Data centres / Western Europe / Germany
Telekom Industrial AI Cloud, Munich (Tucherpark)
Tucherpark, Munich, Germany.
OperatingGermany
What we checked
- Telekom's media kit says the Industrial AI Cloud launched in February 2026 at the Tucherpark facility in Munich, operated through T-Systems with NVIDIA and SAP. (source)
- A trade report says the system uses up to 10,000 Blackwell GPUs in a repurposed data centre. (source)
A renovated Munich data centre hosting up to about 10,000 NVIDIA Blackwell GPUs. No MW figure published in what we fetched. Stage date is the opening press event in Telekom's media calendar.
Operate this site or have better evidence? .
- Operator
- Deutsche Telekom (T-Systems)
- Owner
- Deutsche Telekom
- Stage
- Operating (source, 4 February 2026)
- Cooling
- GPU pods use heat exchangers for thermal management.
Printable community case file
Telekom Industrial AI Cloud, Munich (Tucherpark)
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Operating, recorded 4 February 2026 | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Operating, dated 4 February 2026: stage source
- Checked statement. Telekom's media kit says the Industrial AI Cloud launched in February 2026 at the Tucherpark facility in Munich, operated through T-Systems with NVIDIA and SAP. source
- Checked statement. A trade report says the system uses up to 10,000 Blackwell GPUs in a repurposed data centre. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
4 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
4 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Capacity (MW)
- Power source
- Grid connection
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Telekom Industrial AI Cloud, Munich (Tucherpark): capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/telekom-munich-tucherpark
BibTeX
@misc{computefinder_data_centres_telekom_munich_tucherpark,
title = {Telekom Industrial AI Cloud, Munich (Tucherpark): capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0060}},
number = {cf-dc-0060},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0060. Permanent link: https://computefinder.net/entity/cf-dc-0060. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/telekom-munich-tucherpark. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0060"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Germany
- KDO data centre, Oldenburg
- German Climate Computing Centre (DKRZ), Hamburg
- Schwarz Digits Lübbenau data centre
- JUPITER exascale system, Forschungszentrum Jülich
- HLRS Stuttgart (Hunter and HammerHAI)
All detailed records in Germany / Same recorded stage in Germany
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact