, logo, trademark graphic, quotation, linked third-party document or dataset is imported. No hardware-vendor, whole-directory, domain-wide or recurring-source grant is inferred. Undated source tense does not establish current installation or availability."
     }
    },
    {
     "value_text": "EuroHPC names AMD Instinct MI430X accelerators for the planned Alice Recoque unified partition.",
     "value_num": null,
     "unit": null,
     "scope": "Announced future Alice Recoque unified accelerated nodes only, stated for TGCC at Bruyeres-le-Chatel. No GPU quantities, performance, delivery, commissioning, operation, current availability or neighbouring-system hardware is inferred.",
     "stage": "announced",
     "basis": "reported",
     "label": "source_claim",
     "as_of": null,
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "source_version": null,
     "source_published_on": null,
     "source_updated_on": null,
     "retrieved_at": null,
     "reviewed_at": "2026-11-01T04:26:23.610Z",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "EuroHPC Joint Undertaking",
      "licence": "The linked Commission notice applies CC BY 4.0 to EU-owned content unless otherwise stated; third-party material is excluded. No blanket hardware/vendor licence is claimed.",
      "scope": "Only independently worded attributed basic identifiers from the selected Arrhenius and planned Alice Recoque directory paragraphs, with ordinary exact links. No source tables, quantities, performance figures, logos, images, brands as graphics, contacts or linked third-party documents are imported. Independent review accepts only these exact selected facts and ordinary links.",
      "licence_url": "https://commission.europa.eu/legal-notice_en",
      "attribution": "EuroHPC Joint Undertaking; Our Supercomputers; exact directory and legal notice linked. No endorsement.",
      "modification_notice": "Technical identifiers condensed into original concise statements; no specification table or other source expression/asset is reproduced.",
      "conditions": "A different independent review completed at 2026-11-01T04:26:23.610Z. The actual EuroHPC directory footer points to the directly inspected Commission legal notice. Its CC BY4.0 scope applies only to EU-owned content unless otherwise indicated, with attribution/change acknowledgement and third-party/personal/mark exclusions. The exact use is minimal independently worded attributed family/planned-model identifiers and selected-source limit accounts only; no table, quantity, benchmark, image, logo, trademark graphic, quotation, linked third-party document or dataset is imported. No hardware-vendor, whole-directory, domain-wide or recurring-source grant is inferred. Undated source tense does not establish current installation or availability."
     }
    }
   ],
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only the selected Alice Recoque directory paragraphs were inspected. They do not state grid voltage/named substation, explicit PUE kind/period, bounded water withdrawal/consumption/WUE or an official point/CRS. Future liquid-cooling language is not a measured water account. The provisional scalar-partition description is excluded; its stated mid-2026 announcement expectation is not evidence of a later event.",
     "source_url": "https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "EuroHPC Joint Undertaking",
      "licence": "The linked Commission notice applies CC BY 4.0 to EU-owned content unless otherwise stated; third-party material is excluded. No blanket hardware/vendor licence is claimed.",
      "scope": "Only independently worded attributed basic identifiers from the selected Arrhenius and planned Alice Recoque directory paragraphs, with ordinary exact links. No source tables, quantities, performance figures, logos, images, brands as graphics, contacts or linked third-party documents are imported. Independent review accepts only these exact selected facts and ordinary links.",
      "licence_url": "https://commission.europa.eu/legal-notice_en",
      "attribution": "EuroHPC Joint Undertaking; Our Supercomputers; exact directory and legal notice linked. No endorsement.",
      "modification_notice": "Technical identifiers condensed into original concise statements; no specification table or other source expression/asset is reproduced.",
      "conditions": "A different independent review completed at 2026-11-01T04:26:23.610Z. The actual EuroHPC directory footer points to the directly inspected Commission legal notice. Its CC BY4.0 scope applies only to EU-owned content unless otherwise indicated, with attribution/change acknowledgement and third-party/personal/mark exclusions. The exact use is minimal independently worded attributed family/planned-model identifiers and selected-source limit accounts only; no table, quantity, benchmark, image, logo, trademark graphic, quotation, linked third-party document or dataset is imported. No hardware-vendor, whole-directory, domain-wide or recurring-source grant is inferred. Undated source tense does not establish current installation or availability."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "page_url": "https://computefinder.net/data-centres/alice-recoque-tgcc",
   "permalink": "https://computefinder.net/entity/cf-dc-0097"
  },
  {
   "id": "cf-dc-0098",
   "slug": "acr2-accra",
   "name": "ACR2 Data Centre",
   "country": "GH",
   "locality": "Accra",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "source_reference": {
    "reference_id": "ghana-acr2-historical-account-20261017",
    "source_url": "https://moc.gov.gh/2025/10/31/digital-realty-opens-state-of-the-art-acr2-data-centre-in-accra/",
    "source_publication_on": "2025-10-31",
    "source_updated_on": null,
    "observed_at": "2026-10-17T14:35:42Z",
    "independently_reviewed_at": "2026-10-17T14:37:47Z",
    "source_sha256": null,
    "source_bytes": null,
    "parsed_evidence_sha256": "b24adbd8bfe5224bc2331d0166409bc4bf64e1cda3a54d20e351408e58c27c97",
    "source_hash_basis": "SHA256 of retained connected-web parsed original response bundle from root read at 14:36:44 UTC, not raw origin bytes. Raw body hash, byte count and origin acquisition time are unknown.",
    "scope": "Two minimal attributed historical identity/locality and commissioning-report facts from one complete 90-line article, not a directory or current-stage audit.",
    "selected_identity_count": 1,
    "event_date": null,
    "geographic_normalisation": "GH normalised from Ghana; Accra is a locality, not a street address, coordinate, campus boundary or ministry office address."
   },
   "institutional_source": {
    "url": "https://moc.gov.gh/2025/10/31/digital-realty-opens-state-of-the-art-acr2-data-centre-in-accra/",
    "label": "Read Ghana's ministry account dated 31 October 2025",
    "updated_on": null,
    "note": "Read the historical official report and its date. This is not a current service, allocation, purchase, availability or application route."
   },
   "source_notice": {
    "publisher": "Ministry of Communication, Digital Technology and Innovations, Ghana",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "ComputeFinder independently states two minimal attributed basic facts and provides an ordinary unframed link. No article narrative, quotations, images, logos, personal/contact details, tables or datasets are reproduced or adapted. No endorsement, blanket source clearance or recurring-monitoring grant. No applicable reuse prohibition was visible in the complete article; bounded terms discovery was inconclusive, not proof none exists. Any newly evidenced applicable restriction requires review."
   },
   "notes": "The ministry account published 31 October 2025 identifies ACR2 in Accra and reports commissioning. This historical account is not verification of current operation or available compute. Current stage, legal operator/owner, capacity, power, cooling, connectivity, access, street address and coordinates remain unknown. The ministry footer address is not this facility address. Existing Onix Accra 1 and Digital Realty company records are not aliases or evidence of a shared campus or phase. One selected historical omission is not a new 2026 market arrival or Ghana/Africa completeness.",
   "facts": [
    {
     "text": "Ghana's communication ministry identifies ACR2 Data Centre in Accra in its 31 October 2025 account.",
     "source_url": "https://moc.gov.gh/2025/10/31/digital-realty-opens-state-of-the-art-acr2-data-centre-in-accra/"
    },
    {
     "text": "The ministry reports commissioning in that dated account; it is a historical report, not a current operating-stage check.",
     "source_url": "https://moc.gov.gh/2025/10/31/digital-realty-opens-state-of-the-art-acr2-data-centre-in-accra/"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "Two minimal attributed historical facts, exact basic-fact/link use, facility grain and deduplication; not source narrative adaptation, present operation, operator/owner, capacity, access or global coverage.",
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "Only the selected 31 October 2025 ministry article was inspected. It states no grid voltage/named substation, design/target/measured PUE, bounded water withdrawal/consumption/WUE, hardware model identifier or explicit facility point/CRS. An IT-load/rack statement is not any of these fields and is not imported. The ministry office address is not a facility coordinate. No current whole-facility stage is rechecked.",
     "source_url": "https://moc.gov.gh/2025/10/31/digital-realty-opens-state-of-the-art-acr2-data-centre-in-accra/",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "Ghana Ministry of Communication, Digital Technology and Innovations",
      "licence": "Copyright retained; no explicit open licence verified for the selected ministry article.",
      "scope": "Only an independently worded bounded selected-article inspection-limit account and ordinary exact link. No article narrative, quantities, quotations, photographs, contact/address data, downloadable assets or developer content is imported. Independent review accepts only this original selected-article inspection-limit account and ordinary link.",
      "licence_url": null,
      "attribution": "Ghana ministry; selected 31 October 2025 article linked; no endorsement.",
      "modification_notice": "Original concise description of the bounded check only; source expression and assets are excluded.",
      "conditions": "A different independent review completed at 2026-11-01T04:26:23.610Z. The selected ministry article and copyright footer were directly inspected. Only an original bounded inspection-limit account and ordinary exact link are accepted; no article prose, quotation, IT-load/rack quantity, photograph, ministry contact/address, form or asset is imported. Government authorship is not public domain or an explicit open licence. The separate DigitalRealty operator-source/notice hold remains unchanged; no current facility or licence conclusion is transferred."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "decision_evidence": {
    "checked_on": "2026-10-17",
    "review_by": "2026-10-23",
    "independently_reviewed_at": "2026-10-17T19:39:38Z",
    "source_updated_on": null,
    "event_date": null,
    "retrieved_at": null,
    "raw_body_sha256": null,
    "raw_body_bytes": null,
    "mode": "link_only",
    "title": "ACR2 source route",
    "claims": [],
    "source_url": "https://www.digitalrealty.com/data-centers/emea/accra/acr2",
    "source_label": "Digital Realty ACR2 source",
    "publisher": "Digital Realty",
    "source_publication_date": null,
    "observed_at_upper_bound": "2026-10-17T19:37:08Z",
    "parsed_evidence": {
     "sha256": "e8e84e6363a165c669ffeb86466c0e27b539315cc667b3dad1a3876ca2cb6465",
     "kind": "Complete connected-tool parsed source-page response block including its wrapper, not origin HTML or factual-reuse clearance"
    },
    "next_step": "Open the original for its dates, scope and conditions. This link does not verify current operation or availability.",
    "limitations": "Source discovery only. No factual content from this page is admitted here. Current stage, capacity, exact physical identity, legal owner or operator, location and available compute are not newly verified. The existing historical ministry account and its original clocks remain unchanged. No source publication or update date was established by this link check.",
    "source_notice": {
     "publisher": "Digital Realty Trust",
     "licence": "Copyright retained; ordinary link only",
     "licence_url": null,
     "scope": "Ordinary unframed no-charge link with neutral source identification only. No source facts, narrative, quotations, images, brochure, tables, contacts or datasets reproduced or adapted; no endorsement, product interaction, open licence, blanket domain or recurring-monitoring grant. Actual linked Terms and Legal destinations returned parsed navigation/footer shells without substantive conditions. Those conditions remain unknown, not permission or proof that restrictions are absent. Factual reuse remains held until readable applicable exact-use conditions or separately usable evidence and independent review; do not repeat the unchanged shell fetch or paraphrase around this hold."
    }
   },
   "page_url": "https://computefinder.net/data-centres/acr2-accra",
   "permalink": "https://computefinder.net/entity/cf-dc-0098"
  },
  {
   "id": "cf-dc-0130",
   "slug": "paix-acc1-accra",
   "name": "PAIX Accra (ACC-1)",
   "aliases": [
    "PAIX ACC-1"
   ],
   "country": "GH",
   "locality": "Accra",
   "operator": "PAIX Data Centres",
   "owner": null,
   "record_scope": "facility",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "location": {
    "address": "42 Ring Road Central, Accra, Ghana",
    "precision": "address",
    "source_url": "https://www.paix.io/ghana",
    "source_date": null,
    "checked_on": "2026-11-11",
    "note": "Operator-reported facility address. Exact entrance, parcel boundary and coordinates are not verified; confirm visitor and delivery directions directly."
   },
   "institutional_source": {
    "url": "https://www.paix.io/ghana",
    "label": "Ask PAIX about Accra ACC-1 colocation",
    "updated_on": null,
    "note": "Use the Ghana facility page for the local contact and Book a Tour route. Confirm rack space, power, network connections and deployment dates for your requirements; a tour request is not a capacity reservation."
   },
   "source_notice": {
    "publisher": "PAIX Data Centres",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity and location facts with an ordinary operator link. No marketing text, specifications, images, maps or personal details reproduced. No endorsement or current availability claim."
   },
   "notes": "PAIX identifies its Accra facility through its Ghana page and ACC-1 factsheet link. It is recorded separately from ACR2 in Accra; the sources read do not establish whether they share a building, campus or operator. Current operating stage, available space, power and prices are not verified here.",
   "facts": [
    {
     "text": "PAIX identifies its Accra facility on its Ghana page and links an ACC-1 factsheet.",
     "source_url": "https://www.paix.io/ghana"
    },
    {
     "text": "The operator gives the facility address as 42 Ring Road Central, Accra, Ghana, and provides a local contact and tour-enquiry route.",
     "source_url": "https://www.paix.io/ghana"
    }
   ],
   "checked_on": "2026-11-11",
   "review_by": "2026-12-11",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/paix-acc1-accra",
   "permalink": "https://computefinder.net/entity/cf-dc-0130"
  },
  {
   "id": "cf-dc-0131",
   "slug": "onix-accra-amrahia",
   "name": "Onix Accra",
   "country": "GH",
   "locality": "Amrahia-Katamanso, Accra",
   "operator": "Onix Data Centres",
   "owner": null,
   "record_scope": "facility",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "location": {
    "address": "Amrahia-Katamanso towards Dodowa, Accra, Ghana",
    "precision": "locality",
    "source_url": "https://onixdatacentres.com/contact-us/",
    "source_date": null,
    "checked_on": "2026-11-11",
    "note": "Operator-reported directional locality, not a verified street address or entrance. Confirm delivery and visitor directions directly. Do not substitute a company office address or infer coordinates."
   },
   "institutional_source": {
    "url": "https://onixdatacentres.com/contact-us/",
    "label": "Ask Onix about colocation or virtual machines",
    "updated_on": null,
    "note": "For your own hardware, specify the Accra colocation facility near Amrahia-Katamanso. For a virtual-machine enquiry, ask where the workload would be hosted and confirm CPU, memory, storage, network access, support, price and start date. GPU support and current availability are not verified here. An enquiry is not a reservation."
   },
   "source_notice": {
    "publisher": "Onix Data Centres",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, locality and advertised-service facts with ordinary operator links. No marketing text, certification claims, specifications, prices, maps, images or personal contacts reproduced; no endorsement or availability claim."
   },
   "notes": "Onix advertises both colocation and virtual machines. These are different enquiry paths: colocation is for your own equipment, while the VM service needs a separate specification and hosting-location check. The operator-level VM page does not establish that a particular workload will run at this Accra facility. No capacity, current operating stage, certification, power, efficiency, GPU or available-compute inference is made. This is not a newly opened facility or an additional Onix campus.",
   "facts": [
    {
     "text": "Onix identifies an Accra colocation facility on its website.",
     "source_url": "https://onixdatacentres.com/"
    },
    {
     "text": "Its contact page labels the data-centre location as Amrahia-Katamanso towards Dodowa, Accra, Ghana, and provides an enquiry route.",
     "source_url": "https://onixdatacentres.com/contact-us/"
    },
    {
     "text": "Onix advertises a virtual-machine service with a Talk to Us enquiry route. Confirm the hosting location and workload specification directly.",
     "source_url": "https://onixdatacentres.com/home/virtual-machine/"
    }
   ],
   "checked_on": "2026-11-11",
   "review_by": "2026-12-11",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/onix-accra-amrahia",
   "permalink": "https://computefinder.net/entity/cf-dc-0131"
  },
  {
   "id": "cf-dc-0099",
   "slug": "malawi-national-data-centre-lilongwe",
   "name": "National Data Centre, Lilongwe",
   "country": "MW",
   "locality": "Lilongwe",
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "source_reference": {
    "reference_id": "malawi-lilongwe-historical-account-20261017",
    "source_url": "https://dmap.pppc.mw/news/national-data-centre-ll-completed-set-to-strengthen-malawi-s-digital-infrastructure",
    "source_publication_on": "2026-04-28",
    "source_updated_on": null,
    "observed_at": "2026-10-17T15:35:03Z",
    "observation_basis": "Observation upper bound from an actual runtime clock after the complete parsed original returned; exact fetch completion and origin acquisition times are unknown.",
    "retrieved_at": null,
    "independently_reviewed_at": "2026-10-17T15:36:27Z",
    "source_sha256": null,
    "source_bytes": null,
    "parsed_evidence_sha256": "f2d04edee7c17dddca8d0bb1e8174157b4e941f4e023ebd942f627927a5008ab",
    "source_hash_basis": "SHA256 of the retained connected-web parsed original response bundle, including its wrapper; not raw origin bytes. Raw body hash, byte count and origin acquisition time are unknown.",
    "scope": "Two minimal attributed historical identity/locality and civil/infrastructure-installation milestone facts from one complete original article; not a directory, phase inventory or current-stage audit.",
    "selected_identity_count": 1,
    "event_date": null,
    "geographic_normalisation": "MW normalised from Malawi; Lilongwe is a locality, not a street address, coordinate or campus boundary. The title suffix LL is not expanded into Roman II or a phase number."
   },
   "institutional_source": {
    "url": "https://dmap.pppc.mw/news/national-data-centre-ll-completed-set-to-strengthen-malawi-s-digital-infrastructure",
    "label": "Read the PPPC/DMAP account dated 28 April 2026",
    "updated_on": null,
    "note": "Read the dated official construction account. This is not a current service, allocation, purchase, availability or application route."
   },
   "source_notice": {
    "publisher": "Public Private Partnership Commission / Digital Malawi Acceleration Project (PPPC/DMAP)",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "ComputeFinder independently states two minimal attributed basic facts and provides an ordinary unframed link. No article narrative, quotations, images, logos, personal/contact details, tables or datasets are reproduced or adapted. No endorsement, blanket source clearance or recurring-monitoring grant. Copyright remains with the source. The actual linked terms/privacy pages contain parsed navigation/footer shells without substantive notice text; this bounded inspection is not proof that no other terms exist. No applicable restriction on this precise minimal factual account or ordinary link was visible. Any newly evidenced applicable restriction requires review."
   },
   "notes": "The PPPC/DMAP account published 28 April 2026 identifies the National Data Centre in Lilongwe and reports a civil/infrastructure-installation completion milestone. This is not verification of present operation, complete technical readiness, capacity or available compute. Current legal operator/owner, power, cooling, connectivity, access, street address and coordinates remain unknown. Additional-server plans, hosted-system counts, funding and the separate Blantyre disaster-recovery site are excluded. The article title suffix LL does not establish Roman II, an expansion or another physical phase. The institutional footer address is not a facility address. One selected historical omission is not a new October market arrival or Malawi/Africa completeness.",
   "facts": [
    {
     "text": "A PPPC/DMAP account published on 28 April 2026 identifies the National Data Centre in Lilongwe, Malawi.",
     "source_url": "https://dmap.pppc.mw/news/national-data-centre-ll-completed-set-to-strengthen-malawi-s-digital-infrastructure"
    },
    {
     "text": "That dated account reports completion of the civil and infrastructure installation works; it is a historical construction milestone, not a current operating-stage or availability check.",
     "source_url": "https://dmap.pppc.mw/news/national-data-centre-ll-completed-set-to-strengthen-malawi-s-digital-infrastructure"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "Two minimal attributed basic facts, exact factual-account/link use, historical milestone, facility grain and deduplication. Excludes present operation, complete technical readiness, capacity, operator/owner, access, phase identity, separate disaster recovery and global coverage.",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "decision_evidence": {
    "checked_on": "2026-10-17",
    "review_by": "2026-10-23",
    "independently_reviewed_at": "2026-10-17T19:39:38Z",
    "source_updated_on": null,
    "event_date": null,
    "retrieved_at": null,
    "raw_body_sha256": null,
    "raw_body_bytes": null,
    "mode": "facts",
    "title": "Lilongwe historical location and site roles",
    "claims": [
     "The PPPC project account published on 3 September 2025 locates the National Data Centre at the Department of E-Government premises along Paul Kagame Road in Lilongwe.",
     "That account identifies Lilongwe as the primary site and designates the Mandala Data Centre in Blantyre as its separate disaster-recovery site."
    ],
    "source_url": "https://digmap.pppc.mw/updated-environmental-and-social-management-plan-for-the-construction-and-operation-of-a-government-data-centre-in-malawi-at-the-department-of-e-government-in-lilongwe/",
    "source_label": "PPPC: Lilongwe location and separate site-role account",
    "publisher": "Public Private Partnership Commission / Digital Malawi Project",
    "source_publication_date": "2025-09-03",
    "observed_at_upper_bound": "2026-10-17T19:37:08Z",
    "parsed_evidence": {
     "sha256": "b56722462bf6cf4e9730bff8b191ee5b0be72ba489d79d4c3306afb7a9955e72",
     "kind": "Complete connected-tool parsed landing-account response block including its wrapper, not raw origin bytes or the linked ESMP document"
    },
    "next_step": "Read the dated PPPC account for its location and site-role context, then inspect the original documents and any later evidence directly before relying on current status.",
    "limitations": "Historical described premises and site roles only, not coordinates, a building boundary, legal owner or operator, current stage, completed replication, operation, compliance or available compute. Mandala is a separate disaster-recovery reference, not a new facility admission, alias or merged phase. The underlying ESMP was not read or admitted. The earlier April 2026 milestone and all canonical facility facts and dates remain unchanged.",
    "source_notice": {
     "publisher": "Public Private Partnership Commission",
     "licence": "Source copyright retained; exact basic-fact use assessed only",
     "licence_url": null,
     "scope": "Two minimal attributed independently worded basic location and site-role facts and an ordinary unframed original link only. Copyright 2021 PPPC retained. No source narrative, quotations, plan, attachments, tables, maps, images, contacts or datasets reproduced or adapted. No open licence, endorsement, blanket source clearance or recurring-monitoring grant. No express precise-use restriction was visible in the complete landing account and its links/footer; this is not a guarantee that no other terms exist. Reassess newly evidenced applicable restrictions without a paraphrase workaround."
    }
   },
   "page_url": "https://computefinder.net/data-centres/malawi-national-data-centre-lilongwe",
   "permalink": "https://computefinder.net/entity/cf-dc-0099"
  },
  {
   "id": "cf-dc-0100",
   "slug": "elidz-data-centre",
   "name": "ELIDZ data centre",
   "country": "ZA",
   "locality": null,
   "operator": null,
   "owner": null,
   "lat": null,
   "lon": null,
   "street_address": null,
   "access": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "source_reference": {
    "reference_id": "elidz-historical-account-20261017",
    "source_url": "https://www.elidz.co.za/elidz-unveils-r330-million-digital-infrastructure-projects-to-drive-eastern-cape-growth/",
    "source_publication_on": "2026-05-07",
    "source_updated_on": null,
    "observed_at": "2026-10-17T15:50:48Z",
    "observation_basis": "Observation upper bound from an actual runtime clock after the complete parsed entity original returned; exact fetch completion and origin acquisition times are unknown.",
    "retrieved_at": null,
    "independently_reviewed_at": "2026-10-17T15:53:08Z",
    "source_sha256": null,
    "source_bytes": null,
    "parsed_evidence_sha256": "392004e928a10e0cedd4236ab4e3d91704a8edf19fbe0fb61a7b4526a79dee4c",
    "source_hash_basis": "SHA256 of the retained connected-web parsed entity-original response bundle, including its wrapper; not raw origin bytes. Raw body hash, byte count and origin acquisition time are unknown.",
    "scope": "Two minimal entity-attributed historical facts about one data-centre reference within the Zone, not the other portfolio projects, a phase inventory or a current-stage audit. The descriptive label is not a verified formal facility name or building ID.",
    "selected_identity_count": 1,
    "event_date": null,
    "geographic_normalisation": "ZA from the Eastern Cape, South Africa institutional context. Within the Zone is directly reported; the East London institution name is not used to infer a city, street address, coordinate, campus boundary or physical phase."
   },
   "institutional_source": {
    "url": "https://www.elidz.co.za/elidz-unveils-r330-million-digital-infrastructure-projects-to-drive-eastern-cape-growth/",
    "label": "Read the ELIDZ account dated 7 May 2026",
    "updated_on": null,
    "note": "Read the dated entity account and its conditions. This is not a current service, allocation, purchase, availability or application route."
   },
   "source_notice": {
    "publisher": "East London Industrial Development Zone SOC Ltd (ELIDZ)",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "ComputeFinder independently states two minimal attributed basic facts and provides an ordinary unframed original link. No source narrative, quotations, images, logos, personal/contact details, tables or datasets are reproduced or adapted. Copyright remains with the source; no open licence, public-domain status, express linking grant, endorsement, blanket source clearance or recurring-monitoring grant is asserted. No applicable express restriction on this exact minimal factual account or ordinary link was visible in the inspected entity article and home. The actual disclaimer destination and its conditions remain uninspected; that unknown is neither presumed permission nor a presumed prohibition. Any newly evidenced applicable restriction requires review."
   },
   "notes": "ELIDZ data centre is a descriptive institution-qualified label, not a verified formal name, building ID or phase. The entity account published 7 May 2026 identifies one data centre within the Zone and describes it as operational in that historical account. Present operation and available compute have not been independently verified. Current legal operator/owner, capacity, technical readiness, access, city, street address, coordinates, power, cooling and connectivity remain unknown. Other portfolio projects, investment amounts, tier/ISO/uptime assertions, jobs and promised benefits are excluded. The provincial companion is not independent corroboration of these two entity-attributed facts. One selected historical reference is not a new October market arrival, a unique physical-phase census or South Africa/Africa completeness.",
   "facts": [
    {
     "text": "An ELIDZ account dated 7 May 2026 identifies a data centre within the East London Industrial Development Zone.",
     "source_url": "https://www.elidz.co.za/elidz-unveils-r330-million-digital-infrastructure-projects-to-drive-eastern-cape-growth/"
    },
    {
     "text": "That dated account describes the data centre as operational within the Zone; present operation and available compute have not been independently verified.",
     "source_url": "https://www.elidz.co.za/elidz-unveils-r330-million-digital-infrastructure-projects-to-drive-eastern-cape-growth/"
    }
   ],
   "checked_on": "2026-10-17",
   "review_by": "2026-10-23",
   "independently_reviewed_on": "2026-10-17",
   "independent_review_scope": "Two minimal entity-attributed historical facts and ordinary linking, exact basic-fact use, descriptive identity and facility grain. Excludes current operation, availability, capacity, tier/ISO/uptime, legal owner/operator, precise geography, phase identity, other portfolio projects and realised outcomes.",
   "inspection_limits": [
    {
     "fields": [
      "grid_connection",
      "pue",
      "water_use",
      "chips",
      "coordinates"
     ],
     "status": "not_stated_in_inspected_source",
     "scope": "The selected data-centre paragraph gives no chip models, connection voltage/named substation, explicit PUE kind/value, bounded water measure or official point/CRS. A generic scalable MW label, Tier-aligned language, uptime, project funding and other facilities do not fill these fields. No sums, certification validation or fresh current-stage claim.",
     "source_url": "https://www.elidz.co.za/elidz-unveils-r330-million-digital-infrastructure-projects-to-drive-eastern-cape-growth/",
     "checked_on": "2026-11-01",
     "source_notice": {
      "publisher": "East London Industrial Development Zone SOC Ltd",
      "licence": "No source-specific open licence verified.",
      "scope": "Selected-release inspection-limit metadata and ordinary link only; no new technical field.",
      "licence_url": null,
      "attribution": "East London Industrial Development Zone SOC Ltd; exact original linked. No endorsement.",
      "modification_notice": "Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported.",
      "conditions": "A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only this original selected-source inspection-limit account and ordinary link. No new physical-field, stage, capacity, certification or availability fact is imported. Copyright/source rights remain with their holders; no government/public-entity public-domain, blanket content, service-use or recurring-source grant is inferred. Any separately failed or restricted source remains held; no body, asset, contact or dataset is retained."
     }
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "page_url": "https://computefinder.net/data-centres/elidz-data-centre",
   "permalink": "https://computefinder.net/entity/cf-dc-0100"
  },
  {
   "id": "cf-dc-0101",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "independently_reviewed_on": "2026-11-10",
   "independent_review_scope": "Facility identities, location originals, campus reference-point conversions, source-use limits and operator next steps only; current operation, capacity and availability remain unknown.",
   "slug": "ark-cody-park-farnborough",
   "name": "Ark Cody Park data centre campus",
   "record_scope": "campus",
   "country": "GB",
   "locality": "Farnborough, Hampshire",
   "operator": "Ark Data Centres Limited",
   "lat": 51.27889,
   "lon": -0.79262,
   "location": {
    "address": "A57, Cody Park, Old Ively Road, Farnborough, Hampshire, GU14 0LH",
    "precision": "campus",
    "source_url": "https://assets.publishing.service.gov.uk/media/5e328b0ced915d09393b8808/Permit_VP3235DJ.pdf",
    "checked_on": "2026-11-10",
    "source_date": "2020-01-27",
    "grid_reference": "484310, 153997 (British National Grid)",
    "note": "Campus reference point converted from the Environment Agency issued permit, introductory note, page 2. It is not a building entrance. The public-register point differs; this record retains the dated issued-permit point."
   },
   "institutional_source": {
    "url": "https://www.ark-d-c.com/",
    "label": "Visit Ark to discuss colocation or hosting",
    "updated_on": null,
    "note": "Operator homepage and enquiry route. Ask Ark to confirm the campus, service, access and current availability."
   },
   "source_notice": {
    "publisher": "Environment Agency / GOV.UK",
    "licence": "Open Government Licence v3.0, except third-party material",
    "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
    "scope": "Contains public sector information licensed under the Open Government Licence v3.0. Original attributed summaries of regulator-issued facility identity, address and site-reference facts only. No operator website content, applicant reports, diagrams, logos or legal conditions reproduced. Coordinates are our conversion of the issued notice reference from British National Grid to WGS84, rounded to five decimal places; they identify a campus reference point, not a building boundary or entrance. No endorsement or current permit-compliance, operating-stage or availability conclusion."
   },
   "notes": "A campus record for the Farnborough installation identified by the Environment Agency. Individual buildings are not counted separately here. The dated permit identifies a location and operator; current operation, available compute and capacity have not been verified.",
   "facts": [
    {
     "text": "The Environment Agency identifies Cody Park Data Centre in Farnborough and names Ark Data Centres Limited as its operator.",
     "source_url": "https://www.gov.uk/government/publications/gu14-0lh-ark-data-centres-limited-environmental-permit-issued-eprvp3235dja001"
    },
    {
     "text": "Its issued permit locates the installation at A57, Cody Park, Old Ively Road, Farnborough, Hampshire GU14 0LH.",
     "source_url": "https://assets.publishing.service.gov.uk/media/5e328b0ced915d09393b8808/Permit_VP3235DJ.pdf"
    },
    {
     "text": "The permit introductory note gives the site reference as British National Grid 484310, 153997.",
     "source_url": "https://assets.publishing.service.gov.uk/media/5e328b0ced915d09393b8808/Permit_VP3235DJ.pdf"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/ark-cody-park-farnborough",
   "permalink": "https://computefinder.net/entity/cf-dc-0101"
  },
  {
   "id": "cf-dc-0102",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "independently_reviewed_on": "2026-11-10",
   "independent_review_scope": "Facility identities, location originals, campus reference-point conversions, source-use limits and operator next steps only; current operation, capacity and availability remain unknown.",
   "slug": "ark-spring-park-corsham",
   "name": "Ark Spring Park data centre campus",
   "record_scope": "campus",
   "country": "GB",
   "locality": "Corsham, Wiltshire",
   "operator": "Ark Data Centres Limited",
   "lat": 51.41844,
   "lon": -2.21954,
   "location": {
    "address": "Westwells Road, Corsham, Wiltshire, SN13 9GB",
    "precision": "campus",
    "source_url": "https://assets.publishing.service.gov.uk/media/673373c5f407dcf2b561357a/Application_Variation_V003_Notice_Issued_-_07112024.pdf",
    "checked_on": "2026-11-10",
    "source_date": "2024-11-07",
    "grid_reference": "ST 84830 68848 (British National Grid)",
    "note": "Campus reference point converted from the Environment Agency variation notice introductory note. It is not a building entrance or an inventory of the campus buildings."
   },
   "institutional_source": {
    "url": "https://www.ark-d-c.com/",
    "label": "Visit Ark to discuss colocation or hosting",
    "updated_on": null,
    "note": "Operator homepage and enquiry route. Ask Ark to confirm the campus, service, access and current availability."
   },
   "source_notice": {
    "publisher": "Environment Agency / GOV.UK",
    "licence": "Open Government Licence v3.0, except third-party material",
    "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
    "scope": "Contains public sector information licensed under the Open Government Licence v3.0. Original attributed summaries of regulator-issued facility identity, address and site-reference facts only. No operator website content, applicant reports, diagrams, logos or legal conditions reproduced. Coordinates are our conversion of the issued notice reference from British National Grid to WGS84, rounded to five decimal places; they identify a campus reference point, not a building boundary or entrance. No endorsement or current permit-compliance, operating-stage or availability conclusion."
   },
   "notes": "A campus record for Spring Park in Corsham. The Environment Agency notice was issued on 7 November 2024 and published on 13 November 2024. These are historical source dates, not a check of current operation or compute available to buy. The campus and its individual buildings must not be counted together as distinct sites.",
   "facts": [
    {
     "text": "The Environment Agency identifies Spring Park Data Centre in Corsham and names Ark Data Centres Limited as its operator.",
     "source_url": "https://www.gov.uk/government/publications/sn13-9gb-ark-data-centres-limited-environmental-issued-eprpp3003pwv003"
    },
    {
     "text": "The regulator-issued notice gives the installation address as Westwells Road, Corsham, Wiltshire SN13 9GB.",
     "source_url": "https://assets.publishing.service.gov.uk/media/673373c5f407dcf2b561357a/Application_Variation_V003_Notice_Issued_-_07112024.pdf"
    },
    {
     "text": "The notice introductory note gives the site reference as ST 84830 68848.",
     "source_url": "https://assets.publishing.service.gov.uk/media/673373c5f407dcf2b561357a/Application_Variation_V003_Notice_Issued_-_07112024.pdf"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/ark-spring-park-corsham",
   "permalink": "https://computefinder.net/entity/cf-dc-0102"
  },
  {
   "id": "cf-dc-0103",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": "The operator describes links to Kenyan carrier networks, regional fibre connections and routes to cable landing stations in Mombasa. Ask which carriers and routes are available for your service; this is an undated operator account, not a current connectivity test.",
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "independently_reviewed_on": "2026-11-10",
   "independent_review_scope": "Facility identities, location originals, campus reference-point conversions, source-use limits and operator next steps only; current operation, capacity and availability remain unknown.",
   "slug": "africa-data-centres-nbo1-nairobi",
   "name": "Africa Data Centres NBO1 Nairobi",
   "aliases": [
    "NB01 Nairobi"
   ],
   "record_scope": "facility",
   "country": "KE",
   "locality": "Nairobi",
   "operator": "Africa Data Centres",
   "lat": null,
   "lon": null,
   "location": {
    "address": "Sameer Industrial Park, Nairobi, Kenya",
    "precision": "address",
    "source_url": "https://www.africadatacentres.com/nairobi/",
    "checked_on": "2026-11-10",
    "source_date": null,
    "note": "Operator-reported industrial-park location. Exact building coordinates and a street number are not recorded here."
   },
   "institutional_source": {
    "url": "https://www.africadatacentres.com/nairobi/",
    "label": "Ask Africa Data Centres about NBO1 colocation",
    "updated_on": null,
    "note": "The official facility page includes a tour/enquiry form. Confirm rack or cage availability, power, connectivity, contract and lead time directly with the operator."
   },
   "source_notice": {
    "publisher": "Africa Data Centres",
    "licence": "Copyright retained; no open source-content licence asserted",
    "licence_url": null,
    "scope": "ComputeFinder independently states minimal attributed identity, location and service-category facts and supplies an ordinary unframed operator link. No marketing narrative, tables, numerical specifications, certifications, images or logos copied. Not a bulk operator-directory import or a licence over the linked material. No endorsement or current availability claim."
   },
   "notes": "NBO1 is the code on the current operator page. Its linked older datasheet spells the code NB01; that spelling is retained as a search alias, not a second facility. The undated page describes colocation services, but does not establish current rack availability, an opening date or a dated whole-facility operating stage. Older datasheet capacity figures are excluded.",
   "facts": [
    {
     "text": "Africa Data Centres identifies its Nairobi facility as NBO1 and locates it at Sameer Industrial Park, Nairobi, Kenya.",
     "source_url": "https://www.africadatacentres.com/nairobi/"
    },
    {
     "text": "The operator describes colocation options including cages, racks and cross-connects, and provides a facility-tour enquiry form.",
     "source_url": "https://www.africadatacentres.com/nairobi/"
    },
    {
     "text": "The operator describes Kenyan carrier access, regional fibre connections and routes to cable landing stations in Mombasa. Current carrier choice, route diversity and service availability need direct confirmation.",
     "source_url": "https://www.africadatacentres.com/nairobi/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/africa-data-centres-nbo1-nairobi",
   "permalink": "https://computefinder.net/entity/cf-dc-0103"
  },
  {
   "id": "cf-dc-0104",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "ixafrica-nbox1-mombasa-road-nairobi",
   "name": "iXAfrica NBOX1 Nairobi campus",
   "aliases": [
    "NBOX1"
   ],
   "country": "KE",
   "locality": "Cabanas, Mombasa Road, Nairobi",
   "operator": "iXAfrica Data Centre",
   "record_scope": "campus",
   "location": {
    "address": "Cabanas, Mombasa Road, Nairobi, Kenya",
    "precision": "address",
    "source_url": "https://ixafrica.co.ke/campus-specs/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Operator-published campus locality and road. Exact parcel boundaries and building coordinates are not recorded."
   },
   "institutional_source": {
    "url": "https://ixafrica.co.ke/campus-specs/",
    "label": "Ask iXAfrica about NBOX1 colocation",
    "note": "The operator lists colocation, connectivity, bespoke halls, migration and remote-hands services. Confirm the building, rack or hall, power, access and lead time directly.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "iXAfrica Data Centre",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, location and service facts with ordinary operator links. No marketing text, specifications tables, images or logos reproduced. No endorsement or current availability claim."
   },
   "notes": "One campus record covers NBOX1.1 and NBOX1.2; they are not counted again as separate sites. The undated operator page calls NBOX1.1 live but does not establish the current stage of the whole campus or space available to rent.",
   "facts": [
    {
     "text": "iXAfrica identifies its NBOX1 campus on Mombasa Road in Nairobi, with a contact address at Cabanas.",
     "source_url": "https://ixafrica.co.ke/campus-specs/"
    },
    {
     "text": "The operator distinguishes NBOX1.1 and NBOX1.2 within this campus and offers colocation and related support services.",
     "source_url": "https://ixafrica.co.ke/campus-specs/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/ixafrica-nbox1-mombasa-road-nairobi",
   "permalink": "https://computefinder.net/entity/cf-dc-0104"
  },
  {
   "id": "cf-dc-0105",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "digital-realty-icolo-nbo1-karen-nairobi",
   "name": "Digital Realty (iColo) Nairobi One (NBO1)",
   "aliases": [
    "Nairobi One",
    "iColo NBO1",
    "Digital Realty NBO1"
   ],
   "country": "KE",
   "locality": "Karen, Nairobi",
   "operator": "Digital Realty (formerly iColo)",
   "record_scope": "facility",
   "location": {
    "address": "Karen, Nairobi, Kenya",
    "precision": "address",
    "source_url": "https://www.icolo.io/location/nbo1/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Operator-reported district. Street address, exact building coordinates and the physical boundary with the NBO2 expansion are not recorded."
   },
   "institutional_source": {
    "url": "https://www.icolo.io/location/nbo1/",
    "label": "Ask Digital Realty about Nairobi One",
    "note": "The facility page offers colocation, a satellite teleport and a book-a-visit contact route. Ask for current service availability and whether your enquiry concerns NBO1 or NBO2.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "iColo / Digital Realty",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, location and service facts with ordinary operator links. No marketing text, specifications tables, images or logos reproduced. No endorsement or current availability claim."
   },
   "notes": "This is the iColo/Digital Realty facility in Karen. Africa Data Centres NBO1 at Sameer Industrial Park and PAIX NBO-1 at Britam Tower are different facilities. NBO2 is retained as expansion context, not added as a second site while its physical boundary is unresolved.",
   "facts": [
    {
     "text": "The operator identifies Nairobi One as NBO1 in Karen and reports a September 2019 launch.",
     "source_url": "https://www.icolo.io/location/nbo1/"
    },
    {
     "text": "The facility page describes colocation and satellite-teleport services; its banner says iColo has rebranded to Digital Realty.",
     "source_url": "https://www.icolo.io/location/nbo1/"
    },
    {
     "text": "A separate operator notice describes NBO2 as an addition to its Nairobi campus. An exact separate plot is not established here.",
     "source_url": "https://www.icolo.io/news/digital-realty-strengthens-nairobi-as-east-africa-digital-gateway-with-new-data-center/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/digital-realty-icolo-nbo1-karen-nairobi",
   "permalink": "https://computefinder.net/entity/cf-dc-0105"
  },
  {
   "id": "cf-dc-0106",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "digital-realty-icolo-mba1-miritini-mombasa",
   "name": "Digital Realty (iColo) Mombasa One (MBA1)",
   "aliases": [
    "Mombasa One",
    "iColo MBA1",
    "Digital Realty MBA1"
   ],
   "country": "KE",
   "locality": "Miritini, Mombasa",
   "operator": "Digital Realty (formerly iColo)",
   "record_scope": "facility",
   "location": {
    "address": "Miritini, Mombasa, Kenya",
    "precision": "address",
    "source_url": "https://www.icolo.io/location/mba1/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Operator-reported district. Exact street address, plot and building coordinates are not recorded."
   },
   "institutional_source": {
    "url": "https://www.icolo.io/location/mba1/",
    "label": "Ask Digital Realty about Mombasa One",
    "note": "Use the facility page and book-a-visit route to confirm rack space, power, connectivity and lead time.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "iColo / Digital Realty",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, location and service facts with ordinary operator links. No marketing text, specifications tables, images or logos reproduced. No endorsement or current availability claim."
   },
   "notes": "MBA1 is the Miritini facility. The operator describes future campus expansion, which is not counted as additional existing buildings here. MBA2 in Nyali is a separate location.",
   "facts": [
    {
     "text": "The operator locates MBA1 at Miritini and reports that it has been operational since 2017.",
     "source_url": "https://www.icolo.io/location/mba1/"
    },
    {
     "text": "Its facility page offers colocation and a route to book a visit.",
     "source_url": "https://www.icolo.io/location/mba1/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/digital-realty-icolo-mba1-miritini-mombasa",
   "permalink": "https://computefinder.net/entity/cf-dc-0106"
  },
  {
   "id": "cf-dc-0107",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "digital-realty-icolo-mba2-nyali-mombasa",
   "name": "Digital Realty (iColo) Mombasa Two (MBA2)",
   "aliases": [
    "Mombasa Two",
    "iColo MBA2",
    "Digital Realty MBA2"
   ],
   "country": "KE",
   "locality": "Nyali, Mombasa",
   "operator": "Digital Realty (formerly iColo)",
   "record_scope": "facility",
   "location": {
    "address": "Nyali, Mombasa, Kenya",
    "precision": "address",
    "source_url": "https://www.icolo.io/location/mba2/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Operator-reported district. Exact street address, plot and building coordinates are not recorded."
   },
   "institutional_source": {
    "url": "https://www.icolo.io/location/mba2/",
    "label": "Ask Digital Realty about Mombasa Two",
    "note": "Use the facility page and book-a-visit route to confirm rack space, power, connectivity and lead time.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "iColo / Digital Realty",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, location and service facts with ordinary operator links. No marketing text, specifications tables, images or logos reproduced. No endorsement or current availability claim."
   },
   "notes": "One facility record covers MBA2 and its data halls. It is distinct from MBA1 at Miritini. A historical launch does not establish current rack availability.",
   "facts": [
    {
     "text": "The operator identifies MBA2 in Nyali, Mombasa, and reports a 2022 launch.",
     "source_url": "https://www.icolo.io/location/mba2/"
    },
    {
     "text": "Its facility page offers colocation and a route to book a visit.",
     "source_url": "https://www.icolo.io/location/mba2/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/digital-realty-icolo-mba2-nyali-mombasa",
   "permalink": "https://computefinder.net/entity/cf-dc-0107"
  },
  {
   "id": "cf-dc-0108",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "paix-nbo1-britam-tower-nairobi",
   "name": "PAIX Nairobi (NBO-1)",
   "aliases": [
    "PAIX NBO-1",
    "PAIX Data Centre Nairobi"
   ],
   "country": "KE",
   "locality": "Upper Hill, Nairobi",
   "operator": "PAIX Data Centres",
   "record_scope": "facility",
   "location": {
    "address": "Britam Tower, Hospital Road, Upper Hill, Nairobi, Kenya",
    "precision": "address",
    "source_url": "https://www.paix.io/kenya",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Operator-reported building and street. Occupied floors and exact building coordinates are not recorded."
   },
   "institutional_source": {
    "url": "https://www.paix.io/kenya",
    "label": "Ask PAIX about Nairobi colocation",
    "note": "The Kenya facility page has a book-a-tour route and local sales contact. Confirm your rack, connectivity and power requirements directly.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "PAIX Data Centres",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, location and service facts with ordinary operator links. No marketing text, specifications tables, images or logos reproduced. No endorsement or current availability claim."
   },
   "notes": "PAIX NBO-1 at Britam Tower is distinct from Africa Data Centres NBO1 at Sameer Industrial Park and Digital Realty/iColo NBO1 in Karen.",
   "facts": [
    {
     "text": "PAIX locates its Nairobi facility at Britam Tower on Hospital Road in Upper Hill.",
     "source_url": "https://www.paix.io/kenya"
    },
    {
     "text": "The operator provides a tour-booking route and describes connectivity to KIXP and Nairobi-IX.",
     "source_url": "https://www.paix.io/kenya"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/paix-nbo1-britam-tower-nairobi",
   "permalink": "https://computefinder.net/entity/cf-dc-0108"
  },
  {
   "id": "cf-dc-0109",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "telkom-kenya-milimani-exchange-nairobi",
   "name": "Telkom Kenya Milimani Exchange data centre",
   "country": "KE",
   "locality": "Nairobi",
   "operator": "Telkom Kenya",
   "record_scope": "facility",
   "location": {
    "address": "Milimani Exchange, Bishop Road, adjacent to NSSF Building, Nairobi, Kenya",
    "precision": "address",
    "source_url": "https://telkom.co.ke/business/wholesale-content/data-centre/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Operator-published facility address. Building coordinates are not recorded."
   },
   "institutional_source": {
    "url": "https://telkom.co.ke/business/wholesale-content/data-centre/",
    "label": "Ask Telkom Kenya about colocation",
    "note": "Use the wholesale data-centre page and its sales or account-manager route. Specify Nairobi Milimani Exchange or Mombasa Telephone House, then confirm rack space, power and connectivity.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Telkom Kenya",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, location and service facts with ordinary operator links. No marketing text, specifications tables, images or logos reproduced. No endorsement or current availability claim."
   },
   "notes": "Telkom describes two city facilities on one page. Shared technical specifications have not been assigned to either site or added together. Current rack availability is unknown.",
   "facts": [
    {
     "text": "Telkom Kenya identifies its Nairobi data centre at Milimani Exchange, Bishop Road, adjacent to NSSF Building, Nairobi, Kenya.",
     "source_url": "https://telkom.co.ke/business/wholesale-content/data-centre/"
    },
    {
     "text": "The shared wholesale page offers colocation, hosting, peering and caching services and supplies a sales enquiry route.",
     "source_url": "https://telkom.co.ke/business/wholesale-content/data-centre/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/telkom-kenya-milimani-exchange-nairobi",
   "permalink": "https://computefinder.net/entity/cf-dc-0109"
  },
  {
   "id": "cf-dc-0110",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "telkom-kenya-telephone-house-mombasa",
   "name": "Telkom Kenya Mombasa Telephone House data centre",
   "country": "KE",
   "locality": "Mombasa",
   "operator": "Telkom Kenya",
   "record_scope": "facility",
   "location": {
    "address": "Mombasa Telephone House, Mombasa, Kenya",
    "precision": "address",
    "source_url": "https://telkom.co.ke/business/wholesale-content/data-centre/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Operator-published facility address. Building coordinates are not recorded. The source does not supply a street name."
   },
   "institutional_source": {
    "url": "https://telkom.co.ke/business/wholesale-content/data-centre/",
    "label": "Ask Telkom Kenya about colocation",
    "note": "Use the wholesale data-centre page and its sales or account-manager route. Specify Nairobi Milimani Exchange or Mombasa Telephone House, then confirm rack space, power and connectivity.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Telkom Kenya",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, location and service facts with ordinary operator links. No marketing text, specifications tables, images or logos reproduced. No endorsement or current availability claim."
   },
   "notes": "Telkom describes two city facilities on one page. Shared technical specifications have not been assigned to either site or added together. Current rack availability is unknown.",
   "facts": [
    {
     "text": "Telkom Kenya identifies its Mombasa data centre at Mombasa Telephone House, Mombasa, Kenya.",
     "source_url": "https://telkom.co.ke/business/wholesale-content/data-centre/"
    },
    {
     "text": "The shared wholesale page offers colocation, hosting, peering and caching services and supplies a sales enquiry route.",
     "source_url": "https://telkom.co.ke/business/wholesale-content/data-centre/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/telkom-kenya-telephone-house-mombasa",
   "permalink": "https://computefinder.net/entity/cf-dc-0110"
  },
  {
   "id": "cf-dc-0111",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "aws-didcot-north-oxfordshire",
   "name": "Didcot North Data Centre Campus",
   "country": "GB",
   "locality": "Didcot, Oxfordshire",
   "operator": "Amazon Data Services UK Limited",
   "record_scope": "campus",
   "location": {
    "address": "Former Didcot A Power Station, Didcot, OX11 7BF, United Kingdom",
    "precision": "address",
    "source_url": "https://www.gov.uk/government/publications/ox11-7bf-amazon-data-services-uk-limited-environmental-permit-issued-eprgp3127lva001",
    "source_date": "2026-08-03",
    "checked_on": "2026-11-10",
    "note": "Location is limited to the place and postcode in the regulator notice. An exact building point or street number has not been established."
   },
   "institutional_source": {
    "url": "https://www.gov.uk/government/publications/ox11-7bf-amazon-data-services-uk-limited-environmental-permit-issued-eprgp3127lva001",
    "label": "Read the original Environment Agency notice",
    "note": "Use the named operator and installation to investigate this site. This notice is not a commercial booking route or a current operation check.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Environment Agency / GOV.UK",
    "licence": "Open Government Licence v3.0, except third-party material",
    "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
    "scope": "Contains public sector information licensed under the Open Government Licence v3.0. Identity and location summaries use the regulator-authored GOV.UK notice only; no conditional-licence public-register data, applicant material, images or numerical specifications are imported. No endorsement or current permit-compliance, operating-stage or availability conclusion."
   },
   "notes": "This record identifies Didcot North under EPR/GP3127LV/A001 at OX11 7BF. It is not an inventory of every installation on the former power-station site. The dated notice does not establish current operation or available compute.",
   "facts": [
    {
     "text": "The Environment Agency notice identifies the installation as Didcot North Data Centre Campus, former Didcot A Power Station and names Amazon Data Services UK Limited as the operator.",
     "source_url": "https://www.gov.uk/government/publications/ox11-7bf-amazon-data-services-uk-limited-environmental-permit-issued-eprgp3127lva001"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/aws-didcot-north-oxfordshire",
   "permalink": "https://computefinder.net/entity/cf-dc-0111"
  },
  {
   "id": "cf-dc-0112",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "aws-swindon-data-centre",
   "name": "Swindon Data Centre Back-up Generation Facility",
   "country": "GB",
   "locality": "Swindon",
   "operator": "Amazon Data Services UK Limited",
   "record_scope": "facility",
   "location": {
    "address": "Swindon, SN4 0QD, United Kingdom",
    "precision": "address",
    "source_url": "https://www.gov.uk/government/publications/sn4-0qd-amazon-data-services-uk-limited-environmental-permit-issued-eprfp3000lya001",
    "source_date": "2022-04-05",
    "checked_on": "2026-11-10",
    "note": "Location is limited to the place and postcode in the regulator notice. An exact building point or street number has not been established."
   },
   "institutional_source": {
    "url": "https://www.gov.uk/government/publications/sn4-0qd-amazon-data-services-uk-limited-environmental-permit-issued-eprfp3000lya001",
    "label": "Read the original Environment Agency notice",
    "note": "Use the named operator and installation to investigate this site. This notice is not a commercial booking route or a current operation check.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Environment Agency / GOV.UK",
    "licence": "Open Government Licence v3.0, except third-party material",
    "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
    "scope": "Contains public sector information licensed under the Open Government Licence v3.0. Identity and location summaries use the regulator-authored GOV.UK notice only; no conditional-licence public-register data, applicant material, images or numerical specifications are imported. No endorsement or current permit-compliance, operating-stage or availability conclusion."
   },
   "notes": "Identified through an environmental-permit publication. A permit for a named installation does not establish its current physical operating stage, completed fit-out or compute available to buy.",
   "facts": [
    {
     "text": "The Environment Agency notice identifies the installation as Swindon Data Centre Back-up Generation Facility and names Amazon Data Services UK Limited as the operator.",
     "source_url": "https://www.gov.uk/government/publications/sn4-0qd-amazon-data-services-uk-limited-environmental-permit-issued-eprfp3000lya001"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/aws-swindon-data-centre",
   "permalink": "https://computefinder.net/entity/cf-dc-0112"
  },
  {
   "id": "cf-dc-0113",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "green-mountain-romford-north",
   "name": "Romford North Data Centre",
   "country": "GB",
   "locality": "Romford",
   "operator": "Green Mountain DC UK Limited",
   "record_scope": "facility",
   "location": {
    "address": "Romford, RM7 7PN, United Kingdom",
    "precision": "address",
    "source_url": "https://www.gov.uk/government/publications/rm7-7pn-green-mountain-dc-uk-limited-environmental-permit-issued-eprfp3630euv002",
    "source_date": "2026-02-27",
    "checked_on": "2026-11-10",
    "note": "Location is limited to the place and postcode in the regulator notice. An exact building point or street number has not been established."
   },
   "institutional_source": {
    "url": "https://www.gov.uk/government/publications/rm7-7pn-green-mountain-dc-uk-limited-environmental-permit-issued-eprfp3630euv002",
    "label": "Read the original Environment Agency notice",
    "note": "Use the named operator and installation to investigate this site. This notice is not a commercial booking route or a current operation check.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Environment Agency / GOV.UK",
    "licence": "Open Government Licence v3.0, except third-party material",
    "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
    "scope": "Contains public sector information licensed under the Open Government Licence v3.0. Identity and location summaries use the regulator-authored GOV.UK notice only; no conditional-licence public-register data, applicant material, images or numerical specifications are imported. No endorsement or current permit-compliance, operating-stage or availability conclusion."
   },
   "notes": "Identified through an environmental-permit publication. A permit for a named installation does not establish its current physical operating stage, completed fit-out or compute available to buy.",
   "facts": [
    {
     "text": "The Environment Agency notice identifies the installation as Romford North Data Centre and names Green Mountain DC UK Limited as the operator.",
     "source_url": "https://www.gov.uk/government/publications/rm7-7pn-green-mountain-dc-uk-limited-environmental-permit-issued-eprfp3630euv002"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/green-mountain-romford-north",
   "permalink": "https://computefinder.net/entity/cf-dc-0113"
  },
  {
   "id": "cf-dc-0114",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "iron-mountain-lon3-slough",
   "name": "LON3 Data Centre",
   "country": "GB",
   "locality": "Slough",
   "operator": "Iron Mountain (UK) Data Centre Limited",
   "record_scope": "facility",
   "location": {
    "address": "Slough, SL1 4PF, United Kingdom",
    "precision": "address",
    "source_url": "https://www.gov.uk/government/publications/sl1-4pf-iron-mountain-uk-data-centre-limited-environmental-permit-issued-eprtp3120lea001",
    "source_date": "2026-01-15",
    "checked_on": "2026-11-10",
    "note": "Location is limited to the place and postcode in the regulator notice. An exact building point or street number has not been established."
   },
   "institutional_source": {
    "url": "https://www.gov.uk/government/publications/sl1-4pf-iron-mountain-uk-data-centre-limited-environmental-permit-issued-eprtp3120lea001",
    "label": "Read the original Environment Agency notice",
    "note": "Use the named operator and installation to investigate this site. This notice is not a commercial booking route or a current operation check.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Environment Agency / GOV.UK",
    "licence": "Open Government Licence v3.0, except third-party material",
    "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
    "scope": "Contains public sector information licensed under the Open Government Licence v3.0. Identity and location summaries use the regulator-authored GOV.UK notice only; no conditional-licence public-register data, applicant material, images or numerical specifications are imported. No endorsement or current permit-compliance, operating-stage or availability conclusion."
   },
   "notes": "This record identifies LON3 under EPR/TP3120LE/A001 only. A shared postcode does not establish a shared building or operator. The dated notice does not establish current operation or available colocation space.",
   "facts": [
    {
     "text": "The Environment Agency notice identifies the installation as LON3 Data Centre and names Iron Mountain (UK) Data Centre Limited as the operator.",
     "source_url": "https://www.gov.uk/government/publications/sl1-4pf-iron-mountain-uk-data-centre-limited-environmental-permit-issued-eprtp3120lea001"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/iron-mountain-lon3-slough",
   "permalink": "https://computefinder.net/entity/cf-dc-0114"
  },
  {
   "id": "cf-dc-0115",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "colt-hayes-ub4-london",
   "name": "COLT Hayes data centre",
   "country": "GB",
   "locality": "Hayes, London",
   "operator": "Colt Data Centre Services UK Limited",
   "record_scope": "facility",
   "location": {
    "address": "Hayes, UB4 0SL, United Kingdom",
    "precision": "address",
    "source_url": "https://www.gov.uk/government/publications/ub4-0sl-colt-data-centre-services-uk-limited-environmental-permit-issued-eprgp3721sqa001",
    "source_date": "2025-08-11",
    "checked_on": "2026-11-10",
    "note": "Location is limited to the place and postcode in the regulator notice. An exact building point or street number has not been established."
   },
   "institutional_source": {
    "url": "https://www.gov.uk/government/publications/ub4-0sl-colt-data-centre-services-uk-limited-environmental-permit-issued-eprgp3721sqa001",
    "label": "Read the original Environment Agency notice",
    "note": "Use the named operator and installation to investigate this site. This notice is not a commercial booking route or a current operation check.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Environment Agency / GOV.UK",
    "licence": "Open Government Licence v3.0, except third-party material",
    "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
    "scope": "Contains public sector information licensed under the Open Government Licence v3.0. Identity and location summaries use the regulator-authored GOV.UK notice only; no conditional-licence public-register data, applicant material, images or numerical specifications are imported. No endorsement or current permit-compliance, operating-stage or availability conclusion."
   },
   "notes": "Identified through an environmental-permit publication. A permit for a named installation does not establish its current physical operating stage, completed fit-out or compute available to buy.",
   "facts": [
    {
     "text": "The Environment Agency notice identifies the installation as COLT- Hayes and names Colt Data Centre Services UK Limited as the operator.",
     "source_url": "https://www.gov.uk/government/publications/ub4-0sl-colt-data-centre-services-uk-limited-environmental-permit-issued-eprgp3721sqa001"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/colt-hayes-ub4-london",
   "permalink": "https://computefinder.net/entity/cf-dc-0115"
  },
  {
   "id": "cf-dc-0116",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "colt-powergate-north-acton-london",
   "name": "Colt Powergate data centre",
   "country": "GB",
   "locality": "North Acton, London",
   "operator": "Colt Data Centre Services UK Limited",
   "record_scope": "facility",
   "location": {
    "address": "North Acton, NW10 6PW, United Kingdom",
    "precision": "address",
    "source_url": "https://www.gov.uk/government/publications/nw10-6pw-colt-data-centre-services-uk-limited-environmental-permit-issued-eprdp3107lfa001",
    "source_date": "2024-05-31",
    "checked_on": "2026-11-10",
    "note": "Location is limited to the place and postcode in the regulator notice. An exact building point or street number has not been established."
   },
   "institutional_source": {
    "url": "https://www.gov.uk/government/publications/nw10-6pw-colt-data-centre-services-uk-limited-environmental-permit-issued-eprdp3107lfa001",
    "label": "Read the original Environment Agency notice",
    "note": "Use the named operator and installation to investigate this site. This notice is not a commercial booking route or a current operation check.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Environment Agency / GOV.UK",
    "licence": "Open Government Licence v3.0, except third-party material",
    "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
    "scope": "Contains public sector information licensed under the Open Government Licence v3.0. Identity and location summaries use the regulator-authored GOV.UK notice only; no conditional-licence public-register data, applicant material, images or numerical specifications are imported. No endorsement or current permit-compliance, operating-stage or availability conclusion."
   },
   "notes": "Identified through an environmental-permit publication. A permit for a named installation does not establish its current physical operating stage, completed fit-out or compute available to buy.",
   "facts": [
    {
     "text": "The Environment Agency notice identifies the installation as Colt - Powergate and names Colt Data Centre Services UK Limited as the operator.",
     "source_url": "https://www.gov.uk/government/publications/nw10-6pw-colt-data-centre-services-uk-limited-environmental-permit-issued-eprdp3107lfa001"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/colt-powergate-north-acton-london",
   "permalink": "https://computefinder.net/entity/cf-dc-0116"
  },
  {
   "id": "cf-dc-0117",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": null,
   "lon": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "nlighten-london-hoddesdon-stn1",
   "name": "nLighten London Hoddesdon (STN1)",
   "aliases": [
    "nLighten STN1"
   ],
   "country": "GB",
   "locality": "Hoddesdon, Hertfordshire",
   "operator": "nLighten",
   "record_scope": "facility",
   "location": {
    "address": "Geddings Road, Hoddesdon, EN11 0NT, United Kingdom",
    "precision": "address",
    "source_url": "https://www.nlighten.eu/wp-content/uploads/2024/07/nLighten_Datasheet_UK_London-Hoddesdon_STN1_EN.pdf",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Address from the operator datasheet. Exact building coordinates and plot boundaries are not recorded."
   },
   "institutional_source": {
    "url": "https://www.nlighten.eu/wp-content/uploads/2024/07/nLighten_Datasheet_UK_London-Hoddesdon_STN1_EN.pdf",
    "label": "Read nLighten’s Hoddesdon facility datasheet",
    "note": "The datasheet includes operator enquiry email addresses. Ask nLighten to confirm current services, availability and lead time for STN1.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "nLighten",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, location and service facts with ordinary operator links. No marketing text, specifications tables, images or logos reproduced. No endorsement or current availability claim."
   },
   "notes": "The operator datasheet includes design targets and proposed end-state capacity. These do not establish delivered capacity or current availability.",
   "facts": [
    {
     "text": "nLighten identifies its STN1 London Hoddesdon data centre on Geddings Road, EN11 0NT.",
     "source_url": "https://www.nlighten.eu/wp-content/uploads/2024/07/nLighten_Datasheet_UK_London-Hoddesdon_STN1_EN.pdf"
    },
    {
     "text": "The datasheet describes carrier-neutral connectivity and on-site support and includes an operator enquiry route.",
     "source_url": "https://www.nlighten.eu/wp-content/uploads/2024/07/nLighten_Datasheet_UK_London-Hoddesdon_STN1_EN.pdf"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/nlighten-london-hoddesdon-stn1",
   "permalink": "https://computefinder.net/entity/cf-dc-0117"
  },
  {
   "id": "cf-dc-0118",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "lat": 51.51113,
   "lon": -0.00561,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "global-switch-london-north-docklands",
   "name": "Global Switch London North (East India Dock House)",
   "aliases": [
    "East India Dock House",
    "Financial Times Print Works"
   ],
   "country": "GB",
   "locality": "Docklands, London",
   "operator": "Global Switch",
   "record_scope": "building",
   "location": {
    "address": "East India Dock House, 240 East India Dock Road, London, E14 9YY, United Kingdom",
    "precision": "building",
    "source_url": "https://www.globalswitch.com/data-centres/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Operator-published street address. The rounded building point comes from Wikidata Q26263559, which cites the National Heritage List for England; it is not a surveyed boundary or entrance. London East and London South are not included in this building record.",
    "coordinate_source_url": "https://www.wikidata.org/wiki/Q26263559"
   },
   "institutional_source": {
    "url": "https://www.globalswitch.com/data-centres/london/",
    "label": "Ask Global Switch about London North",
    "note": "Use the operator’s London enquiry form and specify London North, rather than another building on the London campus. Confirm current space, power, connectivity and lead time.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Global Switch; Wikidata Q26263559",
    "licence": "Operator content copyright retained; Wikidata main-namespace structured data CC0 1.0",
    "licence_url": "https://creativecommons.org/publicdomain/zero/1.0/",
    "scope": "Wikidata CC0 applies only to its structured building identity and coordinate point. Operator address and enquiry facts are minimal independently worded attributions with ordinary links; no operator content licence is asserted. No images, maps, specifications tables, endorsement or current availability claim."
   },
   "notes": "A building record for London North. The wider Global Switch London campus is not separately counted here. It is distinct from the Telehouse Docklands campus.",
   "facts": [
    {
     "text": "Global Switch lists London North at East India Dock House, 240 East India Dock Road, London E14 9YY.",
     "source_url": "https://www.globalswitch.com/data-centres/"
    },
    {
     "text": "Wikidata Q26263559 records this building point; our display rounds it to five decimal places.",
     "source_url": "https://www.wikidata.org/wiki/Q26263559"
    },
    {
     "text": "The operator’s London page provides an enquiry form for its campus.",
     "source_url": "https://www.globalswitch.com/data-centres/london/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/global-switch-london-north-docklands",
   "permalink": "https://computefinder.net/entity/cf-dc-0118"
  },
  {
   "id": "cf-dc-0119",
   "country": "NG",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "rack-centre-lgs1-oregun-lagos",
   "name": "Rack Centre LGS 1 Lagos",
   "operator": "Rack Centre",
   "locality": "Oregun, Ikeja, Lagos",
   "record_scope": "building",
   "location": {
    "address": "18, Jagal Close, Oregun, Ikeja, Lagos, Nigeria",
    "precision": "address",
    "source_url": "https://rack-centre.com/lgs-2-data-centre-event/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Shared campus address, not an individual building entrance or surveyed point."
   },
   "institutional_source": {
    "url": "https://rack-centre.com/contact-us/",
    "label": "Ask Rack Centre about LGS 1 colocation",
    "note": "For your own equipment, ask about a single rack or a private cage, and specify LGS 1, power density, network connections and intended start date. The advertised options are campus-wide: confirm which building can meet your requirements, available space, delivery timing and price. This is an enquiry, not a reservation. Service options checked 13 November 2026; the operator page’s update date is not stated.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Rack Centre",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, location and campus service-option facts with ordinary links only. No source narrative, tables, images, logos, prices or technical specifications reproduced; no endorsement or current availability claim."
   },
   "notes": "LGS 1 is one of two buildings on the Rack Centre campus. No additional campus record is counted. Published campus totals must not be assigned to either building or added again. Current operation, available space, power and prices have not been verified.",
   "facts": [
    {
     "text": "Rack Centre identifies LGS 1 as a building on its Lagos campus.",
     "source_url": "https://rack-centre.com/lagos-data-centre-campus-expansion/"
    },
    {
     "text": "Its LGS 2 event notice gives the campus address as 18, Jagal Close, Oregun, Ikeja, Lagos.",
     "source_url": "https://rack-centre.com/lgs-2-data-centre-event/"
    },
    {
     "text": "Rack Centre describes single-rack and private-cage colocation options for its Lagos campus. This campus-wide offer does not establish availability in LGS 1. Service options checked 13 November 2026, not a refresh of the older location evidence.",
     "source_url": "https://rack-centre.com/data-centre-services/colocation/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/rack-centre-lgs1-oregun-lagos",
   "permalink": "https://computefinder.net/entity/cf-dc-0119"
  },
  {
   "id": "cf-dc-0120",
   "country": "NG",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "rack-centre-lgs2-oregun-lagos",
   "name": "Rack Centre LGS 2 Lagos",
   "operator": "Rack Centre",
   "locality": "Oregun, Ikeja, Lagos",
   "record_scope": "building",
   "location": {
    "address": "18, Jagal Close, Oregun, Ikeja, Lagos, Nigeria",
    "precision": "address",
    "source_url": "https://rack-centre.com/lgs-2-data-centre-event/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Shared campus address, not an individual building entrance or surveyed point."
   },
   "institutional_source": {
    "url": "https://rack-centre.com/contact-us/",
    "label": "Ask Rack Centre about LGS 2 colocation",
    "note": "For your own equipment, ask about a single rack or a private cage, and specify LGS 2, power density, network connections and intended start date. The advertised options are campus-wide: confirm which building can meet your requirements, available space, delivery timing and price. This is an enquiry, not a reservation. Service options checked 13 November 2026; the operator page’s update date is not stated.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Rack Centre",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, location and campus service-option facts with ordinary links only. No source narrative, tables, images, logos, prices or technical specifications reproduced; no endorsement or current availability claim."
   },
   "notes": "LGS 2 is one of two buildings on the Rack Centre campus. No additional campus record is counted. Published campus totals must not be assigned to either building or added again. Current operation, available space, power and prices have not been verified.",
   "facts": [
    {
     "text": "Rack Centre identifies LGS 2 as a building on its Lagos campus.",
     "source_url": "https://rack-centre.com/lagos-data-centre-campus-expansion/"
    },
    {
     "text": "Its LGS 2 event notice gives the campus address as 18, Jagal Close, Oregun, Ikeja, Lagos.",
     "source_url": "https://rack-centre.com/lgs-2-data-centre-event/"
    },
    {
     "text": "Rack Centre describes single-rack and private-cage colocation options for its Lagos campus. This campus-wide offer does not establish availability in LGS 2. Service options checked 13 November 2026, not a refresh of the older location evidence.",
     "source_url": "https://rack-centre.com/data-centre-services/colocation/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/rack-centre-lgs2-oregun-lagos",
   "permalink": "https://computefinder.net/entity/cf-dc-0120"
  },
  {
   "id": "cf-dc-0121",
   "country": "NG",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "open-access-data-centres-los1-lagos",
   "name": "Open Access Data Centres Lagos (LOS1)",
   "aliases": [
    "OADC Lagos"
   ],
   "operator": "Open Access Data Centres",
   "locality": "Lagos; location conflict recorded",
   "record_scope": "facility",
   "location": {
    "address": "Lagos, Nigeria; precise location unresolved",
    "precision": "address",
    "source_url": "https://ixpn.ng/locations/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "IXPN lists a Lekki Phase 1 address, while the operator webpage names Eko Atlantic. The precise location is unresolved here. Confirm the physical entrance directly before visiting or arranging delivery."
   },
   "institutional_source": {
    "url": "https://openaccessdc.net/lagos",
    "label": "Ask OADC about Lagos LOS1 colocation",
    "note": "Confirm the exact address, live phase, rack/power availability and connectivity. This LOS1 is not Digital Realty LOS1 on Victoria Island.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Internet Exchange Point of Nigeria (IXPN); Open Access Data Centres",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded identity and location facts with attribution and ordinary links only. No source narrative, tables, images, logos or technical specifications reproduced; no endorsement or current availability claim."
   },
   "notes": "OADC identifies Lagos LOS1 as a colocation facility. Its location statements require reconciliation; no exact street address or coordinates are admitted. Phase-specific commissioned power and available compute remain unknown. No OADC source prose or specifications are reproduced.",
   "facts": [
    {
     "text": "OADC identifies its Lagos facility as LOS1 and offers a colocation enquiry route.",
     "source_url": "https://openaccessdc.net/lagos"
    },
    {
     "text": "IXPN lists Open Access Data Centers in Lekki Phase 1, Lagos.",
     "source_url": "https://ixpn.ng/locations/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/open-access-data-centres-los1-lagos",
   "permalink": "https://computefinder.net/entity/cf-dc-0121"
  },
  {
   "id": "cf-dc-0122",
   "country": "NG",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "digital-realty-medallion-los1-victoria-island-lagos",
   "name": "Digital Realty Lagos LOS1 (Victoria Island)",
   "operator": "Digital Realty",
   "locality": "Victoria Island, Lagos",
   "record_scope": "facility",
   "location": {
    "address": "8A, Saka Tinubu Street, Victoria Island, Lagos, Nigeria",
    "precision": "address",
    "source_url": "https://ixpn.ng/locations/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "IXPN-reported address. Exact building coordinates and current service availability are not established."
   },
   "institutional_source": {
    "url": "https://www.digitalrealty.com/",
    "label": "Ask Digital Realty about Lagos LOS1",
    "note": "Use the operator homepage and specify Victoria Island LOS1 at Saka Tinubu Street, not OADC LOS1. Confirm the current operator, service and availability.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Internet Exchange Point of Nigeria (IXPN)",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded identity and location facts with attribution and ordinary links only. No source narrative, tables, images, logos or technical specifications reproduced; no endorsement or current availability claim."
   },
   "notes": "An IXPN-listed facility identity, distinct from OADC LOS1. The operator link uses the homepage only. No Digital Realty website content or restricted deep links are imported. An exchange point listing does not establish rentable compute or the operating state of the whole building.",
   "facts": [
    {
     "text": "IXPN lists Digital Realty LOS1 at 8A, Saka Tinubu Street, Victoria Island, Lagos.",
     "source_url": "https://ixpn.ng/locations/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/digital-realty-medallion-los1-victoria-island-lagos",
   "permalink": "https://computefinder.net/entity/cf-dc-0122"
  },
  {
   "id": "cf-dc-0123",
   "country": "NG",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "digital-realty-medallion-lkk2-ogbombo-lagos",
   "name": "Digital Realty Lagos LKK2 (Ogbombo)",
   "operator": "Digital Realty",
   "locality": "Ogbombo Road, Lagos",
   "record_scope": "building",
   "location": {
    "address": "Mopo Onibeju Village, Ogbombo Road, Building 2, Lagos, Nigeria",
    "precision": "address",
    "source_url": "https://ixpn.ng/locations/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "IXPN-reported building address. Exact coordinates, parcel boundaries and the physical relationship with LKK1 remain unverified."
   },
   "institutional_source": {
    "url": "https://www.digitalrealty.com/",
    "label": "Ask Digital Realty about Lagos LKK2",
    "note": "Use the operator homepage and specify LKK2, Ogbombo Road, Building 2. Confirm the current service, access and available space.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Internet Exchange Point of Nigeria (IXPN)",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded identity and location facts with attribution and ordinary links only. No source narrative, tables, images, logos or technical specifications reproduced; no endorsement or current availability claim."
   },
   "notes": "IXPN spells the listed operator name Digital Ralty; this record normalises the name to Digital Realty. LKK1 is not counted without separate identity/location evidence. No operator website specifications or restricted deep links are imported; current operation and availability remain unknown.",
   "facts": [
    {
     "text": "IXPN lists LKK2 at Mopo Onibeju Village, Ogbombo Road, Building 2.",
     "source_url": "https://ixpn.ng/locations/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/digital-realty-medallion-lkk2-ogbombo-lagos",
   "permalink": "https://computefinder.net/entity/cf-dc-0123"
  },
  {
   "id": "cf-dc-0124",
   "country": "NG",
   "owner": null,
   "stage": "announced",
   "stage_as_of": "2026-11-10",
   "stage_source_url": "https://www.kasicloud.com/",
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "kasi-cloud-los-campus-lekki-lagos",
   "name": "Kasi Cloud LOS Campus",
   "operator": "Kasi Cloud",
   "locality": "Lekki, Lagos",
   "record_scope": "campus",
   "location": {
    "address": "Lekki, Lagos, Nigeria",
    "precision": "address",
    "source_url": "https://www.kasicloud.com/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Locality only. The operator office address is not a campus address; the site entrance is unverified."
   },
   "institutional_source": {
    "url": "https://www.kasicloud.com/contact-us",
    "label": "Ask Kasi Cloud about LOS Campus",
    "note": "Use the operator’s general contact form or listed sales contact and name LOS Campus. Confirm project status, campus address, service timing and whether your requirements can be met. This is an enquiry route, not a booking or availability confirmation. Enquiry route checked 11 November 2026; the operator’s page-update date is not stated.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Kasi Cloud",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded identity and location facts with attribution and ordinary links only. No source narrative, tables, images, logos or technical specifications reproduced; no endorsement or current availability claim."
   },
   "notes": "Operator-listed planned campus, labelled Coming Soon when checked. No completion date or current service availability is established. Individual proposed buildings are not counted separately.",
   "facts": [
    {
     "text": "Kasi Cloud lists LOS Campus in Lekki, Lagos as Coming Soon.",
     "source_url": "https://www.kasicloud.com/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/kasi-cloud-los-campus-lekki-lagos",
   "permalink": "https://computefinder.net/entity/cf-dc-0124"
  },
  {
   "id": "cf-dc-0125",
   "country": "NG",
   "owner": null,
   "stage": "announced",
   "stage_as_of": "2026-11-10",
   "stage_source_url": "https://www.kasicloud.com/",
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "kasi-cloud-dnek-campus-eket",
   "name": "Kasi Cloud DNEK Campus",
   "operator": "Kasi Cloud",
   "locality": "Eket, Akwa Ibom",
   "record_scope": "campus",
   "location": {
    "address": "Eket, Akwa Ibom, Nigeria",
    "precision": "address",
    "source_url": "https://www.kasicloud.com/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Locality only. The operator office address is not a campus address; the site entrance is unverified."
   },
   "institutional_source": {
    "url": "https://www.kasicloud.com/contact-us",
    "label": "Ask Kasi Cloud about DNEK Campus",
    "note": "Use the operator’s general contact form or listed sales contact and name DNEK Campus. Confirm project status, campus address, service timing and whether your requirements can be met. This is an enquiry route, not a booking or availability confirmation. Enquiry route checked 11 November 2026; the operator’s page-update date is not stated.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Kasi Cloud",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded identity and location facts with attribution and ordinary links only. No source narrative, tables, images, logos or technical specifications reproduced; no endorsement or current availability claim."
   },
   "notes": "Operator-listed planned campus, labelled Coming Soon when checked. No completion date or current service availability is established. Individual proposed buildings are not counted separately.",
   "facts": [
    {
     "text": "Kasi Cloud lists DNEK Campus in Eket, Akwa Ibom as Coming Soon.",
     "source_url": "https://www.kasicloud.com/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/kasi-cloud-dnek-campus-eket",
   "permalink": "https://computefinder.net/entity/cf-dc-0125"
  },
  {
   "id": "cf-dc-0126",
   "country": "NG",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "slug": "africa-data-centres-los1-lagos",
   "name": "Africa Data Centres LOS1 Lagos",
   "operator": "Africa Data Centres",
   "locality": "Eko Atlantic City, Lagos",
   "record_scope": "facility",
   "location": {
    "address": "Eko Atlantic City, Lagos, Nigeria",
    "precision": "address",
    "source_url": "https://www.africadatacentres.com/lagos/",
    "source_date": null,
    "checked_on": "2026-11-10",
    "note": "Operator-reported district, not a street address or verified entrance. Confirm delivery and visitor directions directly."
   },
   "institutional_source": {
    "url": "https://www.africadatacentres.com/lagos/",
    "label": "Ask Africa Data Centres about LOS1 Lagos colocation",
    "note": "Use the facility enquiry form to confirm racks, power density, connectivity and deployment dates. This LOS1 is distinct from OADC and Digital Realty LOS1.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Africa Data Centres",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded identity and location facts with attribution and ordinary links only. No source narrative, tables, images, logos or technical specifications reproduced; no endorsement or current availability claim."
   },
   "notes": "The operator announced that its Lagos facility had opened in December 2021. That historical milestone is not proof of current operation or available space. Capacity figures are omitted because dated announcements and the current site page use different figures and scopes.",
   "facts": [
    {
     "text": "Africa Data Centres identifies LOS1 Lagos in Eko Atlantic City and provides a facility enquiry route.",
     "source_url": "https://www.africadatacentres.com/lagos/"
    },
    {
     "text": "Its 6 December 2021 announcement reported the opening of a Lagos facility; it did not establish current availability.",
     "source_url": "https://www.africadatacentres.com/africa-data-centres-unveils-new-10mw-data-centre-in-lagos/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/africa-data-centres-los1-lagos",
   "permalink": "https://computefinder.net/entity/cf-dc-0126"
  },
  {
   "id": "cf-dc-0135",
   "country": "NG",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-12",
   "review_by": "2026-12-12",
   "slug": "galaxy-backbone-nssc-dc1-abuja",
   "name": "Galaxy Backbone NSSC DC1 Abuja",
   "operator": "Galaxy Backbone Limited",
   "locality": "Abuja",
   "record_scope": "facility",
   "institutional_source": {
    "url": "https://galaxybackbone.com.ng/request-a-quote/",
    "label": "Ask Galaxy Backbone about Abuja NSSC DC1",
    "note": "Use the operator’s quote-request form and specify Abuja NSSC DC1. For colocation, describe your own equipment, rack space, power, network and intended start date. For hosted compute, separately confirm the service specification and hosting location. Ask about current eligibility, availability and price; an enquiry is not a reservation.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Galaxy Backbone Limited",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded identity and location facts with attribution and ordinary links only. No source narrative, tables, images, logos or technical specifications reproduced; no endorsement or current availability claim."
   },
   "notes": "The operator identifies NSSC DC1 in Abuja. Its Phase 1 reference is context for this named facility, not an additional site. A company office address is not a verified data-hall address. The source’s publication year is not established. Current stage, capacity, certification, street address, coordinates and available compute remain unverified.",
   "facts": [
    {
     "text": "Galaxy Backbone identifies National Shared Services Centre Data Center 1 (NSSC DC1), Phase 1, in Abuja.",
     "source_url": "https://galaxybackbone.com.ng/galaxy-backbone-limited-national-shared-service-dc1-ph1-abuja-achieves-uptime-institute-tier-iii-certification-of-constructed-facility/"
    },
    {
     "text": "The operator advertises colocation and cloud services and links a quote-request form. Confirm the service and hosting location for your workload.",
     "source_url": "https://galaxybackbone.com.ng/data-center-services/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/galaxy-backbone-nssc-dc1-abuja",
   "permalink": "https://computefinder.net/entity/cf-dc-0135"
  },
  {
   "id": "cf-dc-0136",
   "country": "NG",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-12",
   "review_by": "2026-12-12",
   "slug": "galaxy-backbone-kano",
   "name": "Galaxy Backbone Kano data centre",
   "operator": "Galaxy Backbone Limited",
   "locality": "Kano",
   "record_scope": "facility",
   "institutional_source": {
    "url": "https://galaxybackbone.com.ng/request-a-quote/",
    "label": "Ask Galaxy Backbone about its Kano data centre",
    "note": "Use the operator’s quote-request form and specify Kano, not Abuja. Describe whether you need space for your own equipment or a hosted service, plus power, network and intended start date. Confirm the physical facility and hosting location, current availability, eligibility and quotation before committing.",
    "updated_on": null
   },
   "source_notice": {
    "publisher": "Galaxy Backbone Limited",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded identity and location facts with attribution and ordinary links only. No source narrative, tables, images, logos or technical specifications reproduced; no endorsement or current availability claim."
   },
   "notes": "The operator’s FAQ identifies a data centre in Kano separately from its Abuja facility. This is a descriptive facility label, not a verified formal building name. No office address is assigned to the data centre. Current stage, capacity, certification, street address, coordinates and available compute remain unverified; operator-level cloud services do not establish that a particular workload can run in Kano.",
   "facts": [
    {
     "text": "Galaxy Backbone’s FAQ identifies separate data centres in Abuja and Kano.",
     "source_url": "https://galaxybackbone.com.ng/ufaqs/does-galaxy-backbone-operate-a-datacentre/"
    },
    {
     "text": "The operator provides a general service quote-request route. Ask specifically about the Kano facility and the service you need.",
     "source_url": "https://galaxybackbone.com.ng/request-a-quote/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/galaxy-backbone-kano",
   "permalink": "https://computefinder.net/entity/cf-dc-0136"
  },
  {
   "id": "cf-dc-0140",
   "country": "NG",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-12",
   "review_by": "2026-12-12",
   "slug": "21ctl-ikeja-data-centre",
   "name": "21CTL Ikeja data centre",
   "operator": "21st Century Technologies",
   "locality": "Ikeja",
   "record_scope": "facility",
   "institutional_source": {
    "url": "https://www.21ctl.com/digital-infrastructure",
    "label": "Ask 21CTL about its Ikeja data centre",
    "updated_on": null,
    "note": "Use the general company contact details printed on the data-centre page and specify Ikeja. Confirm the current operator, facility address, service type, rack and power requirements, network, intended start date and quotation. The contact route is not a booking or availability confirmation; do not treat the office address as a facility entrance."
   },
   "source_notice": {
    "publisher": "21st Century Technologies",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded attributed facility identity, district and general enquiry-route facts with an ordinary source link. No source narrative, specification table, images, logos, personal contacts or price data reproduced. No endorsement, legal-ownership or current availability claim."
   },
   "notes": "The company website lists Ikeja Data Center as a named facility entry. The operator is shown under the website's 21st Century Technologies brand; legal ownership is not established. Ikeja is a locality label, not a verified street address or entrance. The general Lekki office address is not assigned to this facility. Current stage, capacity, certification, coordinates and available compute remain unverified. This is not a GPU-rental offer.",
   "facts": [
    {
     "text": "21st Century Technologies lists Ikeja Data Center on its digital-infrastructure page.",
     "source_url": "https://www.21ctl.com/digital-infrastructure"
    },
    {
     "text": "The same page provides general company contact details. Specify the named facility and confirm the hosting location and service directly.",
     "source_url": "https://www.21ctl.com/digital-infrastructure"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/21ctl-ikeja-data-centre",
   "permalink": "https://computefinder.net/entity/cf-dc-0140"
  },
  {
   "id": "cf-dc-0141",
   "country": "NG",
   "owner": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-12",
   "review_by": "2026-12-12",
   "slug": "21ctl-ikoyi-data-centre",
   "name": "21CTL Ikoyi data centre",
   "operator": "21st Century Technologies",
   "locality": "Ikoyi",
   "record_scope": "facility",
   "institutional_source": {
    "url": "https://www.21ctl.com/digital-infrastructure",
    "label": "Ask 21CTL about its Ikoyi data centre",
    "updated_on": null,
    "note": "Use the general company contact details printed on the data-centre page and specify Ikoyi. Confirm the current operator, facility address, service type, rack and power requirements, network, intended start date and quotation. The contact route is not a booking or availability confirmation; do not treat the office address as a facility entrance."
   },
   "source_notice": {
    "publisher": "21st Century Technologies",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded attributed facility identity, district and general enquiry-route facts with an ordinary source link. No source narrative, specification table, images, logos, personal contacts or price data reproduced. No endorsement, legal-ownership or current availability claim."
   },
   "notes": "The company website lists Ikoyi Data Center as a named facility entry. The operator is shown under the website's 21st Century Technologies brand; legal ownership is not established. Ikoyi is a locality label, not a verified street address or entrance. The general Lekki office address is not assigned to this facility. Current stage, capacity, certification, coordinates and available compute remain unverified. This is not a GPU-rental offer.",
   "facts": [
    {
     "text": "21st Century Technologies lists Ikoyi Data Center on its digital-infrastructure page.",
     "source_url": "https://www.21ctl.com/digital-infrastructure"
    },
    {
     "text": "The same page provides general company contact details. Specify the named facility and confirm the hosting location and service directly.",
     "source_url": "https://www.21ctl.com/digital-infrastructure"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/21ctl-ikoyi-data-centre",
   "permalink": "https://computefinder.net/entity/cf-dc-0141"
  },
  {
   "id": "cf-dc-0127",
   "country": "ZA",
   "operator": "Africa Data Centres",
   "owner": null,
   "record_scope": "campus",
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": "The operator describes hot- and cold-aisle containment. This does not establish liquid-cooling support, rack power density or measured efficiency; confirm the intended hall and equipment requirements.",
   "connectivity_note": "The operator describes links to major hubs and dark-fibre infrastructure. Named carriers, routes, bandwidth and current connection availability are not verified here; ask which options can serve your racks.",
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "source_notice": {
    "publisher": "Africa Data Centres",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, location and service facts with ordinary operator links. No marketing text, specification tables, images, logos or prices reproduced. No endorsement or current availability claim."
   },
   "slug": "africa-data-centres-jhb1-midrand",
   "name": "Africa Data Centres JHB1 Midrand",
   "locality": "Midrand, Johannesburg",
   "institutional_source": {
    "url": "https://www.africadatacentres.com/midrand/",
    "label": "Ask Africa Data Centres about JHB1 Midrand colocation",
    "updated_on": null,
    "note": "Use the facility enquiry form and specify the site code, racks or hall, power requirement and move-in date. Confirm which services and space are available for your deployment."
   },
   "notes": "One listing covers the named Midrand campus and its expansion halls. The operator page contains older expansion plans; ask which halls can meet your requirements now. A street address, exact building point and current available capacity have not been established here.",
   "facts": [
    {
     "text": "Africa Data Centres identifies JHB1 as its Midrand location in Johannesburg and provides a facility-tour enquiry form.",
     "source_url": "https://www.africadatacentres.com/midrand/"
    },
    {
     "text": "The Midrand page describes connectivity to major hubs and dark-fibre infrastructure, plus hot- and cold-aisle containment. These are operator descriptions, not verified service availability or performance.",
     "source_url": "https://www.africadatacentres.com/midrand/"
    },
    {
     "text": "A 13 April 2026 operator announcement identifies Midrand and Samrand as its Gauteng campuses.",
     "source_url": "https://www.africadatacentres.com/africa-data-centres-partners-with-oni-tel-to-enhance-data-centre-connectivity-in-south-africa/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/africa-data-centres-jhb1-midrand",
   "permalink": "https://computefinder.net/entity/cf-dc-0127"
  },
  {
   "id": "cf-dc-0128",
   "country": "ZA",
   "operator": "Africa Data Centres",
   "owner": null,
   "record_scope": "campus",
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": "The operator describes cold-aisle containment. Confirm the cooling arrangement for your intended hall, rack power density and equipment. This description alone does not establish liquid-cooling support or measured efficiency.",
   "connectivity_note": "The operator describes Samrand as carrier- and cloud-neutral, with links to major hubs and dark-fibre infrastructure. Ask which carriers, cloud connections and cross-connects can serve your deployment; neutrality does not establish that every option is available.",
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "source_notice": {
    "publisher": "Africa Data Centres",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, location and service facts with ordinary operator links. No marketing text, specification tables, images, logos or prices reproduced. No endorsement or current availability claim."
   },
   "slug": "africa-data-centres-jhb2-samrand",
   "name": "Africa Data Centres JHB2 Samrand",
   "locality": "Samrand, Centurion",
   "institutional_source": {
    "url": "https://www.africadatacentres.com/samrand-2/",
    "label": "Ask Africa Data Centres about JHB2 Samrand colocation",
    "updated_on": null,
    "note": "Use the facility enquiry form and specify the site code, racks or hall, power requirement and move-in date. Confirm which services and space are available for your deployment."
   },
   "notes": "One listing covers the named Samrand campus, not each hall or expansion phase. Older operator pages describe different expansion capacities, so no single current capacity is assigned. Ask the operator to confirm the site address and which halls, services and power can meet your required date.",
   "facts": [
    {
     "text": "Africa Data Centres identifies JHB2 as its Samrand location in Centurion and provides a facility-tour enquiry form.",
     "source_url": "https://www.africadatacentres.com/samrand-2/"
    },
    {
     "text": "The Samrand page describes carrier- and cloud-neutral colocation, hub and dark-fibre connectivity, and cold-aisle containment. These are undated operator descriptions, not confirmed current service availability.",
     "source_url": "https://www.africadatacentres.com/samrand-2/"
    },
    {
     "text": "A 13 April 2026 operator announcement identifies Midrand and Samrand as its Gauteng campuses.",
     "source_url": "https://www.africadatacentres.com/africa-data-centres-partners-with-oni-tel-to-enhance-data-centre-connectivity-in-south-africa/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/africa-data-centres-jhb2-samrand",
   "permalink": "https://computefinder.net/entity/cf-dc-0128"
  },
  {
   "id": "cf-dc-0129",
   "country": "ZA",
   "operator": "Africa Data Centres",
   "owner": null,
   "record_scope": "campus",
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "lat": null,
   "lon": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": "The operator describes hot- and cold-aisle containment. Confirm the intended hall, rack power density and cooling compatibility; liquid-cooling support and measured efficiency are not established here.",
   "connectivity_note": "The operator describes carrier fibre connections and internet-exchange hosting. Ask which networks and exchange ports are available at CPT1, how cross-connects are ordered and what your deployment needs; a network connection is not itself a compute offer.",
   "checked_on": "2026-11-10",
   "review_by": "2026-12-10",
   "source_notice": {
    "publisher": "Africa Data Centres",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded, attributed identity, location and service facts with ordinary operator links. No marketing text, specification tables, images, logos or prices reproduced. No endorsement or current availability claim."
   },
   "slug": "africa-data-centres-cpt1-cape-town",
   "name": "Africa Data Centres CPT1 Cape Town",
   "locality": "Cape Town",
   "institutional_source": {
    "url": "https://www.africadatacentres.com/capetown/",
    "label": "Ask Africa Data Centres about CPT1 Cape Town colocation",
    "updated_on": null,
    "note": "Use the facility enquiry form and specify the site code, racks or hall, power requirement and move-in date. Confirm which services and space are available for your deployment."
   },
   "notes": "This listing covers CPT1 and its expansion halls as one campus. The facility page contains older expansion plans; the dated 2024 announcement is historical context, not a statement of capacity or availability today. A street address and exact building point are not recorded here.",
   "facts": [
    {
     "text": "Africa Data Centres identifies CPT1 as its Cape Town colocation location and provides a facility-tour enquiry form.",
     "source_url": "https://www.africadatacentres.com/capetown/"
    },
    {
     "text": "The Cape Town page describes carrier fibre connectivity, internet-exchange hosting and hot- and cold-aisle containment. These are undated operator descriptions; the same page retains older expansion plans, so current services need direct confirmation.",
     "source_url": "https://www.africadatacentres.com/capetown/"
    },
    {
     "text": "A 25 July 2024 operator announcement describes additional halls on the existing CPT1 campus in South Africa.",
     "source_url": "https://www.africadatacentres.com/africa-data-centres-announces-additional-6mw-capacity-now-live-in-cape-town/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/africa-data-centres-cpt1-cape-town",
   "permalink": "https://computefinder.net/entity/cf-dc-0129"
  },
  {
   "id": "cf-dc-0132",
   "slug": "raxio-ug1-namanve",
   "name": "Raxio Uganda UG1",
   "country": "UG",
   "locality": "Namanve Industrial Park",
   "operator": "Raxio Group",
   "owner": null,
   "record_scope": "facility",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "institutional_source": {
    "url": "https://www.raxiogroup.com/data-centres/uganda/",
    "label": "Ask Raxio about Uganda UG1 colocation",
    "updated_on": null,
    "note": "Use Get in touch or Schedule a tour on the Uganda facility page and select Raxio Uganda UG1. Specify your equipment, rack space, power, network and intended start date. Ask for a current quotation and confirmation of available space; an enquiry is not a reservation."
   },
   "source_notice": {
    "publisher": "Raxio Group",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded attributed identity, locality and enquiry facts with an ordinary operator link. No marketing narrative, specification tables, PDFs, prices, images, maps or personal contacts reproduced. No endorsement or current availability claim."
   },
   "notes": "The operator identifies UG1 in Namanve Industrial Park, Uganda. This is a colocation enquiry route for your own equipment, not a GPU rental or confirmed compute offer. Historical and current rack counts differ, so capacity and certification are not admitted here. Current operating stage, available space, street address and coordinates remain unverified. Company contact addresses are not substituted for the facility location.",
   "facts": [
    {
     "text": "Raxio identifies its Uganda UG1 data centre in Namanve Industrial Park.",
     "source_url": "https://www.raxiogroup.com/data-centres/uganda/"
    },
    {
     "text": "The Uganda facility page provides Get in touch and Schedule a tour routes with a Uganda UG1 selection.",
     "source_url": "https://www.raxiogroup.com/data-centres/uganda/"
    }
   ],
   "checked_on": "2026-11-12",
   "review_by": "2026-12-12",
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/raxio-ug1-namanve",
   "permalink": "https://computefinder.net/entity/cf-dc-0132"
  },
  {
   "id": "cf-dc-0133",
   "operator": "Raxio Group",
   "owner": null,
   "record_scope": "facility",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-12",
   "review_by": "2026-12-12",
   "source_notice": {
    "publisher": "Raxio Group",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded attributed identity, locality and enquiry facts with an ordinary operator link. No marketing narrative, specification tables, PDFs, prices, images, maps or personal contacts reproduced. No endorsement or current availability claim."
   },
   "slug": "raxio-ao1-luanda",
   "name": "Raxio Angola AO1",
   "country": "AO",
   "locality": "Outskirts of Luanda",
   "institutional_source": {
    "url": "https://www.raxiogroup.com/data-centres/angola/",
    "label": "Ask Raxio about Angola AO1 colocation",
    "updated_on": null,
    "note": "Use Get in touch on the Angola facility page and specify AO1, your equipment, rack space, power, network and intended start date. Ask for current availability and a quotation; an enquiry is not a reservation."
   },
   "notes": "The operator identifies AO1 on the outskirts of Luanda. This is a colocation enquiry route, not confirmed available compute. The facility page mixes future and present language, so current operating stage is not assigned. Capacity, certification, street address and coordinates remain unverified; the company contact address is not substituted for the facility.",
   "facts": [
    {
     "text": "Raxio identifies its Angola AO1 facility on the outskirts of Luanda.",
     "source_url": "https://www.raxiogroup.com/data-centres/angola/"
    },
    {
     "text": "The Angola facility page provides a Get in touch enquiry route.",
     "source_url": "https://www.raxiogroup.com/data-centres/angola/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/raxio-ao1-luanda",
   "permalink": "https://computefinder.net/entity/cf-dc-0133"
  },
  {
   "id": "cf-dc-0134",
   "operator": "Raxio Group",
   "owner": null,
   "record_scope": "facility",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": null,
   "connectivity_note": null,
   "checked_on": "2026-11-12",
   "review_by": "2026-12-12",
   "source_notice": {
    "publisher": "Raxio Group",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded attributed identity, locality and enquiry facts with an ordinary operator link. No marketing narrative, specification tables, PDFs, prices, images, maps or personal contacts reproduced. No endorsement or current availability claim."
   },
   "slug": "raxio-civ1-grand-bassam",
   "name": "Raxio Côte d’Ivoire CIV1",
   "aliases": [
    "Raxio Côte d’Ivoire CI1"
   ],
   "country": "CI",
   "locality": "Grand Bassam, VITIB",
   "institutional_source": {
    "url": "https://www.raxiogroup.com/data-centres/cote-divoire/",
    "label": "Ask Raxio about Côte d’Ivoire colocation",
    "updated_on": null,
    "note": "Use Get in touch on the Côte d’Ivoire facility page. The facility page calls the site CIV1, while the enquiry selector uses Raxio Côte d’Ivoire CI1. Specify the Grand Bassam facility and confirm the site code with Raxio. Include equipment, rack space, power, network and intended start date; ask for current availability and a quotation."
   },
   "notes": "Raxio locates the facility at the Village of Innovation and Technology (VITIB) in Grand Bassam. Its facility page uses CIV1, while its index and enquiry selector use CI1. These labels are kept on one record for the same linked country facility, not counted as two sites or treated as proof of a formal rename. Current stage, available space, capacity, certification, street address and coordinates remain unverified.",
   "facts": [
    {
     "text": "Raxio identifies CIV1 in Grand Bassam, within the Village of Innovation and Technology (VITIB).",
     "source_url": "https://www.raxiogroup.com/data-centres/cote-divoire/"
    },
    {
     "text": "Raxio’s site-wide enquiry selector uses CI1 rather than the facility page’s CIV1 label.",
     "source_url": "https://www.raxiogroup.com/contact/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/raxio-civ1-grand-bassam",
   "permalink": "https://computefinder.net/entity/cf-dc-0134"
  },
  {
   "id": "cf-dc-0137",
   "operator": "Raxio Group",
   "owner": null,
   "record_scope": "facility",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": "The operator describes indirect adiabatic cooling. Confirm the cooling arrangement and compatible rack power density for your intended equipment; this does not establish liquid-cooling support, measured PUE or water use.",
   "connectivity_note": "The operator describes carrier-neutral colocation with fibre providers, cross-connects and separate network-entry paths. Ask which carriers and cloud connections can serve your racks, how cross-connects are ordered and what the lead time is; no specific service availability is verified here.",
   "checked_on": "2026-11-12",
   "review_by": "2026-12-12",
   "source_notice": {
    "publisher": "Raxio Group",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded attributed identity, locality, network and cooling descriptions with ordinary operator links. No marketing narrative, specification tables, PDFs, prices, images, maps or personal contacts reproduced. No performance guarantee, endorsement or current availability claim."
   },
   "slug": "raxio-drc1-kinshasa",
   "name": "Raxio DR Congo DRC1",
   "country": "CD",
   "locality": "Limete industriel, Kinshasa",
   "institutional_source": {
    "url": "https://www.raxiogroup.com/data-centres/dr-congo/",
    "label": "Ask Raxio about DRC1 colocation",
    "updated_on": null,
    "note": "Use Get in touch or Schedule a tour on the facility page and specify DRC1. Describe your own equipment, rack space, power, network and intended start date. Confirm the facility entrance, current services, available space and quotation directly; an enquiry is not a reservation."
   },
   "notes": "The operator's own DRC1 facility page identifies Limete industriel in Kinshasa. This is a locality, not a verified street address or entrance. The record covers the named facility, not separate halls or expansion phases. This is a colocation enquiry route, not a GPU rental or confirmed compute offer. Current stage, capacity, certification, coordinates and available compute remain unverified.",
   "facts": [
    {
     "text": "The operator describes carrier-neutral connectivity, cross-connects and indirect adiabatic cooling. These are undated facility descriptions, not confirmation of current service availability or measured performance.",
     "source_url": "https://www.raxiogroup.com/data-centres/dr-congo/"
    },
    {
     "text": "Raxio identifies DRC1 in Limete industriel in Kinshasa, DR Congo.",
     "source_url": "https://www.raxiogroup.com/data-centres/dr-congo/"
    },
    {
     "text": "The facility page provides Get in touch and Schedule a tour enquiry routes.",
     "source_url": "https://www.raxiogroup.com/data-centres/dr-congo/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/raxio-drc1-kinshasa",
   "permalink": "https://computefinder.net/entity/cf-dc-0137"
  },
  {
   "id": "cf-dc-0138",
   "operator": "Raxio Group",
   "owner": null,
   "record_scope": "facility",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": "The operator describes indirect adiabatic cooling. Confirm the cooling arrangement and compatible rack power density for your intended equipment; this does not establish liquid-cooling support, measured PUE or water use.",
   "connectivity_note": "The operator describes carrier-neutral colocation with fibre providers, cross-connects and separate network-entry paths. Ask which carriers and cloud connections can serve your racks, how cross-connects are ordered and what the lead time is; no specific service availability is verified here.",
   "checked_on": "2026-11-12",
   "review_by": "2026-12-12",
   "source_notice": {
    "publisher": "Raxio Group",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded attributed identity, locality, network and cooling descriptions with ordinary operator links. No marketing narrative, specification tables, PDFs, prices, images, maps or personal contacts reproduced. No performance guarantee, endorsement or current availability claim."
   },
   "slug": "raxio-et1-addis-ababa",
   "name": "Raxio Ethiopia ET1",
   "country": "ET",
   "locality": "ICT Park, Addis Ababa",
   "institutional_source": {
    "url": "https://www.raxiogroup.com/data-centres/ethiopia/",
    "label": "Ask Raxio about ET1 colocation",
    "updated_on": null,
    "note": "Use Get in touch or Schedule a tour on the facility page and specify ET1. Describe your own equipment, rack space, power, network and intended start date. Confirm the facility entrance, current services, available space and quotation directly; an enquiry is not a reservation."
   },
   "notes": "The operator's own ET1 facility page places the data centre inside the ICT Park in Addis Ababa. This does not establish an exact street address, parcel boundary or visitor entrance. This is a colocation enquiry route, not a GPU rental or confirmed compute offer. Current stage, capacity, certification, coordinates and available compute remain unverified.",
   "facts": [
    {
     "text": "The operator describes carrier-neutral connectivity, cross-connects and indirect adiabatic cooling. These are undated facility descriptions, not confirmation of current service availability or measured performance.",
     "source_url": "https://www.raxiogroup.com/data-centres/ethiopia/"
    },
    {
     "text": "Raxio identifies ET1 in ICT Park in Addis Ababa, Ethiopia.",
     "source_url": "https://www.raxiogroup.com/data-centres/ethiopia/"
    },
    {
     "text": "The facility page provides Get in touch and Schedule a tour enquiry routes.",
     "source_url": "https://www.raxiogroup.com/data-centres/ethiopia/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/raxio-et1-addis-ababa",
   "permalink": "https://computefinder.net/entity/cf-dc-0138"
  },
  {
   "id": "cf-dc-0139",
   "operator": "Raxio Group",
   "owner": null,
   "record_scope": "facility",
   "lat": null,
   "lon": null,
   "stage": "unknown",
   "stage_as_of": null,
   "stage_source_url": null,
   "capacity": [],
   "planning": [],
   "certifications": [],
   "participation": null,
   "power_note": null,
   "cooling_note": "The operator describes indirect adiabatic cooling. Confirm the cooling arrangement and compatible rack power density for your intended equipment; this does not establish liquid-cooling support, measured PUE or water use.",
   "connectivity_note": "The operator describes carrier-neutral colocation with fibre providers, cross-connects and separate network-entry paths. Ask which carriers and cloud connections can serve your racks, how cross-connects are ordered and what the lead time is; no specific service availability is verified here.",
   "checked_on": "2026-11-12",
   "review_by": "2026-12-12",
   "source_notice": {
    "publisher": "Raxio Group",
    "licence": "Copyright retained; no open content licence asserted",
    "licence_url": null,
    "scope": "Minimal independently worded attributed identity, locality, network and cooling descriptions with ordinary operator links. No marketing narrative, specification tables, PDFs, prices, images, maps or personal contacts reproduced. No performance guarantee, endorsement or current availability claim."
   },
   "slug": "raxio-mz1-matola",
   "name": "Raxio Mozambique MZ1",
   "country": "MZ",
   "locality": "Beluluane Industrial Park, Matola",
   "institutional_source": {
    "url": "https://www.raxiogroup.com/data-centres/mozambique/",
    "label": "Ask Raxio about MZ1 colocation",
    "updated_on": null,
    "note": "Use Get in touch or Schedule a tour on the facility page and specify MZ1. Describe your own equipment, rack space, power, network and intended start date. Confirm the facility entrance, current services, available space and quotation directly; an enquiry is not a reservation."
   },
   "notes": "The operator's own MZ1 facility page places the data centre in Beluluane Industrial Park in Matola, outside central Maputo. The contact page's Maputo reference describes the wider area; this record uses the facility page's Matola locality. No street address or exact entrance is recorded. This is a colocation enquiry route, not a GPU rental or confirmed compute offer. Current stage, capacity, certification, coordinates and available compute remain unverified.",
   "facts": [
    {
     "text": "The operator describes carrier-neutral connectivity, cross-connects and indirect adiabatic cooling. These are undated facility descriptions, not confirmation of current service availability or measured performance.",
     "source_url": "https://www.raxiogroup.com/data-centres/mozambique/"
    },
    {
     "text": "Raxio identifies MZ1 in Beluluane Industrial Park in Matola, Mozambique.",
     "source_url": "https://www.raxiogroup.com/data-centres/mozambique/"
    },
    {
     "text": "The facility page provides Get in touch and Schedule a tour enquiry routes.",
     "source_url": "https://www.raxiogroup.com/data-centres/mozambique/"
    }
   ],
   "grid_connection": null,
   "pue": null,
   "water_use": null,
   "chips": null,
   "inspection_limits": null,
   "page_url": "https://computefinder.net/data-centres/raxio-mz1-matola",
   "permalink": "https://computefinder.net/entity/cf-dc-0139"
  }
 ]
}