Data centres / UK and Ireland / Ireland
Cruiserath Road data centre expansion
Cruiserath Road, Dublin 15, Ireland.
PermittedIreland
What we checked
- An Coimisiun Pleanala granted permission with revised conditions on 19 December 2025 for a data centre at Cruiserath Road, after third-party appeals. (source)
- The inspector's report notes the existing site is covered by an EPA industrial emissions licence for combustion with a total thermal input of 50MW or more, which would need updating. (source)
The applicant is Universal Developers LLC and no end operator is named. An appellant claimed a 73MW constant load but the applicant disputed it, so no capacity claim is made.
Operate this site or have better evidence? .
- Operator
- Not stated
- Owner
- Not stated
- Stage
- Permitted (source, 19 December 2025)
- Power
- The inspector's report says a grid connection is in place, with power for one building available immediately and for the next building from 2027; appellants disputed the demand implications.
- Grid connection
- The Cruiserath Inspector’s Report identifies a 220 kV transmission line and on-site 220 kV GIS substation as the supply context for the proposed extension. (220 kV)
Scope: ABP318180 proposal for Buildings E/F/G within the existing Cruiserath campus only. The report discusses earlier substation approvals and existing campus infrastructure; no actual energisation date, present supply availability, capacity or current operation of the proposed extension is established. The voltage is not MW/MVA and no existing/new building capacities are combined.. Stage: Stage not known. Basis: reported. Evidence: official source. Evidence date: not stated. source. Source version: not established. Source published: not stated; source updated: not stated; retrieved: not recorded; reviewed: 2026-11-01T03:10:26.335Z; evidence checked: 1 November 2026.
An Coimisiún Pleanála / former An Bord Pleanála: Copyright retained; no open content licence verified for the authority report. Minimal independently worded attributed basic technical facts from the authority’s own report description/assessment and ordinary unframed links only. No protected report passage/adaptation, developer EIAR, technical table, drawing, map, figure, submission, personal contact or underlying dataset is imported. An Coimisiún Pleanála, Inspector’s Report ABP-318180-23; exact original linked in source_url. No endorsement. Selected case/phase-specific statements reduced to an original concise factual account. Authority-reported applicant estimates/plans remain attributed, not verified outcomes. A different independent review completed at 2026-11-01T03:10:26.335Z accepts only these original, minimal, attributed basic-fact statements from the authority-authored Inspector report and an ordinary unframed link. Authority and third-party copyrights remain reserved. No report prose, adaptation, table, map, figure, developer EIAR, submission or underlying dataset is imported. No source-content open licence, public-domain determination, ownership ruling, endorsement or recurring-use grant is declared. The Copyright, Legal Notices and Disclaimer originals were directly read; the third-party permission condition is respected by excluding developer material.
Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.
- The Cruiserath Inspector’s Report identifies a 220 kV transmission line and on-site 220 kV GIS substation as the supply context for the proposed extension. (220 kV)
- PUE
- The Inspector records the applicant’s annualised DESIGN PUE of 1.12 for the proposed Cruiserath development. (1.12)
Scope: ABP318180 proposed Buildings E/F/G design only, as recorded in section10.1.3. Annualised design ratio, not measured/site-wide/current operating performance, a contractual result or independently validated efficiency. The separate generic pact benchmark is not assigned to this development.. Stage: Announced. Basis: reported. Evidence: official source. PUE kind: design. Evidence date: not stated. source. Source version: not established. Source published: not stated; source updated: not stated; retrieved: not recorded; reviewed: 2026-11-01T03:10:26.335Z; evidence checked: 1 November 2026.
An Coimisiún Pleanála / former An Bord Pleanála: Copyright retained; no open content licence verified for the authority report. Minimal independently worded attributed basic technical facts from the authority’s own report description/assessment and ordinary unframed links only. No protected report passage/adaptation, developer EIAR, technical table, drawing, map, figure, submission, personal contact or underlying dataset is imported. An Coimisiún Pleanála, Inspector’s Report ABP-318180-23; exact original linked in source_url. No endorsement. Selected case/phase-specific statements reduced to an original concise factual account. Authority-reported applicant estimates/plans remain attributed, not verified outcomes. A different independent review completed at 2026-11-01T03:10:26.335Z accepts only these original, minimal, attributed basic-fact statements from the authority-authored Inspector report and an ordinary unframed link. Authority and third-party copyrights remain reserved. No report prose, adaptation, table, map, figure, developer EIAR, submission or underlying dataset is imported. No source-content open licence, public-domain determination, ownership ruling, endorsement or recurring-use grant is declared. The Copyright, Legal Notices and Disclaimer originals were directly read; the third-party permission condition is respected by excluding developer material.
Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.
- The Inspector records the applicant’s annualised DESIGN PUE of 1.12 for the proposed Cruiserath development. (1.12)
- Water use
- The Inspector reports projected additional mains-water demand for cooling of about 1110 m³ annually for the proposed Cruiserath development.
Scope: Only the proposal’s additional public-mains cooling-water demand described in sections11.9.8 and11.9.12. This is a projected approximate annual requirement with no separately named calendar year, not metered consumption, total site withdrawal, all-process/domestic demand, a WUE value or a current operating result. No rainwater/stored-water share, storage volume, stormwater discharge or existing-campus water total is imported or added.. Stage: Announced. Basis: reported. Evidence: official source. Water boundary: Proposed Buildings E/F/G extension: supplemental public-mains water for cooling, principally hot periods, abstracted at low-demand times for storage. Annual estimate only; rainwater contribution, total withdrawal and consumptive/return fraction not quantified here.. Evidence date: not stated. source. Source version: not established. Source published: not stated; source updated: not stated; retrieved: not recorded; reviewed: 2026-11-01T03:10:26.335Z; evidence checked: 1 November 2026.
An Coimisiún Pleanála / former An Bord Pleanála: Copyright retained; no open content licence verified for the authority report. Minimal independently worded attributed basic technical facts from the authority’s own report description/assessment and ordinary unframed links only. No protected report passage/adaptation, developer EIAR, technical table, drawing, map, figure, submission, personal contact or underlying dataset is imported. An Coimisiún Pleanála, Inspector’s Report ABP-318180-23; exact original linked in source_url. No endorsement. Selected case/phase-specific statements reduced to an original concise factual account. Authority-reported applicant estimates/plans remain attributed, not verified outcomes. A different independent review completed at 2026-11-01T03:10:26.335Z accepts only these original, minimal, attributed basic-fact statements from the authority-authored Inspector report and an ordinary unframed link. Authority and third-party copyrights remain reserved. No report prose, adaptation, table, map, figure, developer EIAR, submission or underlying dataset is imported. No source-content open licence, public-domain determination, ownership ruling, endorsement or recurring-use grant is declared. The Copyright, Legal Notices and Disclaimer originals were directly read; the third-party permission condition is respected by excluding developer material.
Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.
- The Inspector reports projected additional mains-water demand for cooling of about 1110 m³ annually for the proposed Cruiserath development.
Inspect the limits of this source check
These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.
- Chips, Coordinates: Not inspected in this scope. This scope checks only the named planning report’s identity, electrical, explicit design-PUE and projected additional cooling-water passages. No chip or verified official point/CRS inspection was performed. No whole-report/whole-application technical completeness is claimed. Scope recorded 1 November 2026; inspected source context. An Coimisiún Pleanála / former An Bord Pleanála: Copyright retained; no open content licence verified for the authority report. Minimal independently worded attributed basic technical facts from the authority’s own report description/assessment and ordinary unframed links only. No protected report passage/adaptation, developer EIAR, technical table, drawing, map, figure, submission, personal contact or underlying dataset is imported. An Coimisiún Pleanála, Inspector’s Report ABP-318180-23; exact original linked in source_url. No endorsement. Selected case/phase-specific statements reduced to an original concise factual account. Authority-reported applicant estimates/plans remain attributed, not verified outcomes. A different independent review completed at 2026-11-01T03:10:26.335Z accepts only these original, minimal, attributed basic-fact statements from the authority-authored Inspector report and an ordinary unframed link. Authority and third-party copyrights remain reserved. No report prose, adaptation, table, map, figure, developer EIAR, submission or underlying dataset is imported. No source-content open licence, public-domain determination, ownership ruling, endorsement or recurring-use grant is declared. The Copyright, Legal Notices and Disclaimer originals were directly read; the third-party permission condition is respected by excluding developer material.
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| PL06F.318180 (FW22A/0308): construction of a data centre, granted with revised conditions on appeal | Granted with conditions | 19 December 2025 |
Printable community case file
Cruiserath Road data centre expansion
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Permitted, recorded 19 December 2025 | Inspect the stage source and limits |
| Where is the formal decision evidence? | 1 planning item recorded | Check the authority's complete file, reference and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Permitted, dated 19 December 2025: stage source
- Decision evidence. PL06F.318180 (FW22A/0308): construction of a data centre, granted with revised conditions on appeal: Granted with conditions, 19 December 2025.
- Checked statement. An Coimisiun Pleanala granted permission with revised conditions on 19 December 2025 for a data centre at Cruiserath Road, after third-party appeals. source
- Checked statement. The inspector's report notes the existing site is covered by an EPA industrial emissions licence for combustion with a total thermal input of 50MW or more, which would need updating. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
6 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
6 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Operator
- Capacity (MW)
- Cooling
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Cruiserath Road data centre expansion: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/cruiserath-road-universal-developers
BibTeX
@misc{computefinder_data_centres_cruiserath_road_universal_developers,
title = {Cruiserath Road data centre expansion: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0027}},
number = {cf-dc-0027},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0027. Permanent link: https://computefinder.net/entity/cf-dc-0027. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/cruiserath-road-universal-developers. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0027"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Ireland
- Google Grange Castle DC3
- EdgeConneX DUB06, Ballymakaily, Lucan
- Equinix Profile Park Plot 100
- Vantage Dublin DUB1 (Profile Park)
- Vantage DUB11, Ballybane and Kilbride, Clondalkin
All detailed records in Ireland / Same recorded stage in Ireland
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact