ComputeFinder

Data centres / Western Europe / France

Alice Recoque (proposed TGCC location)

Bruyères-le-Châtel, France.

Stage not knownFrance

What we checked

This is an attributed scientific computing system identity, not a verified physical campus, building or phase boundary. The source-described organisational role is not verification of the legal operator, owner or host. No current operation, hardware, capacity, power, capital flow or available compute is inferred. Publisher publication/update dates are unknown; the observation date is not an announcement, commissioning or service-start date. The source uses future-tense location wording; it does not establish delivery, installation or a formal current project stage. A shared locality label does not merge this account with Eclairion or establish shared or separate physical buildings, campuses or phases. Related generic EuroHPC Benchmark and Development guidance retains its 12 October 2026 evidence date. It does not verify current eligibility, an open call, allocation or participation for this system. Three admitted names are not three newly operating physical sites, complete directory factual depth or worldwide coverage.

Operate this site or have better evidence? .

Operator
Not stated
Owner
Not stated
Stage
Stage not known
Chips
  • EuroHPC names AMD EPYC Venice processors for the planned Alice Recoque unified partition.
    Scope: Announced future Alice Recoque unified partition, stated for TGCC at Bruyeres-le-Chatel. No scalar-partition composition, site-wide inventory, CPU quantities, delivery, commissioning, installed or available capacity is inferred.. Stage: Announced. Basis: reported. Evidence: source claim. Evidence date: not stated. source. Source version: not established. Source published: not stated; source updated: not stated; retrieved: not recorded; reviewed: 2026-11-01T04:26:23.610Z; evidence checked: 1 November 2026.
    EuroHPC Joint Undertaking: The linked Commission notice applies CC BY 4.0 to EU-owned content unless otherwise stated; third-party material is excluded. No blanket hardware/vendor licence is claimed.. Only independently worded attributed basic identifiers from the selected Arrhenius and planned Alice Recoque directory paragraphs, with ordinary exact links. No source tables, quantities, performance figures, logos, images, brands as graphics, contacts or linked third-party documents are imported. Independent review accepts only these exact selected facts and ordinary links. EuroHPC Joint Undertaking; Our Supercomputers; exact directory and legal notice linked. No endorsement. Technical identifiers condensed into original concise statements; no specification table or other source expression/asset is reproduced. A different independent review completed at 2026-11-01T04:26:23.610Z. The actual EuroHPC directory footer points to the directly inspected Commission legal notice. Its CC BY4.0 scope applies only to EU-owned content unless otherwise indicated, with attribution/change acknowledgement and third-party/personal/mark exclusions. The exact use is minimal independently worded attributed family/planned-model identifiers and selected-source limit accounts only; no table, quantity, benchmark, image, logo, trademark graphic, quotation, linked third-party document or dataset is imported. No hardware-vendor, whole-directory, domain-wide or recurring-source grant is inferred. Undated source tense does not establish current installation or availability.
  • EuroHPC names AMD Instinct MI430X accelerators for the planned Alice Recoque unified partition.
    Scope: Announced future Alice Recoque unified accelerated nodes only, stated for TGCC at Bruyeres-le-Chatel. No GPU quantities, performance, delivery, commissioning, operation, current availability or neighbouring-system hardware is inferred.. Stage: Announced. Basis: reported. Evidence: source claim. Evidence date: not stated. source. Source version: not established. Source published: not stated; source updated: not stated; retrieved: not recorded; reviewed: 2026-11-01T04:26:23.610Z; evidence checked: 1 November 2026.
    EuroHPC Joint Undertaking: The linked Commission notice applies CC BY 4.0 to EU-owned content unless otherwise stated; third-party material is excluded. No blanket hardware/vendor licence is claimed.. Only independently worded attributed basic identifiers from the selected Arrhenius and planned Alice Recoque directory paragraphs, with ordinary exact links. No source tables, quantities, performance figures, logos, images, brands as graphics, contacts or linked third-party documents are imported. Independent review accepts only these exact selected facts and ordinary links. EuroHPC Joint Undertaking; Our Supercomputers; exact directory and legal notice linked. No endorsement. Technical identifiers condensed into original concise statements; no specification table or other source expression/asset is reproduced. A different independent review completed at 2026-11-01T04:26:23.610Z. The actual EuroHPC directory footer points to the directly inspected Commission legal notice. Its CC BY4.0 scope applies only to EU-owned content unless otherwise indicated, with attribution/change acknowledgement and third-party/personal/mark exclusions. The exact use is minimal independently worded attributed family/planned-model identifiers and selected-source limit accounts only; no table, quantity, benchmark, image, logo, trademark graphic, quotation, linked third-party document or dataset is imported. No hardware-vendor, whole-directory, domain-wide or recurring-source grant is inferred. Undated source tense does not establish current installation or availability.

Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.

Inspect the limits of this source check

These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.

  • Grid connection, PUE, Water use, Coordinates: Not stated in the inspected source. Only the selected Alice Recoque directory paragraphs were inspected. They do not state grid voltage/named substation, explicit PUE kind/period, bounded water withdrawal/consumption/WUE or an official point/CRS. Future liquid-cooling language is not a measured water account. The provisional scalar-partition description is excluded; its stated mid-2026 announcement expectation is not evidence of a later event. Scope recorded 1 November 2026; inspected source context. EuroHPC Joint Undertaking: The linked Commission notice applies CC BY 4.0 to EU-owned content unless otherwise stated; third-party material is excluded. No blanket hardware/vendor licence is claimed.. Only independently worded attributed basic identifiers from the selected Arrhenius and planned Alice Recoque directory paragraphs, with ordinary exact links. No source tables, quantities, performance figures, logos, images, brands as graphics, contacts or linked third-party documents are imported. Independent review accepts only these exact selected facts and ordinary links. EuroHPC Joint Undertaking; Our Supercomputers; exact directory and legal notice linked. No endorsement. Technical identifiers condensed into original concise statements; no specification table or other source expression/asset is reproduced. A different independent review completed at 2026-11-01T04:26:23.610Z. The actual EuroHPC directory footer points to the directly inspected Commission legal notice. Its CC BY4.0 scope applies only to EU-owned content unless otherwise indicated, with attribution/change acknowledgement and third-party/personal/mark exclusions. The exact use is minimal independently worded attributed family/planned-model identifiers and selected-source limit accounts only; no table, quantity, benchmark, image, logo, trademark graphic, quotation, linked third-party document or dataset is imported. No hardware-vendor, whole-directory, domain-wide or recurring-source grant is inferred. Undated source tense does not establish current installation or availability.

Read EuroHPC JU's Alice Recoque directory account
Source page date not stated. Official publisher identity, stated or intended place and organisational-role account only. General access-calls navigation is not current system eligibility, an immediate allocation or available compute; related programme facts retain their own dates.

Related recorded research routes

These links open our existing programme records in directory order, not a ranking. Inspect each record's eligibility, dates and official next step. Listing a route does not mean a call is open, you qualify, an allocation is guaranteed or this facility has compute available.

This navigation reuses the programme records and their existing check dates; it is not a new source or availability check.

Linked European Union / European High-Performance Computing Joint Undertaking source articles: CC BY 4.0, selected EU-owned content only. European Union / EuroHPC JU, Our Supercomputers (https://www.eurohpc-ju.europa.eu/supercomputers/our-supercomputers_en). Reduced and adapted by ComputeFinder to selected scientific-system identity, stated or intended place and source-described organisational-role facts, retaining source tense and uncertainty. Rights notice: https://commission.europa.eu/legal-notice_en . Provided as-is without warranties. No endorsement. Excludes photographs and captions, attributed third-party material, quotations, people, logos, trademarks, technical tables, hardware, performance, rankings and other assets. No blanket domain or recurring-monitoring clearance.

Printable community case file

Alice Recoque (proposed TGCC location)

Record checked 17 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Stage not known, date not recordedInspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Stage not known, with no stage source recorded.
  • Checked statement. EuroHPC JU says Alice Recoque will be located at CEA's TGCC supercomputing centre in Bruyères-le-Châtel, France. source
  • Checked statement. The directory names the Jules Verne consortium as Alice Recoque's intended operator. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

1 of 13 facility fields recorded

2 separately recorded source statements. These are not included in the facility-field count.

1 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 17 October 2026. Reported and planned figures are shown as such. Independently reviewed on 17 October 2026: Six exact EU-authored identity, stated/intended place and source-described/intended organisational-role statements, source-tense/geography distinctions and selected twelve-name reconciliation; retained raw body and existing precise licence basis, zero new network reads.. Missing facility fields remain unverified. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 17). Alice Recoque (proposed TGCC location): capacity, planning and power. ComputeFinder. Retrieved November 14, 2026, from https://computefinder.net/data-centres/alice-recoque-tgcc

BibTeX
@misc{computefinder_data_centres_alice_recoque_tgcc,
  title        = {Alice Recoque (proposed TGCC location): capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0097}},
  number       = {cf-dc-0097},
  note         = {Page last checked 17 October 2026. Retrieved 14 November 2026.}
}

Stable ID: cf-dc-0097. Permanent link: https://computefinder.net/entity/cf-dc-0097. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/alice-recoque-tgcc. Page last checked 17 October 2026. Retrieved 14 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0097"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in France

All detailed records in France / Same recorded stage in France

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact