Data centres / Western Europe / France
Eclairion Bruyères-le-Châtel
Bruyères-le-Châtel, Essonne, France.
OperatingFrance
What we checked
- Eclairion describes the site's first phase as operational since 2025; the exact operating date is not stated. (source)
- Eclairion describes direct liquid cooling for the site's high-density racks. (source)
- RTE publishes a June 2025 to October 2026 works schedule for a 225 kV underground line to the site. (source)
- Géorisques identifies the regulated installation at 2 rue de la Libération as Eclairion Paris Sud, formerly HPC Data Service and BDC2. (source)
- The Essonne prefecture records a public consultation from 2 December 2019 to 10 January 2020, an ICPE registration order dated 27 April 2020, and commissioning deadline extensions in 2023, 2024 and 2025. (source)
The operator describes a first phase as operational since 2025, but gives no exact opening date. Full-site delivery is shown separately for Q4 2027. RTE publishes a June 2025 to October 2026 works schedule for a 225 kV underground connection. The formal ICPE consultation closed on 10 January 2020. The prefecture page lists deadline extensions in 2023, 2024 and, most recently, 25 March 2025. The ICPE environmental registration and deadline extensions do not establish the main-facility building permit. The current DRIEAT route is for operational complaints, not support or opposition. These separate schedules and procedures do not establish whole-site completion, available capacity or community consent.
Operate this site or have better evidence? .
- Operator
- Eclairion
- Owner
- Not stated
- Stage
- Operating (source, stage date not recorded)
- Cooling
- Eclairion describes direct liquid cooling for the site's high-density racks.
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| 15-page ICPE environmental registration order 2020-PREF/DCPPAT/BUPPE/073 (internally numbered 1/15-15/15) in RAA no. 052 (not the main building permit) | Approved | 27 April 2020 | |
| ICPE commissioning deadline extension (not a new building permission) | Approved | 25 March 2025 |
Printable community case file
Eclairion Bruyères-le-Châtel
Record checked 6 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Operating, date not recorded | Inspect the stage source and limits |
| Where is the formal decision evidence? | 2 planning items recorded | Check the authority's complete file, reference and conditions |
| How can operational concerns be raised? | Report an operational ICPE concern to DRIEAT Île-de-France Checked 6 October 2026. This is a standing regulatory complaint route for the operating installation, not a project consultation. The recorded ICPE public consultation closed on 10 January 2020, and ComputeFinder found no current formal participation window. | Use the regulator's complaint page for operational nuisance or compliance concerns; this is not consultation or a route for general support or opposition |
| Which promises became outcomes? | Review 5 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Operating, date not recorded: stage source
- Decision evidence. 15-page ICPE environmental registration order 2020-PREF/DCPPAT/BUPPE/073 (internally numbered 1/15-15/15) in RAA no. 052 (not the main building permit): Approved, 27 April 2020.
- Decision evidence. ICPE commissioning deadline extension (not a new building permission): Approved, 25 March 2025.
- Checked statement. Eclairion describes the site's first phase as operational since 2025; the exact operating date is not stated. source
- Checked statement. Eclairion describes direct liquid cooling for the site's high-density racks. source
- Checked statement. RTE publishes a June 2025 to October 2026 works schedule for a 225 kV underground line to the site. source
- Checked statement. Géorisques identifies the regulated installation at 2 rue de la Libération as Eclairion Paris Sud, formerly HPC Data Service and BDC2. source
- Checked statement. The Essonne prefecture records a public consultation from 2 December 2019 to 10 January 2020, an ICPE registration order dated 27 April 2020, and commissioning deadline extensions in 2023, 2024 and 2025. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
4 of 13 facility fields recorded
5 separately recorded source statements. These are not included in the facility-field count.
4 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Capacity (MW)
- Power source
- Grid connection
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 6 October 2026. Reported and planned figures are shown as such. Independently reviewed on 6 October 2026. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 6). Eclairion Bruyères-le-Châtel: capacity, planning and power. ComputeFinder. Retrieved November 17, 2026, from https://computefinder.net/data-centres/eclairion-bruyeres-le-chatel
BibTeX
@misc{computefinder_data_centres_eclairion_bruyeres_le_chatel,
title = {Eclairion Bruyères-le-Châtel: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0067}},
number = {cf-dc-0067},
note = {Page last checked 6 October 2026. Retrieved 17 November 2026.}
}Stable ID: cf-dc-0067. Permanent link: https://computefinder.net/entity/cf-dc-0067. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/eclairion-bruyeres-le-chatel. Page last checked 6 October 2026. Retrieved 17 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0067"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in France
- Campus IA, Fouju
- Digital Realty Paris South (Mistral AI cluster)
- Data4 Paris-Saclay campus (PAR01, PAR02, PAR03)
- Fluidstack France 1 GW AI supercomputer
- Alice Recoque (proposed TGCC location)
All detailed records in France / Same recorded stage in France
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact