ComputeFinder

Data centres / UK and Ireland / United Kingdom

Kao Data Harlow campus

Harlow, Essex, United Kingdom.

OperatingUnited Kingdom

What we checked

Capacity is the operator's stated IT equipment load for the fully built four-building campus, not current live capacity. Per-building MW figures differ between Kao pages (8.8MW versus 10MW for the first two buildings) and their metric is unstated, so they are omitted. Coordinates are the postcode centroid for the campus address.

Operate this site or have better evidence? .

Operator
Kao Data
Owner
Not stated
Stage
Operating (source, 2 October 2026)
Power
Kao says the campus runs on 100 percent renewable electricity, with HVO fuelled backup generators.
Cooling
The operator cites free-air cooled halls with an SLA-backed PUE of 1.2, and says KLON-03 supports hybrid air and direct-to-chip liquid cooling.
Connectivity
Carrier neutral; a 2022 release lists carriers including BT Openreach, euNetworks, Jisc, LINX, Lumen and Vorboss.
Certifications
BREEAM Excellent, NVIDIA DGX-Ready
Inspect the limits of this source check

These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.

  • PUE: No field value admitted. The location page gives an SLA-backed PUE statement. This author does not relabel a contractual service assertion as design, target or measured, and proposes no scalar. A separately scoped kind/measurement clarification is needed. Scope recorded 1 November 2026; inspected source context. Kao Data / Harlow Operations Limited: Copyright retained; no open licence verified.. Source-only inspection-limit metadata and ordinary links; no new physical field is proposed from these pages. Kao Data / Harlow Operations Limited; exact original linked in source_url. No endorsement. Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported. A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only this original selected-source inspection-limit account and ordinary link. The operator pages retain copyright and the inspected privacy policy concerns personal-data processing; it is not a source-content reuse grant or complete website-terms clearance. No scalar PUE classification, third-party testimony, contacts, marketing expression or incidental GPU inventory is imported. Old parent facts and coordinates remain unchanged and are not newly verified.
  • Grid connection, Water use, Chips, Coordinates: Not inspected in this scope. Selected Harlow location and KLON03 announcement passages were read, not a planning/EIA, upstream connection or water-accounting audit. Announced hybrid/direct-to-chip cooling and free-air cooling do not establish water withdrawal, consumption or WUE. Incidental historical GPU deployments were not taken as this campus-wide technical inventory. No explicit verified official point/CRS is admitted; old coordinates are unchanged, not newly verified. Scope recorded 1 November 2026; inspected source context. Kao Data / Harlow Operations Limited: Copyright retained; no open licence verified.. Source-only inspection-limit metadata and ordinary links; no new physical field is proposed from these pages. Kao Data / Harlow Operations Limited; exact original linked in source_url. No endorsement. Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported. A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only this original selected-source inspection-limit account and ordinary link. The operator pages retain copyright and the inspected privacy policy concerns personal-data processing; it is not a source-content reuse grant or complete website-terms clearance. No scalar PUE classification, third-party testimony, contacts, marketing expression or incidental GPU inventory is imported. Old parent facts and coordinates remain unchanged and are not newly verified.

Capacity

Capacity
MeasureStageBasisMWAs ofSource
IT loadAnnouncedreported712 October 2026source

These figures measure different things and are not added together.

Printable community case file

Kao Data Harlow campus

Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Operating, recorded 2 October 2026Inspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 4 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Operating, dated 2 October 2026: stage source
  • Checked statement. Kao lists KLON-01 and KLON-02 as operational, KLON-03 as under development and KLON-04 as planned on its Harlow page. source
  • Checked statement. The campus page says the finished four-building campus would support 71MW of IT equipment load, with potential to reach 150MW of IT load later. source
  • Checked statement. Kao announced on 8 June 2026 a 10-year deployment for Nebius at the campus, described as 22MW. source
  • Checked statement. Kao announced KLON-02 as fully commissioned and operational on 28 November 2023. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

7 of 13 facility fields recorded

4 separately recorded source statements. These are not included in the facility-field count.

7 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 2). Kao Data Harlow campus: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/kao-data-harlow

BibTeX
@misc{computefinder_data_centres_kao_data_harlow,
  title        = {Kao Data Harlow campus: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0007}},
  number       = {cf-dc-0007},
  note         = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}

Stable ID: cf-dc-0007. Permanent link: https://computefinder.net/entity/cf-dc-0007. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/kao-data-harlow. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0007"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in United Kingdom

All detailed records in United Kingdom / Same recorded stage in United Kingdom

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact