ComputeFinder

Explore

Explore projects, places and technology

Find a project or place, understand what it depends on, and follow the questions that matter to you.

Go deeper

From need to afterlife

Capital, workforce, governance, community agency and environmental consequences run across these stages. Expansion, better use of existing assets, repair and retirement each deserve scrutiny.

Lifecycle questions and current library routes
StageQuestionStarting pointsCoverage limit
Need and alternativesWhat outcome needs compute, and what could meet it?Start with the workload · Inspect research and its limitsDemand forecasts and useful outcomes need their own evidence.
Research and designWhich technologies, software and standards shape the options?Technology and supply · Standards · ResearchSelected references, rather than a complete research or software catalogue.
Materials and manufactureWhat inputs and manufacturing dependencies matter?Chips, systems and facility inputsUpstream materials and manufacturing coverage need further depth.
Land, capital and permissionsWhat is proposed, who is involved and what remains conditional?Read the project evidence briefing · Finance questions · Policy evidenceProject-specific agreements and financing are established only where cited.
Power, water and networksWhich connections and local resources govern delivery?Large-load grid rules · Power, cooling and connectivity · Local evidence questionsA general rule does not establish a particular project connection or local effect.
Build and commissionWhat supports the recorded stage, and which phase does it describe?Find a sourced record · Explore the map and accessible tableSource records can describe projects, facilities or systems; they are not a census of unique facilities.
Access and allocationWho can use the resource, on what terms and through which route?Find a route to compute · Free and funded routesA listing does not establish current eligibility, an allocation or available capacity.
Operate and maintainWhat makes the service usable, reliable and supportable?Services and practical questions · Standards and evidence · Provider recordsLive reliability, utilisation and service performance are not measured by this index.
Use and improveWhat useful outcome results, and can existing resources meet it better?Research context · Tools and assumptions · Economics and who paysInstalled capacity, spending and efficiency claims do not by themselves establish a useful outcome.
Repair, upgrade and reuseCould equipment or a site stay useful through repair or a different use?Reviewed JRC component-reuse guidance · Service questionsHistorical guidance describes component harvesting/testing and firmware/data-erasure constraints. Certified refurbishment, secondary-GPU brokerage and completed reuse outcomes remain unassessed.
Retire, recover and restoreWhat happens to data, equipment, materials, sites and continuing obligations?Operator-reported ASPIRE 1 system retirement · Reviewed grid-span removal and cleanup conditions · Questions for a placeNSCC reports retirement of the named ASPIRE 1 system on 31 August 2023. That is separate from recovery, disposal, building/site closure or restoration. The named NVE grid-asset obligation is starting evidence only; completed removal, compliance, bonds and stranded-asset liability remain unestablished.

Follow the evidence

Read what is changing, inspect the recorded-field coverage, or reuse data with its source conditions. Stage, source date, publication date and review date describe different things. Missing evidence does not establish absence.

See the method, source and licence limits and correction route.