Dartford AI data centre campus, New Barn Road

AnnouncedUnited Kingdom4 of 13 fields known

Dartford, Kent, United Kingdom.

Operator
Not stated
Owner
Not stated
Stage
Announced (source, 1 July 2026)
Power
The direction records a total power load of up to 300MW alongside associated energy and utility works.

Proposal stage. The figures are the applicant's proposed totals for up to four buildings, recorded in the direction dated 1 July 2026: 240MW IT load and 300MW total power load. The applicant is named as CSE52 Limited; the end operator is not stated.

Capacity

MeasureStageBasisMWAs ofSource
IT loadAnnouncedreported2401 July 2026source
Facility loadAnnouncedreported3001 July 2026source

These figures measure different things and are not added together.

Planning

What we checked

What we do not know yet

4 of 13 fields in a complete record are filled. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Other sites in United Kingdom