Data centre records
162 data centres and proposed sites, each with the facts we could source and a plain list of what we could not.
Most public data on individual data centres is thin. Capacity, power source and efficiency are often missing, and where they exist they are measured in different ways. So each record shows every figure with its metric (IT load, facility load or grid connection), its stage (announced, permitted, under construction, operating) and its source, and we never add them together. A blank means unknown, not zero.
For the largest AI campuses see frontier AI data centres. To see where this data comes from, and which sources we can and cannot reuse, see data sources.
Related company disclosures
- SpaceX reports 1.7GW of nameplate compute in third-quarter results. Event 20 October 2026. Investigate individual facilities with their own evidence and dates.
Filters cover these 162 detailed records. Operating does not mean compute is available to buy. Stage dates and checked dates differ; open each record for its evidence and limits. A field-level view is on the coverage page. Epoch frontier sites are listed separately.
Showing 3 of 162 detailed records.
Matching records by stage
How many of our records sit at each stage. This counts sites, not megawatts.
Show this chart as a table
| Stage | Sites |
|---|---|
| Announced | 1 |
| Under construction | 1 |
| Stage not known | 1 |
Norway
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Green Mountain OSL-Enebakk | Green Mountain | Enebakk, about 20 km from Oslo | Under construction Recorded date: 17 November 2023 Checked 2 October 2026 | |
| Gromstul data centre (Project Telemark), Skien | WS Computing AS | Gromstul, Skien, Telemark | Stage not known Recorded date: 12 December 2025 Checked 2 October 2026 | |
| Stargate Norway (Kvandal, Narvik) | Nscale | Kvandal, near Narvik | Announced Recorded date: 31 July 2025 Checked 2 October 2026 |
By region
- UK and Ireland 40 records, 1 frontier AI sites
- Nordics 23 records, 5 frontier AI sites
- Western Europe 27 records, 1 frontier AI sites
- North America 5 records, 77 frontier AI sites
- Asia Pacific 15 records, 8 frontier AI sites
- Middle East 1 records, 1 frontier AI sites
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact