Groningen AI Factory (Zernike, Eurofiber data centre)

AnnouncedNetherlands4 of 13 fields known

Zernike campus, Groningen, Netherlands.

Operator
Eurofiber Cloud Infra
Owner
Not stated
Stage
Announced (source, 21 September 2026)
Power
The programme says the site already has adequate electrical connections and so adds no extra grid congestion.
Cooling
Waste heat is to serve about 2,000 homes through WarmteStad, and no surface or drinking water is used for cooling.

About 1,800 GPUs are planned; no MW figure. Completion is expected in 2027 with full operation by early 2028. The funding sum differs between sources (about EUR 200 million).

What we checked

What we do not know yet

4 of 13 fields in a complete record are filled. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Other sites in Netherlands