North Weald Airfield data centre campus
North Weald Bassett, Essex, United Kingdom.
Stage not knownUnited Kingdom
What we checked
- The outline application covers up to two data centre buildings plus offices, with up to 77,148 square metres of gross external floorspace, with all matters reserved except access. (source)
- Planning Committee A voted to approve EPF/0849/25 with conditions on 10 December 2025. The current register records Approved with Conditions (Subject to s106 Legal Agreement), with no decision date shown as checked on 6 October 2026. (source)
- The committee addendum records a conditional Heritage and Innovation Hub centred on the listed air traffic control tower, with heritage, local skills and digital-inclusion activity and reasonable SME opportunities. Detailed design, fit-out and programming remain for reserved matters or listed-building consent; delivery is subject to required consents, security and viability, and the owner must use reasonable endeavours to obtain statutory consents within 12 months of commencement. (source)
- The addendum says managed public access should begin within 12 months of first occupation, outside the secure perimeter and only insofar as the area is within the owner's control. A council-approved protocol must cover opening arrangements and complaints or escalation; safety, security or maintenance closures are temporary, with notice to the council and public where practicable. (source)
- Reserved-matters applications may cover the whole site or phases and are due within three years of the date of permission. No decision date is shown on the current register, so the calendar deadline remains unknown. (source)
The council officer report names Global Infrastructure UK Ltd as applicant, while the site operator remains recorded as Google from earlier published project material. The committee vote does not establish an issued permission or approve the reserved layout, scale, appearance or landscaping. No MW figure was found; the scheme is described by floorspace only.
Operate this site or have better evidence? .
- Operator
- Owner
- Not stated
- Stage
- Stage not known (source, stage date not recorded)
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| EPF/0849/25: committee voted to approve with conditions, subject to a section 106 legal agreement; no decision date is shown | Status not known | 10 December 2025 |
Printable community case file
North Weald Airfield data centre campus
Record checked 6 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Stage not known, date not recorded | Inspect the stage source and limits |
| Where is the formal decision evidence? | 1 planning item recorded | Check the authority's complete file, reference and conditions |
| How can the public participate? | Epping Forest planning application search and comment route Checked 6 October 2026. Search for EPF/0849/25 and any later reserved-matters applications. As checked on 6 October 2026, the council record was marked Under Consultation but displayed a consultation deadline of 9 December 2025 and no decision date, so it does not establish a live window. Current commentability and any reserved-matters reference or deadline remain unknown; verify the live register. Guidance checked on 14 October 2026: the council asks respondents to use their own views rather than AI-written comments. Whether EPF/0849/25 currently accepts comments remains unverified. This is a guidance-only check, not a fresh application-status or whole-record review. | Use the recorded route for its stated purpose and verify its current status; identify the responsible authority or process separately and do not infer a live window from this record |
| Which promises became outcomes? | Review 5 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Stage not known, date not recorded: stage source
- Decision evidence. EPF/0849/25: committee voted to approve with conditions, subject to a section 106 legal agreement; no decision date is shown: Status not known, 10 December 2025.
- Checked statement. The outline application covers up to two data centre buildings plus offices, with up to 77,148 square metres of gross external floorspace, with all matters reserved except access. source
- Checked statement. Planning Committee A voted to approve EPF/0849/25 with conditions on 10 December 2025. The current register records Approved with Conditions (Subject to s106 Legal Agreement), with no decision date shown as checked on 6 October 2026. source
- Checked statement. The committee addendum records a conditional Heritage and Innovation Hub centred on the listed air traffic control tower, with heritage, local skills and digital-inclusion activity and reasonable SME opportunities. Detailed design, fit-out and programming remain for reserved matters or listed-building consent; delivery is subject to required consents, security and viability, and the owner must use reasonable endeavours to obtain statutory consents within 12 months of commencement. source
- Checked statement. The addendum says managed public access should begin within 12 months of first occupation, outside the secure perimeter and only insofar as the area is within the owner's control. A council-approved protocol must cover opening arrangements and complaints or escalation; safety, security or maintenance closures are temporary, with notice to the council and public where practicable. source
- Checked statement. Reserved-matters applications may cover the whole site or phases and are due within three years of the date of permission. No decision date is shown on the current register, so the calendar deadline remains unknown. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
2 of 13 facility fields recorded
5 separately recorded source statements. These are not included in the facility-field count.
2 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Stage
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 6 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 6). North Weald Airfield data centre campus: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/north-weald-airfield-data-centre
BibTeX
@misc{computefinder_data_centres_north_weald_airfield_data_centre,
title = {North Weald Airfield data centre campus: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0006}},
number = {cf-dc-0006},
note = {Page last checked 6 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0006. Permanent link: https://computefinder.net/entity/cf-dc-0006. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/north-weald-airfield-data-centre. Page last checked 6 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0006"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in United Kingdom
- QTS Cambois Data Centre Campus
- Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone)
- Culham AI Growth Zone (UKAEA Culham Campus)
- Nscale Loughton AI Campus
- Google Waltham Cross data centre
All detailed records in United Kingdom / Same recorded stage in United Kingdom
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact