Data centres / Netherlands
Google Middenmeer data centre
OperatingNetherlands4 of 13 fields known
Middenmeer, Wieringermeer, Netherlands.
- Operator
- Owner
- Stage
- Operating (source)
- Power
- Google said it expected about 80 per cent renewable energy for the site in 2024, supplied partly by offshore wind.
Operator page gives an operating-since year (2020) only, so no stage date is set. No MW figure.
What we checked
- Google's location page says the Middenmeer data centre has operated since 2020 on an industrial estate north of Amsterdam. (source)
What we do not know yet
4 of 13 fields in a complete record are filled. Still missing:
- Capacity (MW)
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.