Data centres / Western Europe / France
Data4 Paris-Saclay campus (PAR01, PAR02, PAR03)
Nozay and Marcoussis, Essonne, France.
Stage not knownFrance
What we checked
- Data4 lists PAR01 and PAR03 at Nozay and PAR02 at Marcoussis on 133 hectares with 505 MW of total power capacity (metric not defined). (source)
This combined PAR01, PAR02 and PAR03 record does not establish which buildings or phases are operating. Its stage is therefore unknown until phase-specific evidence is recorded. The 505 MW figure is a power capacity of the whole campus with an undefined metric, not evidence of delivered IT load.
Operate this site or have better evidence? .
- Operator
- Data4
- Owner
- Not stated
- Stage
- Stage not known (source, stage date not recorded)
- Power
- Data4 quotes campus power capacities of 250 MW each for PAR01 and PAR03 and 5 MW for PAR02, 505 MW overall, without defining the metric.
- Connectivity
- The operator says the campus connects to more than 70 telecom operators and over 150 public cloud platforms.
Printable community case file
Data4 Paris-Saclay campus (PAR01, PAR02, PAR03)
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Stage not known, date not recorded | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 1 checked statement and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Stage not known, date not recorded: stage source
- Checked statement. Data4 lists PAR01 and PAR03 at Nozay and PAR02 at Marcoussis on 133 hectares with 505 MW of total power capacity (metric not defined). source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
3 of 13 facility fields recorded
1 separately recorded source statement. These are not included in the facility-field count.
3 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Stage
- Capacity (MW)
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Data4 Paris-Saclay campus (PAR01, PAR02, PAR03): capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/data4-paris-saclay
BibTeX
@misc{computefinder_data_centres_data4_paris_saclay,
title = {Data4 Paris-Saclay campus (PAR01, PAR02, PAR03): capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0069}},
number = {cf-dc-0069},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0069. Permanent link: https://computefinder.net/entity/cf-dc-0069. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/data4-paris-saclay. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0069"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in France
- Phoenix Group Lyon AI data-centre project
- Campus IA, Fouju
- Eclairion Bruyères-le-Châtel
- Digital Realty Paris South (Mistral AI cluster)
- Fluidstack France 1 GW AI supercomputer
All detailed records in France / Same recorded stage in France
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact