Correction log
Every correction suggested to us, what happened to it and why. Entries are added, never edited, removed or relabelled.
Open items: 1. Logged in total: 40. By status: Received 0, Checked 1, Accepted 16, Declined 0, Published 23.
| Id | Received | Page | Summary | Status | Reason |
|---|---|---|---|---|---|
| C-0001 | 4 October 2026 | /data-centres/google-fredericia | The operating stage lacked a date. Google's 14 December 2020 post establishes operation by its publication date, not an exact opening day. | Published Received 4 October 2026 then Checked 5 October 2026 then Accepted 5 October 2026 then Published 5 October 2026 | Accepted by the authorised AI editor under Marc's delegated routine-fact rule after precise-use source clearance, direct original retrieval and independent review. Whole-record check date and capacity are unchanged. Publication is recorded separately after automatic build and live verification. Decided 5 October 2026 |
| C-0002 | 4 October 2026 | /data-centres/dcai-gefion-copenhagen | The operating stage lacked a dated primary source. The Foundation's 23 October 2024 release supports the historical stage, retaining pilot access, host locality and power boundaries. | Published Received 4 October 2026 then Checked 5 October 2026 then Accepted 5 October 2026 then Published 5 October 2026 | Accepted by the authorised AI editor under Marc's delegated routine-fact rule after precise-use source clearance, direct original retrieval and independent review. This is not general customer availability, current ownership verification, new capacity or a whole-record refresh. Publication is recorded separately after automatic build and live verification. Decided 5 October 2026 |
| C-0003 | 5 October 2026 | /data-centres/google-eemshaven | The parliamentary page is dated 23 June 2022; the note now describes historical existing-site evidence, not a current stage or opening-day check. | Published Received 5 October 2026 then Checked 5 October 2026 then Accepted 5 October 2026 then Published 5 October 2026 | Accepted by the authorised AI editor under Marc’s delegated routine-fact rule after precise-use clearance, direct originals and current independent review. This narrow context correction does not refresh the whole record or publish the held Eclairion item. Published history follows automatic build and live verification. Decided 5 October 2026 |
| C-0004 | 5 October 2026 | /data-centres/microsoft-middenmeer | The parliamentary page is dated 23 June 2022 and names Wieringermeer. The note distinguishes historical source wording from the existing Middenmeer mapping and separate expansion reporting. | Published Received 5 October 2026 then Checked 5 October 2026 then Accepted 5 October 2026 then Published 5 October 2026 | Accepted by the authorised AI editor under Marc’s delegated routine-fact rule after precise-use clearance, direct originals and current independent review. This narrow context correction does not refresh the whole record or publish the held Eclairion item. Published history follows automatic build and live verification. Decided 5 October 2026 |
| C-0005 | 5 October 2026 | /data-centres/data4-paris-saclay | The combined campus record does not establish a common operating stage across its phases. The stage is unknown; the existing undefined power metric is not delivered IT load. | Published Received 5 October 2026 then Checked 5 October 2026 then Accepted 5 October 2026 then Published 5 October 2026 | Accepted by the authorised AI editor under Marc’s delegated routine-fact rule after precise-use clearance, direct originals and current independent review. This narrow context correction does not refresh the whole record or publish the held Eclairion item. Published history follows automatic build and live verification. Decided 5 October 2026 |
| C-0006 | 11 October 2026 | /free-compute#airr-gateway-route | AIRR Gateway guidance was updated on 28 September 2026, not 25 August. Monthly review is normal practice and two months to resource access is a target maximum. | Published Received 11 October 2026 then Checked 11 October 2026 then Accepted 11 October 2026 then Published 11 October 2026 | Accepted by the authorised AI editor after direct GOV.UK retrieval, an exact-use OGL v3 assessment and independent factual review. Release verification remains a separate step. Decided 11 October 2026 |
| C-0007 | 12 October 2026 | /free-compute/nersc-ercap-allocations | The 5 October 2026 pre-allocation-year deadline had passed. The record now separates that closed window from year-round proposal acceptance and resource-contingent additional allocation awards. | Published Received 12 October 2026 then Checked 12 October 2026 then Accepted 12 October 2026 then Published 12 October 2026 | Accepted by the authorised AI editor after direct NERSC retrieval, a bounded source-use assessment and independent factual review. Published after automatic build 132b1de2-67d3-4ef7-8d69-30fca8e9afd7 succeeded for merge 15852f6658703987263c0cf362e7984c27dfaaaf and the live record was read back. Decided 12 October 2026 |
| C-0008 | 12 October 2026 | /free-compute/pawsey-partner-allocation-scheme | The listed 2027 submission window ended on 5 October 2026. The record now separates that passed window from committee review, notification, award and active access. | Published Received 12 October 2026 then Checked 12 October 2026 then Accepted 12 October 2026 then Published 12 October 2026 | Accepted by the authorised AI editor after current primary-source retrieval, a bounded source-use assessment and independent factual review. Published after automatic build 56f2b3c1-d8d5-446d-9e8d-54e5a75a5eb9 succeeded for merge 008803b47f3c29197b94753791823e13c9173405 and the live record was read back. Decided 12 October 2026 |
| C-0009 | 12 October 2026 | /free-compute/nci-australia-access-schemes | Both recorded NCI routes are closed. The dedicated Adapter page says Q4 2026 while the access hub retains a passed Q1 2026 reopening label, so no exact reopening date is inferred. | Published Received 12 October 2026 then Checked 12 October 2026 then Accepted 12 October 2026 then Published 12 October 2026 | Accepted by the authorised AI editor after current direct retrieval of both NCI pages, a bounded source-use assessment and independent factual review. Published after automatic build b0cbb464-7d88-40f5-8302-277b60304d7f succeeded for merge 7c73365f66ce7a110006841910c341d4416efffc and the live record was read back. Decided 12 October 2026 |
| C-0010 | 14 October 2026 | /site-directory | Epoch attributes AI hardware ownership, not necessarily facility ownership or operation. The shared catalogue must not treat that field as a facility operator. | Accepted Received 14 October 2026 then Checked 14 October 2026 then Accepted 14 October 2026 | Accepted by the authorised AI editor after direct original dictionary retrieval and independent source-definition review. Raw source records, estimates, confidence and collection dates are preserved; implementation review and automatic release/live verification remain separate. Decided 14 October 2026 |
| C-0011 | 14 October 2026 | /site-directory | Publication confirmation for C-0010: Epoch hardware-owner and facility-operator meanings are now separated. The earlier accepted entry and its history are unchanged. | Published Received 14 October 2026 then Checked 14 October 2026 then Accepted 14 October 2026 then Published 14 October 2026 | PR198 merge cb0d31448ef45d6faab0aa0b6d87734dabbfb2c1 passed independent exact-tree KEEP and 289 tests. Automatic push production 9c374ac8-61ef-4280-b122-50f5389c4b40 succeeded; live Oracle directory and AI HTML role wording were verified. Raw live JSON readback was unavailable, not claimed verified. Action309 terminal4851 retains exact proof. Decided 14 October 2026 |
| C-0012 | 14 October 2026 | /supply-chain/800-vdc-power-architecture | The previous constraint inferred most existing halls did not use 800 VDC from a vendor roadmap. No observed adoption count supported that conclusion. | Accepted Received 14 October 2026 then Checked 14 October 2026 then Accepted 14 October 2026 | Accepted by the authorised editor after direct original retrieval, precise licensed OCP adaptation assessment and independent source review. The replacement separates voltage, rack power, site-specific compatibility and dated deployment evidence. Exact candidate review, automatic release and live verification remain separate. Decided 14 October 2026 |
| C-0013 | 14 October 2026 | /supply-chain/800-vdc-power-architecture | Publication confirmation for C-0012: the unsupported most-halls prevalence inference is replaced by dated conceptual, deployment and site-specific boundaries. The earlier accepted entry is unchanged. | Published Received 14 October 2026 then Checked 14 October 2026 then Accepted 14 October 2026 then Published 14 October 2026 | PR200 merge b1159baff8e728de431d13eccb2baa261a8f53a9 passed independent exact-tree KEEP and295tests. Automatic push production203ab7bf-f728-493a-81c0-945929303851 succeeded; live four answers, original source, specific BY-SA licence and guide/Sites onward links were verified on desktop. Phone and real audience use remain unknown. Decided 14 October 2026 |
| C-0014 | 14 October 2026 | /sites | The power-chart explanation linked a zero estimate to a site not being built without a recorded lifecycle basis. Power estimates alone do not establish construction or operating stage. | Accepted Received 14 October 2026 then Checked 14 October 2026 then Accepted 14 October 2026 | The dated-building investigation separates source estimates, historical building reports, unfinished expansion and forecasts. The chart now names its unchanged 2 October snapshot and removes the unsupported lifecycle inference. Independent candidate review, automatic release and live verification remain separate gates. Decided 14 October 2026 |
| C-0015 | 14 October 2026 | /sites | Publication confirmation for C-0014: a zero power estimate no longer supplies an unsupported construction-stage inference. The earlier accepted entry is unchanged. | Published Received 14 October 2026 then Checked 14 October 2026 then Accepted 14 October 2026 then Published 14 October 2026 | PR202 merge e5065876787cd999c409ebb61c186df30a0e598c retained exact-tree8d819a22 independent KEEP. Natural push productionab83cd03-5e61-4c18-bfc2-2ee1bb2ff519 passed305tests; live dated evidence, ordinary-stage separation, map country groups and additive JSON were verified. Historical estimates remain dated2October. Phone and actual usefulness remain unmeasured. Decided 14 October 2026 |
| C-0016 | 15 October 2026 | /providers/cerebras | The editor withdrew unsupported free-tier descriptions from suitability, access and the tier fact. Current tiers and conditions remain unrecorded; the official pricing link is retained. This does not establish that no free access exists. | Accepted Received 15 October 2026 then Checked 15 October 2026 then Accepted 15 October 2026 | Accepted as a bounded editorial withdrawal after current original retrieval and independent exact-use review. Only ComputeFinder-owned uncertainty copy and an ordinary unframed link are admitted, not replacement source content, prices, credit conditions or a whole-record refresh. Existing facts and their 3 October check date remain unchanged. Automatic release and live verification are separate gates. Decided 15 October 2026 |
| C-0017 | 15 October 2026 | /providers/cerebras | Publication confirmation for C-0016: unsupported free-tier descriptions were withdrawn while current conditions remain unrecorded and the official pricing link remains. C-0016 and all earlier history are unchanged. | Published Received 15 October 2026 then Checked 15 October 2026 then Accepted 15 October 2026 then Published 15 October 2026 | PR231 merged as d001cc891ed92ee083e4200ea1252d19a96b746e after immutable independent KEEP and 349 local/preview tests. Natural push production08cf3678-4d72-4662-aabd-608e17548e43 succeeded at03:43:36.223UTC; live corrected fields, old date, official keyboard exit and exact provider JSON were verified. Production log output stops at the deploy command, so its test count and Worker version are not claimed. Phone and actual use remain unverified. Decided 15 October 2026 |
| C-0018 | 15 October 2026 | /providers/groq | Withdrew the stale corporate-status access note and unsupported detailed pricing fact, and replaced the redirected pricing locator with an ordinary official models link. Current access conditions are unrecorded; retained evidence and its older date are unchanged. | Accepted Received 15 October 2026 then Checked 15 October 2026 then Accepted 15 October 2026 | Accepted by the authorised editor after fetched originals and independent exact-use review. This admits only editorial withdrawal, own uncertainty wording and an unframed link, not republication of restricted corporate, licensing, billing, model or pricing content. The one retained fact and 3 October check date are not refreshed or re-cleared. Exact immutable review, automatic release and live verification remain separate gates. Decided 15 October 2026 |
| C-0019 | 15 October 2026 | /providers/groq | Publication confirmation for C-0018: the stale access note and unsupported pricing detail were withdrawn, with current access left unrecorded and an ordinary official models link. C-0018 and earlier history are unchanged. | Published Received 15 October 2026 then Checked 15 October 2026 then Accepted 15 October 2026 then Published 15 October 2026 | PR233 merge6ad24b4886c1f74d4ad832279f62e22ce04e71f8 passed independent exact-tree KEEP at04:39:04UTC and351tests. Preview8b1f90cb succeeded04:38:52.383UTC; natural push production469ef467-4b06-468c-95a4-e4ac21732aab succeeded04:40:58.996UTC with351passes andWorkerd4f7c4d2. Live unknown-conditions note, one retained fact, older date, official keyboard destination and exact provider JSON were verified. No replacement source content was admitted; phone and real use remain unverified. Decided 15 October 2026 |
| C-0020 | 15 October 2026 | /news | Two alliance summaries used URLs for the same original. They are consolidated into one editorial withdrawal notice with both historical identities retained, not a newly verified source account. | Accepted Received 15 October 2026 then Checked 15 October 2026 then Accepted 15 October 2026 | Accepted after independent source-identity and exact-use review. This removes adapted source descriptions and retains one ordinary source link plus aliases; no replacement article claims, copied title/body or open reuse licence are admitted. The 16 September archive date is retained separately from the 15 October correction. Earlier correction entries are unchanged. Exact-head review, automatic release and live readback remain separate gates. Decided 15 October 2026 |
| C-0021 | 17 October 2026 | /news#news-7355b949981a45cf | The Victoria news account used a blanket exclusion for projects already under assessment and called planning expectations new rules. Replace it with the official guide's dated application cutoff and future-amendment distinction; withdraw unchecked technical conditions. | Accepted Received 17 October 2026 then Checked 17 October 2026 then Accepted 17 October 2026 | Independent source/use review checked two minimal attributed facts from the Victorian Department of Transport and Planning guide, updated14October. Permit applications lodged on or after23September are its stated scope; specific legal effect or an exemption is not established here. Preserve the28September archive date, old source identity and permalink. No copied source content, open licence or recurring grant. Code review, automatic production and live verification remain separate gates. Decided 17 October 2026 |
| C-0022 | 19 October 2026 | /countries/ghana | The headline presented legal absence and facility status without the dates and limits retained in the detailed record. It is replaced by neutral reader orientation, not new legal or operating claims. | Accepted Received 19 October 2026 then Checked 19 October 2026 then Accepted 19 October 2026 | Editorial withdrawal based on the existing record: the AI-law absence observation is limited to early 2025. Independent local challenge accepted the narrower wording, not current Ghanaian law or the unchanged detailed claims. Country and institutional evidence dates remain unchanged. Exact-candidate review, automatic publication and live verification are separate gates. Decided 19 October 2026 |
| C-0023 | 20 October 2026 | /countries/ghana | Publication confirmation for C-0022: a current HTTP response contains the neutral reader orientation and no longer contains the former complete undated legal and facility assurance. C-0022 and all earlier entries remain unchanged. | Published Received 20 October 2026 then Checked 20 October 2026 then Accepted 20 October 2026 then Published 20 October 2026 | PR330 was independently reviewed and automatically deployed on 19 October. A newly supported ordinary canonical HTTP GET at 01:48:47.635 UTC on 20 October returned 200 with the neutral text present and exact former assurance absent. Independent delivery review at 01:51:15 UTC examined the checker, retained result and reviewed source, not full saved response bytes or a second fetch. This confirms bounded response wording, not visible placement, current Ghanaian law, source freshness, device interaction or reader benefit. The 2 October country and separate 17 October institutional evidence dates remain unchanged. Decided 20 October 2026 |
| C-0024 | 20 October 2026 | /countries/jamaica | The headline used present legal-absence and future consultation framing beyond its own not-confirmed-since note. The closing policy-support inference also exceeded the dated report. Both are replaced with neutral reader guidance, not new legal or access findings. | Accepted Received 20 October 2026 then Checked 20 October 2026 then Accepted 20 October 2026 | Current-base recovery of the independently challenged 19 October editorial withdrawal. The dated attributed report, instrument, source URL, record check and review dates remain unchanged. The 20 October receipt names this current integration decision, not the original discovery date or a new source check. No current Jamaican law, consultation outcome, support or compute availability is established. Exact-candidate review, original device/readback gates and automatic publication remain separate. Decided 20 October 2026 |
| C-0025 | 28 October 2026 | /free-compute/eurohpc-extreme-scale-access | The recorded 26 October cut-off was still described as next. Date the wording to the retained 12 October source check, label that cut-off as passed and leave later cut-offs and current application status unverified. | Accepted Received 28 October 2026 then Checked 28 October 2026 then Accepted 28 October 2026 | Bounded editorial correction to retained evidence, not a new source acquisition or current call-status finding. Independent read-only review keeps the dated qualification without treating a past cut-off as closure. Source URLs, 12 October check date, the live-page/PDF date discrepancy and unrelated programme facts remain unchanged. Exact-candidate review, automatic publication and live verification are separate gates. Decided 28 October 2026 |
| C-0026 | 28 October 2026 | /free-compute/nscc-eighth-call-2026 | The retained 23 October deadline was not labelled as passed. Date the wording to the 17 October source check, preserve the unknown timezone and older 16 October discrepancy, and leave current application status and later windows unverified. | Accepted Received 28 October 2026 then Checked 28 October 2026 then Accepted 28 October 2026 | Bounded editorial qualification of already-published procedural evidence, not a fresh source check or a claim that the call closed. Original source URLs, copyright conditions, charged conditional access, check and review dates remain unchanged. Independent editorial review keeps the dated qualification; exact-candidate review, automatic publication and live verification remain separate. Decided 28 October 2026 |
| C-0027 | 30 October 2026 | /free-compute/airr-cloud-access-call | The prominent deadline wording gave generic open-or-closed uncertainty despite retained evidence that AIRR Cloud Access was closed at the 3 October check. Show that recorded status clearly and keep present status unverified. | Accepted Received 30 October 2026 then Checked 30 October 2026 then Accepted 30 October 2026 | Bounded presentation correction of already-published evidence, independently reviewed without a new source acquisition or present-status claim. The 28 September banner statement, original source URLs, all prior facts and 3 October check date are retained. Exact-candidate review, browser acceptance, automatic publication and live verification remain separate. Decided 30 October 2026 |
| C-0028 | 6 November 2026 | /free-compute/eurohpc-benchmark-and-development-access | Prepared bounded metadata correction: label the recorded 1 November cut-off as passed and show the separately checked next future 1 December cut-off, without renewing 12 October eligibility and policy evidence. Exact originals, use conditions, three-way timing disagreement and readiness boundary are recorded in docs/reviews/eurohpc-benchmark-metadata-2026-11-06.md. Independent factual/use and exact-candidate acceptance, applicable native tests, automatic publication and live verification remain pending; no publication is claimed. | Checked Received 6 November 2026 then Checked 6 November 2026 | Not decided yet |
| C-0029 | 11 November 2026 | /countries/thailand | The Thailand headline and policy row presented September press reporting as a current nationwide pause and used a news date as a legal effective date. The account now labels the reporting and its dates, leaves current enforceable status unverified, and separates BOI screening from a construction stop. BOI's displayed 8 July page date is not a legal commencement date. | Accepted Received 11 November 2026 then Checked 11 November 2026 then Accepted 11 November 2026 | Fresh reads of the affected BOI and September source pages support a narrower account. This correction does not assert that a pause ended, a new rule took effect, a tariff was enacted or compute became available. Unrelated facts retain their own dates. Decided 11 November 2026 |
| C-0030 | 11 November 2026 | /countries/ghana | The Onix country row presented operation, ownership and certification as current alongside rack figures from a March 2021 trade report. Use the operator contact locality and enquiry route, mark current stage unknown, and retain the old report as historical rather than current inventory. | Accepted Received 11 November 2026 then Checked 11 November 2026 then Accepted 11 November 2026 | The operator contact page identifies Onix Data Centre in Amrahia-Katamanso towards Dodowa, Accra. The current contact reading does not verify current ownership, certification, operating stage or rack capacity. The dated historical source remains linked; other Ghana policy, legal and grid claims and their dates are unchanged. Decided 11 November 2026 |
| C-0031 | 11 November 2026 | /countries/ghana | The Ghana summary and Act row gave blanket no-localisation and no-explicit-transfer-conditions wording. Replace it with bounded duties from the official Act, a link to the separately labelled draft bill, and practical workload-specific checks without treating the draft as enacted. | Accepted Received 11 November 2026 then Checked 11 November 2026 then Accepted 11 November 2026 | DPC-hosted Act 843 sections 27, 30 and 47 support registration, processor-security and contract duties and transfer-country registration particulars. The section 30(4) test is a processor not domiciled in Ghana, not simply a processor outside Ghana. DPC hosts the other document as a draft bill; its publication does not establish enactment. This is not an exhaustive sector-specific legal assessment. Other facility, policy and grid facts retain their own dates. Decided 11 November 2026 |
| C-0032 | 11 November 2026 | /countries/oman | The Oman overview relied on an older digest saying personal-data executive regulations had not been issued. Link the official Executive Regulation 34/2024 and identify its cross-border transfer chapter instead of carrying that stale gap forward. | Accepted Received 11 November 2026 then Checked 11 November 2026 then Accepted 11 November 2026 | The ministry publishes the regulation under Ministerial Decision 34/2024. Its official English text contains cross-border controls in Articles 37 to 40. This correction is not a complete current-law, later-amendment or sector-specific assessment, and does not treat a hosting location as compliance clearance. Other country facts retain their own dates. Decided 11 November 2026 |
| C-0033 | 12 November 2026 | /countries/angola | The overview presented a 2023 groundbreaking account and expected 2024 opening as current construction-stage information. Replace that stale present-tense description with operator-sourced AO1 identity, Luanda locality and an enquiry route; current stage and capacity remain unverified. | Published Received 12 November 2026 then Checked 12 November 2026 then Accepted 12 November 2026 then Published 12 November 2026 | Routine publisher correction based on the current operator facility page and its mixed future/present language. No opening date, operation, capacity, certification, address or availability is inferred. Other country policy, legal and grid claims retain their original check date. Prior correction entries are unchanged. Decided 12 November 2026 |
| C-0034 | 12 November 2026 | /countries/ethiopia | The Raxio row used group-level secondary reporting to present an operating stage and Tier III description. Replace that account with operator-sourced ET1 identity, ICT Park locality and practical enquiry guidance; current stage, certification and availability remain unverified. | Published Received 12 November 2026 then Checked 12 November 2026 then Accepted 12 November 2026 then Published 12 November 2026 | Routine evidence correction and reader-journey improvement using the operator's own ET1 page. No capacity, current tariff, street address, GPU offer or country-wide freshness is inferred. Other country evidence retains its 2 October 2026 check date. Decided 12 November 2026 |
| C-0035 | 12 November 2026 | /countries/nigeria | The overview foregrounded an unconfirmed April 2026 launch target, market-capacity estimates and GPU shipments, and labelled Nxtra operating without current independent verification. Use Kasi's dated Coming Soon labels, practical facility-enquiry guidance and explicit unknowns instead of deployment assurances. | Published Received 12 November 2026 then Checked 12 November 2026 then Accepted 12 November 2026 then Published 12 November 2026 | Kasi's own page identifies two distinct planned campuses and retains Coming Soon labels. That is not proof of closure, no available service or a delivered opening. Nxtra's earlier secondary report remains linked but is not independently verified current operation, capacity or installed GPU inventory. No source refusal is bypassed and other country evidence keeps its original date. Decided 12 November 2026 |
| C-0036 | 13 November 2026 | /countries/nigeria | LG3 was labelled planned beside an expired Q1 2026 opening target and an unrelated other-operator aside. Mark its current stage unknown and ask for direct opening, space, power and delivery confirmation. | Published Received 13 November 2026 then Checked 13 November 2026 then Accepted 13 November 2026 then Published 13 November 2026 | The retained trade-guide target does not establish present operation or availability. Independent editorial review supports this narrow qualification. The existing source URL and country check date remain unchanged; no new operator timing, closure or unavailable-service claim is added. Decided 13 November 2026 |
| C-0037 | 13 November 2026 | /countries/chile | The overview presented faster permitting and regional market superlatives without a current evidence date. Replace those assurances with practical service and access checks and an explicit boundary around the older evidence. | Published Received 13 November 2026 then Checked 13 November 2026 then Accepted 13 November 2026 then Published 13 November 2026 | Editorial qualification of the retained dated source basis, not a new current-law or market-ranking assessment. Independent editorial and code-scope review retained the attributed plan context. The underlying policy, grid and facility records, source URLs and older dates remain unchanged, as does the separately checked AWS account. No change of law, unavailable-service claim or facility opening is inferred. Decided 13 November 2026 |
| C-0038 | 13 November 2026 | /countries/chile | The grid note carried a dimensionally ambiguous annual-loss figure and an undated storage description. Withdraw the loss number without inventing another unit, date the trade source and add site-specific connection checks. | Published Received 13 November 2026 then Checked 13 November 2026 then Accepted 13 November 2026 then Published 13 November 2026 | The full cited DPL article dated 28 July 2026 uses an unclear annual power-unit expression. Independent editorial challenge supports narrowing the account. No corrected energy quantity, spare capacity or current connection availability is inferred. Other records and parent evidence dates remain unchanged. Decided 13 November 2026 |
| C-0039 | 14 November 2026 | /free-compute/cscs-allocation-schemes | The detailed CSCS scheme account is replaced by a narrower, independently sourced Swiss national LUMI guide. The existing page URL is retained; current intake and deadlines remain unverified. | Published Received 14 November 2026 then Checked 14 November 2026 then Accepted 14 November 2026 then Published 14 November 2026 | Source-use reassessment led to withdrawal of the prior detailed account and direct CSCS links. Separately fetched LUMI guidance supports the limited national-access route, not a new open-call or award claim. Other CSCS routes are outside this record, not declared closed. Decided 14 November 2026 |
| C-0040 | 14 November 2026 | /countries/chile | The sectoral-authorisation row labelled a law in force while citing only a trade report and repeating a general 25-day installation claim. Mark the status unconfirmed and withdraw the unverified timetable. | Published Received 14 November 2026 then Checked 14 November 2026 then Accepted 14 November 2026 then Published 14 November 2026 | The full linked DPL News article is dated 28 July 2026. Its reported time-saving figures do not verify statutory commencement, permit coverage or a deadline for an individual data-centre project. This is an evidence qualification, not a finding that the law was repealed, is not in force or guarantees a different timetable. The source URL and other country facts, dates, prior corrections and separately dated AWS account remain unchanged. Decided 14 November 2026 |
How this log works
- First reply within 7 days. If a suggestion has no reply after 7 days, the log page says so.
- A public count of open items on the correction log.
- Marc Winn is responsible for editorial policy and source permissions. An authorised AI agent may decide routine factual corrections using sources already cleared for that use, directly fetched evidence and independent review. Conflicting evidence, consequential contested claims, source-rights questions, private information and commercial commitments go to Marc.
- A suggestion is evidence, not an instruction. Submitting this form does not change a public fact. Accepted changes must pass tests, deployment and live checks, with the editorial reason and date recorded.
- Declines always say why. The log is append-only: entries are never edited, removed or relabelled.
- A suggestion without a source link is still logged, but it cannot change a fact.
Statuses move one way: received, checked, then accepted or declined (with a reason), then published. A person adds each entry to this log after reading the suggestion, so the count above covers what has been logged, not messages still waiting for a first reply. To suggest a correction, use the form.
Checked on 4 October 2026 and due for review by 4 January 2027.