Google Hamina data centre

Hamina, Finland.

OperatingFinland

What we checked

Operating since 2011 on the site of a former paper mill. A September 2026 Google post announces EUR 13 billion of Finnish investment including new facilities at Kajaani, Muhos and Vaala; those sites are not yet separate records because no capacity or permit details were found.

Operate this site or have better evidence? .

Operator
Google
Owner
Google
Stage
Operating (source, 9 September 2026)
Power
Google reports 98 per cent carbon-free energy in Finland in 2023 and a 22-year agreement supporting life extension of the Loviisa nuclear plant.
Cooling
Seawater from the Bay of Finland is used for cooling, and a heat recovery link with Haminan Energia is planned to cover about 80 per cent of local heat demand.

Printable community case file

Google Hamina data centre

Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Operating, recorded 9 September 2026Inspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Operating, dated 9 September 2026: stage source
  • Checked statement. Google's location page says Hamina has operated since 2011 and uses seawater cooling. source
  • Checked statement. A Google post dated 9 September 2026 describes the Hamina site as operating for 15 years and adds planned new facilities at Kajaani, Muhos and Vaala. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

5 of 13 facility fields recorded

2 separately recorded source statements. These are not included in the facility-field count.

5 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 2). Google Hamina data centre: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/google-hamina

BibTeX
@misc{computefinder_data_centres_google_hamina,
  title        = {Google Hamina data centre: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0038}},
  number       = {cf-dc-0038},
  note         = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}

Stable ID: cf-dc-0038. Permanent link: https://computefinder.net/entity/cf-dc-0038. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/google-hamina. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0038"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in Finland

All detailed records in Finland / Same recorded stage in Finland

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact