atNorth ICE02 campus

OperatingIceland6 of 13 fields known

Near Keflavik International Airport, Iceland.

Operator
atNorth
Owner
Not stated
Stage
Operating (source, 2 October 2026)
Power
The operator says the campus runs on renewable energy, with N+1 distribution and at least 24 hours of generator fuel.
Cooling
Chilled water with dry coolers and natural free cooling, a stated PUE of 1.2 or lower, and capability for 100 kW plus liquid-cooled racks.
Connectivity
Five diverse fibre entry points and two meet-me rooms per building; latency of about 21 ms to Frankfurt.
Certifications
ISO/IEC 27001, ISO 14001, ISO 9001, ISO 45001

Operator page states an 83 MW campus power capacity without defining the metric, so it is not in the structured field. Trade press reports further expansion; we did not verify it.

What we checked

What we do not know yet

6 of 13 fields in a complete record are filled. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Other sites in Iceland