Data centres / Netherlands
Meta Zeewolde data centre (cancelled)
CancelledNetherlands3 of 13 fields known
Zeewolde, Flevoland, Netherlands.
- Operator
- Meta
- Owner
- Not stated
- Stage
- Cancelled (source, 1 July 2022)
Cancelled. A trade report said full build would have been 200 MW across five halls, but the metric is not stated, so no capacity entry is made.
Planning
| Decision or document | Status | Date |
|---|---|---|
| Municipal approval followed by Dutch government refusal to sell the land; project dropped by Meta | Withdrawn | 1 July 2022 |
What we checked
- Meta confirmed on 1 July 2022 that it would not build at Zeewolde after the Dutch state declined to sell the needed land. (source)
- The Dutch parliament's data centre page describes the 166-hectare Zeewolde project as suspended pending extra conditions. (source)
What we do not know yet
3 of 13 fields in a complete record are filled. Still missing:
- Owner
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.