Data centres / Ireland
Cruiserath Road data centre expansion
PermittedIreland3 of 13 fields known
Cruiserath Road, Dublin 15, Ireland.
- Operator
- Not stated
- Owner
- Not stated
- Stage
- Permitted (source, 19 December 2025)
- Power
- The inspector's report says a grid connection is in place, with power for one building available immediately and for the next building from 2027; appellants disputed the demand implications.
The applicant is Universal Developers LLC and no end operator is named. An appellant claimed a 73MW constant load but the applicant disputed it, so no capacity claim is made.
Planning
| Decision or document | Status | Date |
|---|---|---|
| PL06F.318180 (FW22A/0308): construction of a data centre, granted with revised conditions on appeal | Granted with conditions | 19 December 2025 |
What we checked
- An Coimisiun Pleanala granted permission with revised conditions on 19 December 2025 for a data centre at Cruiserath Road, after third-party appeals. (source)
- The inspector's report notes the existing site is covered by an EPA industrial emissions licence for combustion with a total thermal input of 50MW or more, which would need updating. (source)
What we do not know yet
3 of 13 fields in a complete record are filled. Still missing:
- Owner
- Operator
- Capacity (MW)
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.