Data centre records
141 data centres and proposed sites, each with the facts we could source and a plain list of what we could not.
Most public data on individual data centres is thin. Capacity, power source and efficiency are often missing, and where they exist they are measured in different ways. So each record shows every figure with its metric (IT load, facility load or grid connection), its stage (announced, permitted, under construction, operating) and its source, and we never add them together. A blank means unknown, not zero.
For the largest AI campuses see frontier AI data centres. To see where this data comes from, and which sources we can and cannot reuse, see data sources.
Related company disclosures
- SpaceX reports 1.7GW of nameplate compute in third-quarter results. Event 20 October 2026. Investigate individual facilities with their own evidence and dates.
Filters cover these 141 detailed records. Operating does not mean compute is available to buy. Stage dates and checked dates differ; open each record for its evidence and limits. A field-level view is on the coverage page. Epoch frontier sites are listed separately.
Showing 31 of 141 detailed records.
Matching records by stage
How many of our records sit at each stage. This counts sites, not megawatts.
Show this chart as a table
| Stage | Sites |
|---|---|
| Announced | 8 |
| Permitted | 3 |
| Operating | 9 |
| Stage not known | 11 |
United Kingdom
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Ark Cody Park data centre campus | Ark Data Centres Limited | Farnborough, Hampshire | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Ark Spring Park data centre campus | Ark Data Centres Limited | Corsham, Wiltshire | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone) | Nscale | Wallsend, North Tyneside | Announced Recorded date: 16 September 2025 Checked 2 October 2026 | |
| COLT Hayes data centre | Colt Data Centre Services UK Limited | Hayes, London | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Colt Powergate data centre | Colt Data Centre Services UK Limited | North Acton, London | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Culham AI Growth Zone (UKAEA Culham Campus) | Not stated | Culham, Oxfordshire | Announced Recorded date: 10 February 2025 Checked 2 October 2026 | |
| Dartford AI data centre campus, New Barn Road | Not stated | Dartford, Kent | Announced Recorded date: 1 July 2026 Checked 2 October 2026 | |
| Data centre campus, Ampthill Road, Bedford | Not stated | Ampthill Road, Bedford area (Central Bedfordshire) | Announced Recorded date: 15 June 2026 Checked 6 October 2026 | |
| Didcot North Data Centre Campus | Amazon Data Services UK Limited | Didcot, Oxfordshire | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Digital Realty LHR26 (Slough Trading Estate) | Digital Realty | Slough Trading Estate, Slough | Operating Recorded date: 2 October 2026 Checked 2 October 2026 | |
| Equinix LD10 (Slough) | Equinix | Slough, Berkshire | Operating Recorded date: 2 October 2026 Checked 2 October 2026 | |
| Global Switch London North (East India Dock House) | Global Switch | Docklands, London | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Google Waltham Cross data centre | Waltham Cross (Theobalds Business Park, Cheshunt), Hertfordshire | Operating Recorded date: 16 September 2025 Checked 2 October 2026 | ||
| Kao Data Harlow campus | Kao Data | Harlow, Essex | Operating Recorded date: 2 October 2026 Checked 2 October 2026 | |
| Lanarkshire AI Growth Zone (DataVita, Airdrie) | DataVita | Airdrie and Chapelhall, North Lanarkshire | Announced Recorded date: 29 January 2026 Checked 2 October 2026 | |
| LON3 Data Centre | Iron Mountain (UK) Data Centre Limited | Slough | Stage not known Stage date not recorded Checked 10 November 2026 | |
| nLighten London Hoddesdon (STN1) | nLighten | Hoddesdon, Hertfordshire | Stage not known Stage date not recorded Checked 10 November 2026 | |
| North Wales AI Growth Zone (Prosperity Parc and Trawsfynydd) | Not stated | Anglesey and Gwynedd, North Wales | Announced Recorded date: 13 November 2025 Checked 2 October 2026 | |
| North Weald Airfield data centre campus | North Weald Bassett, Essex | Stage not known Stage date not recorded Checked 6 October 2026 | ||
| Nscale Loughton AI Campus | Nscale | Loughton, Essex | Announced Recorded date: 16 September 2025 Checked 2 October 2026 | |
| Pure DC LON01 Brent Cross | Pure DC | Brent Cross, London | Operating Recorded date: 3 September 2026 Checked 2 October 2026 | |
| QTS Cambois Data Centre Campus | QTS | Cambois, Blyth, Northumberland | Permitted Recorded date: 2 December 2025 Checked 2 October 2026 | |
| Romford North Data Centre | Green Mountain DC UK Limited | Romford | Stage not known Stage date not recorded Checked 10 November 2026 | |
| SDC M40 Campus, Wapseys Wood | Not stated | Wapseys Wood landfill site, Buckinghamshire | Announced Recorded date: 16 March 2026 Checked 2 October 2026 | |
| Swindon Data Centre Back-up Generation Facility | Amazon Data Services UK Limited | Swindon | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Teesworks data centre site | Not stated | Redcar, Teesside | Permitted Recorded date: 11 August 2025 Checked 2 October 2026 | |
| Telehouse London Docklands campus | Telehouse | Docklands, London | Operating Recorded date: 2 October 2026 Checked 2 October 2026 | |
| Vantage Bridgend data centre campus (former Ford engine plant) | Vantage Data Centers | Waterton, Bridgend, South Wales | Permitted Recorded date: 2 October 2025 Checked 2 October 2026 | |
| Vantage Cardiff campus (CWL1, Newport) | Vantage Data Centers | Newport, South Wales (Vantage calls it Cardiff) | Operating Recorded date: 2 October 2026 Checked 2 October 2026 | |
| Virtus LONDON5 (Stockley Park) | Virtus Data Centres | Stockley Park, Hayes, London | Operating Recorded date: 2 October 2026 Checked 2 October 2026 | |
| Virtus Slough campus | Virtus Data Centres | Slough, Berkshire | Operating Recorded date: 2 October 2026 Checked 2 October 2026 |
By region
- UK and Ireland 40 records, 1 frontier AI sites
- Nordics 23 records, 5 frontier AI sites
- Western Europe 24 records, 1 frontier AI sites
- North America 5 records, 77 frontier AI sites
- Asia Pacific 9 records, 8 frontier AI sites
- Middle East 1 records, 1 frontier AI sites
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact