Gefion AI supercomputer (DCAI), Copenhagen

Copenhagen, Denmark.

OperatingDenmark

What we checked

The Foundation's 23 October 2024 release says Gefion was launched and was being readied for selected customers in a pilot phase. It identifies Digital Realty as the host in Denmark but does not name the facility or city. The Copenhagen locality remains based on the existing trade report.

Operate this site or have better evidence? .

Operator
Danish Centre for AI Innovation (DCAI)
Owner
Danish Centre for AI Innovation (DCAI)
Stage
Operating (source, 23 October 2024)
Power
The Novo Nordisk Foundation says the hosting data centre runs on 100 percent renewable energy. This is not a statement of Gefion's power demand or the site's capacity.
Chips
  • The Novo Nordisk Foundation identified NVIDIA H100 Tensor Core GPUs in Gefion in its 23 October 2024 release.
    Scope: Gefion system at its historical launch/pilot-description grain only. Not an inventory of a named Digital Realty building or a claim about current installed/available GPUs, host-facility stage, customer access or capacity. No GPU count is imported.. Stage: Stage not known. Basis: reported. Evidence: source claim. Evidence date: not stated. source. Source version: not established. Source published: 23 October 2024; source updated: not stated; retrieved: not recorded; reviewed: 2026-11-01T03:34:53.155Z; evidence checked: 1 November 2026.
    Novo Nordisk Foundation: Copyright retained; no open licence verified for this release.. Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review. Novo Nordisk Foundation; exact original linked. No endorsement. Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported. A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only the original minimal attributed historical Gefion hardware-identifier account and ordinary exact link. The actual release/footer retains all rights. The first independent request for the linked grant-IP policy returned tool-level not-accessible; it was not retried and no policy contents or grant are borrowed from the preparer. No open content licence, domain-wide permission or recurring-use grant is asserted. Source expression, quotations, counts, tables, images, marks, contacts and datasets are excluded.

Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.

Inspect the limits of this source check

These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.

  • Grid connection, PUE, Water use, Coordinates: Not stated in the inspected source. The inspected release gives no grid voltage/named substation, explicit design/target/measured PUE, bounded withdrawal/consumption/WUE or explicit official point/CRS in its selected technical sections. Renewable-energy and sustainable-design assertions are not those measurements. Host building remains unnamed; no coordinate or site-boundary inference. Scope recorded 1 November 2026; inspected source context. Novo Nordisk Foundation: Copyright retained; no open licence verified for this release.. Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review. Novo Nordisk Foundation; exact original linked. No endorsement. Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported. A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only the original minimal attributed historical Gefion hardware-identifier account and ordinary exact link. The actual release/footer retains all rights. The first independent request for the linked grant-IP policy returned tool-level not-accessible; it was not retried and no policy contents or grant are borrowed from the preparer. No open content licence, domain-wide permission or recurring-use grant is asserted. Source expression, quotations, counts, tables, images, marks, contacts and datasets are excluded.

Printable community case file

Gefion AI supercomputer (DCAI), Copenhagen

Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Operating, recorded 23 October 2024Inspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 3 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Operating, dated 23 October 2024: stage source
  • Checked statement. A trade report says Gefion has 191 NVIDIA DGX H100 servers with 1,528 H100 GPUs, hosted in a Digital Realty data centre in Copenhagen. source
  • Checked statement. The Novo Nordisk Foundation says DCAI then owned and would operate Gefion, which uses 1,528 NVIDIA H100 GPUs. source
  • Checked statement. The Foundation says Digital Realty hosts Gefion in a data centre in Denmark and that the hosting facility runs on 100 percent renewable energy. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

5 of 13 facility fields recorded

3 separately recorded source statements. These are not included in the facility-field count.

5 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 2). Gefion AI supercomputer (DCAI), Copenhagen: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/dcai-gefion-copenhagen

BibTeX
@misc{computefinder_data_centres_dcai_gefion_copenhagen,
  title        = {Gefion AI supercomputer (DCAI), Copenhagen: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0036}},
  number       = {cf-dc-0036},
  note         = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}

Stable ID: cf-dc-0036. Permanent link: https://computefinder.net/entity/cf-dc-0036. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/dcai-gefion-copenhagen. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0036"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in Denmark

All detailed records in Denmark / Same recorded stage in Denmark

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact