Data centres / Nordics / Norway

Green Mountain OSL-Enebakk

Enebakk, about 20 km from Oslo, Norway.

Under constructionNorway

What we checked

The only source we fetched is a November 2023 press release, which expected completion in September 2024 and a 41.5 MW site total, without defining that total. Current status should be rechecked on the operator site.

Operate this site or have better evidence? .

Operator
Green Mountain
Owner
Not stated
Stage
Under construction (source, 17 November 2023)
Power
The operator states the site runs on 100 per cent renewable power.

Capacity

Capacity
MeasureStageBasisMWAs ofSource
IT loadUnder constructionreported1017 November 2023source

These figures measure different things and are not added together.

Printable community case file

Green Mountain OSL-Enebakk

Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Under construction, recorded 17 November 2023Inspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Under construction, dated 17 November 2023: stage source
  • Checked statement. A 10 MW IT-load expansion in a three-storey, 9,600 square metre building was announced in November 2023, with about 5 MW pre-leased to an unnamed customer. source
  • Checked statement. The release said construction would start once the final start-up permit was approved, with completion projected for September 2024. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

4 of 13 facility fields recorded

2 separately recorded source statements. These are not included in the facility-field count.

4 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 2). Green Mountain OSL-Enebakk: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/green-mountain-osl-enebakk

BibTeX
@misc{computefinder_data_centres_green_mountain_osl_enebakk,
  title        = {Green Mountain OSL-Enebakk: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0033}},
  number       = {cf-dc-0033},
  note         = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}

Stable ID: cf-dc-0033. Permanent link: https://computefinder.net/entity/cf-dc-0033. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/green-mountain-osl-enebakk. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0033"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in Norway

All detailed records in Norway / Same recorded stage in Norway

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact