EdgeConneX DUB06, Ballymakaily, Lucan

PermittedIreland6 of 13 fields known

Ballymakaily, Lucan, Co. Dublin, Ireland.

Operator
EdgeConneX
Owner
Not stated
Stage
Permitted (source, 31 July 2025)
Power
The inspector's report says the grid connection comes via a 110kV EirGrid substation under a flexible-demand conditional offer, with permitted on-site gas power plants supplying the data centres.
Cooling
The inspector's report notes mechanical cooling units on the roofs of the data halls.

The 30MW is the maximum operational electrical demand stated by the applicant, as summarised in the inspector's report, and is entered as facility demand rather than IT load.

Capacity

MeasureStageBasisMWAs ofSource
Facility loadPermittedpermitted3031 July 2025source

These figures measure different things and are not added together.

Planning

What we checked

What we do not know yet

6 of 13 fields in a complete record are filled. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Other sites in Ireland