ComputeFinder

Data centres / UK and Ireland / Ireland

EdgeConneX DUB06, Ballymakaily, Lucan

Ballymakaily, Lucan, Co. Dublin, Ireland.

PermittedIreland

What we checked

The 30MW is the maximum operational electrical demand stated by the applicant, as summarised in the inspector's report, and is entered as facility demand rather than IT load.

Operate this site or have better evidence? .

Operator
EdgeConneX
Owner
Not stated
Stage
Permitted (source, 31 July 2025)
Power
The inspector's report says the grid connection comes via a 110kV EirGrid substation under a flexible-demand conditional offer, with permitted on-site gas power plants supplying the data centres.
Cooling
The inspector's report notes mechanical cooling units on the roofs of the data halls.
Grid connection
  • The DUB06 Inspector’s account identifies the permitted Kishoge 110 kV GIS substation as the planned permanent supply route for the wider Facility Campus, including DUB06. (110 kV)
    Scope: ABP317802 DUB06 proposal within the Ballymakaily Facility Campus only. This is the Inspector’s account of the applicant’s supply description; the 110 kV class and permitted campus substation/link do not establish a current DUB06 connection, energisation, connection rights, MW/MVA capacity or operation. Other DUB04/DUB05 phases are not merged or summed.. Stage: Permitted. Basis: reported. Evidence: official source. Evidence date: not stated. source. Source version: not established. Source published: not stated; source updated: not stated; retrieved: not recorded; reviewed: 2026-11-01T03:10:26.335Z; evidence checked: 1 November 2026.
    An Coimisiún Pleanála / former An Bord Pleanála: Copyright retained; no open content licence verified for the authority report. Minimal independently worded attributed basic technical facts from the authority’s own report description/assessment and ordinary unframed links only. No protected report passage/adaptation, developer EIAR, technical table, drawing, map, figure, submission, personal contact or underlying dataset is imported. An Coimisiún Pleanála, Inspector’s Report ABP-317802-23; exact original linked in source_url. No endorsement. Selected case/phase-specific statements reduced to an original concise factual account. Authority-reported applicant estimates/plans remain attributed, not verified outcomes. A different independent review completed at 2026-11-01T03:10:26.335Z accepts only these original, minimal, attributed basic-fact statements from the authority-authored Inspector report and an ordinary unframed link. Authority and third-party copyrights remain reserved. No report prose, adaptation, table, map, figure, developer EIAR, submission or underlying dataset is imported. No source-content open licence, public-domain determination, ownership ruling, endorsement or recurring-use grant is declared. The Copyright, Legal Notices and Disclaimer originals were directly read; the third-party permission condition is respected by excluding developer material.

Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.

Inspect the limits of this source check

These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.

  • PUE, Water use, Chips, Coordinates: Not inspected in this scope. Only selected identity/power paragraphs and bounded keyword windows were inspected; searches returning no exact phrase are not proof of absence or a full165-page/EIAR audit. No PUE kind, water measurement/boundary/period, chips or verified point/CRS is admitted. Developer EIAR remains uninspected under the third-party condition. Scope recorded 1 November 2026; inspected source context. An Coimisiún Pleanála / former An Bord Pleanála: Copyright retained; no open content licence verified for the authority report. Minimal independently worded attributed basic technical facts from the authority’s own report description/assessment and ordinary unframed links only. No protected report passage/adaptation, developer EIAR, technical table, drawing, map, figure, submission, personal contact or underlying dataset is imported. An Coimisiún Pleanála, Inspector’s Report ABP-317802-23; exact original linked in source_url. No endorsement. Selected case/phase-specific statements reduced to an original concise factual account. Authority-reported applicant estimates/plans remain attributed, not verified outcomes. A different independent review completed at 2026-11-01T03:10:26.335Z accepts only these original, minimal, attributed basic-fact statements from the authority-authored Inspector report and an ordinary unframed link. Authority and third-party copyrights remain reserved. No report prose, adaptation, table, map, figure, developer EIAR, submission or underlying dataset is imported. No source-content open licence, public-domain determination, ownership ruling, endorsement or recurring-use grant is declared. The Copyright, Legal Notices and Disclaimer originals were directly read; the third-party permission condition is respected by excluding developer material.

Capacity

Capacity
MeasureStageBasisMWAs ofSource
Facility loadPermittedpermitted3031 July 2025source

These figures measure different things and are not added together.

Planning

Planning
Decision or documentStatusDateReview
PL06S.317802 (SD22A/0333): two adjoined single storey data centres, granted with conditions on appealGranted with conditions31 July 2025

Printable community case file

EdgeConneX DUB06, Ballymakaily, Lucan

Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Permitted, recorded 31 July 2025Inspect the stage source and limits
Where is the formal decision evidence?1 planning item recordedCheck the authority's complete file, reference and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

7 of 13 facility fields recorded

2 separately recorded source statements. These are not included in the facility-field count.

7 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 2). EdgeConneX DUB06, Ballymakaily, Lucan: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/edgeconnex-lucan-dub06

BibTeX
@misc{computefinder_data_centres_edgeconnex_lucan_dub06,
  title        = {EdgeConneX DUB06, Ballymakaily, Lucan: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0023}},
  number       = {cf-dc-0023},
  note         = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}

Stable ID: cf-dc-0023. Permanent link: https://computefinder.net/entity/cf-dc-0023. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/edgeconnex-lucan-dub06. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0023"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in Ireland

All detailed records in Ireland / Same recorded stage in Ireland

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact