Kao Data Harlow campus

OperatingUnited Kingdom7 of 13 fields known

Harlow, Essex, United Kingdom.

Operator
Kao Data
Owner
Not stated
Stage
Operating (source, 2 October 2026)
Power
Kao says the campus runs on 100 percent renewable electricity, with HVO fuelled backup generators.
Cooling
The operator cites free-air cooled halls with an SLA-backed PUE of 1.2, and says KLON-03 supports hybrid air and direct-to-chip liquid cooling.
Connectivity
Carrier neutral; a 2022 release lists carriers including BT Openreach, euNetworks, Jisc, LINX, Lumen and Vorboss.
Certifications
BREEAM Excellent, NVIDIA DGX-Ready

Capacity is the operator's stated IT equipment load for the fully built four-building campus, not current live capacity. Per-building MW figures differ between Kao pages (8.8MW versus 10MW for the first two buildings) and their metric is unstated, so they are omitted. Coordinates are the postcode centroid for the campus address.

Capacity

MeasureStageBasisMWAs ofSource
IT loadAnnouncedreported712 October 2026source

These figures measure different things and are not added together.

What we checked

What we do not know yet

7 of 13 fields in a complete record are filled. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.