Data centres / United Kingdom

Pure DC LON01 Brent Cross

OperatingUnited Kingdom5 of 13 fields known

Brent Cross, London, United Kingdom.

Operator
Pure DC
Owner
Not stated
Stage
Operating (source, 3 September 2026)
Power
Pure DC says the campus has full planning permission and power secured for what it calls a 90MW campus.
Cooling
Pure DC describes a closed-loop system and an average annualised PUE of 1.29; the new building is described as closed-loop liquid cooled.

The operator's 90MW, 20MW and 70MW figures are not labelled as IT, facility or grid, so they are not entered as capacity claims. Building 1 is live and Building 2 is under construction, hence the site is shown as operating.

Planning

What we checked

What we do not know yet

5 of 13 fields in a complete record are filled. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.