OperatingDenmark
What we checked
- A trade report says Gefion has 191 NVIDIA DGX H100 servers with 1,528 H100 GPUs, hosted in a Digital Realty data centre in Copenhagen. (source)
- The Novo Nordisk Foundation says DCAI then owned and would operate Gefion, which uses 1,528 NVIDIA H100 GPUs. (source)
- The Foundation says Digital Realty hosts Gefion in a data centre in Denmark and that the hosting facility runs on 100 percent renewable energy. (source)
The Foundation's 23 October 2024 release says Gefion was launched and was being readied for selected customers in a pilot phase. It identifies Digital Realty as the host in Denmark but does not name the facility or city. The Copenhagen locality remains based on the existing trade report.
Operate this site or have better evidence? .
- Operator
- Danish Centre for AI Innovation (DCAI)
- Owner
- Danish Centre for AI Innovation (DCAI)
- Stage
- Operating (source, 23 October 2024)
- Power
- The Novo Nordisk Foundation says the hosting data centre runs on 100 percent renewable energy. This is not a statement of Gefion's power demand or the site's capacity.
- Chips
- The Novo Nordisk Foundation identified NVIDIA H100 Tensor Core GPUs in Gefion in its 23 October 2024 release.
Scope: Gefion system at its historical launch/pilot-description grain only. Not an inventory of a named Digital Realty building or a claim about current installed/available GPUs, host-facility stage, customer access or capacity. No GPU count is imported.. Stage: Stage not known. Basis: reported. Evidence: source claim. Evidence date: not stated. source. Source version: not established. Source published: 23 October 2024; source updated: not stated; retrieved: not recorded; reviewed: 2026-11-01T03:34:53.155Z; evidence checked: 1 November 2026.
Novo Nordisk Foundation: Copyright retained; no open licence verified for this release.. Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review. Novo Nordisk Foundation; exact original linked. No endorsement. Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported. A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only the original minimal attributed historical Gefion hardware-identifier account and ordinary exact link. The actual release/footer retains all rights. The first independent request for the linked grant-IP policy returned tool-level not-accessible; it was not retried and no policy contents or grant are borrowed from the preparer. No open content licence, domain-wide permission or recurring-use grant is asserted. Source expression, quotations, counts, tables, images, marks, contacts and datasets are excluded.
Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.
- The Novo Nordisk Foundation identified NVIDIA H100 Tensor Core GPUs in Gefion in its 23 October 2024 release.
Inspect the limits of this source check
These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.
- Grid connection, PUE, Water use, Coordinates: Not stated in the inspected source. The inspected release gives no grid voltage/named substation, explicit design/target/measured PUE, bounded withdrawal/consumption/WUE or explicit official point/CRS in its selected technical sections. Renewable-energy and sustainable-design assertions are not those measurements. Host building remains unnamed; no coordinate or site-boundary inference. Scope recorded 1 November 2026; inspected source context. Novo Nordisk Foundation: Copyright retained; no open licence verified for this release.. Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review. Novo Nordisk Foundation; exact original linked. No endorsement. Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported. A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only the original minimal attributed historical Gefion hardware-identifier account and ordinary exact link. The actual release/footer retains all rights. The first independent request for the linked grant-IP policy returned tool-level not-accessible; it was not retried and no policy contents or grant are borrowed from the preparer. No open content licence, domain-wide permission or recurring-use grant is asserted. Source expression, quotations, counts, tables, images, marks, contacts and datasets are excluded.
Printable community case file
Gefion AI supercomputer (DCAI), Copenhagen
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Operating, recorded 23 October 2024 | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 3 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Operating, dated 23 October 2024: stage source
- Checked statement. A trade report says Gefion has 191 NVIDIA DGX H100 servers with 1,528 H100 GPUs, hosted in a Digital Realty data centre in Copenhagen. source
- Checked statement. The Novo Nordisk Foundation says DCAI then owned and would operate Gefion, which uses 1,528 NVIDIA H100 GPUs. source
- Checked statement. The Foundation says Digital Realty hosts Gefion in a data centre in Denmark and that the hosting facility runs on 100 percent renewable energy. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
5 of 13 facility fields recorded
3 separately recorded source statements. These are not included in the facility-field count.
5 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Capacity (MW)
- Grid connection
- Cooling
- PUE
- Water use
- Connectivity
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Gefion AI supercomputer (DCAI), Copenhagen: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/dcai-gefion-copenhagen
BibTeX
@misc{computefinder_data_centres_dcai_gefion_copenhagen,
title = {Gefion AI supercomputer (DCAI), Copenhagen: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0036}},
number = {cf-dc-0036},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0036. Permanent link: https://computefinder.net/entity/cf-dc-0036. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/dcai-gefion-copenhagen. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0036"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Denmark
All detailed records in Denmark / Same recorded stage in Denmark
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim