ComputeFinder

Data centres / Middle East / United Arab Emirates

Moro Hub Green Data Centre (Solar Park)

Mohammed bin Rashid Al Maktoum Solar Park, United Arab Emirates.

Stage not knownUnited Arab Emirates

What we checked

This record distinguishes historical inauguration milestones from the current status of a whole campus. Green is part of the source-reported name, not independently verified environmental performance. An inauguration does not verify completion of every planned phase, current whole-campus operation or compute available to buy. No Warsan facts or other facilities are merged here. Current legal owner and facility operator, precise coordinates, street address, capacity, power, cooling, planning and current eligibility or availability remain unverified. One named record does not establish UAE-wide coverage or a unique-facility census.

Operate this site or have better evidence? .

Operator
Not stated
Owner
Not stated
Stage
Stage not known

Linked Dubai Electricity and Water Authority (DEWA) source articles: DEWA source copyright retained; no open reuse licence asserted. Three minimal original historical facts from the two dated DEWA notices, with attribution and ordinary unframed source links. This is not an open licence or permission to adapt the articles, import a database, copy passages, quotations, personal names, images or other assets. DEWA retains copyright; material is provided as-is without currency warranties. No claim of DEWA endorsement or legal certainty. Source dates and precise use checked 15 October 2026. Specifications, superlatives, certification, renewable-energy and carbon-benefit claims are excluded.

Printable community case file

Moro Hub Green Data Centre (Solar Park)

Record checked 15 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Stage not known, date not recordedInspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Stage not known, with no stage source recorded.
  • Checked statement. DEWA reported the inauguration of the Moro Hub Green Data Centre at the Mohammed bin Rashid Al Maktoum Solar Park on 16 February 2023. source
  • Checked statement. DEWA reported the inauguration of a second phase at the same solar-park facility on 22 January 2025. This is a dated phase milestone, not verification of a completed campus or available compute. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

0 of 13 facility fields recorded

2 separately recorded source statements. These are not included in the facility-field count.

0 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 15 October 2026. Reported and planned figures are shown as such. Independently reviewed on 15 October 2026: the three basic historical locality and inauguration facts, their source dates and precise original-fact/link-out use. Missing facility fields remain unverified. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 15). Moro Hub Green Data Centre (Solar Park): evidence and recorded limits. ComputeFinder. Retrieved November 14, 2026, from https://computefinder.net/data-centres/moro-hub-solar-park

BibTeX
@misc{computefinder_data_centres_moro_hub_solar_park,
  title        = {Moro Hub Green Data Centre (Solar Park): evidence and recorded limits},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0078}},
  number       = {cf-dc-0078},
  note         = {Page last checked 15 October 2026. Retrieved 14 November 2026.}
}

Stable ID: cf-dc-0078. Permanent link: https://computefinder.net/entity/cf-dc-0078. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/moro-hub-solar-park. Page last checked 15 October 2026. Retrieved 14 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0078"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

All detailed records in United Arab Emirates / Same recorded stage in United Arab Emirates

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact