Data centres / Norway

Green Mountain OSL-Enebakk

Under constructionNorway4 of 13 fields known

Enebakk, about 20 km from Oslo, Norway.

Operator
Green Mountain
Owner
Not stated
Stage
Under construction (source, 17 November 2023)
Power
The operator states the site runs on 100 per cent renewable power.

The only source we fetched is a November 2023 press release, which expected completion in September 2024 and a 41.5 MW site total, without defining that total. Current status should be rechecked on the operator site.

Capacity

MeasureStageBasisMWAs ofSource
IT loadUnder constructionreported1017 November 2023source

These figures measure different things and are not added together.

What we checked

What we do not know yet

4 of 13 fields in a complete record are filled. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.