Data centres / UK and Ireland / United Kingdom
Vantage Bridgend data centre campus (former Ford engine plant)
Waterton, Bridgend, South Wales, United Kingdom.
PermittedUnited Kingdom
What we checked
- The applicant is VDC CWL4 Limited, a Vantage company, for a site of about 55 hectares at the former Ford engine plant. (source)
- Committee minutes record the hybrid application as approved on 2 October 2025, subject to conditions. (source)
- The government's November 2025 announcement names Vantage as a partner in a South Wales AI Growth Zone including the former Ford Bridgend engine plant. (source)
The planning report does not state MW. The government says the South Wales AI Growth Zone, along the M4 from Newport to Bridgend, has potential to harness over 1GW by the early 2030s, but the metric is unstated and it covers several sites.
Operate this site or have better evidence? .
- Operator
- Vantage Data Centers
- Owner
- Not stated
- Stage
- Permitted (source, 2 October 2025)
- Power
- The planning report says existing National Grid lines could supply the campus for roughly five years until late 2031, when a permanent connection is due, and an interim power solution needs a separate reserved matters application.
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| P/25/247/HYB hybrid application: outline for the campus and full permission for the first data centre, approved by Bridgend Development Control Committee | Approved | 2 October 2025 | |
| Officer report recommending approval of P/25/247/HYB | Approved | Not stated |
Printable community case file
Vantage Bridgend data centre campus (former Ford engine plant)
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Permitted, recorded 2 October 2025 | Inspect the stage source and limits |
| Where is the formal decision evidence? | 2 planning items recorded | Check the authority's complete file, reference and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 3 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Permitted, dated 2 October 2025: stage source
- Decision evidence. P/25/247/HYB hybrid application: outline for the campus and full permission for the first data centre, approved by Bridgend Development Control Committee: Approved, 2 October 2025.
- Decision evidence. Officer report recommending approval of P/25/247/HYB: Approved, date not stated.
- Checked statement. The applicant is VDC CWL4 Limited, a Vantage company, for a site of about 55 hectares at the former Ford engine plant. source
- Checked statement. Committee minutes record the hybrid application as approved on 2 October 2025, subject to conditions. source
- Checked statement. The government's November 2025 announcement names Vantage as a partner in a South Wales AI Growth Zone including the former Ford Bridgend engine plant. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
4 of 13 facility fields recorded
3 separately recorded source statements. These are not included in the facility-field count.
4 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Capacity (MW)
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Vantage Bridgend data centre campus (former Ford engine plant): capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/vantage-bridgend-ford-engine-plant
BibTeX
@misc{computefinder_data_centres_vantage_bridgend_ford_engine_plant,
title = {Vantage Bridgend data centre campus (former Ford engine plant): capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0012}},
number = {cf-dc-0012},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0012. Permanent link: https://computefinder.net/entity/cf-dc-0012. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/vantage-bridgend-ford-engine-plant. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0012"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in United Kingdom
- QTS Cambois Data Centre Campus
- Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone)
- Culham AI Growth Zone (UKAEA Culham Campus)
- Nscale Loughton AI Campus
- Google Waltham Cross data centre
All detailed records in United Kingdom / Same recorded stage in United Kingdom
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact