What we checked
- HLRS says Hunter was inaugurated on 16 January 2025 with 48.1 petaflops peak and 188 nodes of AMD MI300A. (source)
- A March 2026 trade report says EuroHPC signed a contract with HPE for HammerHAI at HLRS, expected to run in the second half of 2026. (source)
Hunter is in service; the HammerHAI AI Factory system was contracted in March 2026 for operation in the second half of 2026, which we have not confirmed. No MW figure found.
Operate this site or have better evidence? .
- Operator
- High-Performance Computing Center Stuttgart (HLRS)
- Owner
- University of Stuttgart
- Stage
- Operating (source, 16 January 2025)
- Cooling
- Hunter uses fully fanless direct liquid cooling.
- Chips
- HLRS lists AMD Instinct MI300A for the APU nodes of Hunter.
Scope: Hunter APU partition only. The undated system page is not proof of a current service state or chip availability, not the CPU partition or a whole-HLRS inventory. No quantities, performance, power or hardware generation for other systems is inferred.. Stage: Stage not known. Basis: reported. Evidence: source claim. Evidence date: not stated. source. Source version: not established. Source published: not stated; source updated: not stated; retrieved: not recorded; reviewed: 2026-11-01T03:34:53.155Z; evidence checked: 1 November 2026.
High-Performance Computing Center Stuttgart, University of Stuttgart: Copyright retained; no open licence verified for these HLRS pages.. Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review. High-Performance Computing Center Stuttgart, University of Stuttgart; exact original linked. No endorsement. Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported. A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only two original minimal attributed processor-identification facts at separate Hunter APU/CPU partition grain and ordinary links. The actual institutional release and system-page footer retain rights; no substantive reuse grant appeared in inspected footer text. That is not permission or proof none exists. No counts, technical table, benchmark, power figure, source expression, assets, contacts, whole-HLRS inventory or recurring/domain grant is imported. - HLRS lists AMD EPYC 9374F for the CPU nodes of Hunter.
Scope: Hunter CPU-node partition only, distinct from the MI300A APU nodes. No summed inventory, current GPU availability, Hawk/Herder/HammerHAI mapping, measured PUE or facility operation date is inferred.. Stage: Stage not known. Basis: reported. Evidence: source claim. Evidence date: not stated. source. Source version: not established. Source published: not stated; source updated: not stated; retrieved: not recorded; reviewed: 2026-11-01T03:34:53.155Z; evidence checked: 1 November 2026.
High-Performance Computing Center Stuttgart, University of Stuttgart: Copyright retained; no open licence verified for these HLRS pages.. Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review. High-Performance Computing Center Stuttgart, University of Stuttgart; exact original linked. No endorsement. Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported. A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only two original minimal attributed processor-identification facts at separate Hunter APU/CPU partition grain and ordinary links. The actual institutional release and system-page footer retain rights; no substantive reuse grant appeared in inspected footer text. That is not permission or proof none exists. No counts, technical table, benchmark, power figure, source expression, assets, contacts, whole-HLRS inventory or recurring/domain grant is imported.
Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.
- HLRS lists AMD Instinct MI300A for the APU nodes of Hunter.
Inspect the limits of this source check
These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.
- Grid connection, PUE, Water use, Coordinates: Not stated in the inspected source. The selected Hunter release/system page supplies no connection voltage/named upstream substation, explicit design/target/measured PUE, bounded withdrawal/consumption/WUE or verified official point/CRS. Fanless direct-liquid cooling and reported average kW are not PUE or water accounting. Future Herder-building heat reuse is not a Hunter current result. Scope recorded 1 November 2026; inspected source context. High-Performance Computing Center Stuttgart, University of Stuttgart: Copyright retained; no open licence verified for these HLRS pages.. Only minimal independently worded attributed basic facts and ordinary unframed exact source links are proposed. No source narrative, quotations, table, figures, assets, contacts, marks, source bodies or dataset import. Independent factual and exact-use review completed at 2026-11-01T03:34:53.155Z. This mapping does not renew that review. High-Performance Computing Center Stuttgart, University of Stuttgart; exact original linked. No endorsement. Selected information reduced to original concise factual statements; no source text, chart, table, image, node-log example or other asset is imported. A different independent source fact/exact-use review completed at 2026-11-01T03:34:53.155Z. KEEP only two original minimal attributed processor-identification facts at separate Hunter APU/CPU partition grain and ordinary links. The actual institutional release and system-page footer retain rights; no substantive reuse grant appeared in inspected footer text. That is not permission or proof none exists. No counts, technical table, benchmark, power figure, source expression, assets, contacts, whole-HLRS inventory or recurring/domain grant is imported.
Printable community case file
HLRS Stuttgart (Hunter and HammerHAI)
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Operating, recorded 16 January 2025 | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Operating, dated 16 January 2025: stage source
- Checked statement. HLRS says Hunter was inaugurated on 16 January 2025 with 48.1 petaflops peak and 188 nodes of AMD MI300A. source
- Checked statement. A March 2026 trade report says EuroHPC signed a contract with HPE for HammerHAI at HLRS, expected to run in the second half of 2026. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
5 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
5 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Capacity (MW)
- Power source
- Grid connection
- PUE
- Water use
- Connectivity
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). HLRS Stuttgart (Hunter and HammerHAI): capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/hlrs-stuttgart
BibTeX
@misc{computefinder_data_centres_hlrs_stuttgart,
title = {HLRS Stuttgart (Hunter and HammerHAI): capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0062}},
number = {cf-dc-0062},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0062. Permanent link: https://computefinder.net/entity/cf-dc-0062. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/hlrs-stuttgart. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0062"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Germany
- KDO data centre, Oldenburg
- German Climate Computing Centre (DKRZ), Hamburg
- Schwarz Digits Lübbenau data centre
- Telekom Industrial AI Cloud, Munich (Tucherpark)
- JUPITER exascale system, Forschungszentrum Jülich
All detailed records in Germany / Same recorded stage in Germany
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact