Data centre records
141 data centres and proposed sites, each with the facts we could source and a plain list of what we could not.
Most public data on individual data centres is thin. Capacity, power source and efficiency are often missing, and where they exist they are measured in different ways. So each record shows every figure with its metric (IT load, facility load or grid connection), its stage (announced, permitted, under construction, operating) and its source, and we never add them together. A blank means unknown, not zero.
For the largest AI campuses see frontier AI data centres. To see where this data comes from, and which sources we can and cannot reuse, see data sources.
Related company disclosures
- SpaceX reports 1.7GW of nameplate compute in third-quarter results. Event 20 October 2026. Investigate individual facilities with their own evidence and dates.
Filters cover these 141 detailed records. Operating does not mean compute is available to buy. Stage dates and checked dates differ; open each record for its evidence and limits. A field-level view is on the coverage page. Epoch frontier sites are listed separately.
Showing 12 of 141 detailed records.
Matching records by stage
How many of our records sit at each stage. This counts sites, not megawatts.
Show this chart as a table
| Stage | Sites |
|---|---|
| Announced | 2 |
| Stage not known | 10 |
Nigeria
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| 21CTL Ikeja data centre | 21st Century Technologies | Ikeja | Stage not known Stage date not recorded Checked 12 November 2026 | |
| 21CTL Ikoyi data centre | 21st Century Technologies | Ikoyi | Stage not known Stage date not recorded Checked 12 November 2026 | |
| Africa Data Centres LOS1 Lagos | Africa Data Centres | Eko Atlantic City, Lagos | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Digital Realty Lagos LKK2 (Ogbombo) | Digital Realty | Ogbombo Road, Lagos | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Digital Realty Lagos LOS1 (Victoria Island) | Digital Realty | Victoria Island, Lagos | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Galaxy Backbone Kano data centre | Galaxy Backbone Limited | Kano | Stage not known Stage date not recorded Checked 12 November 2026 | |
| Galaxy Backbone NSSC DC1 Abuja | Galaxy Backbone Limited | Abuja | Stage not known Stage date not recorded Checked 12 November 2026 | |
| Kasi Cloud DNEK Campus | Kasi Cloud | Eket, Akwa Ibom | Announced Recorded date: 10 November 2026 Checked 10 November 2026 | |
| Kasi Cloud LOS Campus | Kasi Cloud | Lekki, Lagos | Announced Recorded date: 10 November 2026 Checked 10 November 2026 | |
| Open Access Data Centres Lagos (LOS1) | Open Access Data Centres | Lagos; location conflict recorded | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Rack Centre LGS 1 Lagos | Rack Centre | Oregun, Ikeja, Lagos | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Rack Centre LGS 2 Lagos | Rack Centre | Oregun, Ikeja, Lagos | Stage not known Stage date not recorded Checked 10 November 2026 |
By region
- UK and Ireland 40 records, 1 frontier AI sites
- Nordics 23 records, 5 frontier AI sites
- Western Europe 24 records, 1 frontier AI sites
- North America 5 records, 77 frontier AI sites
- Asia Pacific 9 records, 8 frontier AI sites
- Middle East 1 records, 1 frontier AI sites
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact