Data centres / Western Europe / Netherlands

Groningen AI Factory (Zernike, Eurofiber data centre)

Zernike campus, Groningen, Netherlands.

AnnouncedNetherlands

What we checked

About 1,800 GPUs are planned; no MW figure. Completion is expected in 2027 with full operation by early 2028. The funding sum differs between sources (about EUR 200 million).

Operate this site or have better evidence? .

Operator
Eurofiber Cloud Infra
Owner
Not stated
Stage
Announced (source, 21 September 2026)
Power
The programme says the site already has adequate electrical connections and so adds no extra grid congestion.
Cooling
Waste heat is to serve about 2,000 homes through WarmteStad, and no surface or drinking water is used for cooling.

Printable community case file

Groningen AI Factory (Zernike, Eurofiber data centre)

Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Announced, recorded 21 September 2026Inspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 3 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Announced, dated 21 September 2026: stage source
  • Checked statement. A September 2026 programme update says the Dutch AI Factory supercomputer of about 1,800 GPUs will sit in an existing Eurofiber data centre on the Zernike campus. source
  • Checked statement. An industry report says the facility is due for completion in 2027, with the supercomputer fully operational by early 2028. source
  • Checked statement. A trade report of October 2025 says Groningen was one of six new EuroHPC AI Factory sites, with funding of about EUR 200 million. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

4 of 13 facility fields recorded

3 separately recorded source statements. These are not included in the facility-field count.

4 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 2). Groningen AI Factory (Zernike, Eurofiber data centre): capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/groningen-ai-factory-eurofiber

BibTeX
@misc{computefinder_data_centres_groningen_ai_factory_eurofiber,
  title        = {Groningen AI Factory (Zernike, Eurofiber data centre): capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0055}},
  number       = {cf-dc-0055},
  note         = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}

Stable ID: cf-dc-0055. Permanent link: https://computefinder.net/entity/cf-dc-0055. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/groningen-ai-factory-eurofiber. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0055"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in Netherlands

All detailed records in Netherlands / Same recorded stage in Netherlands

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact