What is new
What we have added or changed, newest first. Subscribe with the feed.
- 17 November 2026
News: Intel opinion piece on its D-series GPUs
A short dated item on Intel's 16 November opinion piece describing its D-series GPU family, with the questions to ask suppliers before planning around it and a note that it is not proof of compute available to order.
- 17 November 2026
News: Illinois feedback on a draft resource-adequacy mitigation plan
A short dated item on the Illinois Power Agency and Illinois EPA draft plan published for feedback on 16 November, with the 15 January 2027 5pm CT deadline, the official comment route and a note that comments are posted publicly.
- 17 November 2026
AirTrunk Andhra Pradesh proposals now cite the company's dated announcement
The AirTrunk supply-chain page now cites AirTrunk's 16 November announcement for its two proposed Andhra Pradesh campuses, replacing an undated LinkedIn post. It gives the stated 400 MW and 1,400 MW figures separately and notes that the power measure is not specified.
- 17 November 2026
LUMI: a starting point for Icelandic researchers
The LUMI access page now points Icelandic researchers to IHPC for route guidance and explains that Puhuri registration follows an award.
- 17 November 2026
News: two PJM proposals for large loads and interconnection
Short dated items on PJM's 16 November announcements of proposed ride-through requirements for large computational loads and of studying generation and load together in interconnection. Both are proposals; neither announcement establishes approval or implementation.
- 17 November 2026
LUMI: the Estonian request route
The LUMI access page now links Estonian researchers to the University of Tartu LUMI request form, with ETAIS as the first check.
- 17 November 2026
News: historical data centre electricity estimates and a supplier order
Two short dated items: Harvard's announcement of scenario-based modelling of facility electricity use for May 2024 to April 2025, with a question to ask about local proposals, and Powell Industries' mention of a data centre order of about US$85 million.
- 17 November 2026
LUMI: the Swedish academic route through SUPR
The LUMI access page now points Swedish academic researchers to the current NAISS LUMI round in SUPR, and companies and public authorities to EuroHPC.
- 17 November 2026
News: BIS announces a rule on remote access to advanced computing
A short dated account of BIS's 16 November announcement of an interim final rule on remote access to advanced chips and servers, with a link to the official text and the US policy page. It does not establish when the rule takes effect or whether a transaction needs a licence.
- 17 November 2026
LUMI: free small-scale testing in Norway
Norwegian students and researchers can now see Sigma2's free SSEW testing route, for up to three months, separate from normal allocations, which can carry institutional contributions.
- 16 November 2026
LUMI: Polish academic test grants, and the regular call that has closed
The LUMI access page now shows Polish academic researchers the 30-day test grant they can apply for at any time through PLGrid, separate from regular 12-month grants. The latest regular call, PLL/2026/11, closed on 28 September 2026; no later call is recorded.
- 16 November 2026
LUMI: a working first step for Danish academic researchers
LUMI's Denmark guide points to a university Front Office page that no longer works. The LUMI access page now sends Danish academic researchers to DeiC's Get help page to find their own university's HPC contact and confirm the right national LUMI route. This is guidance, not an allocation.
- 16 November 2026
LUMI: the Belgian software-development route
The LUMI access page now gives Belgian academic researchers a software-development route, applied for continuously with monthly review until a last cut-off on 5 April 2027; projects submitted after early December 2026 end on 28 October 2027. The final regular cut-off of 15 February 2027 is noted separately. Preparatory conditions need confirmation.
- 16 November 2026
BSC AI Factory page now links the Spanish RES route
Navigation only: the BSC AI Factory access page now points to the separate Spanish Supercomputing Network (RES) record, which has its own eligibility and calls. No facts, statuses or check dates changed.
- 16 November 2026
LUMI: the Dutch academic route through SURF
The LUMI access page now points Dutch researchers to SURF's Small Compute guide, with the main conditions: a permanent, tenured or tenure-track post at a listed organisation, conditional temporary appointments, and NWO-awarded use at no cost to the applicant. The current NWO call status is not verified.
- 16 November 2026
LUMI: how Finnish academic researchers apply through MyCSC
The LUMI access page now carries the Finnish route's existing conditions and adds the practical step: create a MyCSC project in the LUMI category, not an ordinary CSC project, and, as CSC advises for new users, start with Development.
- 16 November 2026
News: a Texas registration for a Core Scientific - Hunt data centre building in Quinlan
A short account of the 13 November TDLR architectural barriers registration, with its scope and status. The record alone does not establish planning permission, that building work has started, a power connection or compute available to order. It links the original record.
- 16 November 2026
SINAPAD 2026 call: who can lead a project and which submission entrance to use
The page and its open researcher route now explain who can lead a project, including hosted researchers with a consent letter, and the choice between the general entrance and the dedicated entrance for Libra, Petrobras and qualifying science and technology institutions. Costs remain unknown.
- 16 November 2026
CtrlS Chennai Datacenter Park added as a campus record
A new record places the park in Ambattur, Chennai, notes that CtrlS offers colocation there, and gives a route to ask CtrlS which building could serve you, about space, rack power, timing and a written quote. Buildings, capacity, stage and technical details remain unknown.
- 16 November 2026
Two Yotta data centres in India: NM1 Navi Mumbai and D1 Greater Noida
New facility records give each site's locality, that Yotta offers colocation there, and a route to ask Yotta's sales team about racks, power, current space and a written quote. Address, capacity, stage and technical details remain unknown.
- 16 November 2026
OADC Lagos and Durban: which subsea cable lands at each
OADC's Lagos (LOS1) record now notes the operator's statement that it is the Nigerian landing station for Equiano, and its Durban (DUR1) record that it is the KwaZulu-Natal landing station for 2Africa. Each says what to ask OADC about cable access, cross-connects and resilience; no capacity, price or ready-service claim is made.
- 16 November 2026
Four programme corrections: eligibility, year-round routes and closed calls
Updated NVIDIA Inception's founder and technology-use eligibility, separated HPCI's year-round calls from its closed main call, marked the Clementina XXI IPAC research call closed while preserving the separate charged-service enquiry route, and repaired the Alliance Canada competition link. Other programme evidence dates and existing corrections are preserved; dataset release 1.4.1 uses the existing shared export version.
- 16 November 2026
ARCHER2 users: move data you want to keep before 17:00 GMT on 20 November
The ARCHER2 page now leads with the official data warning: no login or access to home, work or solid-state scratch after the scheduled end, so start transfers early. RDFaaS /epsrc and /general data is kept until 31 March 2027 and reached later through Cirrus; separate limited NSCDS storage is only for projects with national HPC allocations continuing beyond ARCHER2. The main link now opens the end-of-service guide.
- 15 November 2026
IndiaAI compute portal: what to prepare and why profile verification comes first
The page now sets out the order: check your category's criteria, sign in through MeriPehchaan, get your profile verified, then request compute and any subsidy; neither is guaranteed. There is no free-GPU promise, and current intake and detailed policy terms remain unverified.
- 15 November 2026
German researchers can apply for regular GCS projects on Hunter or SuperMUC-NG at any time
The Gauss Centre page now separates rolling regular applications on Hunter and SuperMUC-NG from the large-scale and JUPITER window of 11 January to 15 February 2027. Both need German university or public research employment and review; neither promises immediate or free compute.
- 15 November 2026
Czech researchers can apply to IT4Innovations' 39th Open Access call by 24 November
A new record gives the deadline, the eligibility for employees of Czech research organisations, the English application form and portal, and the Fast Track Access prerequisite for newcomers. Results are planned for January 2027; call charges remain unverified.
- 15 November 2026
EuroHPC Playground and Fast Lane show which GPU partitions are unavailable
Both AI Factory modes now list the partitions their call pages mark unavailable at the 15 November check, single-system 1 to 3 month access and the separate route for academic users. Advertised access times are shown as conditional targets after assessment, not guaranteed start dates.
- 14 November 2026
More research access gaps are resolved from current official guidance
Canada RAS, revised NCI ADAPTER, NERSC initial requests, Finnish LUMI and RES fast-track gain checked next steps. India's subsidised services remain distinct from free access and guaranteed approval. BSC's guide now sits beside its partition restrictions; dated evidence and unresolved call windows stay visible.
- 13 November 2026
More global compute routes have current application guidance
Open, forthcoming and historical calls are separated across more research, student and startup programmes. ARCHER2 carries its service-end warning; GCS shows its next application window. CINECA, Lambda and GCS gain clearer official next steps, while uncertain application windows remain unverified.
- 13 November 2026
Australian and global research routes gain checked next steps
Pawsey and TPU Research Cloud now have source-checked application steps, supervised student conditions and cost limits. Historical NCMAS and DOE windows are separated from current access. NSCC’s eighth-call deadline is corrected to the later 30 October extension; its tentative ninth call remains distinct.
- 13 November 2026
More UK and European research routes have checked application status
Gateway, EuroHPC AI for Science and Benchmark/Development now have dated application steps and limits. Three older UK calls are clearly historical. Researcher starting points now include UK and European options alongside ACCESS; older detail checks remain dated separately.
- 13 November 2026
Funded compute starts with practical application routes
Researcher, student and startup starting points now include dated official-source status checks, the forthcoming ACCESS Maximize window, clear unknowns and closed calls below practical options. Rapid Access names Zenith, and older programme evidence retains its dates.
- 13 November 2026
Priority access pages report their document modification dates
The sitemap now gives separate, publication-history-backed modification dates for the homepage, GPU comparison and funded-compute directory. Builds do not refresh these dates, source evidence dates are unchanged, and pages without an established modification date remain undated.
- 13 November 2026
Westlake agreement vote is distinguished from delivered compute
A town-sourced account identifies the recorded developer-agreement decision and gives the further permission, delivery and service checks needed before relying on the project. No construction start, capacity or settlement terms are inferred.
- 13 November 2026
Chile grid guidance drops an ambiguous annual-loss figure
The grid note dates its trade source, withdraws an unclear unit without substituting a quantity, and points to site-specific connection checks. Older country evidence dates remain unchanged.
- 13 November 2026
Find large-load access checks on Australia’s policy page
The reviewed AEMC account now sits beside Australia’s grid context, with its own determination and review dates, original-source link and practical connection checks. It does not refresh the older policy records or assume an approval.
- 13 November 2026
Chile guidance distinguishes dated evidence from deployment assurances
The overview no longer presents older permitting reports or market superlatives as current assurances. It points to the separately dated AWS access answer and practical service checks, while preserving the underlying evidence and its older dates.
- 13 November 2026
Check access standards before relying on an Australian connection timetable
A source-linked AEMC account distinguishes combined nameplate rating from IT capacity and flags conditional transitional treatment. It gives project-specific checks without assuming a connection approval, general exemption or available compute.
- 13 November 2026
Find the separately dated AWS access answer on the Chile overview
The Chile page now explains selected-customer access and the expected general-availability date, with the reviewed news account, original announcement and practical account/service checks. Older policy, grid and facility evidence keeps its own date.
- 13 November 2026
Separate Kurnool project plans from compute you can order
A minimal issuer-sourced account distinguishes the CleanMax/Neysa MoU and proposed Kurnool project from an operating facility, with practical delivery and service checks. It does not turn headline power or investment figures into available compute.
- 13 November 2026
Check whether your account can use AWS in Chile
A source-linked account separates selected-customer access from expected general availability, with practical checks for services, configurations, quotas and start dates. No GPU inventory or new facility is inferred.
- 13 November 2026
Separate changed contracts from compute you can order
New Fermi and Cerebras accounts explain a terminated tenancy and company-reported contracted capacity, with source links and practical order-specific checks. Neither account invents available GPUs or a newly operating facility.
- 13 November 2026
Check LG3 availability instead of relying on an expired opening target
Nigeria’s LG3 row now distinguishes an old Q1 2026 target from current operating evidence and gives the questions to ask Equinix before planning a deployment. Other country evidence dates remain unchanged.
- 12 November 2026
Nigeria hosting guidance separates plans from available compute
Kasi’s dated Coming Soon labels replace an unconfirmed launch expectation, while Nxtra’s earlier shipment report is no longer treated as current operating evidence. Practical deployment questions point readers to the separately checked facility records.
- 12 November 2026
Find 21CTL’s named Ikeja and Ikoyi facilities
Two distinct records add operator-listed identities, district labels and a general company enquiry route. The Lekki office address is not used as a facility location, and utility or turbine power is not treated as available IT capacity.
- 12 November 2026
Check network and cooling fit at Raxio DRC1, ET1 and MZ1
Three existing records now explain operator-described connectivity and cooling, with practical questions about carriers, cross-connects and equipment compatibility. Availability and performance still need direct confirmation.
- 12 November 2026
Find the right Ethiopia colocation enquiry route
The Ethiopia overview now points to Raxio ET1 in ICT Park, Addis Ababa, with deployment questions and clear limits. Group-level reporting is not used as proof of current stage, certification or rentable compute; other country evidence retains its original date.
- 12 November 2026
Find Raxio facilities in DR Congo, Ethiopia and Mozambique
New DRC1, ET1 and MZ1 records add facility-specific localities and operator enquiry routes. Matola is kept distinct from central Maputo; capacity and current availability remain for the operator to confirm.
- 12 November 2026
Find Galaxy Backbone data centres in Abuja and Kano
Two distinct facility records add operator-sourced city locations and a quote-enquiry route, with questions that separate colocation from hosted compute. Office addresses, certification, capacity and current availability are not assumed.
- 12 November 2026
Angola overview no longer treats old construction plans as current
The Raxio section now uses the operator’s AO1 identity, Luanda locality and enquiry route. Current stage and capacity remain unverified; older policy and grid evidence keeps its own date.
- 12 November 2026
Find Raxio colocation routes in Angola and Côte d’Ivoire
Two facility records add operator-sourced localities and enquiry routes. The Côte d’Ivoire record preserves the CIV1/CI1 label difference so readers can ask about the correct site without double-counting it.
- 12 November 2026
Find Raxio Uganda UG1 and ask about colocation
A new Namanve record identifies the facility and its own operator enquiry route, with practical deployment questions. Capacity, current availability and street address remain unverified.
- 10 November 2026
Understand Nairobi NBO1 connectivity before enquiring
The Africa Data Centres NBO1 record now explains the operator-described Kenyan carrier links, regional fibre connections and routes to Mombasa cable landing stations, with practical questions to confirm current service availability.
- 10 November 2026
Find Africa Data Centres locations in South Africa
New Midrand, Samrand and Cape Town records distinguish the three named campuses and give facility-specific enquiry routes. Expansion halls are not counted as separate sites; current capacity and availability remain for the operator to confirm.
- 10 November 2026
Find more data centres in Kenya and the UK
Fifteen new facility and campus records add operator names, sourced locations and practical original-source or enquiry routes. Nairobi facilities with similar NBO1 codes remain distinct, and campus expansions are not counted again. Current capacity and availability remain unverified.
- 10 November 2026
Norway pauses new data-centre grid reservations
A checked Statnett announcement explains the pause on new capacity reservations, the exceptions for existing and approved connections, and the expected lifting date. Readers can reach the original announcement and existing Norway and grid context.
- 10 November 2026
Compare GPU models, locations and access
Find compute now compares six selected H100 and H200 options across Hyperstack, Nebius and Lambda, with GPU memory, configurations, regions, dated prices where usable and official next steps. The three provider pages carry the same separately dated information; older directory facts keep their original check dates.
- 5 November 2026
Maidsville procurement account retains its regulatory limits
A narrow issuer-attributed account preserves the 28 October filing date and 4 November wording review. Turbine reservation, expected regulatory order and a separate RFP are not completed generation or available compute. Older records and evidence dates are unchanged.
- 5 November 2026
Credit support and construction agreements stay distinct from delivery
A bounded attributed news account links the original issuer announcement and keeps financing, construction and available compute separate. Existing facility, provider, financial amount, capacity, stage and evidence dates are unchanged.
- 4 November 2026
Clearer snapshot dates, publication rules and correction controls
The AI sites hub labels its existing 2 October estimate snapshot before the table. Method and About explain the publication rules and editorial responsibility; provider pages label their official pricing links. Four structured breadcrumb parents now lead to existing pages. Native correction controls prefill the existing editable form without adding individual query links; legacy correction links remain supported. Source facts, figures, evidence dates and canonical record URLs are unchanged.
- 1 November 2026
Closed-loop water review separates its editorial publication record
The existing closed-loop claim review gains a distinct 16-field ComputeFinder dossier-publication envelope across HTML, JSON, CSV, OpenAPI and MCP. Editorial publication date and dossier-specific interests remain unknown. Its 31 October evidence check, DOE/FEMP citation and source notice are unchanged; no empirical cooling or water/electricity trade-off is established.
- 1 November 2026
Employment-units review separates its editorial publication record
The existing job-years, FTE and headcount review gains a distinct 16-field ComputeFinder dossier-publication envelope. Editorial publication date and dossier-specific interests remain unknown. Its 31 October evidence check, UKEF/MHCLG citations and source notices are unchanged; a construction-versus-permanent planning case and realised local employment remain unestablished.
- 1 November 2026
Power-matching review separates its editorial publication record
The existing annual/hourly matching review gains a distinct 16-field ComputeFinder dossier-publication envelope. Editorial publication date and dossier-specific interests remain unknown. Its 31 October evidence check, EPA citation and source notice are unchanged; no named PPA, measured local carbon intensity or transmission-congestion outcome is established.
- 1 November 2026
Long headings and source URLs wrap at phone widths
A wrapping rule prevents the JUPITER heading and a Gadi source-attribution URL from extending beyond a 320px page. Every character and link is retained, the stylesheet cache key is refreshed, and no evidence, source or parent-record clock is changed.
- 1 November 2026
Harlow PUE classification remains an explicit evidence limit
Two independently reviewed selected-source notes retain the SLA-PUE classification limit and the bounded technical inspection. No design/target/measured PUE, physical quantity or new coordinate is admitted; the old whole-record date and existing coordinates are unchanged.
- 1 November 2026
LONDON5 separates incoming MVA and design-PUE inequality
The selected operator sheet supplies an attributed apparent-power incoming-supply account and a design PUE below 1.3. MVA is not converted to MW; the inequality stays textual with null numeric value. No energisation, current delivery, measured efficiency or water zero is inferred.
- 1 November 2026
North Wales announcement receives a bounded technical-inspection note
The selected government announcement is distinguished from site-specific connection and environmental evidence. General future grid/planning measures establish no physical field, delivered capacity or current operation. Parent facts, stage and check date are preserved.
- 1 November 2026
Gefion hardware identifier retains its historical system scope
An independently reviewed H100 identifier is attributed to the Foundation’s 23 October 2024 release at named-system launch/pilot grain. No GPU count, current inventory, host building or compute availability is inferred; the existing parent check is unchanged.
- 1 November 2026
Mäntsälä conditional PUE remains unadmitted as a typed value
A selected-source note records the missing PUE kind and measurement period without adding a scalar or increasing PUE coverage. Other technical fields remain outside the bounded inspection; no historical or future platform statement becomes a current campus inventory.
- 1 November 2026
Lappeenranta future cooling account retains its intake boundary
An attributed issuer announcement concerns future closed-loop server cooling and local-supply intake only. Water volume and unit remain null; the account establishes neither measured consumption, whole-site zero water nor an operating cooling system. The parent stage and date remain unchanged.
- 1 November 2026
Zeewolde context article receives a historical inspection limit
The selected 23 June 2022 parliamentary context article establishes no admitted technical field, physical point or later project-stage finding. Its historical scope does not refresh the existing cancellation record or parent check date.
- 1 November 2026
JUPITER press source receives a bounded technical-inspection note
The selected state press PDF supplies no admitted hardware model, voltage, typed PUE, water measure or official point. Funding, container and renewable assertions are not transferred into these fields; existing record facts and clocks are preserved.
- 1 November 2026
Hunter APU and CPU node families remain separate
Two independently reviewed identifiers retain their separate Hunter APU and CPU-node scopes. No quantities are combined or hardware transferred to other HLRS systems, a current inventory or available compute. A bounded environmental/electrical inspection note preserves the remaining limits.
- 1 November 2026
Fluidstack programme paragraph remains distinct from a physical site
A selected official-host presskit paragraph receives an independently reviewed technical-inspection limit. Broad programme and planned-launch language establishes no named site/phase, connection or operating result. No company-paragraph open licence is inferred.
- 1 November 2026
Rorqual article receives a hardware and facility evidence limit
A selected Calcul Québec article does not turn generic accelerator quantities or commissioning language into processor models, site coordinates or facility operation. Only the bounded inspection note and ordinary source link are added.
- 1 November 2026
MY06 source-stated voltage remains unassigned to a physical phase
Two selected-source notes preserve the operator’s stated but unassigned 275 kV intake while withholding a physical grid field. Exact building/phase allocation is unresolved. The page is not described as silent on voltage, and the separate historical first-phase context is not a current connection claim.
- 1 November 2026
Original Discoverer CPU identifier keeps its separate system scope
Only the original Discoverer CPU-cluster processor identifier is added from independently reviewed project documentation. Upgrade-cluster hardware remains excluded. No combined configuration, current availability, physical phase equivalence or refreshed parent-record check is asserted.
- 1 November 2026
Gadi government case receives a selected-source inspection limit
The selected government research-infrastructure case supplies no admitted hardware model or facility technical field. Its document-specific licence is retained with exclusions and does not extend to other NCI sources; the existing record and source holds remain unchanged.
- 1 November 2026
Arrhenius partition identifiers retain family-level precision
The selected EuroHPC directory identifies separate CPU and GPU-partition families without an inferred retail part number, quantities or current installation. The bounded note records the remaining environmental/electrical/point limits; EU-owned reuse conditions stay source-scoped.
- 1 November 2026
Alice Recoque planned unified-partition identifiers remain prospective
Two selected EuroHPC hardware identifiers retain their announced future unified-partition scope. No provisional scalar composition, delivery, commissioning, site-wide inventory or available compute is inferred. The old parent stage and date remain unchanged.
- 1 November 2026
Accra ministry article receives a bounded technical-inspection note
The selected ministry article supplies no admitted technical field or official facility point. IT-load/rack language and a ministry-office address are not converted into hardware, water, PUE or coordinates. Government authorship is not treated as public domain.
- 1 November 2026
ELIDZ paragraph receives a selected-source technical evidence limit
Only the inspected data-centre paragraph is covered by the new note. Generic power, uptime and certification language establishes no admitted hardware, connection, PUE, water or point value; no full-source or current-stage audit is claimed.
- 1 November 2026
DUB06 electrical evidence retains its wider-campus permission scope
The DUB06 record gains the independently reviewed Inspector’s account of the permitted Kishoge 110 kV campus supply route. The wider-campus component is not a verified current DUB06 connection, energisation or available capacity. Its parent facts and check date remain unchanged.
- 1 November 2026
Cruiserath separates electrical context, design PUE and projected water
The proposed E/F/G extension gains independently reviewed 220 kV context, annualised design PUE and an approximate projected additional mains-cooling demand account. The water estimate remains textual with null numeric value/unit. These are not current measured performance, total-site water or available compute; parent facts and dates remain unchanged.
- 1 November 2026
Wapseys Wood direction receives a bounded inspection note
A selected-source note records the narrow scope of the short Section 35 direction. No new physical field, PUE inferred from a power ratio, water zero or grid connection is admitted. This is not an application-wide inspection or a refreshed parent-record check.
- 1 November 2026
Dartford direction receives a bounded inspection note
A selected-source note distinguishes the short Section 35 direction from physical project evidence. No grid, efficiency, water, chip or coordinate value is admitted; the original record, source facts and check date remain unchanged.
- 1 November 2026
Bedford direction receives a bounded inspection note
A selected-source note keeps the short Section 35 direction separate from technical evidence and a whole planning-application audit. No physical field or source-content licence is inferred, and the parent record’s facts and date remain unchanged.
- 1 November 2026
ASPIRE 1 adds an operator-reported system-retirement example
A third lifecycle-evidence record carries NSCC's report that the named ASPIRE 1 system was decommissioned on 31 August 2023. The event date, fresh 1 November scoped check and actual independent source review remain separate from unknown publication, page update, retrieval and source-version metadata. Retirement does not establish recovery, disposal, site closure/restoration, permit compliance, successor-system status or current available compute. The two earlier guidance/obligation records and all other records retain their facts, rights and clocks.
- 1 November 2026
PARAM Kamrupa gains a bounded hardware-identifier account
The PARAM Kamrupa record gains independently reviewed CPU/GPU identifiers from its own IIT Guwahati section, separate from PARAM Ishan and the newer GPU system. Quantities, current operation and access are not inferred. Its parent 17 October check remains unchanged.
- 1 November 2026
Fugaku chip evidence retains its historical draft scope
The Fugaku host record gains an independently reviewed A64FX development identifier from a selected MEXT draft evaluation paragraph. The February 2022 document context is not an installation event or current inventory. Its parent 14 October check and unknown source clocks remain unchanged.
- 1 November 2026
ASPIRE 1 hardware remains a historical system account
The historical ASPIRE 1 host record gains independently reviewed CPU/GPU identifiers, with one selected-source grid/coordinate limit. No current configuration, ASPIRE2 transfer, access or building-state conclusion is inferred. Its parent 14 October check remains unchanged.
- 1 November 2026
Kirkkonummi separates three planned electrical routes
The Kirkkonummi record gains three independently reviewed voltage/substation-route statements: planned permanent supply, backup and temporary construction supply remain separate. The authority is describing the applicant’s plan, not certifying approval, energisation or available capacity. Its parent 2 October check and existing stage are unchanged.
- 1 November 2026
LUMI gains scoped directory chip-family evidence
The original LUMI record gains a separately reviewed CPU/GPU-family account, preserving the directory’s prospective, model-unspecified GPU wording. LUMI-AI remains distinct. No installed configuration, operating stage or available compute is established; the parent 17 October check is unchanged.
- 1 November 2026
Leonardo chip families retain partition scope
The Leonardo record gains separately reviewed Booster/Data-Centric CPU and Ampere-based GPU-family labels. No A100 model is inferred. Unknown source dates and quantities remain unknown, and the parent record’s facts and 17 October check are unchanged.
- 1 November 2026
MareNostrum 5 separates chip evidence from untyped PUE
The MareNostrum 5 record gains reviewed GPP/ACC chip-family evidence only; NGT partitions remain unadmitted. The selected directory’s PUE inequality has no established design, target or measured basis and is not populated. Parent facts, stage and 17 October check remain unchanged.
- 1 November 2026
MeluXina gains a scoped hardware-family account
The original MeluXina record gains separately reviewed CPU/GPU-family identifiers. MeluXina-AI, installed counts, completion, operation and access are not inferred. The original record and its 17 October check remain unchanged.
- 1 November 2026
Karolina GPU identity keeps its CPU evidence limit
The Karolina record gains a separately reviewed GPU-family statement. The selected CPU cell does not identify a CPU model, so none is invented. Counts, stage and access remain unestablished by this field, with the parent 17 October check unchanged.
- 1 November 2026
Deucalion chip evidence keeps named partitions separate
The Deucalion record gains separately reviewed ARM, x86 and accelerated-partition hardware-family identifiers. No quantities, installation milestone, physical-building boundary or current access are inferred; old record facts and the 17 October check remain unchanged.
- 1 November 2026
Vega gains scoped CPU and GPU identifiers
The Vega record gains separately reviewed CPU/GPU-family evidence with unknown source publication, event, update, retrieval and version clocks. No counts, configuration milestone, operation or access are inferred. The parent record’s 17 October check is unchanged.
- 1 November 2026
Component reuse gains a reviewed historical guidance starting point
A dedicated Stage 10 record describes the exact JRC118550 component-harvesting/testing and firmware/storage-erasure scope, retaining year-only 2019 publication and the 31 October source check and independent review. EU-owned sections retain report-specific CC BY 4.0 attribution and exclusions; no certified provider, secondary-GPU availability or completed reuse benefit is established.
- 1 November 2026
Retirement evidence distinguishes a grid-asset condition from completed restoration
A dedicated Stage 11 record records the NVE202519874-32 condition to remove one approximately 65-metre 66 kV span and the separate works-area cleanup condition, both relative to unknown entry into service. The 5 June issue event and 31 October check/review remain separate. No completed compliance, municipal data-centre closure, bond or attachment licence is inferred.
- 1 November 2026
Dutch TDTR amendment gains a historical rule account
The tennet-nl-tdtr-2026-operationalisation record adds the precisely reviewed notification-timing and release-time-granularity amendment. Its 23 April decision, 7 May Gazette publication, labelled 8 May calendar inference and 31 October check remain separate. This establishes neither current consolidated law, project eligibility nor available transport capacity. All ten earlier grid-context objects remain unchanged.
- 1 November 2026
PJM demand evidence separates forecasting from a load queue
The pjm-load-forecast-adjustments-not-load-queue account preserves PJM's explicit no-load-queue boundary and the separate utility-adjustment process for preparing its long-term load forecast. No queue capacity, firm connection commitment, forecast outcome or current commissioning is inferred. Original publication, source-check and independent-review clocks and unknown retrieval time remain distinct.
- 1 November 2026
Statnett demand categories retain their overlap warning
The statnett-queue-reservation-overlap account distinguishes queued, reserved and connected cases, including possible overlap between special-conditions reservations and the ordinary queue. It imports no customer list, PowerBI data, numeric total or project status. The same two demand accounts are available through HTML, JSON, CSV, OpenAPI and stateless MCP; earlier generation/storage facts and clocks remain unchanged.
- 1 November 2026
EN50600 gains a scoped current DIN catalogue source
The EN50600 entry now uses the reviewed German Part1 catalogue identity, current label, month-precision publication metadata and replacement relationship. It does not establish a uniform current edition, normative requirements or site conformity. The separate one-record standards-evidence JSON and CSV retain the actual source and mapping reviews; other standards and the held EU primary-text check keep their dates.
- 1 November 2026
Migration staffing guidance adds one neutral commercial service scope
A selected AWS Professional Services record links the reviewed migration-staffing documentation. It retains the documentation-only CC BY-SA4.0 scope, separate clocks and marketing/code exclusions in the page and services JSON/CSV. It supplies no quality, suitability, price or current availability assessment. Existing programme routes remain separate.
- 1 November 2026
Physical-server provisioning support gains a scoped starting record
A selected Canonical MAAS record identifies physical-server provisioning and an enterprise-support information route. Minimal independently worded facts and ordinary links retain known website-use limits; no software licence is transferred to website content. Geography and source dates remain unknown, and no rented hardware, managed-cluster operation or current availability is promised.
- 1 November 2026
Facility commissioning gains a provider-attributed service category
A selected Salute record identifies commissioning tests for mechanical, electrical and control systems, with an ordinary source link and the exact minimal-use limits. Copyright stays reserved; privacy terms are not a content licence. The page and services exports supply no certification, facility readiness, staffing, quality or availability finding.
- 1 November 2026
EcoDataCenter names gain a bounded campus-context link
One separately reviewed same_named_campus_context link connects the retained EcoDataCenter 2/Sweden publisher name and address with cf-dc-0046, the existing Borlänge campus record. It is an explicit contextual inference, not a building, phase, parcel, metric, owner/user, operation, availability or coordinate identity. All 193 source records, prior facts, Epoch rights and original 2 October/17 October checks remain unchanged; unique physical facilities stay unknown.
- 1 November 2026
Add a bounded European energy-study source
The jrc-eu-digital-infrastructure-energy-2022 source record adds JRC135926 as a retrospective EU-27 model-method account, with separate data-centre and telecommunications-network scopes and report-specific CC BY 4.0 conditions. No numerical results, underlying inputs, graphics, current demand, forecast, queue position or available compute are imported or inferred. Existing sources and checks remain unchanged.
- 1 November 2026
Water cooling claim reviewed within its FEMP boundary
The closed-loop-label-water-boundaries dossier distinguishes direct site cooling-water demand, electricity use and possible upstream water boundaries using the exact reviewed FEMP guidance. Supporting and counter-evidence lists remain explicitly unrecorded; no site-specific measured water saving or universal cooling outcome is established.
- 1 November 2026
Employment units reviewed without a local hiring forecast
The job-years-fte-and-headcount dossier separates annual FTE/job-year measures, headcount, construction periods and additionality methodology. UKEF employment definitions and MHCLG appraisal guidance have different roles. This is not a completed Hayes planning-application comparison or a verified data-centre hiring or multiplier result.
- 1 November 2026
Annual power matching reviewed against hourly accounting guidance
The annual-matching-hourly-local-power dossier uses EPA guidance to distinguish annual matching from hourly regional accounting. Contractual matching does not itself establish local hourly emissions, congestion relief, delivered power or a particular project outcome.
- 1 November 2026
Add FEMP cooling-water guidance source context
The doe-femp-cooling-water-guidance source record preserves its guidance status, method limits and original link. Publication and source-update dates and reuse terms remain explicitly unknown with the exact-use source notice; the 31 October evidence check does not supply those missing clocks or a licence.
- 1 November 2026
Add EPA hourly electricity matching guidance source context
The epa-hourly-electricity-matching-guidance source record preserves annual/hourly accounting boundaries, the separately recorded 12 December 2025 source-page update and the 31 October check. Publication date and reuse terms remain unknown, with no source licence inferred.
- 1 November 2026
Add UKEF employment-measurement method source context
The ukef-employment-measurement-2024-2025 source record describes the selected modelled employment-unit method and its limits, with the 17 July 2025 publication date separate from the 31 October check and unknown source-update date. Recorded OGL terms and exclusions remain explicit; no employment result is transferred to a data centre.
- 1 November 2026
Add MHCLG employment-appraisal guidance source context
The mhclg-employment-appraisal-guidance source record provides separate additionality-method context, with the 18 February 2026 page update distinct from unknown publication date and the 31 October check. Recorded OGL terms and exclusions remain explicit; it does not independently corroborate UKEF results or establish local benefits.
- 1 November 2026
LUMI-AI gains scoped announced chip identifiers
The LUMI-AI record now carries independently checked EuroHPC chip-family identifiers for the planned system. These are separate from the original LUMI and establish neither installed equipment nor available compute. Original facility facts and dates remain unchanged.
- 1 November 2026
DAEDALUS gains scoped chip identification
The DAEDALUS record now carries independently checked EuroHPC hardware identification. System identity is separate from whole-facility stage, current access and available compute. Original facility facts and dates remain unchanged.
- 1 November 2026
Hepokorpi gains historical shared-grid plan context
The Hepokorpi record now exposes the independently checked 2022 Fingrid shared-substation plan as a separately scoped field. It does not establish a completed Microsoft connection, energisation or later-building association. Original facility facts and dates remain unchanged.
- 1 November 2026
LONDON9 supply and design-PUE statements retain building scope
The Slough campus record now exposes two independently checked operator statements for LONDON9 only. The undated specification retains MVA as apparent power and its PUE inequality as design text. It establishes no campus total, measured PUE or present operation. Original facility facts and dates remain unchanged.
- 1 November 2026
First unscored Trust, Depth and Freshness samples
The dashboard now exposes three dated evidence samples with named denominators, original review clocks and matching JSON, CSV, OpenAPI and MCP output. Numeric ratings remain unassigned; the other seven dimensions remain unassessed. Field presence, source review and actual release stay separate.
- 1 November 2026
Services routing receives a complete scoped recheck
Both existing cards, three official exits and all 31 static task links were checked with generated record and fragment routes. The routing check is dated 31 October, with a one-off 7 November re-entry. Programme eligibility, availability and original record dates are unchanged.
- 1 November 2026
KAUST official-information links rechecked
The Saudi information route and its canonical source share a 31 October link-use check and one-off 7 November re-entry. This verifies the official information destination, not eligibility, funding, a current call or available compute. Saudi policy facts retain their original check.
- 1 November 2026
USTDA study-support example rechecked
The existing Nigeria study-support and assessment-scope account was rechecked against its official original. Its 23 September publication and historical 19 October inclusion remain distinct from the 31 October check and one-off 7 November re-entry; construction finance and delivery are not inferred.
- 1 November 2026
Africa Connected guarantee example rechecked
The existing historical agreement and qualified guarantee-ceiling account was rechecked against the Commission original and its reuse notice. The 2023 publication remains unchanged; the 31 October check and one-off 7 November re-entry do not establish disbursement or delivered infrastructure.
- 1 November 2026
DOE public-support intent example rechecked
The existing intent account was rechecked against the DOE original and source-use policy. Its 16 October announcement remains separate from the 31 October check and one-off 7 November re-entry; payment, completed upgrades and a compute connection remain unverified.
- 31 October 2026
Gromstul grid field retains reviewed permission scope
The existing Gromstul record now exposes its previously reviewed NVE permission account as a scoped grid field in the record, coverage and data exports. The two listed 132 kV line spans remain permitted-only evidence, with their original dates and source limits. No energisation, current operation, capacity or available compute is established; other record facts and dates are unchanged.
- 31 October 2026
Clearer progress and separate scheduled-maintenance evidence
The dashboard leads with dated gaps and recorded work, with audit history available in expandable sections. Scheduled-run evidence retains its original observation and scope separately from released maintenance, source freshness, publication and reader outcomes.
- 31 October 2026
Prepare research and claim-review data routes
Research summaries gain separate JSON and CSV downloads with their original dates, attribution and reuse limits. Claim-review pages and data fields are prepared, but no claim review or new factual finding is published. An empty register has no recorded check date.
- 31 October 2026
Detailed-site exports gain scoped evidence fields
The data model, record pages, coverage checks and machine-readable contract now support separately sourced grid connection, PUE, water use and chip statements. Unknown fields remain null in JSON and empty in CSV. Design, target and measured PUE and water boundaries remain distinct. No site facts, stages, source dates or capacity values have been added or refreshed.
- 31 October 2026
Neutral routes to Statnett connection information
The source register and search provide ordinary links to Statnett connection information and its linked maturity document, with source credit and separate ComputeFinder cautions. Current rules, legal effect and project applicability remain unverified. Older facts and source dates are unchanged.
- 31 October 2026
Neutral routes to two YLE2021 original documents
The source register and search provide ordinary Fingrid and Energiavirasto document links with source credit and separate ComputeFinder cautions. No technical rule, current applicability or project effect is verified, and older facts and source dates are unchanged.
- 30 October 2026
A verified maintenance checkpoint, with separate evidence clocks
The dashboard records a source-bound released maintenance checkpoint after complete HTTP200 and exact-projection checks. This does not refresh source evidence, verify every scheduled run or imply new factual publication or visitor benefit.
- 30 October 2026
AIRR Cloud Access shows its recorded closed status
The programme evidence page and directory now lead with the closed application status recorded at the 3 October check. The original evidence and dates remain unchanged; present application status still needs an official recheck.
- 29 October 2026
UK Covenant policy context
The news account distinguishes conditional strategic support from site approvals, secured power and available compute, with the official policy route and outstanding criteria visible.
- 29 October 2026
Conditional nuclear financing stays separate from delivered compute
A dated DOE account connects conditional Constellation nuclear-uprate financing to finance, US policy and grid context. It preserves the distinction between a commitment, funded or completed work, prospective electricity and available compute. Existing catalogue facts and their dates remain unchanged.
- 27 October 2026
Country searches reach existing data-centre records
Search now finds existing detailed data-centre records by their recorded country and locality, including Gromstul for Norway. Original record evidence, dates and availability limits remain unchanged.
- 27 October 2026
Clarify Kazakhstan planned-project identity
The country record names Data Center Valley in Ekibastuz and the government-described project operator, with the ministry-stated 125MW description. The project remains planned, not evidence of construction, grid connection, operation, access or available compute. Older country evidence dates and the separate Alem.Cloud record remain unchanged.
- 25 October 2026
Official evidence and maintained source coverage
Hepokorpi's existing project questions now link a separately dated environmental-assessment listing, preserving the phase-three permit and unknown current operation. The source register now opens the European Commission's data-centre performance information and consultation route, distinguishing proposals and aggregate reporting from site-level facts. Three precisely assessed recurring source scopes retain their own cadence and review limits; configuration does not establish continuous collection.
- 23 October 2026
Project answers first and a reviewed Nebius financing update
Gromstul, Middenmeer and Hepokorpi now lead with their existing evidence findings, scope and official next checks. A reviewed Nebius financing account connects the news, provider and finance pages while keeping funding separate from spending and available compute. Maintenance can identify saved discovery captures awaiting admission, and actual Meta/Nokia publication evidence closes those older pending claims.
- 22 October 2026
Current results coverage and more reliable discovery follow-through
Reviewed Meta and Nokia results now connect to relevant finance, supply and place context. Meta's annual spending range narrows without a higher ceiling; Nokia's customer orders are kept separate from installed compute. Discovery retains local holds and unknown retrieval times, and already-public claims are reconciled using their actual release evidence.
- 22 October 2026
Clearer starting points and useful content first
The homepage leads to compute access, projects and community questions, with compact news previews. News stories and directory results come before operating and data-processing notes. Evidence labels remain available in expandable explanations; site updates move to the footer, whose links are grouped by task. Existing records, sources and evidence dates retain their meaning.
- 21 October 2026
Reviewed developments now refresh the homepage automatically
Homepage selection follows the latest reviewed source or event dates. A current NVIDIA source guide opens official reading routes; DAEDALUS, Nebius and TorchNeuron coverage connects existing records. The grid-data download declares its file format. Original evidence dates remain separate, and the source guide does not verify every linked announcement.
- 21 October 2026
TorchNeuron beta connects AWS software evidence to provider and Trainium records
Immutable AWS Neuron release notes date the native PyTorch backend public beta to 15 October and record Trainium2/Trainium3 support alongside API and static-shape limits. Existing AWS and Trainium facts retain their 2 October dates; no universal compatibility, performance, capacity, availability or successful migration is inferred.
- 21 October 2026
Nebius builder announcement connects to its existing provider record
A dated Nebius announcement now explains its US$10 million European commitment across compute grants, investor connections and community programmes. The linked membership terms are kept separate from the unspecified special-grant selection and allocation. No award, delivered compute, capacity or current availability is inferred.
- 21 October 2026
DAEDALUS inauguration stays separate from public access
The Greece and DAEDALUS records now carry GRNET's dated inauguration and configuration boundary. First-user access is planned gradually during December, but calls, terms and exact deadlines remain unannounced. The lifecycle enum stays unknown; no current application route, allocation or availability is inferred.
- 21 October 2026
SpaceX evidence connects records to the next source question
Three connections in the existing SpaceX dossier explain the evidence needed for site comparisons, finance and access. Finance and AI-dataset reading routes show the relevant questions and planned source checks. JSON and search carry the same scoped requirements; original claims and record dates remain unchanged.
- 21 October 2026
Company results connect separate claims to the wider compute picture
SpaceX's third-quarter release has one evidence dossier with four separately scoped claims, reporting dates and linked finance, US and site context. News coverage distinguishes source checks, expected events and missed detection deadlines. Historical site estimates retain their dates; worldwide coverage remains incomplete.
- 20 October 2026
Shared links gain an original ComputeFinder preview image
Indexable pages now advertise the same original branded PNG, with image dimensions and descriptive alternative text. Individual page titles, descriptions and canonical URLs stay distinct. This prepares link previews; it does not establish how a social platform displays a card or prove sharing, indexing or traffic.
- 20 October 2026
Three provider records connect dated evidence to decision questions
Baseten, Cerebras and Modal show their original evidence date before access details and link to existing relevant offer-type questions. Provider facts, official links and dates are unchanged. These comparison routes do not confirm a current offer, suitability or availability.
- 20 October 2026
Jamaica framing keeps a dated report separate from current assurances
The country headline and closing inference no longer imply current legal absence, an upcoming consultation or unavailable policy support. The dated account, original source and record dates are retained; this is not a current legal review.
- 20 October 2026
Ghana response-text publication confirmation recorded
The correction log adds a separate confirmation that the current Ghana HTTP response contains the neutral wording and omits the former complete undated assurance. Earlier correction entries and country evidence dates remain unchanged. This is not a new legal, operating, device or reader-use check.
- 20 October 2026
Project and briefing breadcrumbs use existing section destinations
Structured breadcrumbs for the three project evidence files and connected briefing point to Explore and What's changing rather than nonexistent intermediate pages. Canonical URLs, evidence, source dates and visible project content are unchanged. This repairs metadata, not proof of indexing, ranking or reader benefit.
- 19 October 2026
Ghana headline keeps dated evidence separate from current assurances
The country introduction now points readers to recorded infrastructure and official information routes, rather than making undated legal or operating assurances. Other country fields and their original evidence dates are unchanged; this is not a current legal review.
- 17 October 2026
Connect existing project records to their evidence files
Gromstul, Microsoft Middenmeer and Hepokorpi catalogue records now lead directly to their connected evidence files and briefing. Exact record paths preserve identity; original facts, stages and check dates remain unchanged. This improves discovery, not source freshness or current operating evidence.
- 17 October 2026
A connected first edition for finding and understanding compute
The homepage now starts with reader questions and five navigation destinations. Explore follows the full lifecycle with explicit coverage limits; Find compute connects existing access routes. A briefing and three project evidence files share scoped observations, source dates, relationships and unresolved questions. The connected evidence is downloadable as JSON. Existing evidence is reorganised without claiming fresh project progress or global completeness.
- 17 October 2026
African records and an operations question gain scoped source routes
Lilongwe gains two attributed historical premises and separate site-role facts from a dated PPPC account. Existing ACR2 and Virtus Slough records gain neutral original-source exits only; factual reuse remains held on source conditions. Search, exports and printable case files carry the same dates and limits. No facility, current operating claim, permit conclusion or monitoring scope is added.
- 17 October 2026
The map table includes records without a plotted location
All 193 source records are available in the map table, including three records without a plotted location. The homepage and map distinguish the full inventory from the 190 mapped or country-grouped records. Existing markers, facility evidence and source dates are unchanged.
- 17 October 2026
Ghana government infrastructure and Middenmeer planning context gain evidence routes
Ghana now reaches NITA's separately dated institutional service descriptions through Services, search and exports, without implying an open compute offer or a new physical facility. An existing Middenmeer page gains a dated MER-intent notice and its permit-decision boundary; phase and address equivalence remain unknown. Earlier records, facts and source dates are unchanged.
- 17 October 2026
Existing research and project records gain decision evidence
ALCF now leads to its discretionary-allocation information with affiliation and preparation limits. Gromstul gains the NVE electrical-case status and document route, without treating a listed permission as whole-campus operation or capacity. Each note has its own evidence clock; older record facts and dates remain unchanged.
- 17 October 2026
Research access reaches UCT information and an NLHPC course
Services and institutional search reach UCT HPC account information and Chilean introductory training scheduled for 29 October. UCT eligibility remains unverified; the course is not a compute allocation or guaranteed place. Separate link checks preserve older country facts and source dates. No news article or new programme is added.
- 17 October 2026
A dated ELIDZ facility account is now reachable from South Africa
A descriptive South African data-centre reference links to ELIDZ's7May2026 account. Its historical operational description is attributed to that account; present operation, capacity, ownership, precise location and available compute remain unverified. Earlier records and evidence dates are unchanged.
- 17 October 2026
Victoria applicability corrected and a dated Malawi construction account added
The Victoria report now links to official guidance and its application-date cutoff, retaining its28September date and permalink. A separate Lilongwe record links to PPPC's28April construction-milestone account. Current operation, available compute and delivered local outcomes remain unverified; earlier facility records and source dates are unchanged.
- 17 October 2026
A neutral Namibia source route without unsupported facility facts
Source search and the existing Africa register now reach the official Paratus Namibia Armada article. Only the ordinary link is assessed; no article content, physical facility record, current-stage or availability claim is imported. Existing records and source dates are unchanged.
- 17 October 2026
A dated ACR2 account is now reachable from Ghana and site search
A separately attributed Accra record links to the Ghana ministry account published 31 October 2025. Its historical commissioning report is not verification of current operation, capacity, ownership, access or availability. Earlier records and source dates are unchanged.
- 17 October 2026
South Africa research questions reach ilifu institutional information
Services and institutional search now open the South Africa profile with neutral ilifu access-information and overview links. The links have separate check dates and clear limits, without copying procedures or claiming eligibility, an open call, a free programme or available compute. Earlier country and catalogue facts retain their own dates.
- 17 October 2026
Nouakchott searches reach the official project reference without inventing a facility
Search now reaches a scoped Commission source reference for a combined Mauritanian data-centre and cable initiative. Unknown dates and status stay explicit; the initiative is not added as a physical site, map location, programme or available-compute offer. Existing records and their dates are unchanged.
- 17 October 2026
An African programme guarantee illustrates the limits of a funding headline
The finance page adds a dated European Commission example: the 2023 Africa Connected agreement and its up-to EUR 100 million guarantee capacity. A programme ceiling is not money spent, a site allocation, delivered infrastructure or a current funding offer. Earlier case and catalogue dates remain unchanged.
- 17 October 2026
Finance follows public support from intent towards evidence
An existing DOE transmission-funding event now illustrates intended support versus money spent, completed work and an actual compute connection. The finance page links the dated original and existing United States/grid context, with a separate case check. Earlier news, programme and facility dates are unchanged.
- 17 October 2026
Hepokorpi permit evidence reaches the municipal decision directly
The existing Espoo record now links its phase-three permit entry straight to the city decision rather than an intermediary announcement. This is source navigation, not a new permit, current construction update, open appeal window or delivered outcome. Earlier facts and evidence dates remain unchanged.
- 17 October 2026
Uganda research questions reach institutional account information
Services and institutional search now open the Uganda profile with two neutral ACE account-guide and homepage links, separate link dates and clear reuse/access limits. No source procedures are reproduced and no programme, current availability or eligibility is verified. Older country facts and dates remain unchanged.
- 17 October 2026
Find four research-system names through existing evidence records
Aurora and Polaris lead to ALCF, Frontier to OLCF, and Perlmutter to NERSC, using three attributed DOE statements with separate evidence clocks and source notices. Existing allocation routes retain their own dates and cautions. These associations do not verify current operation, availability or eligibility, and add no facilities.
- 17 October 2026
News downloads link back to exact reports
JSON and CSV news records now carry an exact ComputeFinder report URL alongside the unchanged original-source URL. Existing reports, dates, archive targets, aliases and selected editorial feed remain unchanged.
- 17 October 2026
News context and changelog links reach their recorded destinations
Eleven legacy country links now redirect to the existing policy records, and changelog entries with several affected paths produce a valid page and feed link. No underlying news account, country fact or evidence date changed.
- 17 October 2026
Direct report links keep headings clear on phones
News permalinks and the review-cycle section now allow space for wrapped phone navigation. A new stylesheet version delivers the correction to returning readers; source records and evidence dates are unchanged.
- 17 October 2026
Whole-site review cycles make gaps and next checks visible
Public progress now shows risk-based representative reviews across fourteen areas, with unknown dates kept separate from actual scoped findings. Due reviews feed the existing work selection; free discovery connects three audience journeys to useful resources and later evidence of use.
- 17 October 2026
News reports gain direct links
Every existing news report now has a keyboard-accessible link to its own position in the archive, so readers can share or cite a particular account. Recorded stories, source dates and the selected news feed remain unchanged.
- 17 October 2026
Phone news coverage labels match their topics
The expanded regional coverage table now keeps all seven topic labels aligned with their values on phones, including Community. Recorded observations and counts are unchanged.
- 17 October 2026
Standing news coverage and a reviewed Point Tupper proposal account
News now exposes bounded topic and regional observations, distinct candidate/review stages and uncovered areas. A minimal original EverWind proposal account keeps source dates and unknown delivery separate; no worldwide coverage or monitoring claim.
- 17 October 2026
Three European system identities keep proposed locations distinct from available compute
Daedalus, Arrhenius and Alice Recoque gain attributed source records through Greece, Sweden, France, search and exports. Future location and role wording is preserved for Daedalus and Alice Recoque; Arrhenius keeps a campus description with city unknown. Existing records and programme dates stay unchanged. Named identities are not verified operating campuses, legal operators or available capacity.
- 17 October 2026
Saudi Arabia gains an official research-access information route
Services and institutional search now reach KAUST Shaheen public access information through the existing Saudi policy page. The two official links have their own check dates and reuse limits; older policy facts remain unchanged. This is not a free or funded programme, a system specification, a verified open call or an offer of available compute.
- 17 October 2026
LUMI gains a distinct, dated evidence journey
LUMI in Kajaani now has a selected EuroHPC identity and host record, with qualified two-way links to the separately recorded LUMI-AI identity. Search, Finland and exports reach the new record and existing programme guidance. The distinction is not evidence of physical campus boundaries, an upgrade, current operation or available compute. Earlier LUMI-AI and programme evidence dates remain unchanged.
- 17 October 2026
Four research-system evidence records join existing access journeys
Leonardo, MareNostrum 5, MeluXina and Gadi gain attributed named-system evidence through search, place pages and exports. EuroHPC records retain selected locality and host claims; the June 2026 Australian government case study leaves Gadi locality unknown. These are not newly operating physical facilities or offers of compute. Earlier records and allocation guidance retain their own dates and cautions.
- 17 October 2026
Three Indian research systems gain dated evidence routes
PARAM Shivay, PARAM Ganga and PARAM Kamrupa gain attributed system, institution and state records from a government account published in December 2025. India, search and exports link to the original evidence; locality normalisation is not a verified address. Current operation, capacity and allocation remain unknown. Earlier PARAM Siddhi, country and programme facts retain their dates.
- 17 October 2026
Three European research systems gain canonical evidence journeys
Karolina in Ostrava, Vega in Maribor and Deucalion in Guimarães now have separately attributed system identity, locality and host records, linked from existing country summaries to search, exports and generic allocation guidance. These are canonical record additions, not first mentions or newly built facilities. Current operation, capacity, physical boundaries and system eligibility remain unknown; country and programme evidence dates are preserved.
- 17 October 2026
Discoverer gains a sourced Bulgaria research-computing route
Bulgaria, search and exports now reach a separately attributed Discoverer scientific-system identity with Sofia location and Sofia Tech Park host evidence. A related existing EuroHPC record leads to the official general access-calls index, with its original date and cautions. This does not verify an upgrade, physical campus boundary, current operation, hardware, system eligibility or available compute. One selected identity is not a full-directory reconciliation.
- 17 October 2026
Three US research-computing identities connect to recorded access routes
ALCF, OLCF and NERSC gain DOE-attributed identity, host-laboratory and locality records, reachable through search, the US country filter and exports. Existing programme records supply separately dated access cautions and official next steps. Operation, physical boundaries, hardware, capacity and available compute remain unknown. The selected four-row reference excludes ESnet as a network; it is not national or world coverage.
- 17 October 2026
MY06 gains a separately sourced identity and location record
Malaysia, site search and exports now reach a bounded MY06 record from Epoch AI. Its source-reported locality is not a geocode or evidence of current operation, capacity or available compute. Earlier estimates and addresses retain their dates. The selected reference now distinguishes canonical identity admission from detailed facility knowledge and worldwide coverage.
- 17 October 2026
A Japan compute route and an extended Singapore application deadline
Added a bounded GMO GPU Cloud provider record with corporate-access and Japan-hosting limits, linked from Services. NSCC's guide now gives 23 October at 5pm while its older announcement still says 16 October; the timezone remains unknown. A separate DOE account records intended transmission support, not spent funding or delivered compute connections. Earlier records and source dates are preserved.
- 17 October 2026
A source-backed batch expands address and locality discovery
69 existing AI source records gain separately dated publisher address/location fields across nine countries. Some values are localities or plus codes; they do not establish coordinates, facility identity or operation. A bounded external-reference comparison separates existing records, one admission gap and blank source fields from worldwide completeness. Earlier facts and eleven address checks remain unchanged.
- 16 October 2026
Progress connects evidence, scores and learning
The public dashboard now exposes ten assessment dimensions, the existing 0-5 rubric and scoped learning decisions. Scores stay unassigned until independently reviewed evidence supports them; expired assessments cannot look current. Reviewed findings inform existing work priorities without treating releases or clicks as human outcomes.
- 16 October 2026
South Africa gains a bounded heritage-information route
South Africa, Services and the community guide now reach official SAHRIS heritage information and authority context through one canonical source entry. This is a link-out, not imported records, a general planning-permission register or a verified live commenting window. Older facts, source dates and the EIA page baseline remain unchanged.
- 16 October 2026
Source coverage separates a recorded baseline from unmonitored gaps
The existing source register now has a dated region/topic matrix with expandable links to its entries. It separates the one page baseline, unregistered monitoring scopes and two outside recurring-use holds. Unknown finance classification and access-failure coverage stay explicit. Saved-state recovery is verified; no new source request or factual refresh occurred.
- 16 October 2026
Source monitoring starts with one bounded EIA page check
The existing source register records a page-fingerprint baseline and next source-use review for EIA Form 860. This is not a generator dataset import, data-centre fact check or proof of a later unattended refresh. Earlier source evidence dates remain unchanged.
- 16 October 2026
Search reaches published institutional research information
Institution names and recorded identifiers now reach the existing country evidence links through a distinct Institutional information result type. Original source-use limits and link dates stay visible, including UNAM suspension information. These are not programme or available-compute listings; underlying facts and source dates are unchanged.
- 16 October 2026
Mexico gains an official research-computing information route
Mexico and Services now link to UNAM access information and its official suspension notice, with the current call kept separate from older calendar material. This is not an open-call, free or funded offer, allocation or availability claim. Older country facts and their evidence date remain unchanged.
- 16 October 2026
New Zealand gains an official research-computing information route
Services now reaches REANNZ HPC information and official access instructions through New Zealand. The institutional link-out is not a verified free or funded offer, allocation or availability claim. Older country facts and their evidence date remain unchanged.
- 16 October 2026
Argentina gains a research-allocation information route
The IPAC evidence page connects Argentina, Services and the research chooser to official Clementina XXI research conditions and separate organisational service information. A currently open call, future deadline, costs and availability remain unverified. Earlier programme, country and news facts are unchanged.
- 16 October 2026
Brazil gains a sourced research-allocation proposal route
The SINAPAD 2026 call now has a programme evidence page linked from Brazil, Services and the research chooser. Institutional conditions, rolling submission and the Santos Dumont use terms are kept separate from awards, active access, costs and resource availability. Earlier programme, country and news facts are unchanged.
- 16 October 2026
Morocco gains a French-language institutional computing information route
Services now reaches the CNRST HPC-MARWAN wiki and FAQ through Morocco. These are ordinary information links, separate from Toubkal and not a verified free or funded programme. Eligibility, charges, resources and availability remain unverified; older country facts and their evidence date are unchanged.
- 16 October 2026
Public status distinguishes GA report delivery from complete reporting
A receipt-backed analytics component shows the report observation, accepted delivery, reporting window and next evidence check. Search Console remains blocked and scheduled execution is unverified. Private analytics and proof stay excluded; freshness is not renewed by a build, and delivery is not audience growth or visitor benefit.
- 16 October 2026
Uruguay agreement news distinguishes a proposal from delivered compute
A minimal official-source account of the14October agreement links Uruguay, finance context and community questions. Proposed quantities and facility details are not admitted. Earlier news and the fixed newsletter issue/feed remain unchanged; publication is not construction, availability or reader benefit.
- 16 October 2026
Research-support pledges are separated from compute allocations
A European Commission RAISE news account records the 15 October launch of voluntary scientific-computing support. It links the official original and existing access information without inventing eligibility, free resources or availability. Earlier stories and the fixed-cutoff newsletter sample remain unchanged.
- 15 October 2026
Larrison address finds the existing New Carlisle source record
The Anthropic-Amazon New Carlisle estimate now carries Epoch's separately dated source-address field, making street search useful. Its original 2 October estimates and hardware-owner confidence remain unchanged; a source address does not establish coordinates, phase identity, current operation or compute availability.
- 15 October 2026
Chile gains official academic access and policy information
Services now reaches NLHPC academic information and access policies through Chile. These links do not establish unconditional cost-free access, eligibility, an allocation or available resources. Older country facts and their 2 October evidence date remain unchanged.
- 15 October 2026
Public progress separates verified checkpoints from build freshness
The dashboard and public feeds now show a receipt-backed maintenance checkpoint with its original time and separate staleness. Missing failures and unverified report or research delivery stay unknown; planned checks are not promised delivery or a live heartbeat.
- 15 October 2026
Zambia gains official institutional research-access information
Services now reaches ZAMREN services and membership information through the Zambia profile. The links do not establish free or funded access, eligibility, hardware or availability. Older country facts and their 3 October evidence date remain unchanged.
- 15 October 2026
AWS news leads directly to its existing provider record
The AWS community-policy news item now links to the named AWS provider record instead of the whole directory. The announcement, provider facts, original sources and 2 October dates are unchanged. This navigation improvement does not verify implementation, compute availability or reader benefit.
- 15 October 2026
Start a workload memory brief with explicit weight assumptions
A no-JavaScript tool calculates ideal weight payload in GB and GiB from your parameter count and bit width. It does not estimate total runtime memory, GPU fit or speed. Services and the existing offer chooser link the result to further evidence and official next steps.
- 15 October 2026
Kenya gains a bounded institutional research-access route
Services now links to official KENET CHUI access information through the Kenya profile. Eligibility, charges, funding and current availability remain unverified here; this is a link-out, not a free-compute programme or a refresh of older country facts.
- 15 October 2026
Duplicate alliance accounts become one transparent correction
Consolidated two news summaries pointing to the same original and withdrew their adapted descriptions pending a usable source basis. The original link, historical identity aliases and old archive date remain; the editorial notice does not re-verify implementation or availability.
- 15 October 2026
Brazilian HPC school proposal route closes an older archive gap
A narrowly sourced LNCC link-out distinguishes the 19 October proposal deadline from the 2027 school dates, without promising compute, acceptance or support. A reproducible tag-based 7/30-day archive check exposes coverage limits; earlier stories and the fixed-cutoff weekly sample are unchanged.
- 15 October 2026
News review date follows the recorded scoped evidence
The news page uses the same source-bound review date as public progress instead of a stale hand-written date. A bounded review is not a check of every story or source and does not refresh story dates.
- 15 October 2026
Read an unsent weekly briefing sample and selected news feed
A fixed-cutoff public sample connects proposed grid costs, a public evidence inquiry and funding/support routes. A separate Atom feed contains two reviewed news accounts with original dates and licence notices; the changelog feed keeps its existing meaning. Signup stays paused; this release does not send a broadcast.
- 15 October 2026
Finance and services connect questions to evidence and next steps
New task-first sections explain compute funding, infrastructure finance and cost assumptions, then connect workloads and local proposals to existing programmes, guides and official sources. The initial set is bounded, not a ranked directory or availability feed.
- 15 October 2026
Newsletter signup pauses to protect unsubscribe preferences
Removed confirmation contact writes and new signup sends while suppression-safe activation is verified. Old links cannot change existing preferences; token pages omit application scripts and outgoing referrers. The editorial direction is a short weekly briefing, skipping thin weeks; actual delivery remains unverified.
- 15 October 2026
Texas registration evidence separates a filing from delivered compute
A narrow registration account now links directly to an original Texas accessibility record with source attribution, a separately recorded registration date and a no-state-endorsement notice. It does not establish construction, operation or availability. Earlier news records and dates remain unchanged.
- 15 October 2026
Public progress shows coverage, gaps and measurement limits
A public dashboard and read-only health response distinguish repository coverage and local route checks from factual review, autonomous run completion and visitor value. Unknown outcomes stay unmeasured; private operational records and raw analytics are excluded.
- 15 October 2026
Saskatchewan capacity wording withdrawn pending source-use review
The earlier Bell news summary has been replaced with a verification-limit notice and the original government link. No replacement capacity, delivery or availability claim is added, and the announcement date remains unchanged.
- 15 October 2026
Jeffersonville has a separately checked source-address route
The existing Meta Jeffersonville source record can be found by its source-reported 500 8th St address. Nine earlier addresses and their check dates remain unchanged. This is an attributed address field, not verified coordinates, whole-campus operation or compute availability.
- 15 October 2026
Pryor can be found from its source-reported street address
The existing Google Pryor (North) source record is now searchable by Webb St through a separately reviewed Epoch address field. Earlier records and their check dates stay unchanged. The address does not verify coordinates, whole-campus operation or compute availability; the timeline date discrepancy remains unresolved.
- 15 October 2026
The programme chooser reaches every existing programme record
Ten existing programme records missing from the offer-type mappings now appear in the research journey, including Singapore's NSCC call. Neutral labels and recorded access conditions distinguish charged or conditional routes from free access. Region, deadlines and source dates stay unchanged; a mapping is not eligibility or availability. The home links to official pricing instead of promising a future price feed.
- 15 October 2026
Provider data keeps the official next step
Provider JSON and CSV now include the already recorded official pricing-page link, with missing links kept unknown. The additive 1.2.0 format copies no prices and refreshes no source dates, provider facts or availability claims.
- 15 October 2026
Groq access separates unknown conditions from stale corporate-status wording
Withdrew the stale corporate-status access note and unsupported pricing detail. The pricing exit now opens the official models page directly; current access is unrecorded, and the retained fact and its older check date are unchanged.
- 15 October 2026
Token-based labels no longer assume a network currency
Provider cards, records and the GPU guide now ask which token and billing unit applies. The ten existing token-based classifications, underlying provider facts, source dates and data exports are unchanged; no billing unit or current price is inferred.
- 15 October 2026
Cerebras access no longer promises an unsupported free tier
Withdrew three unsupported free-tier descriptions and retained the official pricing link. Current access conditions remain unrecorded rather than inferred from a promotion; other provider facts and their older check date are unchanged.
- 15 October 2026
Nusajaya building evidence distinguishes an estimate from an elapsed projection
The existing DayOne Nusajaya source record now carries Epoch's tracked six-building estimate dated 5 April 2026, with incomplete phases visible. A later ten-building schedule projection is explicitly excluded even though its date has passed; current whole-campus status and compute availability remain unknown.
- 15 October 2026
South Africa connects to current institutional routes
The existing Lengau country-profile row now offers ordinary links to the CHPC user portal and CSIR campus maps. No source content or map is reproduced, old record dates and facts are unchanged, and the links do not verify eligibility, allocation, current facility status or availability.
- 15 October 2026
Historical evidence stays visible beside missing facility fields
Detailed records now distinguish their existing facility-field count from separately recorded source statements. Pages with no recorded facility fields use evidence-and-limits search and citation titles, without promising capacity facts or changing any source, fact, date or coverage metric.
- 15 October 2026
The UAE has a named solar-park data-centre evidence route
A Moro Hub record links DEWA's historical 2023 and 2025 inauguration notices with the named solar-park location. Current whole-campus status, precise coordinates, environmental performance and compute availability remain unverified; phases and other sites are not merged.
- 15 October 2026
New Albany search now finds the existing Prometheus source record
A separately checked Epoch street-address field closes the locality-search gap for Meta Prometheus. Earlier address-check dates and all dated building accounts are preserved; the address does not establish precise coordinates, current campus status or compute availability.
- 15 October 2026
Prometheus has dated building evidence with incomplete phases visible
The existing Meta Prometheus source record now shows Epoch's 31 August 2026 ten-building estimate, its activity inference and unfinished power/construction boundaries. Future projections are excluded; whole-campus status, coordinates and compute availability remain unknown.
- 15 October 2026
Application deadlines stay separate from evidence-check dates
Removed a redundant check-date annotation from NSCC's deadline field so the work selector no longer mistakes it for an expired call. The recorded 16 October deadline, unknown timezone, conditional charges and 14 October evidence date are unchanged.
- 15 October 2026
Jeffersonville has a dated building account without a campus-stage inference
The existing source record now carries Epoch's 4 June 2026 two-building report and its earlier construction distinction. Record-specific check dates keep older evidence from being relabelled by the latest addition; whole-campus status, coordinates and availability remain unknown.
- 14 October 2026
Chester can be found from its source-reported street address
The existing Chester record is now searchable by Meadowville Technology Parkway through a separate licensed Epoch address field. Its dated building inference remains unchanged; the address does not establish precise coordinates, building identity or current campus status.
- 14 October 2026
Chester has dated building evidence with its inference visible
The existing CoreWeave Chester VA record now shows Epoch's 20 May 2026 two-building estimate, its satellite-image inference and an unfinished third-building phase. A later forecast is excluded; whole-campus status, coordinates and compute availability remain unknown.
- 14 October 2026
Singapore researchers have a dated NSCC call information route
A separately checked eighth-call record connects NSCC place evidence to the recorded 16 October 2026 window and official instructions. It distinguishes charged, conditional research allocations from free or currently available compute; the deadline timezone remains unstated.
- 14 October 2026
Singapore has a historical NSCC host evidence route
The Fusionopolis record separates ASPIRE 1's historical host and 31 August 2023 retirement from unknown current building status, successor locations and available compute. Singapore search and a labelled country group reach the evidence and neutral project-call information; missing source-page dates stay unknown.
- 14 October 2026
Pawsey evidence connects to recorded research routes
The Pawsey site record now opens the existing NCMAS, partner-allocation and preparatory-access records, preserving their check dates and eligibility or ended-window limits. A link does not mean a current call, guaranteed allocation or compute availability.
- 14 October 2026
Australia has a named Pawsey evidence route
A dated CSIRO account identifies Pawsey in Kensington, Perth and separates a historical groundwater-cooling proposal from unverified current delivery. Australia search and its existing country group open the record and a later institutional source, not a compute offer.
- 14 October 2026
Colossus 1 can be found from its source-reported address
A separate Epoch address claim makes Riverport searchable and keeps the two Memphis records distinct. It does not assign facility coordinates, operating status or refresh the original estimates.
- 14 October 2026
Colossus 1 has a separately dated building account
The existing source record now shows Epoch's 15 June 2026 one-building report and limited phase context, without assigning a whole-campus operating stage or compute availability. A changed timeline hash prompted a bounded source comparison; earlier extract provenance is retained.
- 14 October 2026
South Africa adds a dated historical source exit
The existing Lengau country-profile row now links to a 2016 government CHPC announcement beside its secondary account. This ordinary link does not reproduce the announcement, refresh the old record fields or verify current facility status and access.
- 14 October 2026
Kobe has a named Fugaku host evidence route
A MEXT-backed record connects Fugaku to its Kobe host and historical 9 March 2021 shared-use milestone. Japan search and a labelled country group open the evidence; current facility status, coordinates, capacity and access remain unknown. One host is not national completeness.
- 14 October 2026
New countries have a map-to-evidence route
Canada, Brazil and India now have explicitly schematic country-group markers leading to their source records, without assigning facility coordinates. Wrapped directory names have a complete pointer and keyboard hit area. Record facts, evidence dates, stages and source terms are unchanged.
- 14 October 2026
Pune has a named AI-facility evidence route
The C-DAC Pune National AI Facility record connects PARAM Siddhi to the government's dated deployment and system commissioning account. Current whole-facility status, precise location, capacity and access remain unknown; Rudra Pilot and GMRT-NCRA are kept separate. Search and the India filter open the evidence, not a compute offer.
- 14 October 2026
Atlanta has a separately dated building report
The existing Fairwater Atlanta record now carries Epoch's 14 June 2026 four-building estimate beside its source-reported address. The dated report does not establish whole-campus completion, current capacity, coordinates or available compute; Recorded stage remains unknown.
- 14 October 2026
Atlanta can be found by its source-reported locality
The existing Fairwater Atlanta source record gains Epoch's public-record address in Fayetteville. Address search opens the same dataset row; no coordinates, operating stage, building report or available compute are inferred. The original estimate snapshot and country-group map placement remain unchanged.
- 14 October 2026
Wisconsin evidence separates a building report from expansion
The existing Fairwater Wisconsin source record gains a searchable source-reported address and Epoch's 15 May 2026 one-building estimate. An unfinished shell, expansion grading and excluded future projections do not establish a completed campus or available compute. Raw estimates, stage and country-group map placement remain unchanged.
- 14 October 2026
Second-review status names what was checked
The Petrópolis and Montréal evidence pages now identify the dated independent review of their two statements and source-use limits. Missing facility fields remain unverified; a statement review is not whole-facility completeness or available compute.
- 14 October 2026
Petrópolis has a named research-compute evidence route
The LNCC hosting account separates the dated Santos Dumont system report from the proposed Macaíba installation. Whole-facility stage, coordinates, capacity and access remain unknown; the Brazilian source articles retain their own licence. A named sample is not national completeness.
- 14 October 2026
Montréal has a named research-compute evidence record
The McGill-Calcul Québec record separates Rorqual's June 2025 commissioning from an undated data-centre postal route. Current whole-facility stage, coordinates, capacity and availability stay unknown. Search and the Canada filter open the dated evidence; one record is not national completeness.
- 14 October 2026
The map separates two operating-evidence routes
Direct map exits open records with an operating stage or dated Epoch operational-building reports. Their scopes stay distinct: neither a completed campus nor compute available to buy is inferred. Existing source records and country-group placement are unchanged.
- 14 October 2026
Dated building reports stay separate from campus completion
Three existing US source records now carry dated Epoch building reports and a separate building-evidence filter. Future projections, unfinished expansion and whole-campus stage remain distinct. Original estimates, addresses and country-group map placement are unchanged.
- 14 October 2026
Council Bluffs has a dated location account
The first detailed US account links Google's May 2025 distinction between expansion at Council Bluffs and new development at Cedar Rapids. Current operation, precise location, capacity and access stay unknown; the imported East record remains distinct. North Weald participation notes add council own-views guidance without refreshing planning status.
- 14 October 2026
Hardware ownership stays distinct from facility operation
Imported Epoch hardware owners are no longer treated as facility operators. The shared directory, search results and AI dataset explain the source-defined role and preserve confidence, raw values, source records and collection dates. Facility operators remain unknown where the source does not identify them.
- 14 October 2026
Sites can be found together, with honest map locations
The shared Sites directory combines detailed and imported records with name, country and recorded-stage filters. Search finds individual AI project records. The map shows country groups when precise locations are missing, and explains overlap and lifecycle gaps without inferring operational status.
- 14 October 2026
Start with the decision you need to make
The home page leads to three existing routes: finding compute, investigating a place and following changes. It also links the existing 800 VDC architecture evidence. No provider ranking, availability claim or record check date changes.
- 14 October 2026
Reviewed official news reaches the public feed
The feed adds the DOE 9 October position and Scottish Parliament 7 October inquiry, with source qualifications, the parliamentary licence and both participation routes. The sweep label distinguishes a bounded review from rechecking the full archive.
- 13 October 2026
Research and community questions are easier to find
Search now distinguishes research, guides and tools, and a water query can find the existing community question guide. Country, policy and place-rule instrument links say cited source because the register includes secondary summaries as well as official originals. Record evidence and check dates are unchanged.
- 13 October 2026
Freshness labels distinguish site changes from evidence checks
The site header now derives its latest change date from the public changelog instead of showing a fixed whole-site check date. The news page separately shows its newest story date. Individual records retain their own evidence dates and limits.
- 12 October 2026
io.net evidence limit is explicit
The provider record now explains why it remains deliberately thin: the current terms reserve site content and restrict copying, publication, distribution and automated collection. The earlier bounded fact and direct provider link remain; no price, availability or suitability claim was added.
- 12 October 2026
NCI access status exposes its conflicting reopening labels
The combined Adapter and Start-up record now marks both routes as closed, records the dedicated Adapter page's Q4 2026 statement alongside the access hub's passed Q1 2026 label, and keeps reopening, application, allocation and active access separate.
- 12 October 2026
Pawsey now marks the listed 2027 submission window as ended
The Partner Allocation Scheme record now marks the official page's visible 5 October 2026 closing date as passed, separates submission from December committee review and notification, and does not treat the page's stale open heading as proof of a current call or portal state.
- 12 October 2026
NERSC now separates the closed annual window from year-round requests
The allocation record now marks the 5 October 2026 pre-allocation-year deadline as closed while preserving NERSC's stated year-round ERCAP route. Year-round proposals do not establish an award or active access; additional allocations may be awarded only while resources remain.
- 12 October 2026
Programme records now return to their recorded place context
National and regional programme evidence pages now link to the matching country profile or policy register. Global records remain unlinked to any one place, and the page keeps a region tag separate from eligibility, availability or award.
- 12 October 2026
Place pages now reveal recorded compute programme evidence
Country and policy pages now connect readers to canonical programme evidence when its region tag matches the place, including the explicit GB-to-UK alias. The alphabetical list is not a ranking, and keeps lifecycle, region, eligibility, availability and award separate rather than treating location as access.
- 12 October 2026
High-intent programme links now open the evidence record
The workload chooser, offer-type pages and GPU access guide now send each funded-programme result to its canonical eligibility, evidence and next-step page instead of a legacy directory anchor. Directory anchors remain available for correction context and browsing.
- 12 October 2026
CINECA now separates a project award from an active user account
The CINECA record now distinguishes ISCRA, EuroHPC, institutional and industrial routes, then follows the user from UserDB registration through Project Account association, validation, separate HPC credentials and an active system budget. Current call dates remain explicitly unverified.
- 12 October 2026
EuroHPC preparation routes now separate benchmarking from development
The combined record now distinguishes a short Benchmark allocation for performance evidence from a longer Development allocation for code, workflow and AI-method validation. It records the next monthly cut-off, system-dependent eligibility, technical review and the readiness confirmation that still separates an award from active access.
- 12 October 2026
EuroHPC Extreme Scale now exposes the proposal-to-system route
The programme record now distinguishes already scalable work, the two-part application, administrative, technical and scientific review, allocation and hosting-site access. It uses the live-page 26 October cut-off while exposing a conflicting Full Call Details date, and does not turn a call or award into available compute.
- 11 October 2026
DOE ALCC now separates project funding, allocation review and facility access
The programme record now explains who can apply, the required external project funding, the single-stage proposal and review route, the closed 2026-2027 call, annual renewal and the facility terms that follow an award.
- 11 October 2026
DOE INCITE now shows the route from project fit to system access
The programme record now separates leadership-scale suitability, discretionary preparation, proposal review, allocation and institutional access. It records the closed 2027 window without implying the next call is open, and distinguishes facility time and storage from project funding.
- 11 October 2026
NSF ACCESS now explains the path from project request to active resource
The programme record now distinguishes project eligibility, request preparation, award, credit exchange and resource-provider acceptance. It records the next checked Maximize window and keeps resource availability and smaller-project deadlines explicit rather than inferred.
- 11 October 2026
Every compute programme has its own evidence page
The 49 recorded programmes now have searchable pages with eligibility, evidence dates, application steps, limits and official next steps. CINECA access prerequisites were checked against its original documentation; current call dates remain unverified. Existing directory links still work.
- 11 October 2026
Cookie settings honour a later Allow choice
Choosing Allow after previously declining now enables consented analytics. Declining again stops journey events, and allowing again reuses the existing script. Search terms and filter values remain excluded from custom events.
- 11 October 2026
AIRR Gateway guidance date and access target corrected
The Gateway record now reflects the official guidance update of 28 September 2026. Monthly review is described as normal practice and the two-month access interval as a target, preserving the source qualifications.
- 7 October 2026
Power guide connects to the 800 VDC evidence record
The power guide now links its rack-density caveat to the existing sourced 800 VDC architecture record. Search Console showed 112 impressions and no clicks at average position 57 through 4 October; the link adds a relevant internal route without changing the record, promising adoption or treating the observation as a useful outcome.
- 6 October 2026
Tools start from the decision in front of you
The tools page now separates three practical routes: find a way to get compute, interpret a project number, or check what a place requires. It points each need to the existing chooser, calculator or rules checker and keeps eligibility, price, availability and missing-record limits visible.
- 6 October 2026
Microsoft Middenmeer has a dated historical observation
The Dutch parliament's 23 June 2022 page now anchors the existing operating label to a dated historical observation. The date is not presented as an opening day or a current status check, the separate expansion remains pending, and capacity stays unknown.
- 6 October 2026
Google Netherlands operating stages have dated evidence
The Eemshaven and Middenmeer records now tie their operating stages to dated Google posts. Eemshaven uses Google's stated opening date; Middenmeer uses a dated operating observation and does not turn that publication date into an exact opening day. Neither record adds a capacity claim.
- 6 October 2026
Funded-programme arrivals can start with the access decision
The free and funded programme directory now links its arriving audience into the workload chooser with funded access preselected, before its evidence filters. The path uses existing records and caveats and does not imply eligibility, availability or award.
- 6 October 2026
The compute chooser keeps optional programme filters out of the way
The main workload and access choices now lead directly to the result action. Three funded-programme evidence filters remain available in one optional disclosure and reopen automatically on filtered links, preserving every existing server-rendered result and caveat.
- 6 October 2026
North Weald separates the committee vote from final permission
The North Weald case file now records the committee vote and the live register's unresolved decision date instead of calling permission issued. It exposes the register's conflicting consultation label and passed deadline, links the official search route and records the proposed Heritage and Innovation Hub as a conditional commitment, not delivered benefit.
- 6 October 2026
Ampthill Road record exposes scale and the current participation sequence
The Ampthill Road case file now records the official proposal as up to four data centre buildings with about 720MW of proposed IT load. It separates the June consultation decision from the later legal change, links current Planning Inspectorate public guidance and keeps the project page, response deadline, permission, delivery and available capacity unknown.
- 6 October 2026
Culham links designation to an official local planning route
The Culham AI Growth Zone case file now links South Oxfordshire District Council's planning search and comment route without assuming it is the eventual consenting route. It keeps the project reference and current deadline unknown and makes clear that the Sunrise announcement, described as a 1.4MW first step, does not establish permission or delivery of a wider data-centre project.
- 6 October 2026
Wapseys Wood links its open consultation
The SDC M40 case file now links the applicant's Stage Two Community Consultation and its 27 October 2026 feedback deadline. It distinguishes applicant feedback from later Planning Inspectorate registration and exposes the applicant and Inspectorate's different submission timings instead of choosing one.
- 6 October 2026
Cobalt Park record separates designation from permission
The Cobalt Park case file now links North Tyneside Council's planning register and records the council's Local Plan consultation boundary that Growth Zone designation does not make development immediate. Exact Stargate and Nscale register searches found no matching application label or current deadline, but the record says descriptions may differ and does not infer permission, absence, a live consultation or community consent.
- 6 October 2026
Eclairion connects its environmental decision to a current concern route
The Bruyères-le-Châtel case file now links the same-address 2020 ICPE environmental registration and latest 2025 commissioning-deadline extension, marks the 2019-20 public consultation as closed, and offers DRIEAT’s standing route for operational concerns without presenting it as a building permit, reopened consultation or evidence of consent.
- 6 October 2026
Eclairion record moved to primary evidence
The Bruyères-le-Châtel record now uses the operator and RTE directly, distinguishes an operating first phase from connection and full-delivery schedules, and leaves the exact opening date and capacity metric unknown. Earlier trade-report customer and 2024 claims were removed.
- 5 October 2026
Community questions connect to bounded research
The shared community guide now lists every curated research record and explains that wider energy evidence can frame a local question but cannot settle one planning decision. A fixed consented action can count an evidence-record open without sending the report title, destination, question or project details.
- 5 October 2026
Research records expose their next-step use
Each curated research record now counts a fixed consented action when a reader continues to community questions, recorded projects or the publication method. The event carries no report title, destination, query or form content, and an action remains a proxy rather than proof of a better local decision.
- 5 October 2026
Curated research has stable evidence records
Each published research entry now has its own indexable address with the source question, method, assumptions, uncertainty, interests, reuse limits and explicit boundary between national research and local project evidence. The route continues into community questions and project records without turning a scenario into a local verdict.
- 5 October 2026
Site stages keep historical and phase uncertainty visible
Two Dutch site notes now date their parliamentary context and distinguish it from a current operating check. Data4 Paris-Saclay remains a combined-campus record with unknown phase status, so an undefined campus power figure is not treated as delivered IT load.
- 5 October 2026
Two Danish operating records have dated primary evidence
Fredericia and Gefion now link their recorded operating stage to dated official evidence. The dates mean operating by the source date, not an exact opening day. Gefion keeps its historical pilot-access caveat and the distinction between a host facility and the computer itself.
- 5 October 2026
First research entry makes energy scenarios easier to question
The research register now links to Berkeley Lab's US data-centre energy report with named authors, model periods, assumptions, uncertainty, funding and reuse limits. It explains what a national scenario cannot establish about a local project; no contested numerical claim or copied chart is published.
- 5 October 2026
Cambois record points to the official participation route
The QTS Cambois shared case file now links to Northumberland County Council's planning search and comment route. It says clearly that ComputeFinder has not recorded a current comment deadline, so a general route is not mistaken for a live consultation window.
- 5 October 2026
Community questions can travel as a meeting pack
The community question guide can now print or save a clean meeting pack with the evidence-state table, infrastructure and opportunity questions, accountability checks and blank named-next-step fields. Its permanent-link copy and print actions reveal no form contents; the pack remains a question structure, not a verdict or evidence of consent.
- 5 October 2026
Provider comparisons start from the access decision
The provider hub now connects its existing records to four next steps: choose an offer type from the workload, compare commercial access models, inspect funded programmes, or prepare a supplier call. It adds no provider facts, rankings, prices, availability or suitability claims.
- 5 October 2026
Country profiles start with the decision
The countries hub now separates four practical routes: understand one place, follow a project, inspect policy and find funded access. It states that coverage gaps are unknown rather than evidence of absence, and that policy direction labels are not rankings or legal advice. No record or direction label changed.
- 5 October 2026
AI campus comparisons lead into decisions
The large AI data-centre page now names power, chips and owners in its search result and opening, then separates three next steps: compare Epoch AI's current estimates, inspect detailed planning and community evidence, or continue into country context. It remains a sourced dataset, not a provider or country ranking, and no record changed.
- 5 October 2026
Funded programme lists can narrow by recorded type
The workload chooser can now limit mapped funded-programme records to their existing directory classification, such as public supercomputing, research grants or cloud credits, alone or with region and deadline-evidence filters. The shareable filter does not establish eligibility, award method or current availability.
- 5 October 2026
Community case files can travel into a meeting
Every detailed site record can now print or save a compact case file containing the recorded stage, planning and checked evidence, source links, shared questions and blank next-step fields. The action adds no facts and does not establish support, permission or delivered benefit; with consent, analytics records only that the print prompt was opened.
- 5 October 2026
Community case files have permanent sharing links
Every detailed site record now exposes the exact permanent link to its shared community case file and a copy action. With analytics consent, the site counts only that a case-file link was copied; it does not send the project name, link or record contents.
- 5 October 2026
Funded programme lists can narrow by deadline evidence
The workload chooser can separate mapped programme records with deadline text from those with no future deadline recorded, alone or with the exact recorded-region filter. The filter is shareable and says clearly that recorded text does not prove a call is open and a missing date does not prove it is closed.
- 5 October 2026
Funded programme lists can narrow by recorded region
The workload chooser can now limit its long funded-programme list to one exact recorded region while keeping the full route shareable. The filter says clearly that a region field is not an eligibility, location or availability decision, and it adds no programme facts.
- 5 October 2026
Funded programme choices show their evidence before the click
The workload chooser now shows each matching programme's recorded region, deadline or explicit deadline gap, and checked date beside its name. Researchers can narrow a long funded-access list before opening the existing eligibility, status and official-next-step record; the list still does not assert availability or eligibility.
- 4 October 2026
Community guide finds the project people recognise
Residents, councils and builders can search a project, operator or place name from the shared-question guide and open its existing detailed record. The journey works without JavaScript, stays limited to site records and does not imply a complete record, current permission or community support.
- 4 October 2026
Site records lead into a shared community case file
Every detailed site record now turns its sourced stage, planning rows, checked statements and missing participation evidence into a next-step table for residents, councils and builders. The route keeps proposals, commitments and delivered outcomes separate and does not infer support, opposition or local benefit.
- 4 October 2026
Search opens named programme records
Programme names now appear in site search with a Programme filter, checked dates and direct links to their existing status-first records. Results do not confirm an open call or eligibility; the record leads to the official next step.
- 4 October 2026
Correction decisions explain the agent and owner roles
The correction promise and privacy explanation disclose delegated routine AI editorial decisions, their evidence and independent-review gates, and the source-clearance and exceptional decisions retained by Marc. Submissions still cannot change public facts automatically.
- 4 October 2026
Research and contested claims have a public review method
A new research surface shows the required source metadata, evidence types, claim-review findings and publication gates. It reports zero curated entries and zero reviewed claims until evidence passes those gates, instead of presenting discovery leads as verified research.
- 4 October 2026
Community questions connect claims to evidence
A printable guide helps residents, councils and builders ask the same questions about planning, participation, power, water, cooling, local effects and conditional benefits. It separates proposals, commitments, permission, construction, operation and delivered outcomes without asserting support or opposition.
- 4 October 2026
Commercial purpose made explicit
ComputeFinder aims to earn a good living through values-aligned work supporting people and places in the infrastructure rollout. The About page replaces blanket no-payment wording with transparent commercial relationships and evidence integrity.
- 4 October 2026
Purpose includes community understanding and shared benefit
The About page now explains the project's aim: understandable, accessible and accountable compute. It invites communities to examine concerns and opportunities, distinguishing proposals, promises and delivered benefits.
- 4 October 2026
Offer chooser continues into provider and programme records
A chooser result now includes one alphabetical, deduplicated list of the provider and programme records already mapped to its matching offer types. The mapping rule is visible, links work without JavaScript and the list does not assert suitability, price or live availability.
- 4 October 2026
Compiled datasets can be downloaded as CSV
Each ComputeFinder-compiled dataset now has a spreadsheet-ready CSV beside its JSON file. Evidence and licence context repeats on every row, nested fields remain JSON text, missing values stay empty and no prices are added.
- 4 October 2026
Official programme and rule links are easier to find
Every programme retains a prominent visit-and-apply route. Policy instruments, country rules, export controls, grid rules, standards and rules-checker results now label their primary-source links as explicit actions instead of leaving the source inside a title or small link.
- 4 October 2026
Choose offer types from the work you need to do
A server-rendered chooser turns a workload and access preference into transparent offer types to compare. It separates direct matches from workload-only alternatives, works without JavaScript and does not rank providers or imply prices, suitability or live availability.
- 4 October 2026
Provider and programme evidence can be corrected in context
Provider details and checked facts, plus programme eligibility, benefits, application steps, deadlines and sourced facts, now open the private correction form at the exact item. Proposed changes and private contact fields stay empty for the visitor.
- 4 October 2026
Detailed site evidence can be corrected in context
Recorded site attributes, capacity claims, planning rows and checked facts now open a correction form at the exact item. Every named evidence gap offers a matching evidence suggestion. Proposed changes and private contact fields stay empty for the visitor.
- 3 October 2026
Useful journeys can be measured without their contents
After analytics consent, the site can count search and directory-filter submissions plus search-result and evidence-gap opens. Event details exclude search terms, filter values, correction text, email addresses and source links, and analytics page locations omit query strings.
- 3 October 2026
Evidence gaps visible across detailed site records
A field-level coverage page shows how many detailed records contain each target field and how many do not. Every gap links to a filtered list of the affected records. Counts describe published records, not global coverage or fact accuracy.
- 3 October 2026
Search works without JavaScript
Search results now arrive in the page response as well as updating while you type. A result-type filter narrows the existing public index without inferring eligibility, availability or missing facts.
- 3 October 2026
Public data available as MCP resources
Model Context Protocol clients can list and read the same public datasets through a stateless, read-only endpoint. Provider and country resource templates preserve the existing licence, source, missing-value and capacity context.
- 3 October 2026
Public data routes are easier for software to discover
An OpenAPI description documents the compiled datasets plus individual provider and country JSON routes. Public JSON responses can be read across origins. The document keeps licence scope, missing-value and capacity limits explicit.
- 3 October 2026
Country and policy corrections in context
Each named site and policy instrument on country profiles, plus every policy-register instrument, now opens a correction form with its exact row, source and page anchor filled in. Proposed changes and private contact fields stay empty for the visitor.
- 3 October 2026
Reusable links to stable records
Every provider, country, detailed site and supply-chain record with a stable ID now offers a neutral Listed on ComputeFinder badge and ready-to-copy embed code. The badge links to the permanent entity address and does not imply endorsement or ranking.
- 3 October 2026
Supply-chain corrections in context
Each supply-chain fact now links to a correction form with its claim, source and page anchor filled in. Company and programme pages offer organisation updates through the same private review queue. Related links rotate through groups and supply layers so later entries can be explored.
- 3 October 2026
Find detailed sites by country and stage
Search the detailed records by site, operator or locality, with country and recorded-stage filters that work without JavaScript. Results show stage dates separately from checked dates, and explain the limits of recorded coverage. Site and region pages link into these filters.
- 3 October 2026
Clearer guide for machine readers
The machine-readable guide explains missing values as not recorded, distinguishes checked dates from stage dates, and directs readers to providers for current prices and availability.
- 3 October 2026
Safer release previews
Release previews have separate storage and a read-only mode. Suggestions and newsletter subscriptions stay on the live site.
- 3 October 2026
Clearer price wording
The footer now reflects what the site publishes: sourced compute and capacity records, with links to providers for current prices and availability. Correction links also leave space below the fixed header.
- 3 October 2026
Find programmes and suggest updates in context
Free and funded compute now has search, type and recorded-region filters that work without JavaScript, plus prominent programme links. Provider, programme and site facts link to an editable correction form with the page, claim and source already filled. Organisation updates go through the same human review process.
- 3 October 2026
Country profiles easier to explore
Related links now move through each region instead of always pointing to its first six profiles. Every profile in a region with peers can be reached from another profile.
- 3 October 2026
Declining analytics now clears analytics cookies
Choosing Decline stops measurement as before and now also removes any Google Analytics cookies already set by an earlier Allow. The home page also links to free compute, open data, export controls, news and the glossary.
- 3 October 2026
Twelve more countries and stronger Israel and Paraguay entries
Cameroon, Central African Republic, Chad, Congo, Democratic Republic of the Congo, Cuba, Djibouti, Eswatini, Gabon, Gambia, Georgia and Guatemala, mostly from legal texts or reported sources, with unclear statuses marked as unclear. Israel now cites the government decision on the data centre connection pause. Paraguay power tariff decrees are marked unconfirmed after two outlets reported their repeal.
- 3 October 2026
Grid rules for large loads and data centre hubs by region
A new page of 10 sourced summaries of how grid operators and regulators handle data centre and other large load connections (ERCOT, AEMO, AEMC, EirGrid, FERC, SPP, PJM, NESO, Berkeley Lab), also available as JSON. Data centre hubs for the UK and Ireland, Nordics, Western Europe, North America, Asia Pacific and the Middle East gather existing records with links; the Middle East hub has fewer than three records and is not indexed.
- 3 October 2026
Twelve more countries, nine programmes, twelve news items
Albania, Algeria, Andorra, the Bahamas, Barbados, Belarus, Benin, Bhutan, Bolivia, Botswana, Brunei and Cambodia (many rest on reported sources and say so); nine more free or funded compute programmes from the UK, EuroHPC, Germany, Switzerland, Spain and the US; news for September on grid connections and data centre rules; and the EU general purpose AI guidelines evidence added to the export controls page. Every file was re-checked against its cited pages by a second reviewer.
- 3 October 2026
Phone layout fixes
Bar charts on /sites now give each bar the full width of the screen on phones, sortable tables gain a Sort by control where the header row is hidden, and the map legend no longer picks up the evidence legend style.
- 3 October 2026
Power guide and frequently asked questions
A guide to what 1MW, 10MW and 100MW mean, worked from the calculator assumptions, and an FAQ of 12 short answers that each link to the page holding the sources.
- 3 October 2026
Open reuse of original data contributions
ComputeFinder-owned summaries, labels and compilation rights are now CC BY 4.0. Downloads include explicit scope and source-term notices, and the sources page separates our contributions from third-party datasets.
- 3 October 2026
Corrections by email
New suggestions are saved privately and emailed to the site owner. An optional email field lets the owner reply directly. Contact details are not published or added to the newsletter.
- 3 October 2026
Offer types, buyer checklist and standards explained
Twelve offer types with questions to ask and the providers that fit, a printable buyer checklist, and what Uptime tiers, ISO 27001, SOC 2, OCP, PUE and other standards do and do not tell you, each from the publisher.
- 3 October 2026
Twelve more countries, fourteen news items, stable IDs
Slovenia, Hungary, Slovakia, Latvia, Croatia, Serbia, Cyprus, Moldova, Armenia, Azerbaijan, Uzbekistan and Jordan; news from 14 to 30 September; permanent /entity/ links and structured data on record pages; charts and the map on the home page.
- 3 October 2026
Map, sortable tables and accessibility pass
A schematic map of 163 data centre and frontier sites with a table version, sortable and filterable tables that stack on phones, an evidence legend, and contrast, focus and caption fixes.
- 3 October 2026
27 more providers and 12 more free compute programmes
Providers added in two further batches (checked against their own pages by a second reviewer) and free or funded schemes from France, Canada, Australia, Europe and the US.
- 3 October 2026
Grid queues, tools, glossary, guides and data downloads
Berkeley Lab interconnection queue figures (CC BY 4.0, credited), a 100MW calculator, a can-I-build checker, a 29 term glossary, three guides, JSON downloads for every dataset, cite blocks and a corrections form with a public log.
- 3 October 2026
25 more providers
GPU clouds, serverless GPU, decentralised networks and regional clouds, each from the provider's own pages with no prices.
- 3 October 2026
News, free compute and export controls
A news page of recent compute items, 28 free and funded compute programmes, 20 rules that depend on chips or training compute, and 16 more providers.
- 3 October 2026
Matching look on every section
Providers, data centres, countries, policy and supply chain pages now share the home page header band.
- 3 October 2026
Thirteen more country profiles
Tunisia, Senegal, Angola, Zambia, Uganda, Bahrain, Oman, Kuwait, Mongolia, Sri Lanka, the Philippines, Pakistan and Bangladesh, with AI policy, data protection, data centres and power context. Many rest on reported sources and say so.
- 2 October 2026
New home page look
A glowing search box, a friendlier guide and four larger tiles for finding compute, seeing where it is built, knowing the rules and following the supply chain.
- 2 October 2026
Monthly newsletter page
A short monthly note on what changed in compute. Signup uses a confirmation email and opens once the email service is connected.
- 2 October 2026
What is new page and feed
A changelog of additions to the site, with an Atom feed.
- 2 October 2026
Site search added
Search across every provider, data centre, country, policy and supply chain page.
- 2 October 2026
Data centre records: 70 sites with sourced facts
Stage, capacity by measure and stage, planning decisions, power and cooling for sites in the UK, Ireland, the Nordics, the Netherlands, Germany, France and Iceland, plus a list of what is unknown for each.
- 2 October 2026
Data sources register: 94 sources and their reuse terms
Where per-site data centre data can be found, how to access it, and whether it can be reused.
- 2 October 2026
Supply chain map: 118 entries
Chips, memory, packaging, networking, cooling, power, cables and new kinds of compute, with constraints labelled as reported where they rest on trade press.
- 2 October 2026
Frontier AI data centres from Epoch AI
93 large AI data centres with owner, estimated power and chips, published under CC BY 4.0, with a JSON download.
- 2 October 2026
Country and territory profiles: 62 places
AI policy, data centres, power and rules for countries and territories from the Crown Dependencies to Africa.
- 2 October 2026
Provider directory and policy register
25 ways to get compute and 17 policy pages, each linked to the provider or the rule itself.
- 2 October 2026
ComputeFinder goes live
Home page, method, sources, corrections and privacy pages, consent-first analytics, sitemap, robots and llms.txt.