Sites: data centres and AI projects
Search the existing detailed records and Epoch AI project records together.
Coverage is partial. A missing result does not mean no data centre exists there. Operating does not establish compute available to buy.
Showing 234 source records.
| Record | Country | Organisation and role | Source-reported address | Recorded stage | Dated building evidence | Evidence type | Record date |
|---|---|---|---|---|---|---|---|
| 21CTL Ikeja data centre | Nigeria | Facility operator: 21st Century Technologies; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-12 |
| 21CTL Ikoyi data centre | Nigeria | Facility operator: 21st Century Technologies; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-12 |
| ACR2 Data Centre | Ghana | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| Africa Data Centres CPT1 Cape Town | South Africa | Facility operator: Africa Data Centres; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Africa Data Centres JHB1 Midrand | South Africa | Facility operator: Africa Data Centres; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Africa Data Centres JHB2 Samrand | South Africa | Facility operator: Africa Data Centres; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Africa Data Centres LOS1 Lagos | Nigeria | Facility operator: Africa Data Centres; facility owner: Not recorded | Eko Atlantic City, Lagos, Nigeria (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Africa Data Centres NBO1 Nairobi | Kenya | Facility operator: Africa Data Centres; facility owner: Not recorded | Sameer Industrial Park, Nairobi, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Alibaba Zhangbei | China | AI hardware owner: Alibaba (confident); facility operator: not recorded | Alibaba Zhangbei Yun Calculation Data Center, Zhangbei County, Zhangjiakou, Hebei, China, 076471 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Alice Recoque (proposed TGCC location) | France | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| Amazon Madison Mega Site | United States | AI hardware owner: Amazon (confident); facility operator: not recorded | Amazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison County (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Amazon Ridgeland | United States | AI hardware owner: Amazon (confident); facility operator: not recorded | 1626 County Line Road Ridgeland, Mississippi (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Anthropic Barber Lake | United States | AI hardware owner: Cipher Mining (confident); facility operator: not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Anthropic Lake Mariner | United States | AI hardware owner: AI XPV Platform (confident); facility operator: not recorded | 7725 Lake Rd, Barker, NY 14012 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Anthropic-Amazon New Carlisle | United States | AI hardware owner: Amazon (confident); facility operator: not recorded | 55001 Larrison Blvd, New Carlisle, IN 46552 (Epoch source claim; checked 2026-10-15; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Argonne Leadership Computing Facility (ALCF) | United States | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| Ark Cody Park data centre campus | United Kingdom | Facility operator: Ark Data Centres Limited; facility owner: Not recorded | A57, Cody Park, Old Ively Road, Farnborough, Hampshire, GU14 0LH (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Ark Spring Park data centre campus | United Kingdom | Facility operator: Ark Data Centres Limited; facility owner: Not recorded | Westwells Road, Corsham, Wiltshire, SN13 9GB (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Arrhenius (Linköping University campus) | Sweden | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| atNorth ICE01 | Iceland | Facility operator: atNorth; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| atNorth ICE02 campus | Iceland | Facility operator: atNorth; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| AWS Berwick | United States | AI hardware owner: Amazon (confident); facility operator: not recorded | 1125 Electron Ave, Berwick, PA 18603 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| AWS New Albany | United States | AI hardware owner: Amazon (confident); facility operator: not recorded | 13360 Miller Rd NW (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Bridge Data Centres MY06 | Malaysia | Facility operator: Bridge Data Centres; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| C-DAC Pune National AI Facility (PARAM Siddhi) | India | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-14 |
| Campus IA, Fouju | France | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Permitted | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone) | United Kingdom | Facility operator: Nscale; facility owner: Not recorded | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Colossus 1 | United States | AI hardware owner: SpaceXAI (confident); facility operator: not recorded | 3231 Riverport Rd, Memphis, TN 38109 (Epoch source claim; checked 2026-10-14; CSV source) | Stage not recorded | 1 operational building reported as of 2026-06-15 (Epoch estimate). Epoch reports one operational building. Its dated account records nearby solar-panel installation; this does not establish whole-campus completion or available compute. Checked 2026-10-14; Timeline source | Epoch AI estimate | 2026-10-02 |
| Colossus 2 | United States | AI hardware owner: SpaceXAI (confident); facility operator: not recorded | 5420 Tulane Rd, Memphis, TN 38109 (Epoch source claim; checked 2026-10-14; CSV source) | Stage not recorded | 2 operational buildings reported as of 2026-06-15 (Epoch estimate). Epoch reports two operational buildings. Its dated construction account still describes an unfinished roof on building 3; the later three-building projection is not an observed outcome. Checked 2026-10-14; Timeline source | Epoch AI estimate | 2026-10-02 |
| COLT Hayes data centre | United Kingdom | Facility operator: Colt Data Centre Services UK Limited; facility owner: Not recorded | Hayes, UB4 0SL, United Kingdom (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Colt Powergate data centre | United Kingdom | Facility operator: Colt Data Centre Services UK Limited; facility owner: Not recorded | North Acton, NW10 6PW, United Kingdom (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Core42 Lake Mariner | United States | AI hardware owner: Core42 (confident); facility operator: not recorded | 7725 Lake Rd, Barker, NY 14012 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| CoreWeave Chester VA | United States | AI hardware owner: CoreWeave (confident); facility operator: not recorded | 1401 Meadowville Technology Parkway, Chester, VA (Epoch source claim; checked 2026-10-14; CSV source) | Stage not recorded | 2 operational buildings reported as of 2026-05-20 (Epoch estimate). Epoch estimates two operational buildings from its dated satellite-image account. It infers Building 2 operation from cooling-fan motion artifacts and describes Building 3 as beginning construction, not a completed expansion. The later three-building projection is excluded. Checked 2026-10-14; Timeline source | Epoch AI estimate | 2026-10-02 |
| CoreWeave Dalton 1 & 2 | United States | AI hardware owner: CoreWeave (confident); facility operator: not recorded | 2205 Industrial South Rd, Dalton, GA, 30721 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| CoreWeave Denton TX | United States | AI hardware owner: CoreWeave (confident); facility operator: not recorded | 8171 Jim Christal Rd, Denton, TX 76207 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| CoreWeave Ellendale ND | United States | AI hardware owner: CoreWeave (confident); facility operator: not recorded | 9685 87th Ave SE, Ellendale, ND 58436 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Coreweave Helios | United States | AI hardware owner: CoreWeave (confident); facility operator: not recorded | 984 County Road 112, Afton, TX 79220 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| CoreWeave Lancaster Greenfield site | United States | AI hardware owner: CoreWeave (confident); facility operator: not recorded | 216 Greenfield Rd, Lancaster, PA (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| CoreWeave Marble NC | United States | AI hardware owner: CoreWeave (confident); facility operator: not recorded | 155 Palmer Ln, Marble, NC 28905 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| CoreWeave Muskogee OK | United States | AI hardware owner: CoreWeave (confident); facility operator: not recorded | 1525 W 43rd St S, Muskogee, OK 74401, USA (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| CoreWeave Norway | Norway | AI hardware owner: CoreWeave (confident); facility operator: not recorded | Stølevegen 39, 4715 Øvrebø, Norway (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Cruiserath Road data centre expansion | Ireland | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Permitted | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Crusoe Abilene Expansion | United States | AI hardware owner: Microsoft (confident); facility operator: not recorded | 5502 Spinks Rd, Abilene, TX 79601 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Culham AI Growth Zone (UKAEA Culham Campus) | United Kingdom | Facility operator: Not recorded; facility owner: UK Atomic Energy Authority | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Daedalus (Lavrio) | Greece | Facility operator: GRNET; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-21 |
| Dartford AI data centre campus, New Barn Road | United Kingdom | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Data centre campus, Ampthill Road, Bedford | United Kingdom | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-06 |
| Data4 Paris-Saclay campus (PAR01, PAR02, PAR03) | France | Facility operator: Data4; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| DayOne Kempas | Malaysia | AI hardware owner: Not recorded; facility operator: not recorded | HP79+MP, 81300 Johor Bahru, Johor, Malaysia (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| DayOne Nusajaya | Malaysia | AI hardware owner: Not recorded; facility operator: not recorded | Not recorded here | Stage not recorded | 6 operational buildings reported as of 2026-04-05 (Epoch estimate). Epoch estimates six operational buildings in its tracked Nusajaya account dated 5 April 2026; Buildings 7 to 10 still appeared mostly complete with construction work at the edges. Its later 2 October estimate relies on an expected construction and ramp schedule, not a new operational observation, and is excluded here. This tracked account does not cover every campus phase or verify current campus status, completed expansion or available compute. Checked 2026-10-15; Timeline source | Epoch AI estimate | 2026-10-02 |
| Deucalion (FCT, Guimarães) | Portugal | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| Didcot North Data Centre Campus | United Kingdom | Facility operator: Amazon Data Services UK Limited; facility owner: Not recorded | Former Didcot A Power Station, Didcot, OX11 7BF, United Kingdom (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Digital Realty (iColo) Mombasa One (MBA1) | Kenya | Facility operator: Digital Realty (formerly iColo); facility owner: Not recorded | Miritini, Mombasa, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Digital Realty (iColo) Mombasa Two (MBA2) | Kenya | Facility operator: Digital Realty (formerly iColo); facility owner: Not recorded | Nyali, Mombasa, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Digital Realty (iColo) Nairobi One (NBO1) | Kenya | Facility operator: Digital Realty (formerly iColo); facility owner: Not recorded | Karen, Nairobi, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Digital Realty Amsterdam sites (metro cluster) | Netherlands | Facility operator: Digital Realty; facility owner: Digital Realty | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Digital Realty Frankfurt campus (metro cluster) | Germany | Facility operator: Digital Realty; facility owner: Digital Realty | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Digital Realty Lagos LKK2 (Ogbombo) | Nigeria | Facility operator: Digital Realty; facility owner: Not recorded | Mopo Onibeju Village, Ogbombo Road, Building 2, Lagos, Nigeria (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Digital Realty Lagos LOS1 (Victoria Island) | Nigeria | Facility operator: Digital Realty; facility owner: Not recorded | 8A, Saka Tinubu Street, Victoria Island, Lagos, Nigeria (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Digital Realty LHR26 (Slough Trading Estate) | United Kingdom | Facility operator: Digital Realty; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Digital Realty Paris South (Mistral AI cluster) | France | Facility operator: Digital Realty; facility owner: Digital Realty | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Discoverer (Sofia Tech Park) | Bulgaria | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| Eclairion Bruyères-le-Châtel | France | Facility operator: Eclairion; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-06 |
| EcoDataCenter 1, Falun | Sweden | Facility operator: EcoDataCenter; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| EcoDataCenter 2 | Sweden | AI hardware owner: Mistral AI (confident); facility operator: not recorded | Kvarnsvedsvägen 420, 784 66 Borlänge, Sweden (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| EcoDataCenter Borlänge campus | Sweden | Facility operator: EcoDataCenter; facility owner: Not recorded | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| EdgeConneX DUB06, Ballymakaily, Lucan | Ireland | Facility operator: EdgeConneX; facility owner: Not recorded | Not recorded here | Permitted | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| EdgeConneX Skellefteå campus | Sweden | Facility operator: EdgeConneX; facility owner: Not recorded | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| ELIDZ data centre | South Africa | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| Equinix Amsterdam IBX sites (metro cluster) | Netherlands | Facility operator: Equinix; facility owner: Equinix | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Equinix LD10 (Slough) | United Kingdom | Facility operator: Equinix; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Equinix Profile Park Plot 100 | Ireland | Facility operator: Equinix; facility owner: Not recorded | Not recorded here | Permitted | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Fluidstack France 1 GW AI supercomputer | France | Facility operator: Fluidstack; facility owner: Not recorded | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Gadi (NCI) | Australia | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| Galaxy Backbone Kano data centre | Nigeria | Facility operator: Galaxy Backbone Limited; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-12 |
| Galaxy Backbone NSSC DC1 Abuja | Nigeria | Facility operator: Galaxy Backbone Limited; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-12 |
| Gefion AI supercomputer (DCAI), Copenhagen | Denmark | Facility operator: Danish Centre for AI Innovation (DCAI); facility owner: Danish Centre for AI Innovation (DCAI) | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Global Switch London North (East India Dock House) | United Kingdom | Facility operator: Global Switch; facility owner: Not recorded | East India Dock House, 240 East India Dock Road, London, E14 9YY, United Kingdom (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Goodnight | United States | AI hardware owner: Google (speculative); facility operator: not recorded | 10001 Lima Rd, Claude, TX 79019 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Arcola | United States | AI hardware owner: Google (confident); facility operator: not recorded | 42575 Arcola Blvd, Sterling, VA 20166 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Bristow | United States | AI hardware owner: Google; facility operator: not recorded | 13001 Rollins Ford Road, Bristow, VA 20136 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Cedar Rapids | United States | AI hardware owner: Google (confident); facility operator: not recorded | 5800 EDGEWOOD RD SW CEDAR RAPIDS, IA 52404 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Columbus | United States | AI hardware owner: Google (confident); facility operator: not recorded | 5076 S High St, Columbus, OH 43207 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Council Bluffs (East) | United States | AI hardware owner: Google (confident); facility operator: not recorded | 10410 Bunge Ave, Council Bluffs, IA 51503 (Epoch source claim; checked 2026-10-14; CSV source) | Stage not recorded | 3 operational buildings reported as of 2026-07-07 (Epoch estimate). Epoch reports three operational buildings. Its dated account describes preparation for possible further buildings, not delivery of that expansion. This source record remains distinct from the detailed Council Bluffs account. Checked 2026-10-14; Timeline source | Epoch AI estimate | 2026-10-02 |
| Google Council Bluffs data centre location | United States | Facility operator: Google; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-14 |
| Google Dietzenbach data centre | Germany | Facility operator: Google; facility owner: Google | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Google Eemshaven data centre | Netherlands | Facility operator: Google; facility owner: Google | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Google Fort Wayne | United States | AI hardware owner: Google (confident); facility operator: not recorded | 6015 Adams Center Road, Fort Wayne, IN 46806 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Fredericia data centre | Denmark | Facility operator: Google; facility owner: Google | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Google Grange Castle DC3 | Ireland | Facility operator: Google; facility owner: Not recorded | Not recorded here | Permitted | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Google Hamina data centre | Finland | Facility operator: Google; facility owner: Google | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Google Hanau data centre | Germany | Facility operator: Google; facility owner: Google | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Google Kansas City East | United States | AI hardware owner: Google (confident); facility operator: not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Lancaster | United States | AI hardware owner: Google (confident); facility operator: not recorded | 105 Whiley Rd, Lancaster, OH 43130 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Lincoln | United States | AI hardware owner: Google (confident); facility operator: not recorded | 5475 Cloud Ct, Lincoln, NE 68514 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Mesa | United States | AI hardware owner: Google (confident); facility operator: not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Middenmeer data centre | Netherlands | Facility operator: Google; facility owner: Google | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Google Midlothian | United States | AI hardware owner: Google (confident); facility operator: not recorded | 3250 Railport Parkway, Midlothian, TX 76065 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google New Albany | United States | AI hardware owner: Google (confident); facility operator: not recorded | 1101 Beech Rd SW, New Albany, OH 43054 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Omaha | United States | AI hardware owner: Google (confident); facility operator: not recorded | 11110 State St, Omaha, NE 68142 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Papillion | United States | AI hardware owner: Google (confident); facility operator: not recorded | 14651-15249 Gold Coast Rd 68138 Papillion Nebraska, USA (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Pryor (North) | United States | AI hardware owner: Google (confident); facility operator: not recorded | 4581 Webb St, Pryor, OK 74361 (Epoch source claim; checked 2026-10-15; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Red Oak | United States | AI hardware owner: Google (confident); facility operator: not recorded | 330 Austin Blvd, Red Oak, TX 75154 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Storey County | United States | AI hardware owner: Google (confident); facility operator: not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google The Dalles | United States | AI hardware owner: Google (confident); facility operator: not recorded | 3500 River Rd, The Dalles, OR (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Waltham Cross | United Kingdom | AI hardware owner: Google (confident); facility operator: not recorded | Land at Maxwell's Farm West, Great Cambridge Road, Cheshunt, EN8 8XH (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Google Waltham Cross data centre | United Kingdom | Facility operator: Google; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Green Mountain OSL-Enebakk | Norway | Facility operator: Green Mountain; facility owner: Not recorded | Not recorded here | Under construction | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Gromstul data centre (Project Telemark), Skien | Norway | Facility operator: WS Computing AS; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Groningen AI Factory (Zernike, Eurofiber data centre) | Netherlands | Facility operator: Eurofiber Cloud Infra; facility owner: Not recorded | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Herbata Limited data centre, Naas | Ireland | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| HLRS Stuttgart (Hunter and HammerHAI) | Germany | Facility operator: High-Performance Computing Center Stuttgart (HLRS); facility owner: University of Stuttgart | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Huawei Horinger | China | AI hardware owner: Huawei (confident); facility operator: not recorded | Huawei, Horinger, China (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Huawei Wuhu | China | AI hardware owner: Huawei (confident); facility operator: not recorded | Wuhu, China (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| iXAfrica NBOX1 Nairobi campus | Kenya | Facility operator: iXAfrica Data Centre; facility owner: Not recorded | Cabanas, Mombasa Road, Nairobi, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| JUPITER exascale system, Forschungszentrum Jülich | Germany | Facility operator: Forschungszentrum Jülich (Jülich Supercomputing Centre); facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Kao Data Harlow campus | United Kingdom | Facility operator: Kao Data; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Karolina (IT4Innovations, Ostrava) | Czechia | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| Kasi Cloud DNEK Campus | Nigeria | Facility operator: Kasi Cloud; facility owner: Not recorded | Eket, Akwa Ibom, Nigeria (Recorded location; checked 2026-11-10; Location source) | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Kasi Cloud LOS Campus | Nigeria | Facility operator: Kasi Cloud; facility owner: Not recorded | Lekki, Lagos, Nigeria (Recorded location; checked 2026-11-10; Location source) | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Lanarkshire AI Growth Zone (DataVita, Airdrie) | United Kingdom | Facility operator: DataVita; facility owner: Not recorded | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Leonardo (CINECA, Bologna) | Italy | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| LNCC Santos Dumont hosting location, Petrópolis | Brazil | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-14 |
| LON3 Data Centre | United Kingdom | Facility operator: Iron Mountain (UK) Data Centre Limited; facility owner: Not recorded | Slough, SL1 4PF, United Kingdom (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| LUMI (CSC, Kajaani) | Finland | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| LUMI-AI AI Factory system, CSC Kajaani | Finland | Facility operator: CSC (IT Center for Science); facility owner: Not recorded | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| MareNostrum 5 (BSC, Barcelona) | Spain | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| McGill-Calcul Québec data centre, Montréal | Canada | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-14 |
| MeluXina (LuxProvide, Bissen) | Luxembourg | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| Meta Aiken | United States | AI hardware owner: Meta (confident); facility operator: not recorded | 7601 State Hwy 105, Trenton, SC 29847, USA (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Meta Bowling Green | United States | AI hardware owner: Meta (confident); facility operator: not recorded | 12356 Middleton Pike, Bowling Green, OH 43402 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Meta Cheyenne | United States | AI hardware owner: Meta (confident); facility operator: not recorded | Cheyenne, WY 82007, USA (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Meta Eagle Mountain | United States | AI hardware owner: Meta (confident); facility operator: not recorded | 1275 N Community Cir, Eagle Mountain, UT 84005 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Meta Gallatin | United States | AI hardware owner: Meta (confident); facility operator: not recorded | 1 Meta Lp, Gallatin, TN 37066 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Meta Huntsville | United States | AI hardware owner: Meta (confident); facility operator: not recorded | 5400 Prosperity Dr NW, Toney, AL (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Meta Hyperion | United States | AI hardware owner: Meta (confident); facility operator: not recorded | Holly Ridge, LA 71269 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Meta Jeffersonville | United States | AI hardware owner: Meta (confident); facility operator: not recorded | 500 8th St, Jeffersonville, IN 47130, USA (Epoch source claim; checked 2026-10-15; CSV source) | Stage not recorded | 2 operational buildings reported as of 2026-06-04 (Epoch estimate). Epoch reports two operational buildings. Its earlier March account distinguished complete-looking shells and cooling from continuing construction. This is a dated building estimate, not verification of the whole campus, completion of every phase or compute availability. Checked 2026-10-15; Timeline source | Epoch AI estimate | 2026-10-02 |
| Meta Kuna | United States | AI hardware owner: Meta (confident); facility operator: not recorded | 601 Kuna Mora Rd, Kuna ID 83634 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Meta Los Lunas | United States | AI hardware owner: Meta (confident); facility operator: not recorded | 4250 Messenger Lp, Los Lunas, NM 87031 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Meta Montgomery | United States | AI hardware owner: Meta (confident); facility operator: not recorded | Co Rd 42, Montgomery, AL 36105, USA (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Meta Odense data centre campus | Denmark | Facility operator: Meta; facility owner: Meta | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Meta Prometheus | United States | AI hardware owner: Meta (confident); facility operator: not recorded | 1 Community Cir, New Albany, OH 43054 (Epoch source claim; checked 2026-10-15; CSV source) | Stage not recorded | 10 operational buildings reported as of 2026-08-31 (Epoch estimate). Epoch estimates ten operational buildings. Its account infers activity in some southern tents while northern structures still await power connections and Building 13 remains under construction. Five future projections are excluded; this is not verification of a completed campus or compute availability. Checked 2026-10-15; Timeline source | Epoch AI estimate | 2026-10-02 |
| Meta Rosemount | United States | AI hardware owner: Meta (confident); facility operator: not recorded | 1772-2396 145th St, Rosemount, MN 55068, USA (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Meta Sarpy | United States | AI hardware owner: Meta (confident); facility operator: not recorded | 14436-14998 Fairview Rd, Springfield, NE 68059, USA (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Meta Temple | United States | AI hardware owner: Meta (confident); facility operator: not recorded | 2310 Eberhardt Rd, Temple, TX 76504 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Meta Zeewolde data centre (cancelled) | Netherlands | Facility operator: Meta; facility owner: Not recorded | Not recorded here | Cancelled | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Meta-QTS Hillsboro 2 | United States | AI hardware owner: Meta (likely); facility operator: not recorded | 4755 NE Huffman St, Hillsboro, OR 97124 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Microsoft Fairwater Atlanta | United States | AI hardware owner: Microsoft (confident); facility operator: not recorded | 1435 Hwy 54 W, Fayetteville, GA 30214 (Epoch source claim; checked 2026-10-14; CSV source) | Stage not recorded | 4 operational buildings reported as of 2026-06-14 (Epoch estimate). Epoch reports four operational buildings. Its June 2026 account reports Buildings 3 and 4 as operational; this is a dated building estimate, not whole-campus completion or compute availability. Checked 2026-10-14; Timeline source | Epoch AI estimate | 2026-10-02 |
