OperatingDenmark
What we checked
- The original 55,000 sq m facility opened in 2019 and a third building was expected to finish in summer 2023. (source)
- In December 2021 Meta announced two more buildings of about 90,000 sq m and a district heating link for the campus. (source)
Existing buildings operate; the two-building expansion announced in December 2021 was cancelled in December 2022. We have no MW figure from a primary source.
Operate this site or have better evidence? .
- Operator
- Meta
- Owner
- Meta
- Stage
- Operating (source, 14 December 2022)
- Power
- A 2021 announcement tied the expansion to 294 MW of renewable energy from two wind projects.
- Cooling
- The campus is connected to Odense district heating so that waste heat is reused.
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| Two-building expansion (about 90,000 sq m) stopped when Meta terminated its contractor | Withdrawn | 14 December 2022 |
Printable community case file
Meta Odense data centre campus
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Operating, recorded 14 December 2022 | Inspect the stage source and limits |
| Where is the formal decision evidence? | 1 planning item recorded | Check the authority's complete file, reference and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Operating, dated 14 December 2022: stage source
- Decision evidence. Two-building expansion (about 90,000 sq m) stopped when Meta terminated its contractor: Withdrawn, 14 December 2022.
- Checked statement. The original 55,000 sq m facility opened in 2019 and a third building was expected to finish in summer 2023. source
- Checked statement. In December 2021 Meta announced two more buildings of about 90,000 sq m and a district heating link for the campus. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
6 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
6 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Capacity (MW)
- Grid connection
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Meta Odense data centre campus: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/meta-odense
BibTeX
@misc{computefinder_data_centres_meta_odense,
title = {Meta Odense data centre campus: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0034}},
number = {cf-dc-0034},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0034. Permanent link: https://computefinder.net/entity/cf-dc-0034. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/meta-odense. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0034"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Denmark
- Google Fredericia data centre
- Gefion AI supercomputer (DCAI), Copenhagen
- Prime Data Centers Esbjerg campus
All detailed records in Denmark / Same recorded stage in Denmark
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact