ComputeFinder

Data centres / UK and Ireland / United Kingdom

Virtus LONDON5 (Stockley Park)

Stockley Park, Hayes, London, United Kingdom.

OperatingUnited Kingdom

What we checked

Capacity covers LONDON5 only. The Stockley Park campus has further buildings (LONDON6, 7, 8, 14) with separate figures whose metric is not stated, so they are excluded. The page is undated.

Operate this site or have better evidence? .

Operator
Virtus Data Centres
Owner
Not stated
Stage
Operating (source, 2 October 2026)
Power
A 2019 Virtus release says the LONDON5 and LONDON6 site had secured power to rise to 110MVA of incoming supply.
Cooling
Virtus says nearby LONDON14 is compatible with direct to chip, immersion and rear door liquid cooling; the LONDON5 page itself gives no cooling detail.
Connectivity
Carrier neutral with on-ramps to major cloud platforms, according to the operator.
Grid connection
  • VIRTUS's undated LONDON5 sheet lists a 36 MVA incoming National Grid supply with diverse routing. (36 MVA)
    Scope: LONDON5 at Stockley Park only. MVA is the operator-reported apparent-power supply rating, not MW, IT load or available compute. The sheet does not establish the external connection voltage, named upstream substation, energisation date or current delivery status. No other Stockley Park phase is merged.. Stage: Stage not known. Basis: reported. Evidence: source claim. Evidence date: not stated. source. Source version: not established. Source published: not stated; source updated: not stated; retrieved: not recorded; reviewed: 2026-11-01T03:23:36.511Z; evidence checked: 1 November 2026.
    VIRTUS Data Centres: Copyright retained; no open licence verified for this specification sheet.. Minimal independently worded attributed basic technical facts and ordinary unframed exact source links only. No copied source expression, specification table, marketing narrative, marks, assets, personal contact, source body or dataset import. VIRTUS Data Centres; exact original linked in source_url. No endorsement. Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported. A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only these minimal independently worded, attributed basic facts and an ordinary unframed exact link. The sheet retains VIRTUS copyright. The actual location/home footer inspection exposed no substantive terms link; that is not permission or proof no other condition exists. No open licence, domain-wide permission, commercial-copying grant or recurring acquisition grant is declared. No sheet expression, technical table, image, map, mark, personal contact or underlying dataset is imported. URL directory and filename are not publication/version clocks.

Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.

PUE
  • VIRTUS's undated LONDON5 sheet states a design PUE below 1.3.
    Scope: LONDON5 design statement only, not measured performance, an exact 1.3 value, an annual result or a current operating assertion. The inequality is kept in text; value_num remains null.. Stage: Stage not known. Basis: reported. Evidence: source claim. PUE kind: design. Evidence date: not stated. source. Source version: not established. Source published: not stated; source updated: not stated; retrieved: not recorded; reviewed: 2026-11-01T03:23:36.511Z; evidence checked: 1 November 2026.
    VIRTUS Data Centres: Copyright retained; no open licence verified for this specification sheet.. Minimal independently worded attributed basic technical facts and ordinary unframed exact source links only. No copied source expression, specification table, marketing narrative, marks, assets, personal contact, source body or dataset import. VIRTUS Data Centres; exact original linked in source_url. No endorsement. Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported. A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only these minimal independently worded, attributed basic facts and an ordinary unframed exact link. The sheet retains VIRTUS copyright. The actual location/home footer inspection exposed no substantive terms link; that is not permission or proof no other condition exists. No open licence, domain-wide permission, commercial-copying grant or recurring acquisition grant is declared. No sheet expression, technical table, image, map, mark, personal contact or underlying dataset is imported. URL directory and filename are not publication/version clocks.

Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.

Inspect the limits of this source check

These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.

  • Water use, Chips, Coordinates: Not stated in the inspected source. The two-page LONDON5 sheet describes chilled-water/free-cooling equipment but supplies no water withdrawal/consumption/WUE amount or measurement boundary/period, installed-chip inventory or explicit verified official point/CRS in the inspected text. A chilled-water system does not prove zero water. This is a selected-sheet limit, not a full planning-file or all-source absence finding. Scope recorded 1 November 2026; inspected source context. VIRTUS Data Centres: Copyright retained; no open licence verified for this specification sheet.. Minimal independently worded attributed basic technical facts and ordinary unframed exact source links only. No copied source expression, specification table, marketing narrative, marks, assets, personal contact, source body or dataset import. VIRTUS Data Centres; exact original linked in source_url. No endorsement. Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported. A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only these minimal independently worded, attributed basic facts and an ordinary unframed exact link. The sheet retains VIRTUS copyright. The actual location/home footer inspection exposed no substantive terms link; that is not permission or proof no other condition exists. No open licence, domain-wide permission, commercial-copying grant or recurring acquisition grant is declared. No sheet expression, technical table, image, map, mark, personal contact or underlying dataset is imported. URL directory and filename are not publication/version clocks.

Capacity

Capacity
MeasureStageBasisMWAs ofSource
IT loadOperatingreported242 October 2026source

These figures measure different things and are not added together.

Printable community case file

Virtus LONDON5 (Stockley Park)

Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Operating, recorded 2 October 2026Inspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Operating, dated 2 October 2026: stage source
  • Checked statement. Virtus says LONDON5 offers over 10,000 square metres of net technical space and 24MW of IT load, designed to Uptime Tier III. source
  • Checked statement. A 2020 Virtus release reported LONDON6 at Stockley Park opening in early Q2 2020. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

8 of 13 facility fields recorded

2 separately recorded source statements. These are not included in the facility-field count.

8 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 2). Virtus LONDON5 (Stockley Park): capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/virtus-london5-stockley-park

BibTeX
@misc{computefinder_data_centres_virtus_london5_stockley_park,
  title        = {Virtus LONDON5 (Stockley Park): capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0009}},
  number       = {cf-dc-0009},
  note         = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}

Stable ID: cf-dc-0009. Permanent link: https://computefinder.net/entity/cf-dc-0009. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/virtus-london5-stockley-park. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0009"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in United Kingdom

All detailed records in United Kingdom / Same recorded stage in United Kingdom

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact