AnnouncedFinland
What we checked
- Nebius announced on 31 March 2026 a multi-building AI factory of 310 MW (metric not defined) on about 100 acres of industrial land. (source)
- The company expects first capacity to be available to customers in 2027. (source)
The release gives 310 MW of power capacity without defining the metric, so we have not entered it as IT, facility or grid power. It gives no permit status; first capacity is expected in 2027.
Operate this site or have better evidence? .
- Operator
- Nebius
- Owner
- Nebius
- Stage
- Announced (source, 31 March 2026)
- Power
- Nebius says electricity sourcing will reflect its mostly low-carbon mix.
- Cooling
- Heat recovery into district heating is planned.
- Water use
- On 31 March 2026, Nebius announced closed-loop server cooling for its planned Lappeenranta campus and said that cooling would avoid reliance on intake from local water supplies.
Scope: Issuer-announced Lappeenranta campus design intention only, separate from the existing Mantsala facility. No commissioned cooling system, current water use or ready compute is inferred. No site-wide or whole-life zero claim is made.. Stage: Announced. Basis: reported. Evidence: source claim. Water boundary: Future server-cooling/local-supply-intake assertion, not measured withdrawal, consumptive loss, WUE, domestic/construction/initial-fill/process demand or indirect electricity-supply water. No volume, WUE denominator, calendar measurement period or independent performance method is supplied in this selected passage. Physical quantities remain null.. Evidence date: not stated. source. Source version: not established. Source published: 31 March 2026; source updated: not stated; retrieved: not recorded; reviewed: 2026-11-01T03:23:36.511Z; evidence checked: 1 November 2026.
Nebius: Copyright retained; no open-content licence verified for these newsroom releases.. Minimal independently worded attributed basic technical facts and ordinary unframed exact source links only. No copied source expression, specification table, marketing narrative, marks, assets, personal contact, source body or dataset import. Nebius; exact original linked in source_url. No endorsement. Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported. A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only the exact minimal independently worded attributed newsroom fact account and ordinary unframed link. The actual newsroom footer and linked Terms of Use of the Nebius Platform were inspected, including Platform/service copying/distribution restrictions. No express condition on this narrow original basic-fact/link account was identified; this does not declare the newsroom outside all terms, imply an open licence, blanket permission, historical-purpose exception or recurring-use grant. Source copyright is retained; no release prose, quotation, table, asset, contact or dataset is imported. Announced/conditional statements retain their original dated scope.
Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.
- On 31 March 2026, Nebius announced closed-loop server cooling for its planned Lappeenranta campus and said that cooling would avoid reliance on intake from local water supplies.
Inspect the limits of this source check
These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.
- Grid connection, PUE, Chips, Coordinates: Not inspected in this scope. Only the issuer release and applicable selected terms were inspected. Company-wide contracted power/GPU-platform statements and Mantsala comparisons are not site-specific Lappeenranta connection/chip/PUE evidence. No voltage/substation, explicit site-specific PUE kind/value, installed-chip configuration or verified official point/CRS is admitted; no planning/EIA audit is claimed. Scope recorded 1 November 2026; inspected source context. Nebius: Copyright retained; no open-content licence verified for these newsroom releases.. Minimal independently worded attributed basic technical facts and ordinary unframed exact source links only. No copied source expression, specification table, marketing narrative, marks, assets, personal contact, source body or dataset import. Nebius; exact original linked in source_url. No endorsement. Minimal independently worded attributed source account and ordinary link only; no source narrative, quotation, table, graphic, contact or dataset imported. A different independent factual and exact-use review completed at 2026-11-01T03:23:36.511Z. KEEP only the exact minimal independently worded attributed newsroom fact account and ordinary unframed link. The actual newsroom footer and linked Terms of Use of the Nebius Platform were inspected, including Platform/service copying/distribution restrictions. No express condition on this narrow original basic-fact/link account was identified; this does not declare the newsroom outside all terms, imply an open licence, blanket permission, historical-purpose exception or recurring-use grant. Source copyright is retained; no release prose, quotation, table, asset, contact or dataset is imported. Announced/conditional statements retain their original dated scope.
Printable community case file
Nebius Lappeenranta AI factory
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Announced, recorded 31 March 2026 | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Announced, dated 31 March 2026: stage source
- Checked statement. Nebius announced on 31 March 2026 a multi-building AI factory of 310 MW (metric not defined) on about 100 acres of industrial land. source
- Checked statement. The company expects first capacity to be available to customers in 2027. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
6 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
6 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Capacity (MW)
- Grid connection
- PUE
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Nebius Lappeenranta AI factory: capacity, planning and power. ComputeFinder. Retrieved November 17, 2026, from https://computefinder.net/data-centres/nebius-lappeenranta
BibTeX
@misc{computefinder_data_centres_nebius_lappeenranta,
title = {Nebius Lappeenranta AI factory: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0042}},
number = {cf-dc-0042},
note = {Page last checked 2 October 2026. Retrieved 17 November 2026.}
}Stable ID: cf-dc-0042. Permanent link: https://computefinder.net/entity/cf-dc-0042. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/nebius-lappeenranta. Page last checked 2 October 2026. Retrieved 17 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0042"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Finland
- Google Hamina data centre
- Microsoft Hepokorpi data centre, Espoo
- Microsoft Kirkkonummi data centre campus
- Nebius Mäntsälä data centre
- LUMI-AI AI Factory system, CSC Kajaani
All detailed records in Finland / Same recorded stage in Finland
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact