Stage not knownSouth Africa
What we checked
- An ELIDZ account dated 7 May 2026 identifies a data centre within the East London Industrial Development Zone. (source)
- That dated account describes the data centre as operational within the Zone; present operation and available compute have not been independently verified. (source)
ELIDZ data centre is a descriptive institution-qualified label, not a verified formal name, building ID or phase. The entity account published 7 May 2026 identifies one data centre within the Zone and describes it as operational in that historical account. Present operation and available compute have not been independently verified. Current legal operator/owner, capacity, technical readiness, access, city, street address, coordinates, power, cooling and connectivity remain unknown. Other portfolio projects, investment amounts, tier/ISO/uptime assertions, jobs and promised benefits are excluded. The provincial companion is not independent corroboration of these two entity-attributed facts. One selected historical reference is not a new October market arrival, a unique physical-phase census or South Africa/Africa completeness.
Operate this site or have better evidence? .
- Operator
- Not stated
- Owner
- Not stated
- Stage
- Stage not known
Inspect the limits of this source check
These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.
- Grid connection, PUE, Water use, Chips, Coordinates: Not stated in the inspected source. The selected data-centre paragraph gives no chip models, connection voltage/named substation, explicit PUE kind/value, bounded water measure or official point/CRS. A generic scalable MW label, Tier-aligned language, uptime, project funding and other facilities do not fill these fields. No sums, certification validation or fresh current-stage claim. Scope recorded 1 November 2026; inspected source context. East London Industrial Development Zone SOC Ltd: No source-specific open licence verified.. Selected-release inspection-limit metadata and ordinary link only; no new technical field. East London Industrial Development Zone SOC Ltd; exact original linked. No endorsement. Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported. A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only this original selected-source inspection-limit account and ordinary link. No new physical-field, stage, capacity, certification or availability fact is imported. Copyright/source rights remain with their holders; no government/public-entity public-domain, blanket content, service-use or recurring-source grant is inferred. Any separately failed or restricted source remains held; no body, asset, contact or dataset is retained.
Read the ELIDZ account dated 7 May 2026
Source page date not stated. Read the dated entity account and its conditions. This is not a current service, allocation, purchase, availability or application route.
Linked East London Industrial Development Zone SOC Ltd (ELIDZ) source articles: Copyright retained; no open content licence asserted. ComputeFinder independently states two minimal attributed basic facts and provides an ordinary unframed original link. No source narrative, quotations, images, logos, personal/contact details, tables or datasets are reproduced or adapted. Copyright remains with the source; no open licence, public-domain status, express linking grant, endorsement, blanket source clearance or recurring-monitoring grant is asserted. No applicable express restriction on this exact minimal factual account or ordinary link was visible in the inspected entity article and home. The actual disclaimer destination and its conditions remain uninspected; that unknown is neither presumed permission nor a presumed prohibition. Any newly evidenced applicable restriction requires review.
Printable community case file
ELIDZ data centre
Record checked 17 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Stage not known, date not recorded | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Stage not known, with no stage source recorded.
- Checked statement. An ELIDZ account dated 7 May 2026 identifies a data centre within the East London Industrial Development Zone. source
- Checked statement. That dated account describes the data centre as operational within the Zone; present operation and available compute have not been independently verified. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
0 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
0 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Operator
- Stage
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 17 October 2026. Reported and planned figures are shown as such. Independently reviewed on 17 October 2026: Two minimal entity-attributed historical facts and ordinary linking, exact basic-fact use, descriptive identity and facility grain. Excludes current operation, availability, capacity, tier/ISO/uptime, legal owner/operator, precise geography, phase identity, other portfolio projects and realised outcomes.. Missing facility fields remain unverified. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 17). ELIDZ data centre: evidence and recorded limits. ComputeFinder. Retrieved November 14, 2026, from https://computefinder.net/data-centres/elidz-data-centre
BibTeX
@misc{computefinder_data_centres_elidz_data_centre,
title = {ELIDZ data centre: evidence and recorded limits},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0100}},
number = {cf-dc-0100},
note = {Page last checked 17 October 2026. Retrieved 14 November 2026.}
}Stable ID: cf-dc-0100. Permanent link: https://computefinder.net/entity/cf-dc-0100. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/elidz-data-centre. Page last checked 17 October 2026. Retrieved 14 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0100"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in South Africa
All detailed records in South Africa / Same recorded stage in South Africa
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact