Data centres / UK and Ireland / United Kingdom
Pure DC LON01 Brent Cross
Brent Cross, London, United Kingdom.
OperatingUnited Kingdom
What we checked
- The operator's page says Building 1 is fully operational with four data halls and Building 2 is under construction. (source)
- A 3 September 2026 release says piling has started on the west shell of the second building, with completion of the wider building scheduled for Q2 2029. (source)
The operator's 90MW, 20MW and 70MW figures are not labelled as IT, facility or grid, so they are not entered as capacity claims. Building 1 is live and Building 2 is under construction, hence the site is shown as operating.
Operate this site or have better evidence? .
- Operator
- Pure DC
- Owner
- Not stated
- Stage
- Operating (source, 3 September 2026)
- Power
- Pure DC says the campus has full planning permission and power secured for what it calls a 90MW campus.
- Cooling
- Pure DC describes a closed-loop system and an average annualised PUE of 1.29; the new building is described as closed-loop liquid cooled.
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| Full planning permission stated on the operator's Brent Cross page (council record not fetched) | Approved | Not stated |
Printable community case file
Pure DC LON01 Brent Cross
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Operating, recorded 3 September 2026 | Inspect the stage source and limits |
| Where is the formal decision evidence? | 1 planning item recorded | Check the authority's complete file, reference and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Operating, dated 3 September 2026: stage source
- Decision evidence. Full planning permission stated on the operator's Brent Cross page (council record not fetched): Approved, date not stated.
- Checked statement. The operator's page says Building 1 is fully operational with four data halls and Building 2 is under construction. source
- Checked statement. A 3 September 2026 release says piling has started on the west shell of the second building, with completion of the wider building scheduled for Q2 2029. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
5 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
5 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Capacity (MW)
- Grid connection
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Pure DC LON01 Brent Cross: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/pure-dc-brent-cross-lon01
BibTeX
@misc{computefinder_data_centres_pure_dc_brent_cross_lon01,
title = {Pure DC LON01 Brent Cross: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0010}},
number = {cf-dc-0010},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0010. Permanent link: https://computefinder.net/entity/cf-dc-0010. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/pure-dc-brent-cross-lon01. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0010"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in United Kingdom
- QTS Cambois Data Centre Campus
- Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone)
- Culham AI Growth Zone (UKAEA Culham Campus)
- Nscale Loughton AI Campus
- Google Waltham Cross data centre
All detailed records in United Kingdom / Same recorded stage in United Kingdom
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact