Microsoft Staffanstorp data centre
OperatingSweden5 of 13 fields known
Staffanstorp, Skåne, Sweden.
- Operator
- Microsoft
- Owner
- Microsoft
- Stage
- Operating (source, 30 August 2022)
- Power
- The withdrawn permit application was for 70 MW of reserve (backup) power, which is not IT or grid capacity.
Reported only: in August 2022 Microsoft dropped the expansion and said it would keep operating the existing site with current backup units while seeking a new southern Sweden site.
Planning
| Decision or document | Status | Date |
|---|---|---|
| Permit application for reserve power expansion (70 MW of backup power) dropped | Withdrawn | 30 August 2022 |
What we checked
- A trade report of 30 August 2022 says Microsoft withdrew a planned 70 MW reserve power expansion at Staffanstorp. (source)
What we do not know yet
5 of 13 fields in a complete record are filled. Still missing:
- Capacity (MW)
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.