Data centres / Norway
Green Mountain OSL-Enebakk
Under constructionNorway4 of 13 fields known
Enebakk, about 20 km from Oslo, Norway.
- Operator
- Green Mountain
- Owner
- Not stated
- Stage
- Under construction (source, 17 November 2023)
- Power
- The operator states the site runs on 100 per cent renewable power.
The only source we fetched is a November 2023 press release, which expected completion in September 2024 and a 41.5 MW site total, without defining that total. Current status should be rechecked on the operator site.
Capacity
| Measure | Stage | Basis | MW | As of | Source |
|---|---|---|---|---|---|
| IT load | Under construction | reported | 10 | 17 November 2023 | source |
These figures measure different things and are not added together.
What we checked
- A 10 MW IT-load expansion in a three-storey, 9,600 square metre building was announced in November 2023, with about 5 MW pre-leased to an unnamed customer. (source)
- The release said construction would start once the final start-up permit was approved, with completion projected for September 2024. (source)
What we do not know yet
4 of 13 fields in a complete record are filled. Still missing:
- Owner
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference