- Meta confirmed on 1 July 2022 that it would not build at Zeewolde after the Dutch state declined to sell the needed land. (source)
- The Dutch parliament's data centre page describes the 166-hectare Zeewolde project as suspended pending extra conditions. (source)
Cancelled. A trade report said full build would have been 200 MW across five halls, but the metric is not stated, so no capacity entry is made.
Operate this site or have better evidence? .
- Operator
- Meta
- Owner
- Not stated
- Stage
- Cancelled (source, 1 July 2022)
Inspect the limits of this source check
These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.
- Grid connection, PUE, Water use, Chips, Coordinates: Not stated in the inspected source. Only the selected 23 June 2022 parliamentary context article was inspected, including its Zeewolde paragraphs. It states no site-specific voltage/named substation, design/target/measured PUE, bounded water withdrawal/consumption/WUE, hardware model or explicit official point/CRS. The historical proposal discussion and household-electricity comparison establish none of those fields or a later cancellation, current stage or delivered capacity. The national description and Wieringermeer/Eemshaven context are not transferred to Zeewolde. This is not an exhaustive municipal planning/EIA review. Scope recorded 1 November 2026; inspected source context. Tweede Kamer der Staten-Generaal: Actual disclaimer permits text reuse with source attribution unless otherwise stated; no named open licence is claimed for this article. Photo/audio licences and exceptions are separate.. Only an independently worded selected-article inspection-limit account with ordinary exact source attribution/link. No article text, energy comparison, quantities, image, photographer/other contacts, audio or linked developer material is imported. A separate independent review has completed for this exact limited account only; no source-content adaptation or recurring acquisition permission follows. Tweede Kamer der Staten-Generaal; Datacenters in Nederland; 23 June 2022; exact original linked. No endorsement. Original concise check-boundary account only; no source expression or asset reproduced. The actual disclaimer copyright text section was read: attribution is required and exceptions remain. The separate non-commercial photo terms are not a general article-text grant. No assets or third-party passages are copied; the page is historical parliamentary context, not a planning/EIA or current operational audit. Independent source/use review completed at 2026-11-01T04:27:58.130Z. This model mapping does not renew source, publication, event, retrieval or parent clocks.
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| Municipal approval followed by Dutch government refusal to sell the land; project dropped by Meta | Withdrawn | 1 July 2022 |
Printable community case file
Meta Zeewolde data centre (cancelled)
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Cancelled, recorded 1 July 2022 | Inspect the stage source and limits |
| Where is the formal decision evidence? | 1 planning item recorded | Check the authority's complete file, reference and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Cancelled, dated 1 July 2022: stage source
- Decision evidence. Municipal approval followed by Dutch government refusal to sell the land; project dropped by Meta: Withdrawn, 1 July 2022.
- Checked statement. Meta confirmed on 1 July 2022 that it would not build at Zeewolde after the Dutch state declined to sell the needed land. source
- Checked statement. The Dutch parliament's data centre page describes the 166-hectare Zeewolde project as suspended pending extra conditions. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
3 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
3 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Meta Zeewolde data centre (cancelled): capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/meta-zeewolde
BibTeX
@misc{computefinder_data_centres_meta_zeewolde,
title = {Meta Zeewolde data centre (cancelled): capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0056}},
number = {cf-dc-0056},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0056. Permanent link: https://computefinder.net/entity/cf-dc-0056. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/meta-zeewolde. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0056"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Netherlands
- Google Eemshaven data centre
- Google Middenmeer data centre
- Microsoft Middenmeer data centre
- Groningen AI Factory (Zernike, Eurofiber data centre)
- Equinix Amsterdam IBX sites (metro cluster)
All detailed records in Netherlands / Same recorded stage in Netherlands
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact