OperatingIceland
What we checked
- atNorth lists ICE01 as a Tier III metro data centre with 2,700 sq m of technical white space and 3.2 MW of power capacity (metric not defined). (source)
Operator page states 3.2 MW of power capacity without defining the metric, so it is not in the structured field. Stage date is the date we read the live page.
Operate this site or have better evidence? .
- Operator
- atNorth
- Owner
- Not stated
- Stage
- Operating (source, 2 October 2026)
- Power
- The operator page says the site runs on renewable energy and keeps fuel for at least 48 hours of generator operation.
- Cooling
- Direct free air cooling, with a stated PUE of 1.2 or lower.
- Connectivity
- Three diverse fibre entry points and two meet-me rooms; stated latency of about 21 ms to Frankfurt and 15.3 ms to Dublin.
- Certifications
- ISO 9001, ISO 14001, ISO/IEC 27001, ISO 45001
Printable community case file
atNorth ICE01
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Operating, recorded 2 October 2026 | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 1 checked statement and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Operating, dated 2 October 2026: stage source
- Checked statement. atNorth lists ICE01 as a Tier III metro data centre with 2,700 sq m of technical white space and 3.2 MW of power capacity (metric not defined). source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
6 of 13 facility fields recorded
1 separately recorded source statement. These are not included in the facility-field count.
6 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Capacity (MW)
- Grid connection
- PUE
- Water use
- Chips
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). atNorth ICE01: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/atnorth-ice01-reykjavik
BibTeX
@misc{computefinder_data_centres_atnorth_ice01_reykjavik,
title = {atNorth ICE01: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0049}},
number = {cf-dc-0049},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0049. Permanent link: https://computefinder.net/entity/cf-dc-0049. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/atnorth-ice01-reykjavik. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0049"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Iceland
All detailed records in Iceland / Same recorded stage in Iceland
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact