ComputeFinder

Data last collected: 2 October 2026 Data last rechecked: 2 October 2026

Data centres / Ireland

Vantage Dublin DUB1 (Profile Park)

Stage not knownIreland4 of 13 fields known

Profile Park, Dublin 22, Ireland.

Operator
Vantage Data Centers
Owner
Not stated
Stage
Stage not known (source, 2 October 2026)
Power
Vantage says an on-site 100MVA multi-fuel generation plant, running HVO and gas from Gas Networks Ireland, will power the campus.
Cooling
Vantage describes a closed-loop chilled water system with air-cooled chillers and economisers.

The page is written in the future tense, so whether the two buildings are live could not be confirmed and stage is unknown. The 52MW is the operator's critical IT load for the first two phases.

Capacity

MeasureStageBasisMWAs ofSource
IT loadAnnouncedreported522 October 2026source

These figures measure different things and are not added together.

What we checked

What we do not know yet

4 of 13 fields in a complete record are filled. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Other sites in Ireland