Data centres / France
Fluidstack France 1 GW AI supercomputer
AnnouncedFrance3 of 13 fields known
France.
- Operator
- Fluidstack
- Owner
- Not stated
- Stage
- Announced (source, 18 February 2025)
- Power
- The project is to be powered by French nuclear electricity.
Reported only: a February 2025 memorandum of understanding with no site disclosed, and 1 GW of dedicated AI compute without a stated metric. We found no later status from the company or authorities.
What we checked
- A trade report of 18 February 2025 says Fluidstack signed a memorandum of understanding for a 1 GW AI supercomputer in France with no site named, targeting 2026 operation for phase one. (source)
What we do not know yet
3 of 13 fields in a complete record are filled. Still missing:
- Owner
- Capacity (MW)
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.