Data centres / Iceland
atNorth ICE02 campus
OperatingIceland6 of 13 fields known
Near Keflavik International Airport, Iceland.
- Operator
- atNorth
- Owner
- Not stated
- Stage
- Operating (source, 2 October 2026)
- Power
- The operator says the campus runs on renewable energy, with N+1 distribution and at least 24 hours of generator fuel.
- Cooling
- Chilled water with dry coolers and natural free cooling, a stated PUE of 1.2 or lower, and capability for 100 kW plus liquid-cooled racks.
- Connectivity
- Five diverse fibre entry points and two meet-me rooms per building; latency of about 21 ms to Frankfurt.
- Certifications
- ISO/IEC 27001, ISO 14001, ISO 9001, ISO 45001
Operator page states an 83 MW campus power capacity without defining the metric, so it is not in the structured field. Trade press reports further expansion; we did not verify it.
What we checked
- atNorth describes ICE02 as a 9-hectare campus with 83 MW of campus power capacity (metric not defined). (source)
What we do not know yet
6 of 13 fields in a complete record are filled. Still missing:
- Owner
- Capacity (MW)
- Grid connection
- PUE
- Water use
- Chips
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.