Data centres / UK and Ireland / United Kingdom
Teesworks data centre site
Redcar, Teesside, United Kingdom.
PermittedUnited Kingdom
What we checked
- Trade press reports Redcar and Cleveland Council approved a data centre scheme at Teesworks in August 2025, with a site area of about 460,000 square metres reported. (source)
- A CMS law firm note says the competing H2Teesside hydrogen consent application was withdrawn on 1 December 2025, after the two proposals were assessed as incompatible. (source)
Weak sourcing: approval is reported by trade and regional press only, and the two reports differ on the type of consent. No MW was stated; a law firm note says the site could host over a gigawatt of computing power, but that metric is unclear so it is left out. No operator or end user was named.
Operate this site or have better evidence? .
- Operator
- Not stated
- Owner
- Teesworks
- Stage
- Permitted (source, 11 August 2025)
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| Reported by trade press: Redcar and Cleveland Council approval in August 2025 (sources differ on whether outline or reserved matters; council record not fetched) | Approved | 11 August 2025 |
Printable community case file
Teesworks data centre site
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Permitted, recorded 11 August 2025 | Inspect the stage source and limits |
| Where is the formal decision evidence? | 1 planning item recorded | Check the authority's complete file, reference and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Permitted, dated 11 August 2025: stage source
- Decision evidence. Reported by trade press: Redcar and Cleveland Council approval in August 2025 (sources differ on whether outline or reserved matters; council record not fetched): Approved, 11 August 2025.
- Checked statement. Trade press reports Redcar and Cleveland Council approved a data centre scheme at Teesworks in August 2025, with a site area of about 460,000 square metres reported. source
- Checked statement. A CMS law firm note says the competing H2Teesside hydrogen consent application was withdrawn on 1 December 2025, after the two proposals were assessed as incompatible. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
3 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
3 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Operator
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Teesworks data centre site: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/teesworks-redcar-data-centre
BibTeX
@misc{computefinder_data_centres_teesworks_redcar_data_centre,
title = {Teesworks data centre site: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0016}},
number = {cf-dc-0016},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0016. Permanent link: https://computefinder.net/entity/cf-dc-0016. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/teesworks-redcar-data-centre. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0016"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in United Kingdom
- QTS Cambois Data Centre Campus
- Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone)
- Culham AI Growth Zone (UKAEA Culham Campus)
- Nscale Loughton AI Campus
- Google Waltham Cross data centre
All detailed records in United Kingdom / Same recorded stage in United Kingdom
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact