ComputeFinder

Data centres / Western Europe / France

Phoenix Group Lyon AI data-centre project

Lyon (city-level project description), France.

AnnouncedFrance

What we checked

This is a planned project, not a currently verified compute access route. The latest reviewed company account reports concept design, not an operating facility. Exact premises, legal site operator, ownership, construction status, capacity metric, permits and current availability are not established here. Older construction and delivery targets are not treated as completed milestones. Ask Phoenix for current site status, the service model and any actual access route before planning a workload. City-level identity only, with no building boundary or street address established.

Operate this site or have better evidence? .

Operator
Not stated
Owner
Not stated
Stage
Announced (source, 30 September 2026)

Ask Phoenix about the Lyon project
Source page date not stated. General corporate enquiry route, not a dedicated Lyon sales or GPU-rental offer. Ask for current project status, the service model and access conditions. An enquiry is not an allocation or capacity confirmation. Checked 18 November 2026.

Linked Phoenix Group PLC source articles: Copyright retained; no open content licence or source clearance asserted. Minimal attributed original project identity, city-level description and dated concept-design account, with ordinary source and enquiry links. Linked terms timed out and were not reviewed. No passages, images, technical tables, raw source, private contacts or financial figures reproduced; no blanket domain permission.

Printable community case file

Phoenix Group Lyon AI data-centre project

Record checked 18 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Announced, recorded 30 September 2026Inspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Announced, dated 30 September 2026: stage source
  • Checked statement. Phoenix Group's update dated 28 October 2026 identifies its first European AI-ready data-centre project in Lyon, France. source
  • Checked statement. In that update, Phoenix reports that the project progressed to RIBA Stage 2 (Concept Design) during the third quarter of 2026, and that a specialist consortium has been appointed for subsequent technical design, engineering coordination and infrastructure planning. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

1 of 13 facility fields recorded

2 separately recorded source statements. These are not included in the facility-field count.

1 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 18 November 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, November 18). Phoenix Group Lyon AI data-centre project: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/phoenix-lyon-ai-development

BibTeX
@misc{computefinder_data_centres_phoenix_lyon_ai_development,
  title        = {Phoenix Group Lyon AI data-centre project: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/data-centres/phoenix-lyon-ai-development}},
  note         = {Page last checked 18 November 2026. Retrieved 20 November 2026.}
}

Page link: https://computefinder.net/data-centres/phoenix-lyon-ai-development. Page last checked 18 November 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Other sites in France

All detailed records in France / Same recorded stage in France

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact