ComputeFinder

Data centres / Western Europe / France

Fluidstack France 1 GW AI supercomputer

France.

AnnouncedFrance

What we checked

Reported only: a February 2025 memorandum of understanding with no site disclosed, and 1 GW of dedicated AI compute without a stated metric. We found no later status from the company or authorities.

Operate this site or have better evidence? .

Operator
Fluidstack
Owner
Not stated
Stage
Announced (source, 18 February 2025)
Power
The project is to be powered by French nuclear electricity.
Inspect the limits of this source check

These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.

  • Grid connection, PUE, Water use, Chips, Coordinates: Not stated in the inspected source. Only the selected Fluidstack announcement paragraph in the English official-host presskit and its cover metadata were inspected for this record. The paragraph states no named-site grid voltage/substation, design/target/measured PUE, bounded water withdrawal/consumption/WUE, hardware model or explicit official point/CRS. Its broad French programme, investment and planned-launch language is not a specific site/phase, connection agreement, delivered capacity, commissioning or current operation. National grid chapters and other companies are not assigned to this record. This is not an exhaustive planning/EIA or later project-status audit. Scope recorded 1 November 2026; inspected source context. Presidency of the French Republic / elysee.fr; selected presskit paragraph attributed to Fluidstack: Actual site notice gives conditional open-content and ordinary deep-link permissions with third-party exclusions. Exact company-paragraph open-licence status/version is unverified; no adaptation grant is claimed for that component.. Only original independently worded selected-Fluidstack-paragraph inspection-limit wording and ordinary attributed exact links. No company paragraph text, image, logo, chart, table, contacts, presskit narrative, programme/financial/jobs quantity or other-company claim is imported. A separate independent review has completed for this exact limited account only. No company-paragraph adaptation, open-content licence or recurring acquisition permission is granted. Site of the Presidency of the French Republic, elysee.fr; Make France an AI Powerhouse; selected Fluidstack paragraph; exact original and legal notice linked. No endorsement. Original concise source-check boundary only; no source prose or asset reproduced. The actual legal/editorial notice was read before the exact English PDF, following a separately Git-frozen discovery/permission decision. Third-party intellectual property and graphics/multimedia are excluded from general site reuse language. No Etalab licence-version or developer-material grant is presumed from government hosting. No parallel-language PDF, BusinessFrance media representation or source body is used or retained. Independent source/use review completed at 2026-11-01T04:46:13.364Z. This model mapping does not renew source, publication, event, retrieval or parent clocks.

Printable community case file

Fluidstack France 1 GW AI supercomputer

Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Announced, recorded 18 February 2025Inspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 1 checked statement and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Announced, dated 18 February 2025: stage source
  • Checked statement. A trade report of 18 February 2025 says Fluidstack signed a memorandum of understanding for a 1 GW AI supercomputer in France with no site named, targeting 2026 operation for phase one. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

3 of 13 facility fields recorded

1 separately recorded source statement. These are not included in the facility-field count.

3 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 2). Fluidstack France 1 GW AI supercomputer: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/fluidstack-france-1gw

BibTeX
@misc{computefinder_data_centres_fluidstack_france_1gw,
  title        = {Fluidstack France 1 GW AI supercomputer: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0070}},
  number       = {cf-dc-0070},
  note         = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}

Stable ID: cf-dc-0070. Permanent link: https://computefinder.net/entity/cf-dc-0070. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/fluidstack-france-1gw. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0070"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in France

All detailed records in France / Same recorded stage in France

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact