Data centres / Finland
Nebius Lappeenranta AI factory
AnnouncedFinland5 of 13 fields known
Lappeenranta, Finland.
- Operator
- Nebius
- Owner
- Nebius
- Stage
- Announced (source, 31 March 2026)
- Power
- Nebius says electricity sourcing will reflect its mostly low-carbon mix.
- Cooling
- Heat recovery into district heating is planned.
The release gives 310 MW of power capacity without defining the metric, so we have not entered it as IT, facility or grid power. It gives no permit status; first capacity is expected in 2027.
What we checked
- Nebius announced on 31 March 2026 a multi-building AI factory of 310 MW (metric not defined) on about 100 acres of industrial land. (source)
- The company expects first capacity to be available to customers in 2027. (source)
What we do not know yet
5 of 13 fields in a complete record are filled. Still missing:
- Capacity (MW)
- Grid connection
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.