| Microsoft Fairwater Wisconsin | United States | AI hardware owner: Microsoft (confident); facility operator: not recorded | 4800 90th St, Mount Pleasant, WI 53403 (Epoch source claim; checked 2026-10-14; CSV source) | Stage not recorded | 1 operational building reported as of 2026-05-15 (Epoch estimate). Epoch reports one operational building. Its May 2026 account describes the shell of Building 2 as nearly complete and grading for a revised expansion plan, not an operational expansion. The 2027 and 2028 projections are excluded. Checked 2026-10-14; Timeline source | Epoch AI estimate | 2026-10-02 |
| Microsoft Goodyear | United States | AI hardware owner: Microsoft (confident); facility operator: not recorded | 14250 W Broadway Rd, Goodyear, AZ 85338 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Microsoft Hepokorpi data centre, Espoo | Finland | Facility operator: Microsoft; facility owner: Microsoft 3465 Finland Oy | Not recorded here | Under construction | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Microsoft Kirkkonummi data centre campus | Finland | Facility operator: Microsoft; facility owner: Microsoft 3465 Finland Oy | Not recorded here | Under construction | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Microsoft Middenmeer data centre | Netherlands | Facility operator: Microsoft; facility owner: Microsoft | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Microsoft Narvik Norway | Norway | AI hardware owner: Nscale (likely); facility operator: not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Microsoft Project Osmium | United States | AI hardware owner: Microsoft (confident); facility operator: not recorded | 5855 SW Kerry St, Cumming, IA 50061 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Microsoft SAT14 | United States | AI hardware owner: Microsoft (confident); facility operator: not recorded | 3545 Wiseman Boulevard, San Antonio, TX 78251 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Microsoft SAT40 | United States | AI hardware owner: Microsoft (confident); facility operator: not recorded | 15000 Lambda Drive, San Antonio, TX 78245 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Microsoft Staffanstorp data centre | Sweden | Facility operator: Microsoft; facility owner: Microsoft | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Microsoft Sweden Central region (Gävle and Sandviken) | Sweden | Facility operator: Microsoft; facility owner: Microsoft | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Microsoft-Nebius New Jersey | United States | AI hardware owner: Nebius (confident); facility operator: not recorded | 3963 S Lincoln Ave, Vineland, New Jersey (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Moro Hub Green Data Centre (Solar Park) | United Arab Emirates | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-15 |
| National Data Centre, Lilongwe | Malawi | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| National Energy Research Scientific Computing Center (NERSC) | United States | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| Nebius Lappeenranta AI factory | Finland | Facility operator: Nebius; facility owner: Nebius | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Nebius Mantsala | Finland | AI hardware owner: Nebius (confident); facility operator: not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Nebius Mäntsälä data centre | Finland | Facility operator: Nebius; facility owner: Nebius | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| nLighten London Hoddesdon (STN1) | United Kingdom | Facility operator: nLighten; facility owner: Not recorded | Geddings Road, Hoddesdon, EN11 0NT, United Kingdom (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| North Wales AI Growth Zone (Prosperity Parc and Trawsfynydd) | United Kingdom | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| North Weald Airfield data centre campus | United Kingdom | Facility operator: Google; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-06 |
| Nscale Keflavik | Iceland | AI hardware owner: Nscale (confident); facility operator: not recorded | Valhallarbraut 868, 262 Reykjanesbær, Iceland (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Nscale Loughton AI Campus | United Kingdom | Facility operator: Nscale; facility owner: Not recorded | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| NSCC Fusionopolis (historical ASPIRE 1 host) | Singapore | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-14 |
| Oak Ridge Leadership Computing Facility (OLCF) | United States | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| Onix Accra | Ghana | Facility operator: Onix Data Centres; facility owner: Not recorded | Amrahia-Katamanso towards Dodowa, Accra, Ghana (Recorded location; checked 2026-11-11; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-11 |
| Open Access Data Centres Lagos (LOS1) | Nigeria | Facility operator: Open Access Data Centres; facility owner: Not recorded | Lagos, Nigeria; precise location unresolved (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| OpenAI Stargate Abilene | United States | AI hardware owner: Oracle (confident); facility operator: not recorded | 5502 Spinks Rd, Abilene, TX 79601 (Epoch source claim; checked 2026-10-14; CSV source) | Stage not recorded | 4 operational buildings reported as of 2026-07-28 (Epoch estimate). Epoch reports four operational buildings. Buildings 5 to 8 were structurally complete and roofed but not confirmed operational; fit-out was ongoing. The November projection is excluded. Checked 2026-10-14; Timeline source | Epoch AI estimate | 2026-10-02 |
| OpenAI Stargate Lordstown | United States | AI hardware owner: Softbank (confident); facility operator: not recorded | 2300 Hallock Young Rd, Warren, OH 44481 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| OpenAI Stargate Michigan | United States | AI hardware owner: Oracle (confident); facility operator: not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| OpenAI Stargate Milam | United States | AI hardware owner: Softbank (confident); facility operator: not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| OpenAI Stargate New Mexico | United States | AI hardware owner: Oracle (confident); facility operator: not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| OpenAI Stargate Shackelford | United States | AI hardware owner: Oracle (confident); facility operator: not recorded | 175 Private Road 1604, Abilene, TX 79601, Shackelford County (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| OpenAI Stargate UAE | United Arab Emirates | AI hardware owner: G42 (likely); facility operator: not recorded | Nexus L&T Project Office, Al Bihouth, Al Dhafrah, Abu Dhabi, United Arab Emirates (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| OpenAI Stargate Wisconsin | United States | AI hardware owner: Oracle (confident); facility operator: not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Oracle Batam | Indonesia | AI hardware owner: Oracle (likely); facility operator: not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Orion Business Park data centre, Ballycoolin | Ireland | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| PAIX Accra (ACC-1) | Ghana | Facility operator: PAIX Data Centres; facility owner: Not recorded | 42 Ring Road Central, Accra, Ghana (Recorded location; checked 2026-11-11; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-11 |
| PAIX Nairobi (NBO-1) | Kenya | Facility operator: PAIX Data Centres; facility owner: Not recorded | Britam Tower, Hospital Road, Upper Hill, Nairobi, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| PARAM Ganga (IIT Roorkee) | India | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| PARAM Kamrupa (IIT Guwahati) | India | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| PARAM Shivay (IIT(BHU), Varanasi) | India | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| Pawsey Centre, Kensington, Perth | Australia | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-14 |
| Prime Data Centers Esbjerg campus | Denmark | Facility operator: Prime Data Centers; facility owner: Prime Data Centers and Brunswick Real Estate (partners) | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Pure DC Dublin Ballycoolin (DUB01 to DUB03) | Ireland | Facility operator: Pure DC; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Pure DC LON01 Brent Cross | United Kingdom | Facility operator: Pure DC; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| QTS Cambois Data Centre Campus | United Kingdom | Facility operator: QTS; facility owner: Blackstone | Not recorded here | Permitted | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| QTS Cedar Rapids | United States | AI hardware owner: Not recorded; facility operator: not recorded | 6200 76th Ave SW, Fairfax, IA 52228 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| QTS Eagle Mountain | United States | AI hardware owner: Meta (speculative); facility operator: not recorded | 652 E Hyperscale Way, Eagle Mountain, UT 84013 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| QTS Richmond 1 | United States | AI hardware owner: Not recorded; facility operator: not recorded | 6000 Technology Blvd, Sandston, VA 23150 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| QTS Richmond 2 | United States | AI hardware owner: Not recorded; facility operator: not recorded | 6030-6070 Technology Blvd, Sandston, VA 23150 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| QTS Richmond 3 | United States | AI hardware owner: Not recorded; facility operator: not recorded | 3525-3543 Portugee Rd, Sandston, VA 23150 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Rack Centre LGS 1 Lagos | Nigeria | Facility operator: Rack Centre; facility owner: Not recorded | 18, Jagal Close, Oregun, Ikeja, Lagos, Nigeria (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Rack Centre LGS 2 Lagos | Nigeria | Facility operator: Rack Centre; facility owner: Not recorded | 18, Jagal Close, Oregun, Ikeja, Lagos, Nigeria (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Raxio Angola AO1 | Angola | Facility operator: Raxio Group; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-12 |
| Raxio Côte d’Ivoire CIV1 | Côte d’Ivoire | Facility operator: Raxio Group; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-12 |
| Raxio DR Congo DRC1 | Congo - Kinshasa | Facility operator: Raxio Group; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-12 |
| Raxio Ethiopia ET1 | Ethiopia | Facility operator: Raxio Group; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-12 |
| Raxio Mozambique MZ1 | Mozambique | Facility operator: Raxio Group; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-12 |
| Raxio Uganda UG1 | Uganda | Facility operator: Raxio Group; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-12 |
| RIKEN Center for Computational Science, Kobe (Fugaku) | Japan | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-14 |
| Romford North Data Centre | United Kingdom | Facility operator: Green Mountain DC UK Limited; facility owner: Not recorded | Romford, RM7 7PN, United Kingdom (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Schwarz Digits Lübbenau data centre | Germany | Facility operator: Schwarz Digits (STACKIT); facility owner: Schwarz Group | Not recorded here | Under construction | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| SDC M40 Campus, Wapseys Wood | United Kingdom | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Southgate Melbourne | Australia | AI hardware owner: Firmus (confident); facility operator: not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| STACK Infrastructure NVA02 | United States | AI hardware owner: Not recorded; facility operator: not recorded | 9590 Hornbaker Rd, Manassas, VA 20109 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Stargate Norway (Kvandal, Narvik) | Norway | Facility operator: Nscale; facility owner: Nscale and Aker (planned 50/50 joint venture) | Not recorded here | Announced | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Start Campus Sines Data Campus | Portugal | AI hardware owner: Nscale (confident); facility operator: not recorded | Start Campus - Sustainable Data Center Services, Sines, Portugal (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Stream Phoenix | United States | AI hardware owner: Not recorded; facility operator: not recorded | 2950 S. Litchfield Road (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Swindon Data Centre Back-up Generation Facility | United Kingdom | Facility operator: Amazon Data Services UK Limited; facility owner: Not recorded | Swindon, SN4 0QD, United Kingdom (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Teesworks data centre site | United Kingdom | Facility operator: Not recorded; facility owner: Teesworks | Not recorded here | Permitted | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Telehouse London Docklands campus | United Kingdom | Facility operator: Telehouse; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Telekom Industrial AI Cloud, Munich (Tucherpark) | Germany | Facility operator: Deutsche Telekom (T-Systems); facility owner: Deutsche Telekom | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Telkom Kenya Milimani Exchange data centre | Kenya | Facility operator: Telkom Kenya; facility owner: Not recorded | Milimani Exchange, Bishop Road, adjacent to NSSF Building, Nairobi, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Telkom Kenya Mombasa Telephone House data centre | Kenya | Facility operator: Telkom Kenya; facility owner: Not recorded | Mombasa Telephone House, Mombasa, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Vantage Bridgend data centre campus (former Ford engine plant) | United Kingdom | Facility operator: Vantage Data Centers; facility owner: Not recorded | Not recorded here | Permitted | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Vantage Cardiff campus (CWL1, Newport) | United Kingdom | Facility operator: Vantage Data Centers; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Vantage DUB11, Ballybane and Kilbride, Clondalkin | Ireland | Facility operator: Vantage Data Centers; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Vantage Dublin DUB1 (Profile Park) | Ireland | Facility operator: Vantage Data Centers; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Vantage TX1 | United States | AI hardware owner: Not recorded; facility operator: not recorded | 14720 Omicron Dr, San Antonio, TX 78245 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| Vega (IZUM, Maribor) | Slovenia | Facility operator: Not recorded; facility owner: Not recorded | Not recorded here | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-10-17 |
| Verne Keflavik campus | Iceland | Facility operator: Verne; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Virtus LONDON5 (Stockley Park) | United Kingdom | Facility operator: Virtus Data Centres; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| Virtus Slough campus | United Kingdom | Facility operator: Virtus Data Centres; facility owner: Not recorded | Not recorded here | Operating | No dated building evidence recorded here | Detailed evidence record | 2026-10-02 |
| VNET Bayin Ulanqab | China | AI hardware owner: VNET (confident); facility operator: not recorded | Bayin, Ulanqab, China (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
| xAI QTS Atlanta | United States | AI hardware owner: SpaceXAI (confident); facility operator: not recorded | 1025 Jefferson Street NW, Atlanta, GA 30318 (Epoch source claim; checked 2026-10-17; CSV source) | Stage not recorded | No dated building evidence recorded here | Epoch AI estimate | 2026-10-02 |
Map and country groups · Detailed evidence records · AI estimates dataset · Evidence coverage
About these records and their limits
These are 234 source records, not a complete or deduplicated world census. A campus may contain several buildings, and sources may describe different phases or the same place. A missing result does not mean no data centre exists there.
Epoch's owner field attributes AI hardware, not necessarily the facility owner or operator. Detailed records keep facility operators and owners distinct. Imported Epoch records have no whole-record lifecycle stage or sourced map coordinates in our current extraction. Separately dated building reports describe some buildings, not an entire completed campus. The building-evidence filter is independent of Recorded stage. Future projections are excluded. 80 existing records carry separately dated, source-reported address/location fields; these do not establish a building/phase identity, map coordinates or operating status. Some values are localities or plus codes rather than street addresses. Display normalises whitespace and dash typography; exported fields retain the source values. Other addresses are not recorded here, not proven absent. Stage not recorded must not be read as unbuilt. Operating does not establish compute available to buy.
Data centre, campus or AI project?
A data centre houses computing infrastructure. A campus can group buildings and shared infrastructure. AI describes the computing use, rather than a separate lifecycle stage. We retain each source's scope and do not infer a building count, operational status or available capacity from a project name.