Data centres / Iceland
Verne Keflavik campus
OperatingIceland4 of 13 fields known
Keflavik, Reykjanes peninsula, Iceland.
- Operator
- Verne
- Owner
- Not stated
- Stage
- Operating (source, 19 May 2025)
- Power
- A new Landsnet substation has 240 MW installed, with 120 MW operational at launch and full capacity expected by end of 2026.
The 120 MW figure is substation capacity operational at May 2025, not data hall capacity.
Capacity
| Measure | Stage | Basis | MW | As of | Source |
|---|---|---|---|---|---|
| Grid connection | Energised | reported | 120 | 19 May 2025 | source |
These figures measure different things and are not added together.
What we checked
- Verne and Landsnet launched a high-capacity substation at Keflavik on 19 May 2025, rated 240 MW installed with 120 MW operational initially. (source)
- A January 2022 trade report said Verne was adding 20 MW and expected the campus to reach 40 MW of a potential 100 MW. (source)
What we do not know yet
4 of 13 fields in a complete record are filled. Still missing:
- Owner
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.