Data centres / UK and Ireland / Ireland
Vantage DUB11, Ballybane and Kilbride, Clondalkin
Ballybane and Kilbride, Clondalkin, Dublin 22, Ireland.
Stage not knownIreland
What we checked
- An Coimisiun Pleanala refused permission on 4 April 2025 after an appeal by Vantage Data Centres DUB11 Limited. (source)
- The inspector's report notes an EPA industrial emissions licence application relating to DUB11 and DUB12. (source)
Permission was refused on appeal on 4 April 2025, so the proposal is not going ahead as filed; stage is left as unknown because no later resubmission was checked. The inspector's report discusses on-site gas generation but its figures were inconsistent, so none are used.
Operate this site or have better evidence? .
- Operator
- Vantage Data Centers
- Owner
- Not stated
- Stage
- Stage not known (source, 4 April 2025)
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| PL06S.317446 (SD22A/0420): demolition and construction of a data centre, refused on appeal | Refused | 4 April 2025 |
Printable community case file
Vantage DUB11, Ballybane and Kilbride, Clondalkin
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Stage not known, recorded 4 April 2025 | Inspect the stage source and limits |
| Where is the formal decision evidence? | 1 planning item recorded | Check the authority's complete file, reference and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Stage not known, dated 4 April 2025: stage source
- Decision evidence. PL06S.317446 (SD22A/0420): demolition and construction of a data centre, refused on appeal: Refused, 4 April 2025.
- Checked statement. An Coimisiun Pleanala refused permission on 4 April 2025 after an appeal by Vantage Data Centres DUB11 Limited. source
- Checked statement. The inspector's report notes an EPA industrial emissions licence application relating to DUB11 and DUB12. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
2 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
2 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Stage
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Vantage DUB11, Ballybane and Kilbride, Clondalkin: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/vantage-dub11-ballybane-kilbride
BibTeX
@misc{computefinder_data_centres_vantage_dub11_ballybane_kilbride,
title = {Vantage DUB11, Ballybane and Kilbride, Clondalkin: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0026}},
number = {cf-dc-0026},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0026. Permanent link: https://computefinder.net/entity/cf-dc-0026. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/vantage-dub11-ballybane-kilbride. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0026"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Ireland
- Google Grange Castle DC3
- EdgeConneX DUB06, Ballymakaily, Lucan
- Equinix Profile Park Plot 100
- Vantage Dublin DUB1 (Profile Park)
- Cruiserath Road data centre expansion
All detailed records in Ireland / Same recorded stage in Ireland
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact