Data centres / North America / United States
Argonne Leadership Computing Facility (ALCF)
Argonne, Illinois, United States.
Stage not knownUnited States
What we checked
- DOE lists Argonne Leadership Computing Facility (ALCF) at Argonne National Laboratory. (source)
- DOE records the facility's locality as Argonne, Illinois. (source)
This is an attributed scientific-facility identity/locality record, not a verified physical campus, building or phase boundary. Host laboratory is not a verified legal operator or owner. The US country filter is an explicit state-to-country normalisation, not a copied country field or geocode. No present operation, hardware, capacity, power, capital flow or available compute is inferred. Related programme navigation retains each existing record's own check date and cautions; it does not verify a current open call or eligibility. Three selected identities do not establish national or worldwide completeness.
Operate this site or have better evidence? .
- Operator
- Not stated
- Owner
- Not stated
- Stage
- Stage not known
Read the DOE Office of Science facility account
Source page date not stated. Official publisher evidence, not a live availability or application page. Follow the related programme records for their separately dated eligibility, cautions and official next steps.
Related recorded research routes
These links open our existing programme records in directory order, not a ranking. Inspect each record's eligibility, dates and official next step. Listing a route does not mean a call is open, you qualify, an allocation is guaranteed or this facility has compute available.
- DOE INCITE Record evidence checked 11 October 2026.
- DOE ASCR Leadership Computing Challenge (ALCC) Record evidence checked 11 October 2026.
This navigation reuses the programme records and their existing check dates; it is not a new source or availability check.
Linked U.S. Department of Energy, Office of Science / ASCR source articles: Selected DOE-authored government information: public domain. DOE acknowledgement: https://science.osti.gov/ascr/Facilities/User-Facilities. Reduced and adapted to the selected facility name, host laboratory and locality, with original uncertainty wording. No endorsement. Third-party resources, contractor sites, images, quotations, hardware, statistics and other assets are excluded. This is not blanket domain or recurring-monitoring permission.
ALCF allocation preparation
- ALCF says researchers at universities, in industry and in government agencies can seek a Director's Discretionary allocation without DOE sponsorship.
- ALCF describes this route as preparation for major INCITE or ALCC awards and requires projects to demonstrate a need for leadership-class resources.
ALCF: Director's Discretionary information. Read the current ALCF public programme information and follow its official application route if the project fits.
Scoped decision evidence checked 17 October 2026; next review by 23 October 2026. Source publication and update dates are not stated. This scoped account does not verify nationality eligibility, every access condition, a guaranteed award, an active account, free access or available compute. Earlier facility identity, system-name and INCITE/ALCC evidence keep their original dates and cautions. The corroborating allocation guide was created on 30 August 2022 and updated on 7 October 2026; those dates do not date the undated programme page.
Argonne National Laboratory / ALCF: Source copyright retained; exact basic-fact use assessed only. Two minimal attributed basic facts and ordinary unframed information link only. No source narrative, quotations, images, contacts or datasets reproduced or adapted. No open licence, public-domain status, endorsement, blanket domain clearance or recurring-monitoring grant. The earlier DOE-authored public-domain assessment does not cover this contractor content. No express restriction was visible on the complete programme and allocation-guide originals; the parent Argonne homepage returned 403 once and its conditions remain uninspected, not permission inferred from absence. Reassess newly evidenced applicable conditions without a paraphrase workaround.
Named systems in the official account
DOE names Aurora and Polaris among ALCF computing resources. DOE source
Names-only evidence checked 17 October 2026; next review by 23 October 2026. A named system is not an additional facility or evidence of a separate campus or phase. This association does not verify current operation, hardware specifications, capacity, available compute, an open call or eligibility. Earlier identity evidence and related programme dates are unchanged. Source page update date is not stated.
U.S. Department of Energy, Office of Science / ASCR: Selected DOE-authored government information: public domain. Reduced to named-system associations only, with DOE acknowledgement and original links. No endorsement. Excludes images, quotations, third-party resources, technical specifications, statistics and rankings. Not blanket source or recurring-monitoring permission.
Printable community case file
Argonne Leadership Computing Facility (ALCF)
Record checked 17 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Stage not known, date not recorded | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
ALCF allocation preparation
- ALCF says researchers at universities, in industry and in government agencies can seek a Director's Discretionary allocation without DOE sponsorship.
- ALCF describes this route as preparation for major INCITE or ALCC awards and requires projects to demonstrate a need for leadership-class resources.
ALCF: Director's Discretionary information. Read the current ALCF public programme information and follow its official application route if the project fits.
Scoped decision evidence checked 17 October 2026; next review by 23 October 2026. Source publication and update dates are not stated. This scoped account does not verify nationality eligibility, every access condition, a guaranteed award, an active account, free access or available compute. Earlier facility identity, system-name and INCITE/ALCC evidence keep their original dates and cautions. The corroborating allocation guide was created on 30 August 2022 and updated on 7 October 2026; those dates do not date the undated programme page.
Argonne National Laboratory / ALCF: Source copyright retained; exact basic-fact use assessed only. Two minimal attributed basic facts and ordinary unframed information link only. No source narrative, quotations, images, contacts or datasets reproduced or adapted. No open licence, public-domain status, endorsement, blanket domain clearance or recurring-monitoring grant. The earlier DOE-authored public-domain assessment does not cover this contractor content. No express restriction was visible on the complete programme and allocation-guide originals; the parent Argonne homepage returned 403 once and its conditions remain uninspected, not permission inferred from absence. Reassess newly evidenced applicable conditions without a paraphrase workaround.
Evidence carried into this printout
- Recorded stage. Stage not known, with no stage source recorded.
- Checked statement. DOE lists Argonne Leadership Computing Facility (ALCF) at Argonne National Laboratory. source
- Checked statement. DOE records the facility's locality as Argonne, Illinois. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
0 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
0 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Operator
- Stage
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 17 October 2026. Reported and planned figures are shown as such. Independently reviewed on 17 October 2026: the two selected DOE-authored name/host and locality statements, explicit US normalisation, exact reduced reuse and existing programme navigation only. Missing facility fields remain unverified. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 17). Argonne Leadership Computing Facility (ALCF): evidence and recorded limits. ComputeFinder. Retrieved November 14, 2026, from https://computefinder.net/data-centres/alcf-argonne
BibTeX
@misc{computefinder_data_centres_alcf_argonne,
title = {Argonne Leadership Computing Facility (ALCF): evidence and recorded limits},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0080}},
number = {cf-dc-0080},
note = {Page last checked 17 October 2026. Retrieved 14 November 2026.}
}Stable ID: cf-dc-0080. Permanent link: https://computefinder.net/entity/cf-dc-0080. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/alcf-argonne. Page last checked 17 October 2026. Retrieved 14 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0080"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in United States
- Google Council Bluffs data centre location
- Oak Ridge Leadership Computing Facility (OLCF)
- National Energy Research Scientific Computing Center (NERSC)
All detailed records in United States / Same recorded stage in United States
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact