atNorth ICE01

OperatingIceland6 of 13 fields known

Reykjavik metropolitan area, Iceland.

Operator
atNorth
Owner
Not stated
Stage
Operating (source, 2 October 2026)
Power
The operator page says the site runs on renewable energy and keeps fuel for at least 48 hours of generator operation.
Cooling
Direct free air cooling, with a stated PUE of 1.2 or lower.
Connectivity
Three diverse fibre entry points and two meet-me rooms; stated latency of about 21 ms to Frankfurt and 15.3 ms to Dublin.
Certifications
ISO 9001, ISO 14001, ISO/IEC 27001, ISO 45001

Operator page states 3.2 MW of power capacity without defining the metric, so it is not in the structured field. Stage date is the date we read the live page.

What we checked

What we do not know yet

6 of 13 fields in a complete record are filled. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.