Data centres / United Kingdom
Virtus LONDON5 (Stockley Park)
OperatingUnited Kingdom6 of 13 fields known
Stockley Park, Hayes, London, United Kingdom.
- Operator
- Virtus Data Centres
- Owner
- Not stated
- Stage
- Operating (source, 2 October 2026)
- Power
- A 2019 Virtus release says the LONDON5 and LONDON6 site had secured power to rise to 110MVA of incoming supply.
- Cooling
- Virtus says nearby LONDON14 is compatible with direct to chip, immersion and rear door liquid cooling; the LONDON5 page itself gives no cooling detail.
- Connectivity
- Carrier neutral with on-ramps to major cloud platforms, according to the operator.
Capacity covers LONDON5 only. The Stockley Park campus has further buildings (LONDON6, 7, 8, 14) with separate figures whose metric is not stated, so they are excluded. The page is undated.
Capacity
| Measure | Stage | Basis | MW | As of | Source |
|---|---|---|---|---|---|
| IT load | Operating | reported | 24 | 2 October 2026 | source |
These figures measure different things and are not added together.
What we checked
- Virtus says LONDON5 offers over 10,000 square metres of net technical space and 24MW of IT load, designed to Uptime Tier III. (source)
- A 2020 Virtus release reported LONDON6 at Stockley Park opening in early Q2 2020. (source)
What we do not know yet
6 of 13 fields in a complete record are filled. Still missing:
- Owner
- Grid connection
- PUE
- Water use
- Chips
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.