Data4 Paris-Saclay campus (PAR01, PAR02, PAR03)

OperatingFrance4 of 13 fields known

Nozay and Marcoussis, Essonne, France.

Operator
Data4
Owner
Not stated
Stage
Operating (source)
Power
Data4 quotes campus power capacities of 250 MW each for PAR01 and PAR03 and 5 MW for PAR02, 505 MW overall, without defining the metric.
Connectivity
The operator says the campus connects to more than 70 telecom operators and over 150 public cloud platforms.

The operator page does not say which buildings or phases are live, so the stage is a campus-level assumption from the page treating it as an operating campus. The 505 MW figure is a power capacity of the whole campus, not a built IT load.

What we checked

What we do not know yet

4 of 13 fields in a complete record are filled. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Other sites in France